SlideShare a Scribd company logo
1 of 11
INTERTANKO’S STANDARD TANKER CHARTERING QUESTIONNAIRE 88 (Q88) Version 3
1. VESSEL DESCRIPTION
1.1 Date updated: 13RD MAR 2015
1.2 Vessel’s name: CHEMICAL LEO
1.3 IMO number: 9427457
1.4 Vessel’s previous name(s) and date(s) of change: N/A
1.5 Date delivered: 30 Jun 2012
1.6 Builder (where built): GANGHUA SHIPYARD TAIXING/CHINA
1.7 Flag: HONGKONG
1.8 Port of Registry: HONGKONG
1.9 Call sign: VRKY7
1.10 Vessel’s satcom phone number: 773120970
Vessel’s faxnumber: 783122166
Vessel’s telexnumber: 447704585/447704586
Vessel’s email address: chemicalleo@huaronghuiyin.bjles.net
1.11 Type of vessel: OIL/CHEMICAL II
1.12 Type of hull: DOUBLE HULL
Classification
1.13 Classification society: BV
1.14 Class notation: BV
1.15 If Classification societychanged,name ofprevious society: N/A
1.16 If Classification societychanged,date of change: N/A
1.17 IMO type, if applicable: II
1.18 Does the vessel have ice class? Ifyes, state what level: ICE CLASS 1A
1.19 Date / place of lastdry-dock: NEWSHIP NEWSHIP
1.20 Date next dry dock due N/A
1.21 Date of lastspecial survey/ next survey due: N/A N/A
1.22 Date of lastannual survey: 2014-05-16
1.23 If ship has Condition AssessmentProgram (CAP), whatis the latestoverall
rating:
N/A
1.24 Does the vessel have a statementof compliance issued under the provisions
of the Condition AssessmentScheme (CAS): If yes, what is the expiry date?
N/A
Dimensions
1.25 Length Over All (LOA): 112.70Metres
1.26 Length Between Perpendiculars (LBP): 106.00Metres
1.27 Extreme breadth (Beam): 17.60 Metres
1.28 Moulded depth: 9.40Metres
1.29 Keel to Masthead (KTM) / KTM in collapsed condition (ifapplicable): 31.5m -
1.30 Bow to Center Manifold (BCM) / Stern to Center Manifold (SCM): 48.0m 64.7m
1.31 Distance bridge frontto center of manifold: 37.0m
1.32 Parallel body distances: Lightship Normal Ballast Summer DWT
Forward to mid-pointmanifold: 29m 31m 32m
Aft to mid-pointmanifold: 26m 27m 31m
Parallel body length: 55m 58m 63m
1.33 FWA at summer draft/ TPC immersion atsummer draft: 157mm 17.21t/cm
1.34 What is the max heightof mastabove waterline (air draft) ASF:
Lightship: 26.8
Normal ballast: 25.5
At loaded summer deadweight: 24.3
Tonnages
1.35 Net Tonnage: 2444
1.36 Gross Tonnage / Reduced Gross Tonnage (ifapplicable): 5424
1.37 Suez Canal Tonnage – Gross (SCGT) / Net (SCNT): 4231
1.38 Panama Canal NetTonnage (PCNT): N/A
Loadline Information
1.39 Loadline Freeboard Draft Deadweight Displacement
Summer: 2.211 7.200 7500 11036
Winter: 2..361 7.050 7260 10778
Tropical: 2.061 7.350 7700 11296
Lightship: 6.801 2.610 3501
Normal BallastCondition: 4.611 4.800 3200 6700
1.40 Does vessel have multiple SDWT? N/A
1.41 If yes, what is the maximum assigned deadweight? N/A
Ownership and Operation
1.42 Registered owner - Full style:
Hua Rong Huiyin Co.Ltd
1.43 Technical operator - Full style:
Greathorse Shipping(S) Pte.Ltd
1.44 Commercial operator - Full style:
Greathorse Shipping(S) Pte.Ltd
1.45 Disponentowner - Full style: N/A
2. CERTIFICATION Issued Last Annual
or Intermediate
Expires
2.1 Safety EquipmentCertificate: 02nd
Nov.2012 18th
May 2014 29th
June 2017
2.2 Safety Radio Certificate: 02nd
Nov.2012 18th
May 2014 29th
June 2017
2.3 Safety Construction Certificate: 02nd
Nov.2012 18th
May 2014 29th
June 2017
2.4 Loadline Certificate: 02nd
Nov.2012 18th
May 2014 29th
June 2017
2.5 International Oil Pollution Prevention Certificate
(IOPPC):
02nd
Nov.2012 18th
May 2014 29th
June 2017
2.6 Safety ManagementCertificate (SMC): 06th
Sept 2013 new 24th
Jun 2018
2.7 DocumentofCompliance (DOC): 04th Jun 2014 04th Jun 2014 25th Jun 2019
2.8 USCG (specify: COC, LOC or COI): N/A
2.9 Civil LiabilityConvention Certificate (CLC): 20 Feb 2015 20 Feb 2016
2.10 Civil Liabilityfor Bunker Oil Pollution Damage
Convention Certificate (CLBC):
20 Feb 2015 20 Feb 2016
2.11 U.S. Certificate of Financial Responsibility(COFR): N/A
2.12 Certificate of Fitness (Chemicals): 05th
May 2014 18th
May 2014 29th
June 2017
2.13 Certificate of Fitness (Gas): N/A N/A
2.14 Certificate of Class: 26th
Jun 2013 18th
May 2014 29th
Jun 2017
2.15 International Ship Security Certificate (ISSC): 06th
Sept 2013 new 24th
Jun 2018
2.16 International Sewage Pollution Prevention Certificate
(ISPPC)
30th
June 2012 29th
June 2017
2.17 International Air Pollution Prevention Certificate (IAPP): 2nd
Nov.2012 18th
