1 APPROVALS................................................................................................................................................................................1
2 VERSION HISTORY.................................................................................................................................................................2
3 SYSTEM TEST PLAN...............................................................................................................................................................2
4 TEST ASSESSMENT .................................................................................................................................................................3
4.1 QUALITY.................................................................................................................................................................................3
4.2 DEFECTS ANALYSIS ..............................................................................................................................................................3
5 OUTSTANDING ISSUES .........................................................................................................................................................4
5.1 OUTSTANDING DEFECTS SUMMARY..................................................................................................................................4
5.2 ACTION PLAN........................................................................................................................................................................4
1
1 Approvals
APPROVALS
Title Name Signiture/Date
2 Version History
Version # Implemented
By
Revision
Date
Approved
By
Approval
Date
Reason
1.0 <Author name> <mm/dd/yy> <Project
Manager
name>
<mm/dd/yy> <reason>
3 System TestPlan
What process is being tested: Xxxx xxxxxx xxxxxxxxxx xxxxxxxx xxxxxxxxx
Xxx xxxxxxx xx xxxxxxxxx xxxxxx xxxx
Script 1: i.e.
Tested by :Moe
Moving vales to field(s) A., B., C.,
Results: Expected totals at Z
PASS/FAIL: PASS
Script 2: i.e
Tested by :Larry
Updating parameters for State Tax Requirements
Results: Mass taxes were too high - FAIL
R.I. values were corrupted. - FAIL
NH values were zero - PASS
PASS/FAIL: --FAIL
Script 3:
Tested by :Curly
Updating parameters for Federal Requirements
Results: Did not continue- Will wait for successful State changes
PASS/FAIL: N/A
4 TestAssessment
4.1 Quality
Description Counts
Total Defects Found 2
Total Test Cases 3
Total Scripts Pass 1
Total Scripts Fail 1
Total Scripts Bypassed 1
4.2 Defects analysis
Describ the test results in detail. Include a detailed description of any defects from the original test
plan, design, test case, or expected results. Include any issues or bugs discovered during the test.
5 OutstandingIssues
5.1 Outstanding Defects Summary
Describe in Summary all defects. This will be used on the open issues matrix. Be brief but concise.
Describe any issues outside of the tests that may be a contributor to the failure of the test
5.2 Action Plan
List outstanding defects
Impact
Planned resolution

More Related Content

Similar to TER

Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summariesgasanden
 
Link Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources
 
Cryoserver V8 admin guide
Cryoserver V8 admin guideCryoserver V8 admin guide
Cryoserver V8 admin guidecryoserver
 
Performance Measures Report Results Summary
Performance Measures Report Results SummaryPerformance Measures Report Results Summary
Performance Measures Report Results SummaryKelly Carlson
 
StresStimulus Load Testing Tool User Guide
StresStimulus Load Testing Tool User GuideStresStimulus Load Testing Tool User Guide
StresStimulus Load Testing Tool User Guidestresstimulus
 
Enterprise Architecture Formulation template
Enterprise Architecture Formulation templateEnterprise Architecture Formulation template
Enterprise Architecture Formulation templateJohn Macasio
 
3 kc18039acaatqzza v1_alcatel-lucent 1646 synchronous multiplexer compact rel...
3 kc18039acaatqzza v1_alcatel-lucent 1646 synchronous multiplexer compact rel...3 kc18039acaatqzza v1_alcatel-lucent 1646 synchronous multiplexer compact rel...
3 kc18039acaatqzza v1_alcatel-lucent 1646 synchronous multiplexer compact rel...jchung6133
 
Yahoo Web Analytics API Reference Guide
Yahoo Web Analytics API Reference GuideYahoo Web Analytics API Reference Guide
Yahoo Web Analytics API Reference GuideAndrew Talcott
 
Trimble total station help
Trimble total station helpTrimble total station help
Trimble total station helpGonçalo Beja
 
BizTalk Practical Course Preview
BizTalk Practical Course PreviewBizTalk Practical Course Preview
BizTalk Practical Course PreviewMoustafaRefaat
 
Manual de servicio serie a1 de baic
Manual de servicio serie a1 de baicManual de servicio serie a1 de baic
Manual de servicio serie a1 de baicGonzalo Martinez
 

Similar to TER (20)

Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
 
Link Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources Past Performance Summaries
Link Resources Past Performance Summaries
 
Cryoserver V8 admin guide
Cryoserver V8 admin guideCryoserver V8 admin guide
Cryoserver V8 admin guide
 
