Modernization of Stores Depot
        Lower Parel

           through

  Intelligent Warehousing
            with
Automated Storage and retrieval
           System
                 Jogendra Yadvendu
                 Dy.CMM-II,CCG, WR
Modernization of Carriage Stores Depot at Carriage
     Repair Workshop, Lower Parel, Western Railway

     Carriage Stores Depot at Lower Parel is the biggest Stores

     Depot on Western Railway.

     Annual material issues value of Rs. 600 Million.




     Accounts for approximately 25 % of the annual issues on

     Western Railway.

     Caters to Carriage Workshop & Divisional Consignees (29).



      It stocks around 1200 stock items out of which 167 are

     safety, 257 are vital, 38 passenger amenity items .

     LHB Coach is a new technology with many items being

     imported and limited indigenous vendors
Major activity at Parel Workshop
Activity   Type   2006-07                07-08
                                         (estimate)

POH        ICF    1531                   1550

           LHB    62                     36

                  Refurbishment of toilets, Laying of
RSP        ICF
                  Stainless Steel Inlay, changing LP Sheet,
                  Limpet Sheet

                  Refurbishment of toilets, changing the
           LHB
                  main door
What does modernization involve ?
    Pragmatic mix of IW-ASRS, Drive in Pallet System,


    Selective Pallet System, conveyor systems etc.

    Structurally strong building with adequate free


    height for vertical storage.

    Adequate material handling equipments and


    transportation facilities such as platform trucks,
    forklifts , LMV, HMV .

    RDBMS based IT application for purchase &


    Inventory management with adequate Hardware
    resources.
Estimated cost of the project
    Sanctioned in M&P Program for the year 2007-08

    under plan head 42.
    Cost: Rs. 138 Million.


    Components involved;


    IW-ASRS;


    Drive in Pallet & Selective Pallet System.


    3 & 5 Ton Forklift


    5 Ton Road Crane


    Truck 9 & 16 Ton


    Multi-utility Vehicle


    Platform Trucks & Others.


    3 Ton EOT Crane.

Why use IW-ASRS at Parel Depot
    Parel workshop has one of the smallest footprint to


    Coach POH ratio.
    Located in the heart of Metropolitan city-Mumbai


    with costly land where lateral expansion is not an
    option.
    POH target of ICF, LHB increasing.


    Area can be released for workshop modernization &


    expansion activities only by releasing the dead space
    being occupied by multifarious stores godowns.
    This is where IW-ASRS comes into play.


    IW-ASRS utilizes vertical storage capacity leading to


    efficient storage & retrieval
Proposed site at Lower Parel
     Central ward of Parel Depot


     Measures 50m * 45 m


     50% area with mezzanine floor


     Max. free height available 6 m.


     Free height available in mezzanine area


     is 3 m.
     Cemented flooring.

General Specifications of IW-ASRS
    S/R Machine:


    Construction: Modular component design. All parts designed

    for 100% duty cycle. Welded steel frame. Single mast tube,
    strut braced. Structural steel base.

    Drive and Idler Wheels: Flanged forged alloy steel. Case

    Hardened to 55 Rockwell C. Reground for concentricity.
    Heavy-duty pillow block bearing support.

    Fork Extractor Mechanism:


    • Construction: Precession fabricated steel


    • Load Capacity: 1500 Kg.


    • Load Support: Industrial Standard Forks


    • Extractor Drive: Patented ball screw and rotator with

    variable frequency drives, industrial gear reducers, and
      brake.
Crane Rail with V-H Drives
    Crane Rail:


    • Floor mounted , Rail mounted .




    Vertical & Horizontal Drives:




    High performance sine-coded, pulse width modulated AC

    vector motor drives which generates an adjustable
    voltage/ frequency three phase output for complete speed
    control.
    Automatic stall prevention and voltage boost prevents

    nuisance tripping during load or line side transient
    conditions.
    The drives will not induce any voltage or distortion back

    into the utility line and maintains a displacement power
    factor of not less than 0.98 throughout its speed range.
Communication & Controls
    Communication:


    • Infrared Modem



    S/R Machine Controls:


    Electrical Components: IEEE code compliance

    throughout. IEEE rated enclosure, sensors, and
    wiring. Panel-mounted diagnostic indicator
    lights. Panel-mounted maintenance controls.
    Logistics and Positioning: Onboard

    programmable controller A-B SLC-500®
    communication by infrared modem. Steel code
    bar, optical address readers. Fine positioning,
    motor-mounted resolvers with 1/16'' accuracy or
    1 deg. Accurate positioning on start-up.
Rack & Pallets
    Safeguards:


    Front and rear aisle-obstruction detectors. Onboard

    and off-board emergency stops. Load and centering
    sensors and interlocks.
    Rack Structure:


    Virtually any post and beam (conventional) existing or

    new racks capable of safely bearing the pallet loads
    (pushback and flow rack). Continuity of vertical shelf
    distance from floor not required. Common depth
    dimension recommended, but differing depths can
    often be accommodated. Racks must be attached to
    the floor but no shimming is needed except with
    extreme floor conditions.
    Maximum Height: 100 ft.