May 2014 29th
June 2017
Documentation
2.18 Does vessel have all updated publications as listed in theVessel Inspection
Questionnaire, Chapter 2- Question 2.24, as applicable:
Yes
2.19 Owner warrant that vessel is member of ITOPF and will remain so for the entire
duration of this voyage/contract:
Yes
3. CREW MANAGEMENT
3.1 Nationalityof Master: CHINA
3.2 Nationalityof Officers: CHINA
3.3 Nationalityof Crew: CHINA
3.4 If Officers/Crew employed by a Manning Agency - Full style: New Xin Yang Crew Agency.
3.5 What is the common working language onboard: CHINESE
3.6 Do officers speak and understand English: YES
3.7 In case of Flag Of Convenience,is the ITF Special Agreementon board: YES
4. HELICOPTERS
4.1 Can the ship complywith the ICS Helicopter Guidelines: N/A
4.2 If Yes, state whether winching or landing area provided: N/A
5. FOR USA CALLS
5.1 Has the vessel Operator submitted a Vessel Spill Response Plan to the US
CoastGuard which has been approved by official USCG letter:
NO
5.2 Qualified individual (QI) - Full style: N/A
5.3 Oil Spill Response Organization (OSRO) -Full style: N/A
5.4 Has technical operator signed the SCIA / C-TPAT agreementwith US customs
concerning drug smuggling:
N/A
6. CARGO AND BALLAST HANDLING
Double Hull Vessels
6.1 Is vessel fitted with centerline bulkhead in all cargo tanks: YES
6.2 If Yes, is bulkhead solid or perforated: Solid
Cargo Tank Capacities
6.3 Capacity (98%) of each natural segregation with double valve (specify tanks): YES
6.4 Total cubic capacity (98%,excluding slop tanks): 8275.7 M3
6.5 Slop tank(s) capacity (98%): 144 M3
6.6 Residual/Retention oil tank(s) capacity(98%),if applicable: NA
6.7 Does vessel have Segregated Ballast Tanks (SBT) or Clean Ballast Tanks (CBT): SBT
SBT Vessels
6.8 What is total capacity of SBT? 3517.4M3
6.9 What percentage of SDWT can vessel maintain with SBT only: 47.6%
6.10 Does vessel meetthe requirements ofMARPOL Annex I Reg 18.2:
(previously Reg 13.2)
YES
Cargo Handling
6.11 How many grades/products can vessel load/discharge with double valve
segregation:
20
6.12 Maximum loading rate for homogenous cargo per manifold connection: 600M3/H
6.13 Maximum loading rate for homogenous cargo loaded simultaneouslythrough
all manifolds:
2288M3/H
6.14 Are there any cargo tank filling restrictions. If yes, please specify: N/A
Pumping Systems
6.15 Pumps: No. Type Capacity
Cargo: 18
2
ELECTRICAL DEEP
WELL PUMP
ELECTRICAL DEEP
WELL PUMP
200 M3/H
100M3/H
Stripping: 0 - -
Eductors: 0 - -
Ballast: 2 ELECTRIC 300M3/H
6.16 How many cargo pumps can be run simultaneouslyat full capacity: 4 pumps/ 800cu.m/hour
Cargo Control Room
6.17 Is ship fitted with a Cargo Control Room (CCR): Yes
6.18 Can tank innage / ullage be read from the CCR: Yes
Gauging and Sampling
6.19 Can ship operate under closed conditions in accordance with ISGOTT: Yes
6.20 What type of fixed closed tank gauging system is fitted: RADAR
6.21 Are overfill (high-high) alarms fitted? If Yes, indicate whether to all tanks or
partial:
Yes/All tanks
Vapor Emission Control
6.22 Is a vapor return system (VRS) fitted: Yes
6.23 Number/size ofVRS manifolds (per side): 2 12"
Venting
6.24 State what type of venting system is fitted: P/V
Cargo Manifolds
6.25 Does vessel complywith the latestedition of the OCIMF 'Recommendations
for Oil Tanker Manifolds and Associated Equipment’:
Yes
6.26 What is the number of cargo connections per side: 20(common 1, each tank 1)
6.27 What is the size of cargo connections: 6’’
6.28 What is the material of the manifold: SS
Manifold Arrangement
6.29 Distance between cargo manifold centers: 600MM
6.30 Distance ships rail to manifold: 2100MM
6.31 Distance manifold to ships side: 2100MM
6.32 Top of rail to center of manifold: 600MM
6.33 Distance main deck to center of manifold: 2100MM
6.34 Manifold heightabove the waterline in normal ballast/ at SDWT condition: 6.7MM 4.3MM
6.35 Number / size reducers: 12〞-8〞/2pc;12〞-6〞/2pc;10”-6”/2pcs
8”-6”/2pcs,6”-5”/2pcs
Stern Manifold
6.36 Is vessel fitted with a stern manifold: YES
6.37 If stern manifold fitted,state size: 200MM
Cargo Heating
6.38 Type of cargo heating system? YES
6.39 If fitted, are all tanks coiled? YES
6.40 If fitted, whatis the material of the heating coils: STAINLESS STEEL
6.41 Maximum temperature cargo can be loaded/maintained: 85C,DGRS 85C,DGRS
Tank Coating
6.42 Are cargo, ballastand slop tanks coated? Coated Type To What Extent
