Shire of Kondinin, Spurr Rd (1995)

  • 833 views
Uploaded on

Shire of Kondinin, Spurr Rd (1995)

Shire of Kondinin, Spurr Rd (1995)

More in: Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
833
On Slideshare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Shire of Kondinin Spurr Road Grain Haulage Road 3.5Km Reconstructed Oct 1995 Spurr Rd. - This Pic Taken October 2001
  • 2. Road Was Resheeted With Gravel And Stabilised With Claycrete. Spurr Rd. - This Pic Taken October 2001 Road Received No Maintenance For First 2 Years and Minimal Since.
  • 3. Today This Road Stands As Testimony To 6 Years Of Usage Without Diminishing The Structure Or Running Surface Of The Road And Without Corrugations Spurr Rd. - This Pic Taken October 2001
  • 4. Nuclear Density Testing Spurr Rd 1996 By Western Geotechnics
  • 5. Drill Hole For Nuclear test
  • 6. Spurr Rd. - This Pic Taken October 2001 The Following Pages Are Reports Of Tests Taken 12 Months After Reconstruction
  • 7.  
  • 8.  
  • 9.  
  • 10.  
  • 11.  
  • 12.  
  • 13.