Fr a200
Fr a200Fr a200
Fr a200
 
Tortoise svn 1.7-en
Tortoise svn 1.7-enTortoise svn 1.7-en
Tortoise svn 1.7-en
 
Performance Measures Report Results Summary
Performance Measures Report Results SummaryPerformance Measures Report Results Summary
Performance Measures Report Results Summary
 
Spring webflow-reference
Spring webflow-referenceSpring webflow-reference
Spring webflow-reference
 
StresStimulus Load Testing Tool User Guide
StresStimulus Load Testing Tool User GuideStresStimulus Load Testing Tool User Guide
StresStimulus Load Testing Tool User Guide
 
Gemini Manual
Gemini ManualGemini Manual
Gemini Manual
 
Mikrotik
MikrotikMikrotik
Mikrotik
 
Enterprise Architecture Formulation template
Enterprise Architecture Formulation templateEnterprise Architecture Formulation template
Enterprise Architecture Formulation template
 
Lesson 1...Guide
Lesson 1...GuideLesson 1...Guide
Lesson 1...Guide
 
3 kc18039acaatqzza v1_alcatel-lucent 1646 synchronous multiplexer compact rel...
3 kc18039acaatqzza v1_alcatel-lucent 1646 synchronous multiplexer compact rel...3 kc18039acaatqzza v1_alcatel-lucent 1646 synchronous multiplexer compact rel...
3 kc18039acaatqzza v1_alcatel-lucent 1646 synchronous multiplexer compact rel...
 
Yahoo Web Analytics API Reference Guide
Yahoo Web Analytics API Reference GuideYahoo Web Analytics API Reference Guide
Yahoo Web Analytics API Reference Guide
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Liquid turbine flow meter
Liquid turbine flow meterLiquid turbine flow meter
Liquid turbine flow meter
 
Liquid turbine flow meter
Liquid turbine flow meterLiquid turbine flow meter
Liquid turbine flow meter
 
Trimble total station help
Trimble total station helpTrimble total station help
Trimble total station help
 
BizTalk Practical Course Preview
BizTalk Practical Course PreviewBizTalk Practical Course Preview
BizTalk Practical Course Preview
 
Manual de servicio serie a1 de baic
Manual de servicio serie a1 de baicManual de servicio serie a1 de baic
Manual de servicio serie a1 de baic
 

TER

  • 1. 1 Test Exit Report PROCESS: Version: Date: Contents 1 APPROVALS................................................................................................................................................................................1 2 VERSION HISTORY.................................................................................................................................................................2 3 SYSTEM TEST PLAN...............................................................................................................................................................2 4 TEST ASSESSMENT .................................................................................................................................................................3 4.1 QUALITY.................................................................................................................................................................................3 4.2 DEFECTS ANALYSIS ..............................................................................................................................................................3 5 OUTSTANDING ISSUES .........................................................................................................................................................4 5.1 OUTSTANDING DEFECTS SUMMARY..................................................................................................................................4 5.2 ACTION PLAN........................................................................................................................................................................4
  • 3. 2 Version History Version # Implemented By Revision Date Approved By Approval Date Reason 1.0 <Author name> <mm/dd/yy> <Project Manager name> <mm/dd/yy> <reason> 3 System TestPlan What process is being tested: Xxxx xxxxxx xxxxxxxxxx xxxxxxxx xxxxxxxxx Xxx xxxxxxx xx xxxxxxxxx xxxxxx xxxx Script 1: i.e. Tested by :Moe Moving vales to field(s) A., B., C., Results: Expected totals at Z PASS/FAIL: PASS Script 2: i.e Tested by :Larry Updating parameters for State Tax Requirements Results: Mass taxes were too high - FAIL R.I. values were corrupted. - FAIL NH values were zero - PASS PASS/FAIL: --FAIL Script 3: Tested by :Curly Updating parameters for Federal Requirements Results: Did not continue- Will wait for successful State changes PASS/FAIL: N/A
  • 4. 4 TestAssessment 4.1 Quality Description Counts Total Defects Found 2 Total Test Cases 3 Total Scripts Pass 1 Total Scripts Fail 1 Total Scripts Bypassed 1 4.2 Defects analysis Describ the test results in detail. Include a detailed description of any defects from the original test plan, design, test case, or expected results. Include any issues or bugs discovered during the test.
  • 5. 5 OutstandingIssues 5.1 Outstanding Defects Summary Describe in Summary all defects. This will be used on the open issues matrix. Be brief but concise. Describe any issues outside of the tests that may be a contributor to the failure of the test 5.2 Action Plan List outstanding defects Impact Planned resolution