Cargo tanks: YES MARINE LINE ALL TANKS
Ballasttanks: YES EPOXY ALL TANKS
Slop tanks: YES MARINE LINE ALL TANKS
6.43 If fitted, what type of anodes areused: Zn-Al-Cd Alloy
7. INERT GAS AND CRUDE OIL WASHING
7.1 Is an Inert Gas System (IGS) fitted:
7.2 Is IGS supplied byflue gas,inert gas (IG) generator and/or nitrogen:
7.3 Is a Crude Oil Washing (COW) installation fitted:
8. MOORING
8.1 Mooring wires (on drums) No. Diameter Material Length Breaking Strength
Forecastle: N/A - - - -
Main deck fwd: N/A - - - -
Main deck aft: N/A - - - -
Poop deck: N/A - - - -
8.2 Wire tails No. - Material Length Breaking Strength
Forecastle: N/A - - - -
Main deck fwd: N/A - - - -
Main deck aft: N/A - - - -
Poop deck: N/A - - - -
8.3 Mooring ropes (on drums) No. Diameter Material Length Breaking Strength
Forecastle: 4 52MM poly 220M 39T
Main deck fwd: N/A - - - -
Main deck aft: N/A - - - -
Poop deck: 4 52MM poly 220M 39T
8.4 Other mooring lines Diameter Material Length Breaking Strength
Forecastle: 4 52MM poly 220M 39T
Main deck fwd: N/A - - - -
Main deck aft: N/A - - - -
Poop deck: 4 52MM poly 220M 39T
8.5 Mooring winches No. # Drums Brake Capacity
Forecastle: 2 SPLIT 18T
Main deck fwd: N/A - -
-- Main deck aft: N/A - -
Poop deck: 2 SPLIT 18T
8.6 Mooring bitts No. SWL
Forecastle: 6 26T
Main deck fwd: 2 26T
Main deck aft: 2 26T
Poop deck: 7 26T
8.7 Closed chocks and/or fairleads ofenclosed type
Forecastle: 7 26T
Main deck fwd: 2 26T
Main deck aft: 2 26T
Poop deck: 9 26T
Emergency Towing System
8.8 Type / SWL of EmergencyTowing system forward: N/A
8.9 Type / SWL of EmergencyTowing system aft: N/A
Anchors
8.10 Number ofshackles on portcable: 9
8.11 Number ofshackles on starboard cable: 9
Escort Tug
8.12 What is SWL and size of closed chock and/or fairleads of enclosed type on
stern:
26T
8.13 What is SWL of bollard on poopdeck suitable for escort tug: 26T
Bow/Stern Thruster
8.14 What is brake horse power ofbow thruster (if fitted): 544HP ELECTRIC
8.15 What is brake horse power ofstern thruster (if fitted): N/A
Single Point Mooring (SPM) Equipment
8.16 Does vessel complywith the latestedition of OCIMF 'Recommendations for
EquipmentEmployed in the Mooring of Vessels atSingle PointMoorings
(SPM)’:
N/A
8.17 Is vessel fitted with chain stopper(s): N/A
8.18 How many chain stopper(s) are fitted: N/A
8.19 State type of chain stopper(s) fitted: N/A
8.20 Safe Working Load (SWL) of chain stopper(s): N/A
8.21 What is the maximum size chain diameter the bow stopper(s) can handle: N/A
8.22 Distance between the bow fairlead and chain stopper/bracket: N/A
8.23 Is bow chock and/or fairlead of enclosed type of OCIMF recommended size
(600mm x 450mm)? Ifnot, give details of size:
N/A
Lifting Equipment
8.24 Derrick / Crane description (Number, SWL and location): 1PCS / 2T/ MANIFOLD
8.25 What is maximum outreach ofcranes / derricks outboard of the ship’s side: 7.2 M
Ship To Ship Transfer (STS)
8.26 Does vessel complywith recommendations contained in OCIMF/ICS Ship To
Ship Transfer Guide (Petroleum or Liquified Gas,as applicable):
YES
9. MISCELLANEOUS
Engine Room
9.1 What type of fuel is used for main propulsion? HFO 180
9.2 What type of fuel is used in the generating plant? MDO
9.3 Capacity of bunker tanks -HFO and MDO/MGO: 247.3M3 92.7M3
9.4 Is vessel fitted with fixed or controllable pitch propeller(s)? YES
Insurance
9.5 P & I Club - Full Style: The Swedish Club
9.6 P & I Club coverage - pollution liabilitycoverage: USD 1,000,000,000
Port State Control
9.7 Date and place of lastPort State Control inspection: 21ST OCT 2014 / DONG NAI/V.N
9.8 Any outstanding deficiencies as reported byany Port State Control: N/A
9.9 If yes, provide details: N/A
Recent Operational History
9.10 Has vessel been involved in a pollution,grounding,serious casualtyor
collision incidentduring the past12 months? If yes, full description:
NO
9.11 Lastthree cargoes /charterers / voyages (Last/ 2nd Last/ 3rd Last):
SEE THE ATTACHED
Vetting
9.12 Date/Place of lastSIRE Inspection: DONGGUAN / 24th
FEB 2015 IDEMITSU
9.13 Date/Place of lastCDI Inspection: N/A
9.14 Recent Oil company inspections/screenings (To the best of owners knowledge and
without guarantee of acceptance for future business)*:
* Blanket "approvals" areno longer given by Oil Majors and ships are accepted for
the voyage on a case by case basis.
N/A
Version 3 (INTERTANKO / Q88.com)

