ProTech is a consultancy and training services provider with a vision to cater to future industry needs through modern technology and innovation. Their mission is to provide top quality engineering and management services. The document then introduces a trainer, M Yasir Arafat, and his qualifications. It discusses ProTech's services around production machinery effectiveness through evaluating Overall Equipment Effectiveness (OEE). ProTech's proposed approach involves collecting machine performance data, analyzing it to identify improvement areas, and providing ongoing support and training to clients. The costs and benefits of ProTech's OEE consultancy package are also outlined.
2. Vision
To be a provider of globally best consultancy and training
services to the industries and organizations catering future
needs, development & growth.
Mission
• ProTech are committed to provide the top class quality
consultancy and training services in engineering and
management to our customers.
Our services are dressed with modern technology and
updated research and innovation that helps our customers to
be strategic all ways.
ProTech
3. Profile of Trainer / consultant
M Yasir Arafat
A professional mechanical engineer registered with PEC,
with post qualification of MBA (Marketing).
+10 years diverse experience in production and Manufacturing
field. Has served engineering & management services in the
following industries
Automobile Manufacturing
Parts/components Manufacturing
Steel industry
Oil & Gas projects
4. We Train & Support your team & business in
Production Machinery Effectiveness & Improvement
Product Development
Quality Management Systems
ISO Documentation & Controlling
Value Addition / Value Engineering
Business Process Outsourcing
Manpower Contracting & Outsourcing
Project Management Plans
Surveying of Production Facility for Loan Application
Project Feasibility Studies and Report Writing
Equipment Erection, Installation, commissioning & Validation
ProTech
5. Production Machinery Effectiveness &
Improvement
Few questions to evaluate
Do you know what is the performance of your
machine
Do you measure the performance of machine
Do you know the machine performing as per
industry standard or not
How do you interpret your down time.
when you improve downtime, you got
production loss or less productivity?
ProTech
6. Concept
“ What you cannot measure , you
cannot improve “
ProTech
7. Production Machinery Effectiveness &
Improvement
The concept of OEE has been presented
here for your knowledge building and control
of your production machinery effectiveness
and efficiency.
OEE stands for Overall Equipment
Effectiveness
It’s a concept that integrate the Performance,
productivity and Quality, so that every factor
will be balanced in achieving the desired
output
ProTech
9. How ProTech Helps you
Our Team of engineers and specialist involve with your team or
coordinator to collect the data.
The data will be colected and forawarded to us on daily basis
through Fax or E-Mail.
Our team of experts will analyze the data on daily basis. Initially
our team will visit daily for training, and later on weekly basis.
The OEE calculations will be done by our experts involving your
team and will presents the results highlighting the key areas of
improvements.
Then your team will continue to follow the procedure throughout
the year and will continue to identify the key improvement areas
with measurements of success.
Amazing improvements will be observed by top management at
the end of year. This learning cycle will be continued with
advance features and training on new development and
technological up-gradation.
ProTech
10. After Services benefits
We can provide you full OEE consultancy
services for one month and calculation and
data analysis check for 3 months done by
your team.
We will be available for your support any
time, we can even work with your team in
night shifts.
Your data will be protected & controlled as
copy right and cannot be shared anywhere.
The management summary will be send to
those only that will be nominated by you.
ProTech
11. Investments
The total Investment for OEE services package includes
training , data analysis, calculations, summarizing results,
management presentation, identification of bottlenecks, key
improvement areas & management summary.
Total investment for one month PKR 150,000.
25 % Payment advance, 25 % each after 7 days
Signing of contract 25 % (Initial)
OEE Training 25 % (After 1st week)
Data collection 1st week 25 % (After 3rd week)
Data Analysis end of month
& presentation of report 25 % (After one month)
ProTech
12. Our other recommended services for your firm
Quality Management Systems
ISO Documentation & Controlling
Value Addition / Value Engineering
Project Management Plans
Project Feasibility Studies and Report Writing
Equipment Erection, Installation, commissioning &
Validation
ProTech