    Pallets:


    Any two or four way pallet capable of being used.

Activities involved in ASRS
    Civil Engineering work of site preparation


    Leveled flooring with adequate bearing


    capacity
    Adequate free height for 15-20 m for


    vertical storage & movement of vertical
    crane.
    New light weigh roof


    Power requirements

Modus Operandi of execution
    Prepare detailed sub estimate of electrical, civil & mechanical


    portion .
    Obtain sanction of respective HOD.


    Prepare STR & DPR.


    Obtain sanction of GM.


    Prepare material schedules for purchase components .


    Prepare tender schedule for works portion.


    Obtain dispensation from COFMOW.


    Float only one works tender to take care of mechanical, civil as


    well as electrical work to be carried out by a single agency on a
    turn key basis.
    Have provision for operation for 2 years by the contracting


    agency along with training to be followed by five years
    comprehensive AMC.
0
                                                     100
                                                                 200
                                                                             300
                                                                                         400
                                                                                               500
                                                                                                       600
                                                                                                               700

                              Preliminary




        07
                                  Work




      JULY-
                                  Detailed




                                                 3030 30
                                                      60
                                  Estimate




                                                 15




             7 AUG-07
                             DPR & STR




                                                       75
                             Associate




                                                 15




 07
 15
                         finance vetting



                                                           90
                                  HOD’s



                                                 10




        07
        30
                                Approval
                                                           100
                              HQ finance
                                                 10




             07
             20
SEPT - SEPT OCT
                                vetting
                                                           110


                         GM’s Sanction
                                                 10
                                                            120




                            COFMOW




             30 OCT 07
                          Dispensation
                                 Material
                                                 30




 07
 30
NOV
                                schedule
                                                                 150


                                                 5




                         Works Tender
                                                                 155




  FEB 08                      Advertised
                                                   45




                                tender
                                                                       200




                                Tender
                                                           90




                           deliberations
                                                                               290




                           Placement of
                                                 15




                 08
15 DEC 071 1 MAY 15
             08 MAY




                            work order
                                                                                   305




                            Engineering
                                                                  180




 08




                           Construction
                                                                                                 485




                                ASRS
                                                           90




                            Assembly &
                                                                                                        575




                               Testing
                                                 15




 15 15 FEB 1




                         Commissioning
           09
NOV 09 APRIL
                                                                                                         590
Management of stores functions during
        construction in central ward
    Shift the employees to the new office

    building coming up under GM’s Power.
    Shift bogie items to bogie sub stores.


    Create sub stores in paint shop for paint

    items & use the released space for bogie
    components.
    Create sub store in furnishing for

    furnishing items.
    Use timber ward for large & costly stores.


    Use jumbo siding for heavy, big stores.

!
PLAN, ELEVATION & SECTION OF
    PAREL STORES DEPOT
FRONT VIEW OF IW-ASRS AT
   PAREL STORES DEPOT
TOP VIEW OF PAREL STORES DEPOT WITH
              IW-ASRS
PALLET & SECTION AT “C”
Generation of Barcode at Purchaser’s Premises



             Barcode Components

•Vendor ID
•Item Code
•Consignee Code
•Order No, Date
ADC Technologies
    Voice systems


    RFID


    OCR


     pick-to-light


     laser scanners


    Bar-coding


     CCD scanners


     hand-held batch and RF terminals


     vehicle-mounted computers


    wearable computers


More Related Content

What's hot

MARTISON CURRICULUM VITAE
MARTISON CURRICULUM  VITAEMARTISON CURRICULUM  VITAE
MARTISON CURRICULUM VITAEMartison Peprah
 
Richard woolbar cv 2019 - offshore
Richard woolbar cv   2019 - offshoreRichard woolbar cv   2019 - offshore
Richard woolbar cv 2019 - offshorerichywoolbar
 
Appendix
AppendixAppendix
Appendixsidou
 
Oil & gas interactive presentation v1, 6th july 2015
Oil & gas interactive presentation   v1, 6th july 2015Oil & gas interactive presentation   v1, 6th july 2015
Oil & gas interactive presentation v1, 6th july 2015Robin Tait
 
terex FantuzziPres
terex FantuzziPresterex FantuzziPres
terex FantuzziPresfinance42
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CVkalki selvan
 
Garrett cooper 2016 resume
Garrett cooper 2016 resumeGarrett cooper 2016 resume
Garrett cooper 2016 resumeGarrett Cooper
 