More Related Content

Similar to Q88 V3 Vessel Description

3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdfMaanMrabet1
 
Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]George Teriakidis
 
DNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkeringDNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkeringGeorge Teriakidis
 
Updated list of certificates and documents to be carried on ship as solas mar...
Updated list of certificates and documents to be carried on ship as solas mar...Updated list of certificates and documents to be carried on ship as solas mar...
Updated list of certificates and documents to be carried on ship as solas mar...Admin-marinerscircle
 
SMC NB track record-EN-March 2016
SMC NB track record-EN-March 2016SMC NB track record-EN-March 2016
SMC NB track record-EN-March 2016Steve Nolan
 
Total Life Cycle Analysis of Private Costs and Externalities for Marine Fuels
Total Life Cycle Analysis of Private Costs and Externalities for Marine FuelsTotal Life Cycle Analysis of Private Costs and Externalities for Marine Fuels
Total Life Cycle Analysis of Private Costs and Externalities for Marine FuelsGiulio Gennaro
 
Cartridge Valves for Submarine, Aircraft Carrier Rocket Launcher – Cunico
Cartridge Valves for Submarine, Aircraft Carrier Rocket Launcher – CunicoCartridge Valves for Submarine, Aircraft Carrier Rocket Launcher – Cunico
Cartridge Valves for Submarine, Aircraft Carrier Rocket Launcher – CunicoCunicoCorp
 
Cartridge valve
Cartridge valveCartridge valve
Cartridge valveCunicoCorp
 
TankerCalc for Bunker Surveyors
TankerCalc for Bunker SurveyorsTankerCalc for Bunker Surveyors
TankerCalc for Bunker SurveyorsMd. Moynul Islam
 
Report collision flinterstar al oraiq final
Report collision flinterstar al oraiq finalReport collision flinterstar al oraiq final
Report collision flinterstar al oraiq finalBavo De Mol
 
List of certificates and documents to be carried on ship as solas marpol and ...
List of certificates and documents to be carried on ship as solas marpol and ...List of certificates and documents to be carried on ship as solas marpol and ...
List of certificates and documents to be carried on ship as solas marpol and ...Admin-marinerscircle
 
CV updated to 2017
CV updated to 2017CV updated to 2017
CV updated to 2017Hosam Mowafy
 
Pollution prevention resolution MEPC.362(79) FINAL.pdf
Pollution prevention resolution MEPC.362(79) FINAL.pdfPollution prevention resolution MEPC.362(79) FINAL.pdf
Pollution prevention resolution MEPC.362(79) FINAL.pdffabitat
 
Assignment 1 Technical and economic review of four possible methods of develo...
Assignment 1 Technical and economic review of four possible methods of develo...Assignment 1 Technical and economic review of four possible methods of develo...
Assignment 1 Technical and economic review of four possible methods of develo...Nikolaos Felessakis
 

Similar to Q88 V3 Vessel Description (20)

terminal-check-list.pdf
terminal-check-list.pdfterminal-check-list.pdf
terminal-check-list.pdf
 
