Quantity Surveyor
INTRODUCTION TO CONSTRUCTION INDUSTRY
+
INTRODUCTION TO DRAWING
GROUP:
• CH’NG PHEI WOON(LEADER)
• CHRISTINA CHUA
• BOON LI YING
• ALISON TANG
• CHONG YI HUI
ASSIGNMENT 1
Mind Map
Definition of Quantity Surveyor
• Providing advices on
procurement, contracts and
project cost management.
• Work as consultants or be
employed by a contractor or sub-
contractor.
Quantity Surveyor Certified board
• The Board of Quantity Surveyors Malaysia was set up by an Act of
Parliament, i.e. Quantity Surveyors Act 1967 (revised 2002). The Board
consists of a President, a Registrar and sixteen (16) members appointed by
the Minister of Works, Malaysia.
• to approve or reject applications for registration or approval to practise
under this Act or to approve any such application subject to such conditions
or restrictions as it may deem fit to impose
• to order the issuance of a written warning or reprimand, the imposition of a
fine, suspension, cancellation, removal or reinstatement in accordance with
Part III and IV Quantity Surveyors Act
Scope of Work Handled by 

Quantity Surveyors
• Cost Planning
• To help the design team to
keep within the budget from
start to the end of the project
• Preliminary Cost Advice
•Give practical advice on
comparative costs of alternative
layouts, materials, components
& methods of construction.
•Contractual Methods
• Advise on the best form of contract
for a specific project.
•Tendering
•Calculating the cost and risk to
tender for the project.
• Choice of Contractor
• Quantity surveyor makes recommendation
of contractors base on past performances
to the employers.
•Valuation of Construction Work
•Quantity surveyor evaluates work
carried out before making certified
payment.
•Increase Efficiency
•Making sure that fairness
exists between employer
and contractors to make
work smoother and easier.
Responsibilities & Tasks at
Different Stages of Construction
• Monitor cost at different stages of project.
• Certify payment and invoices.
• Negotiating disputes.
• Advising on budgets and costs.
• Giving advice for disputes on contracts.
Daily Activities
Construction starts…
• Feasibility studies of a project
• Roughly estimate what’s involve in the project
(Measurement of Sketches)
• Study architects’ and engineers’ plans
• Identify cost and overall budget
(Value Engineering)
• Final detailed estimate is prepared by Quantity
Surveyor and Architect
•During Construction…
• Provide flow of cash data
• Can access cost effects when change of project occur
•After Construction…
•Quantity Surveyor prepare
statement of final account
(Records actual cost for all
sections of job)
Stages that involve in cost planning during
design and construction
Tender
Reconciliation
Comparing tender price
with final cost
Post-Contract Cost
Control
Controlling cost at different
stages of construction
Preliminary Estimate
Using research market price to
estimate
Cost Plan
Calculating project cost
according to elemental
analysis
Cost Check
Evaluating the work
done according to
cost
TYPE

OF
Preliminary Drawing
DRAWING
Tender Drawing
Contract
Drawing
AS-Built
Drawing
Preliminary Drawing
• A rough design with less detail
• Estimate the budget of a project
• Can be used to prepared cost plan
Tender Drawing
• A complete design with full details by Architects
and Structural engineer
• Comprise of architectural and structural drawings
• Can be used to prepare Bills of Quantities
STRUCTURAL DRAWING
By Structural Engineer
Column
Beam
• Between 2 column
Slab
(Floor)
Structural Drawing by Structural Engineer
Architectural Drawingby Architect
Description &
material
rate
Measurement
Quantity
Total Cost
EXAMPLE OF BILLS OF QUANTITIES
Quantity Surveyors ‘Bible book’

SMM2
• Latest edition : SMM2
• SMM 1 Slightly different from
SMM2
• This book is guide for calculation
and format of BILLS OF
QUANTITIES
Contract Drawing
• Same drawing as tender drawings
Contract Drawing = Construction Drawing
Used to prepare contract document
Construction Drawing
As-Built Drawing
• A finalise drawing
Any changes in example Type of tile ,paint
Commonly by Clients or Architects

More Related Content

What's hot

Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorSyafiq Deen
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfChong Yi Hui
 
Costing for-civil-engineering-project
Costing for-civil-engineering-projectCosting for-civil-engineering-project
Costing for-civil-engineering-projecthlksd
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimateArpit Sethia
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Felix Vong
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)Js Cheok
 
Quantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningQuantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningGalala University
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 

What's hot (13)

Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
Costing for-civil-engineering-project
Costing for-civil-engineering-projectCosting for-civil-engineering-project
Costing for-civil-engineering-project
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 
Quantity take off
Quantity take offQuantity take off
Quantity take off
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Quantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningQuantity Surveying & Cost Planning
Quantity Surveying & Cost Planning
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 