What's hot (13)

WaltJohnson
WaltJohnsonWaltJohnson
WaltJohnson
 
Mine specialty-bodies
Mine specialty-bodiesMine specialty-bodies
Mine specialty-bodies
 
Dlw report
Dlw  report Dlw  report
Dlw report
 
MARTISON CURRICULUM VITAE
MARTISON CURRICULUM  VITAEMARTISON CURRICULUM  VITAE
MARTISON CURRICULUM VITAE
 
Richard woolbar cv 2019 - offshore
Richard woolbar cv   2019 - offshoreRichard woolbar cv   2019 - offshore
Richard woolbar cv 2019 - offshore
 
Appendix
AppendixAppendix
Appendix
 
Ollie_CV_2014
Ollie_CV_2014Ollie_CV_2014
Ollie_CV_2014
 
Keith Resume
Keith ResumeKeith Resume
Keith Resume
 
Oil & gas interactive presentation v1, 6th july 2015
Oil & gas interactive presentation   v1, 6th july 2015Oil & gas interactive presentation   v1, 6th july 2015
Oil & gas interactive presentation v1, 6th july 2015
 
Morris Blackwell II Resume-7
Morris Blackwell II Resume-7Morris Blackwell II Resume-7
Morris Blackwell II Resume-7
 
terex FantuzziPres
terex FantuzziPresterex FantuzziPres
terex FantuzziPres
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
Garrett cooper 2016 resume
Garrett cooper 2016 resumeGarrett cooper 2016 resume
Garrett cooper 2016 resume
 

Viewers also liked

ASRS (Automated Storage Retrieval System) projects photo reference
ASRS (Automated Storage Retrieval System) projects photo referenceASRS (Automated Storage Retrieval System) projects photo reference
ASRS (Automated Storage Retrieval System) projects photo reference◼ Mohammad Yusuf
 
Automated Storage and Retrival Systems AS/RS
Automated Storage and Retrival Systems AS/RSAutomated Storage and Retrival Systems AS/RS
Automated Storage and Retrival Systems AS/RSEvren E
 
AUTOMATED STORAGE AND RETRIEVAL SYSTEM
AUTOMATED STORAGE AND RETRIEVAL SYSTEMAUTOMATED STORAGE AND RETRIEVAL SYSTEM
AUTOMATED STORAGE AND RETRIEVAL SYSTEMMihir Patel
 
Fabrication of AGV
Fabrication of AGVFabrication of AGV
Fabrication of AGVSOORAJ V R
 
Automated Material Handling System
Automated Material Handling SystemAutomated Material Handling System
Automated Material Handling SystemRakesh Raki
 
A Mechatronics project on Manufacturing Automation ppt
A Mechatronics project on Manufacturing Automation pptA Mechatronics project on Manufacturing Automation ppt
A Mechatronics project on Manufacturing Automation pptPramod
 
Final report on line follower
Final report on line followerFinal report on line follower
Final report on line followerPriya Hada
 
Project Report for Automated Guided Vehicle
Project Report for Automated Guided VehicleProject Report for Automated Guided Vehicle
Project Report for Automated Guided VehicleSOORAJ V R
 
Line follower robot
Line follower robotLine follower robot
Line follower robotPriya Hada
 
Line following robot - Mini project
Line following robot - Mini projectLine following robot - Mini project
Line following robot - Mini projectAmit Upadhye
 
Automated storage and retrieval system
Automated storage and retrieval systemAutomated storage and retrieval system
Automated storage and retrieval systemPrasanna3804
 

Viewers also liked (14)

ASRS (Automated Storage Retrieval System) projects photo reference
ASRS (Automated Storage Retrieval System) projects photo referenceASRS (Automated Storage Retrieval System) projects photo reference
ASRS (Automated Storage Retrieval System) projects photo reference
 
ASRS (1)
ASRS (1)ASRS (1)
ASRS (1)
 
Shuttle XP Vertical Lift Module - Automated Storage and Retrieval System
Shuttle XP Vertical Lift Module - Automated Storage and Retrieval SystemShuttle XP Vertical Lift Module - Automated Storage and Retrieval System
Shuttle XP Vertical Lift Module - Automated Storage and Retrieval System
 
Automated Storage and Retrival Systems AS/RS
Automated Storage and Retrival Systems AS/RSAutomated Storage and Retrival Systems AS/RS
Automated Storage and Retrival Systems AS/RS
 
AUTOMATED STORAGE AND RETRIEVAL SYSTEM
AUTOMATED STORAGE AND RETRIEVAL SYSTEMAUTOMATED STORAGE AND RETRIEVAL SYSTEM
AUTOMATED STORAGE AND RETRIEVAL SYSTEM
 