3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf3. IMO regulatory by Mr. Kang(Korea).pdf
3. IMO regulatory by Mr. Kang(Korea).pdf
 
Sea Angler Spec
Sea Angler SpecSea Angler Spec
Sea Angler Spec
 
Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]
 
DNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkeringDNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkering
 
Heavy Fuel Oil in the Arctic, 2015
Heavy Fuel Oil in the Arctic, 2015Heavy Fuel Oil in the Arctic, 2015
Heavy Fuel Oil in the Arctic, 2015
 
Updated list of certificates and documents to be carried on ship as solas mar...
Updated list of certificates and documents to be carried on ship as solas mar...Updated list of certificates and documents to be carried on ship as solas mar...
Updated list of certificates and documents to be carried on ship as solas mar...
 
Seca seminar 2013 clean marine - nils høy-pettersen
Seca seminar 2013   clean marine - nils høy-pettersenSeca seminar 2013   clean marine - nils høy-pettersen
Seca seminar 2013 clean marine - nils høy-pettersen
 
SMC NB track record-EN-March 2016
SMC NB track record-EN-March 2016SMC NB track record-EN-March 2016
SMC NB track record-EN-March 2016
 
Total Life Cycle Analysis of Private Costs and Externalities for Marine Fuels
Total Life Cycle Analysis of Private Costs and Externalities for Marine FuelsTotal Life Cycle Analysis of Private Costs and Externalities for Marine Fuels
Total Life Cycle Analysis of Private Costs and Externalities for Marine Fuels
 
Seca seminar 2013 wilh wilhelmsen - per brinchmann
Seca seminar 2013   wilh wilhelmsen - per brinchmannSeca seminar 2013   wilh wilhelmsen - per brinchmann
Seca seminar 2013 wilh wilhelmsen - per brinchmann
 
Havila subsea.pdf
Havila subsea.pdfHavila subsea.pdf
Havila subsea.pdf
 
Cartridge Valves for Submarine, Aircraft Carrier Rocket Launcher – Cunico
Cartridge Valves for Submarine, Aircraft Carrier Rocket Launcher – CunicoCartridge Valves for Submarine, Aircraft Carrier Rocket Launcher – Cunico
Cartridge Valves for Submarine, Aircraft Carrier Rocket Launcher – Cunico
 
Cartridge valve
Cartridge valveCartridge valve
Cartridge valve
 
TankerCalc for Bunker Surveyors
TankerCalc for Bunker SurveyorsTankerCalc for Bunker Surveyors
TankerCalc for Bunker Surveyors
 
Report collision flinterstar al oraiq final
Report collision flinterstar al oraiq finalReport collision flinterstar al oraiq final
Report collision flinterstar al oraiq final
 
List of certificates and documents to be carried on ship as solas marpol and ...
List of certificates and documents to be carried on ship as solas marpol and ...List of certificates and documents to be carried on ship as solas marpol and ...
List of certificates and documents to be carried on ship as solas marpol and ...
 
CV updated to 2017
CV updated to 2017CV updated to 2017
CV updated to 2017
 
Pollution prevention resolution MEPC.362(79) FINAL.pdf
Pollution prevention resolution MEPC.362(79) FINAL.pdfPollution prevention resolution MEPC.362(79) FINAL.pdf
Pollution prevention resolution MEPC.362(79) FINAL.pdf
 
Assignment 1 Technical and economic review of four possible methods of develo...
Assignment 1 Technical and economic review of four possible methods of develo...Assignment 1 Technical and economic review of four possible methods of develo...
Assignment 1 Technical and economic review of four possible methods of develo...
 