Viewers also liked

ICI and ITD presentation
ICI and ITD presentationICI and ITD presentation
ICI and ITD presentationMarco Leong
 
ici & itd presentation
ici & itd presentationici & itd presentation
ici & itd presentationTien Yun
 
Presentation civil engineering (fm)
Presentation  civil engineering (fm)Presentation  civil engineering (fm)
Presentation civil engineering (fm)Sarah Esa
 
Biodiversity and Ecosystem Services in the Tourism Sector
Biodiversity and Ecosystem Services in the Tourism SectorBiodiversity and Ecosystem Services in the Tourism Sector
Biodiversity and Ecosystem Services in the Tourism SectorChristina Beckmann
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 

Viewers also liked (6)

ICI and ITD presentation
ICI and ITD presentationICI and ITD presentation
ICI and ITD presentation
 
ici & itd presentation
ici & itd presentationici & itd presentation
ici & itd presentation
 
Presentation civil engineering (fm)
Presentation  civil engineering (fm)Presentation  civil engineering (fm)
Presentation civil engineering (fm)
 
Biodiversity and Ecosystem Services in the Tourism Sector
Biodiversity and Ecosystem Services in the Tourism SectorBiodiversity and Ecosystem Services in the Tourism Sector
Biodiversity and Ecosystem Services in the Tourism Sector
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 

Similar to Quantity surveyor (ici+itd)-pdf

Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor温 庄壁
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...Galala University
 
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Neha V
 
Duties and job roles of QS.pptx
Duties and job roles of QS.pptxDuties and job roles of QS.pptx
Duties and job roles of QS.pptxSagarKatole1
 
FMA - 2_CM651_Group.pptx
FMA - 2_CM651_Group.pptxFMA - 2_CM651_Group.pptx
FMA - 2_CM651_Group.pptxArJayTambaoan
 
Construction Stages and Construction Teams
Construction Stages and Construction TeamsConstruction Stages and Construction Teams
Construction Stages and Construction TeamsMOHDFIRRDHAUSBINMOHD
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1Daniel Tan
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxmkyong1996
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 AClive Price
 
qsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfqsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfrivenhau
 
25.08.2015 introduction to property development presentation v11
25.08.2015 introduction to property development presentation v1125.08.2015 introduction to property development presentation v11
25.08.2015 introduction to property development presentation v11The Business Council of Mongolia
 
Project Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfProject Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfMOHDFIRRDHAUSBINMOHD
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation newWadeLim
 

Similar to Quantity surveyor (ici+itd)-pdf (20)

Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...
 
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
 
QSS
QSSQSS
QSS
 
Duties and job roles of QS.pptx
Duties and job roles of QS.pptxDuties and job roles of QS.pptx
Duties and job roles of QS.pptx
 
CJM Construction Consulting PowerPoint Presentation
CJM Construction Consulting PowerPoint PresentationCJM Construction Consulting PowerPoint Presentation
CJM Construction Consulting PowerPoint Presentation
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
FMA - 2_CM651_Group.pptx
FMA - 2_CM651_Group.pptxFMA - 2_CM651_Group.pptx
FMA - 2_CM651_Group.pptx
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
Construction Stages and Construction Teams
Construction Stages and Construction TeamsConstruction Stages and Construction Teams
Construction Stages and Construction Teams
 
Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 A
 
SANPPT
SANPPTSANPPT
SANPPT
 
qsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfqsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdf
 
QS.pdf
QS.pdfQS.pdf
QS.pdf
 
25.08.2015 introduction to property development presentation v11
25.08.2015 introduction to property development presentation v1125.08.2015 introduction to property development presentation v11
25.08.2015 introduction to property development presentation v11
 
Project Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfProject Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdf
 
Ddg architecture
Ddg architectureDdg architecture
Ddg architecture
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 

More from Chong Yi Hui

BSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdfBSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdfChong Yi Hui
 
Comparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdfComparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdfChong Yi Hui
 
THEORIES_YIHUI.pdf
THEORIES_YIHUI.pdfTHEORIES_YIHUI.pdf
THEORIES_YIHUI.pdfChong Yi Hui
 
Slides for bscience ii
Slides for bscience iiSlides for bscience ii
Slides for bscience iiChong Yi Hui
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 reportChong Yi Hui
 
Building technology report
Building technology reportBuilding technology report
Building technology reportChong Yi Hui
 
ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404Chong Yi Hui
 
Building construction report
Building construction reportBuilding construction report
Building construction reportChong Yi Hui
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalizedChong Yi Hui
 
Social psychology project ii(comic)
Social psychology project ii(comic)Social psychology project ii(comic)
Social psychology project ii(comic)Chong Yi Hui
 
Account assignment report finale(1)
Account assignment report finale(1)Account assignment report finale(1)
Account assignment report finale(1)Chong Yi Hui
 

More from Chong Yi Hui (20)

btechcompiled.pdf
btechcompiled.pdfbtechcompiled.pdf
btechcompiled.pdf
 
BSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdfBSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdf
 
Comparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdfComparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdf
 
THEORIES_YIHUI.pdf
THEORIES_YIHUI.pdfTHEORIES_YIHUI.pdf
THEORIES_YIHUI.pdf
 
Yihui's pm final
Yihui's pm finalYihui's pm final
Yihui's pm final
 
Pm final
Pm finalPm final
Pm final
 
Btechii-project2
Btechii-project2Btechii-project2
Btechii-project2
 
Btechii
BtechiiBtechii
Btechii
 
Studio report
Studio reportStudio report
Studio report
 
Slides for bscience ii
Slides for bscience iiSlides for bscience ii
Slides for bscience ii
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 
ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Final report
Final reportFinal report
Final report
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalized
 
Statitics
StatiticsStatitics
Statitics
 
English report
English report English report
English report
 
Social psychology project ii(comic)
Social psychology project ii(comic)Social psychology project ii(comic)
Social psychology project ii(comic)
 
Account assignment report finale(1)
Account assignment report finale(1)Account assignment report finale(1)
Account assignment report finale(1)
 

Recently uploaded

Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxruthvilladarez
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 

Recently uploaded (20)

Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docx
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 

Quantity surveyor (ici+itd)-pdf

  • 1. Quantity Surveyor INTRODUCTION TO CONSTRUCTION INDUSTRY + INTRODUCTION TO DRAWING GROUP: • CH’NG PHEI WOON(LEADER) • CHRISTINA CHUA • BOON LI YING • ALISON TANG • CHONG YI HUI ASSIGNMENT 1
  • 3. Definition of Quantity Surveyor • Providing advices on procurement, contracts and project cost management. • Work as consultants or be employed by a contractor or sub- contractor.
  • 4. Quantity Surveyor Certified board • The Board of Quantity Surveyors Malaysia was set up by an Act of Parliament, i.e. Quantity Surveyors Act 1967 (revised 2002). The Board consists of a President, a Registrar and sixteen (16) members appointed by the Minister of Works, Malaysia. • to approve or reject applications for registration or approval to practise under this Act or to approve any such application subject to such conditions or restrictions as it may deem fit to impose • to order the issuance of a written warning or reprimand, the imposition of a fine, suspension, cancellation, removal or reinstatement in accordance with Part III and IV Quantity Surveyors Act
  • 5. Scope of Work Handled by 
 Quantity Surveyors • Cost Planning • To help the design team to keep within the budget from start to the end of the project • Preliminary Cost Advice •Give practical advice on comparative costs of alternative layouts, materials, components & methods of construction.
  • 6. •Contractual Methods • Advise on the best form of contract for a specific project. •Tendering •Calculating the cost and risk to tender for the project.
  • 7. • Choice of Contractor • Quantity surveyor makes recommendation of contractors base on past performances to the employers. •Valuation of Construction Work •Quantity surveyor evaluates work carried out before making certified payment.
  • 8. •Increase Efficiency •Making sure that fairness exists between employer and contractors to make work smoother and easier.
  • 9. Responsibilities & Tasks at Different Stages of Construction • Monitor cost at different stages of project. • Certify payment and invoices. • Negotiating disputes. • Advising on budgets and costs. • Giving advice for disputes on contracts.
  • 10. Daily Activities Construction starts… • Feasibility studies of a project • Roughly estimate what’s involve in the project (Measurement of Sketches) • Study architects’ and engineers’ plans • Identify cost and overall budget (Value Engineering) • Final detailed estimate is prepared by Quantity Surveyor and Architect
  • 11. •During Construction… • Provide flow of cash data • Can access cost effects when change of project occur •After Construction… •Quantity Surveyor prepare statement of final account (Records actual cost for all sections of job)
  • 12. Stages that involve in cost planning during design and construction Tender Reconciliation Comparing tender price with final cost Post-Contract Cost Control Controlling cost at different stages of construction Preliminary Estimate Using research market price to estimate Cost Plan Calculating project cost according to elemental analysis Cost Check Evaluating the work done according to cost
  • 14. Preliminary Drawing • A rough design with less detail • Estimate the budget of a project • Can be used to prepared cost plan
  • 15. Tender Drawing • A complete design with full details by Architects and Structural engineer • Comprise of architectural and structural drawings • Can be used to prepare Bills of Quantities
  • 16. STRUCTURAL DRAWING By Structural Engineer Column Beam • Between 2 column Slab (Floor)
  • 17. Structural Drawing by Structural Engineer
  • 20. Quantity Surveyors ‘Bible book’
 SMM2 • Latest edition : SMM2 • SMM 1 Slightly different from SMM2 • This book is guide for calculation and format of BILLS OF QUANTITIES
  • 21. Contract Drawing • Same drawing as tender drawings Contract Drawing = Construction Drawing Used to prepare contract document