Treia Presentaton 2009

342 views

Published on

Presentation for Texas Renewable Energy Industries Association 2009 Texas Energy Independence Week

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
342
On SlideShare
0
From Embeds
0
Number of Embeds
10
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Treia Presentaton 2009

  1. 1. Levelland : Doing our part to achieve Energy Independence Dave Quinn, Executive Director Levelland Economic Development Corp. Twitter: LevellandEDC
  2. 2. The Beginning <ul><ul><li>2002 Completed feasibility of Texas Ethanol </li></ul></ul><ul><ul><li>2004 Began raising capital </li></ul></ul><ul><ul><li>2005 LEDC Purchases 223 acre site </li></ul></ul><ul><ul><li>2006 Broke Ground on Ethanol Plant </li></ul></ul><ul><ul><li>2006 Permian Basin Rail rebuilds 24 miles of rail from Lubbock to Levelland </li></ul></ul><ul><ul><li>2008 Produced 1 st Gallon of Ethanol </li></ul></ul>
  3. 3. Levelland/Hockley County Ethanol Plant <ul><ul><li>40 million gallons per year </li></ul></ul><ul><ul><li>Feedstock - 100% Local grain sorghum </li></ul></ul><ul><ul><li> (Considered Advanced Bio-fuel) </li></ul></ul><ul><ul><li>Utilizes reclaimed Levelland sewer water </li></ul></ul><ul><ul><li>Ethanol and By-products sold locally </li></ul></ul>
  4. 4. Today’s Focus <ul><ul><li>Maintain Plants Viability </li></ul></ul><ul><ul><li>Create Value Added Products from Ethanol By-Products </li></ul></ul><ul><ul><li>Search out Co-Location Opportunities </li></ul></ul><ul><ul><li>Leverage and Build on Investment in Rail Improvements </li></ul></ul>
  5. 5. Tomorrow’s Focus <ul><ul><li>Bio-Mass Energy Production - Utilizing Locally Grown Feed Stocks </li></ul></ul><ul><ul><li>In The Center of it All - Opportunities in the Wind </li></ul></ul><ul><ul><li>Leveraging Established Manufacturers & Trained Workforce </li></ul></ul><ul><ul><li>Weaving Baskets - Connecting Old with New </li></ul></ul>
  6. 6. <ul><li>Dave Quinn, </li></ul><ul><li>Executive Director </li></ul>Levelland EDC PO Box 1010 Levelland, TX 79336 P: 806.894.0113 F: 806.894.0119 M: 806.470.7778 Follow Us on Twitter: LevellandEDC

×