Q88 V3 Vessel Description

  • 1. INTERTANKO’S STANDARD TANKER CHARTERING QUESTIONNAIRE 88 (Q88) Version 3 1. VESSEL DESCRIPTION 1.1 Date updated: 13RD MAR 2015 1.2 Vessel’s name: CHEMICAL LEO 1.3 IMO number: 9427457 1.4 Vessel’s previous name(s) and date(s) of change: N/A 1.5 Date delivered: 30 Jun 2012 1.6 Builder (where built): GANGHUA SHIPYARD TAIXING/CHINA 1.7 Flag: HONGKONG 1.8 Port of Registry: HONGKONG 1.9 Call sign: VRKY7 1.10 Vessel’s satcom phone number: 773120970 Vessel’s faxnumber: 783122166 Vessel’s telexnumber: 447704585/447704586 Vessel’s email address: chemicalleo@huaronghuiyin.bjles.net 1.11 Type of vessel: OIL/CHEMICAL II 1.12 Type of hull: DOUBLE HULL Classification 1.13 Classification society: BV 1.14 Class notation: BV 1.15 If Classification societychanged,name ofprevious society: N/A 1.16 If Classification societychanged,date of change: N/A 1.17 IMO type, if applicable: II 1.18 Does the vessel have ice class? Ifyes, state what level: ICE CLASS 1A 1.19 Date / place of lastdry-dock: NEWSHIP NEWSHIP 1.20 Date next dry dock due N/A 1.21 Date of lastspecial survey/ next survey due: N/A N/A 1.22 Date of lastannual survey: 2014-05-16 1.23 If ship has Condition AssessmentProgram (CAP), whatis the latestoverall rating: N/A
  • 2. 1.24 Does the vessel have a statementof compliance issued under the provisions of the Condition AssessmentScheme (CAS): If yes, what is the expiry date? N/A Dimensions 1.25 Length Over All (LOA): 112.70Metres 1.26 Length Between Perpendiculars (LBP): 106.00Metres 1.27 Extreme breadth (Beam): 17.60 Metres 1.28 Moulded depth: 9.40Metres 1.29 Keel to Masthead (KTM) / KTM in collapsed condition (ifapplicable): 31.5m - 1.30 Bow to Center Manifold (BCM) / Stern to Center Manifold (SCM): 48.0m 64.7m 1.31 Distance bridge frontto center of manifold: 37.0m 1.32 Parallel body distances: Lightship Normal Ballast Summer DWT Forward to mid-pointmanifold: 29m 31m 32m Aft to mid-pointmanifold: 26m 27m 31m Parallel body length: 55m 58m 63m 1.33 FWA at summer draft/ TPC immersion atsummer draft: 157mm 17.21t/cm 1.34 What is the max heightof mastabove waterline (air draft) ASF: Lightship: 26.8 Normal ballast: 25.5 At loaded summer deadweight: 24.3 Tonnages 1.35 Net Tonnage: 2444 1.36 Gross Tonnage / Reduced Gross Tonnage (ifapplicable): 5424 1.37 Suez Canal Tonnage – Gross (SCGT) / Net (SCNT): 4231
  • 3. 1.38 Panama Canal NetTonnage (PCNT): N/A Loadline Information 1.39 Loadline Freeboard Draft Deadweight Displacement Summer: 2.211 7.200 7500 11036 Winter: 2..361 7.050 7260 10778 Tropical: 2.061 7.350 7700 11296 Lightship: 6.801 2.610 3501 Normal BallastCondition: 4.611 4.800 3200 6700 1.40 Does vessel have multiple SDWT? N/A 1.41 If yes, what is the maximum assigned deadweight? N/A Ownership and Operation 1.42 Registered owner - Full style: Hua Rong Huiyin Co.Ltd 1.43 Technical operator - Full style: Greathorse Shipping(S) Pte.Ltd 1.44 Commercial operator - Full style: Greathorse Shipping(S) Pte.Ltd 1.45 Disponentowner - Full style: N/A 2. CERTIFICATION Issued Last Annual or Intermediate Expires 2.1 Safety EquipmentCertificate: 02nd Nov.2012 18th May 2014 29th June 2017 2.2 Safety Radio Certificate: 02nd Nov.2012 18th May 2014 29th June 2017 2.3 Safety Construction Certificate: 02nd Nov.2012 18th May 2014 29th June 2017 2.4 Loadline Certificate: 02nd Nov.2012 18th May 2014 29th June 2017 2.5 International Oil Pollution Prevention Certificate (IOPPC): 02nd Nov.2012 18th May 2014 29th June 2017
  • 4. 2.6 Safety ManagementCertificate (SMC): 06th Sept 2013 new 24th Jun 2018 2.7 DocumentofCompliance (DOC): 04th Jun 2014 04th Jun 2014 25th Jun 2019 2.8 USCG (specify: COC, LOC or COI): N/A 2.9 Civil LiabilityConvention Certificate (CLC): 20 Feb 2015 20 Feb 2016 2.10 Civil Liabilityfor Bunker Oil Pollution Damage Convention Certificate (CLBC): 20 Feb 2015 20 Feb 2016 2.11 U.S. Certificate of Financial Responsibility(COFR): N/A 2.12 Certificate of Fitness (Chemicals): 05th May 2014 18th May 2014 29th June 2017 2.13 Certificate of Fitness (Gas): N/A N/A 2.14 Certificate of Class: 26th Jun 2013 18th May 2014 29th Jun 2017 2.15 International Ship Security Certificate (ISSC): 06th Sept 2013 new 24th Jun 2018 2.16 International Sewage Pollution Prevention Certificate (ISPPC) 30th June 2012 29th June 2017 2.17 International Air Pollution Prevention Certificate (IAPP): 2nd Nov.2012 18th May 2014 29th June 2017 Documentation 2.18 Does vessel have all updated publications as listed in theVessel Inspection Questionnaire, Chapter 2- Question 2.24, as applicable: Yes 2.19 Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: Yes 3. CREW MANAGEMENT 3.1 Nationalityof Master: CHINA 3.2 Nationalityof Officers: CHINA 3.3 Nationalityof Crew: CHINA 3.4 If Officers/Crew employed by a Manning Agency - Full style: New Xin Yang Crew Agency. 3.5 What is the common working language onboard: CHINESE 3.6 Do officers speak and understand English: YES 3.7 In case of Flag Of Convenience,is the ITF Special Agreementon board: YES 4. HELICOPTERS
  • 5. 4.1 Can the ship complywith the ICS Helicopter Guidelines: N/A 4.2 If Yes, state whether winching or landing area provided: N/A 5. FOR USA CALLS 5.1 Has the vessel Operator submitted a Vessel Spill Response Plan to the US CoastGuard which has been approved by official USCG letter: NO 5.2 Qualified individual (QI) - Full style: N/A 5.3 Oil Spill Response Organization (OSRO) -Full style: N/A 5.4 Has technical operator signed the SCIA / C-TPAT agreementwith US customs concerning drug smuggling: N/A 6. CARGO AND BALLAST HANDLING Double Hull Vessels 6.1 Is vessel fitted with centerline bulkhead in all cargo tanks: YES 6.2 If Yes, is bulkhead solid or perforated: Solid Cargo Tank Capacities 6.3 Capacity (98%) of each natural segregation with double valve (specify tanks): YES 6.4 Total cubic capacity (98%,excluding slop tanks): 8275.7 M3 6.5 Slop tank(s) capacity (98%): 144 M3 6.6 Residual/Retention oil tank(s) capacity(98%),if applicable: NA 6.7 Does vessel have Segregated Ballast Tanks (SBT) or Clean Ballast Tanks (CBT): SBT SBT Vessels 6.8 What is total capacity of SBT? 3517.4M3 6.9 What percentage of SDWT can vessel maintain with SBT only: 47.6% 6.10 Does vessel meetthe requirements ofMARPOL Annex I Reg 18.2: (previously Reg 13.2) YES
  • 6. Cargo Handling 6.11 How many grades/products can vessel load/discharge with double valve segregation: 20 6.12 Maximum loading rate for homogenous cargo per manifold connection: 600M3/H 6.13 Maximum loading rate for homogenous cargo loaded simultaneouslythrough all manifolds: 2288M3/H 6.14 Are there any cargo tank filling restrictions. If yes, please specify: N/A Pumping Systems 6.15 Pumps: No. Type Capacity Cargo: 18 2 ELECTRICAL DEEP WELL PUMP ELECTRICAL DEEP WELL PUMP 200 M3/H 100M3/H Stripping: 0 - - Eductors: 0 - - Ballast: 2 ELECTRIC 300M3/H 6.16 How many cargo pumps can be run simultaneouslyat full capacity: 4 pumps/ 800cu.m/hour Cargo Control Room 6.17 Is ship fitted with a Cargo Control Room (CCR): Yes 6.18 Can tank innage / ullage be read from the CCR: Yes Gauging and Sampling 6.19 Can ship operate under closed conditions in accordance with ISGOTT: Yes 6.20 What type of fixed closed tank gauging system is fitted: RADAR 6.21 Are overfill (high-high) alarms fitted? If Yes, indicate whether to all tanks or partial: Yes/All tanks Vapor Emission Control 6.22 Is a vapor return system (VRS) fitted: Yes 6.23 Number/size ofVRS manifolds (per side): 2 12" Venting 6.24 State what type of venting system is fitted: P/V
  • 7. Cargo Manifolds 6.25 Does vessel complywith the latestedition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment’: Yes 6.26 What is the number of cargo connections per side: 20(common 1, each tank 1) 6.27 What is the size of cargo connections: 6’’ 6.28 What is the material of the manifold: SS Manifold Arrangement 6.29 Distance between cargo manifold centers: 600MM 6.30 Distance ships rail to manifold: 2100MM 6.31 Distance manifold to ships side: 2100MM 6.32 Top of rail to center of manifold: 600MM 6.33 Distance main deck to center of manifold: 2100MM 6.34 Manifold heightabove the waterline in normal ballast/ at SDWT condition: 6.7MM 4.3MM 6.35 Number / size reducers: 12〞-8〞/2pc;12〞-6〞/2pc;10”-6”/2pcs 8”-6”/2pcs,6”-5”/2pcs Stern Manifold 6.36 Is vessel fitted with a stern manifold: YES 6.37 If stern manifold fitted,state size: 200MM Cargo Heating 6.38 Type of cargo heating system? YES 6.39 If fitted, are all tanks coiled? YES 6.40 If fitted, whatis the material of the heating coils: STAINLESS STEEL 6.41 Maximum temperature cargo can be loaded/maintained: 85C,DGRS 85C,DGRS Tank Coating 6.42 Are cargo, ballastand slop tanks coated? Coated Type To What Extent Cargo tanks: YES MARINE LINE ALL TANKS Ballasttanks: YES EPOXY ALL TANKS Slop tanks: YES MARINE LINE ALL TANKS 6.43 If fitted, what type of anodes areused: Zn-Al-Cd Alloy 7. INERT GAS AND CRUDE OIL WASHING
  • 8. 7.1 Is an Inert Gas System (IGS) fitted: 7.2 Is IGS supplied byflue gas,inert gas (IG) generator and/or nitrogen: 7.3 Is a Crude Oil Washing (COW) installation fitted: 8. MOORING 8.1 Mooring wires (on drums) No. Diameter Material Length Breaking Strength Forecastle: N/A - - - - Main deck fwd: N/A - - - - Main deck aft: N/A - - - - Poop deck: N/A - - - - 8.2 Wire tails No. - Material Length Breaking Strength Forecastle: N/A - - - - Main deck fwd: N/A - - - - Main deck aft: N/A - - - - Poop deck: N/A - - - - 8.3 Mooring ropes (on drums) No. Diameter Material Length Breaking Strength Forecastle: 4 52MM poly 220M 39T Main deck fwd: N/A - - - - Main deck aft: N/A - - - - Poop deck: 4 52MM poly 220M 39T 8.4 Other mooring lines Diameter Material Length Breaking Strength Forecastle: 4 52MM poly 220M 39T Main deck fwd: N/A - - - - Main deck aft: N/A - - - - Poop deck: 4 52MM poly 220M 39T 8.5 Mooring winches No. # Drums Brake Capacity Forecastle: 2 SPLIT 18T Main deck fwd: N/A - - -- Main deck aft: N/A - - Poop deck: 2 SPLIT 18T
  • 9. 8.6 Mooring bitts No. SWL Forecastle: 6 26T Main deck fwd: 2 26T Main deck aft: 2 26T Poop deck: 7 26T 8.7 Closed chocks and/or fairleads ofenclosed type Forecastle: 7 26T Main deck fwd: 2 26T Main deck aft: 2 26T Poop deck: 9 26T Emergency Towing System 8.8 Type / SWL of EmergencyTowing system forward: N/A 8.9 Type / SWL of EmergencyTowing system aft: N/A Anchors 8.10 Number ofshackles on portcable: 9 8.11 Number ofshackles on starboard cable: 9 Escort Tug 8.12 What is SWL and size of closed chock and/or fairleads of enclosed type on stern: 26T 8.13 What is SWL of bollard on poopdeck suitable for escort tug: 26T Bow/Stern Thruster 8.14 What is brake horse power ofbow thruster (if fitted): 544HP ELECTRIC 8.15 What is brake horse power ofstern thruster (if fitted): N/A Single Point Mooring (SPM) Equipment 8.16 Does vessel complywith the latestedition of OCIMF 'Recommendations for EquipmentEmployed in the Mooring of Vessels atSingle PointMoorings (SPM)’: N/A 8.17 Is vessel fitted with chain stopper(s): N/A 8.18 How many chain stopper(s) are fitted: N/A 8.19 State type of chain stopper(s) fitted: N/A 8.20 Safe Working Load (SWL) of chain stopper(s): N/A
  • 10. 8.21 What is the maximum size chain diameter the bow stopper(s) can handle: N/A 8.22 Distance between the bow fairlead and chain stopper/bracket: N/A 8.23 Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? Ifnot, give details of size: N/A Lifting Equipment 8.24 Derrick / Crane description (Number, SWL and location): 1PCS / 2T/ MANIFOLD 8.25 What is maximum outreach ofcranes / derricks outboard of the ship’s side: 7.2 M Ship To Ship Transfer (STS) 8.26 Does vessel complywith recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum or Liquified Gas,as applicable): YES 9. MISCELLANEOUS Engine Room 9.1 What type of fuel is used for main propulsion? HFO 180 9.2 What type of fuel is used in the generating plant? MDO 9.3 Capacity of bunker tanks -HFO and MDO/MGO: 247.3M3 92.7M3 9.4 Is vessel fitted with fixed or controllable pitch propeller(s)? YES Insurance 9.5 P & I Club - Full Style: The Swedish Club 9.6 P & I Club coverage - pollution liabilitycoverage: USD 1,000,000,000 Port State Control 9.7 Date and place of lastPort State Control inspection: 21ST OCT 2014 / DONG NAI/V.N 9.8 Any outstanding deficiencies as reported byany Port State Control: N/A 9.9 If yes, provide details: N/A Recent Operational History 9.10 Has vessel been involved in a pollution,grounding,serious casualtyor collision incidentduring the past12 months? If yes, full description: NO 9.11 Lastthree cargoes /charterers / voyages (Last/ 2nd Last/ 3rd Last): SEE THE ATTACHED
  • 11. Vetting 9.12 Date/Place of lastSIRE Inspection: DONGGUAN / 24th FEB 2015 IDEMITSU 9.13 Date/Place of lastCDI Inspection: N/A 9.14 Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*: * Blanket "approvals" areno longer given by Oil Majors and ships are accepted for the voyage on a case by case basis. N/A Version 3 (INTERTANKO / Q88.com)