Asrs
AsrsAsrs
Asrs
 
Fabrication of AGV
Fabrication of AGVFabrication of AGV
Fabrication of AGV
 
Automated Material Handling System
Automated Material Handling SystemAutomated Material Handling System
Automated Material Handling System
 
A Mechatronics project on Manufacturing Automation ppt
A Mechatronics project on Manufacturing Automation pptA Mechatronics project on Manufacturing Automation ppt
A Mechatronics project on Manufacturing Automation ppt
 
Final report on line follower
Final report on line followerFinal report on line follower
Final report on line follower
 
Project Report for Automated Guided Vehicle
Project Report for Automated Guided VehicleProject Report for Automated Guided Vehicle
Project Report for Automated Guided Vehicle
 
Line follower robot
Line follower robotLine follower robot
Line follower robot
 
Line following robot - Mini project
Line following robot - Mini projectLine following robot - Mini project
Line following robot - Mini project
 
Automated storage and retrieval system
Automated storage and retrieval systemAutomated storage and retrieval system
Automated storage and retrieval system
 

Similar to Presentation

Reliable sponge pvt ltd-hot-dip-galvanizing
Reliable sponge pvt ltd-hot-dip-galvanizingReliable sponge pvt ltd-hot-dip-galvanizing
Reliable sponge pvt ltd-hot-dip-galvanizingReliable India
 
01. drop pit table august 2016
01. drop pit table  august 201601. drop pit table  august 2016
01. drop pit table august 2016Amin Paniwala
 
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...Yole Developpement
 
Norwegian rapporterar det bästa rörelseresultatet någonsin – köper ytterligar...
Norwegian rapporterar det bästa rörelseresultatet någonsin – köper ytterligar...Norwegian rapporterar det bästa rörelseresultatet någonsin – köper ytterligar...
Norwegian rapporterar det bästa rörelseresultatet någonsin – köper ytterligar...Norwegian Air Shuttle AB
 
Ascent Energy Global_Power
Ascent Energy Global_PowerAscent Energy Global_Power
Ascent Energy Global_PowerConnor Mead
 
20120209 aqp h1 2012 presentation final
20120209 aqp h1 2012 presentation final20120209 aqp h1 2012 presentation final
20120209 aqp h1 2012 presentation finalspringweb
 
Future wind power forecast errors, and associated costs in the Swedish power ...
Future wind power forecast errors, and associated costs in the Swedish power ...Future wind power forecast errors, and associated costs in the Swedish power ...
Future wind power forecast errors, and associated costs in the Swedish power ...Winterwind
 
Wgcme 0.6 email (2)
Wgcme 0.6 email (2)Wgcme 0.6 email (2)
Wgcme 0.6 email (2)walid najd
 
Ve modify-compact-substation
Ve modify-compact-substationVe modify-compact-substation
Ve modify-compact-substationKamran Uddin
 
Shaft mounted gearbox from Kavitsu
Shaft mounted gearbox from KavitsuShaft mounted gearbox from Kavitsu
Shaft mounted gearbox from KavitsuKaustubh Phadtare
 
CS electric Control Panel Product presentation
CS electric Control Panel Product  presentationCS electric Control Panel Product  presentation
CS electric Control Panel Product presentationMahesh Chandra Manav
 
Maximiliano Martinhao - Rules and Procedures Related to Certification in Brazil
Maximiliano Martinhao - Rules and Procedures Related to Certification in BrazilMaximiliano Martinhao - Rules and Procedures Related to Certification in Brazil
Maximiliano Martinhao - Rules and Procedures Related to Certification in BrazilMIT Forum of Israel
 
Torque systems mdm_stainless_steel_series_product_guide
Torque systems mdm_stainless_steel_series_product_guideTorque systems mdm_stainless_steel_series_product_guide
Torque systems mdm_stainless_steel_series_product_guideElectromate
 

Similar to Presentation (20)

SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
Reliable sponge pvt ltd-hot-dip-galvanizing
Reliable sponge pvt ltd-hot-dip-galvanizingReliable sponge pvt ltd-hot-dip-galvanizing
Reliable sponge pvt ltd-hot-dip-galvanizing
 
Cps Bud
Cps BudCps Bud
Cps Bud
 
01. drop pit table august 2016
01. drop pit table  august 201601. drop pit table  august 2016
01. drop pit table august 2016
 
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Norwegian rapporterar det bästa rörelseresultatet någonsin – köper ytterligar...
Norwegian rapporterar det bästa rörelseresultatet någonsin – köper ytterligar...Norwegian rapporterar det bästa rörelseresultatet någonsin – köper ytterligar...
Norwegian rapporterar det bästa rörelseresultatet någonsin – köper ytterligar...
 
Ascent Energy Global_Power
Ascent Energy Global_PowerAscent Energy Global_Power
Ascent Energy Global_Power
 
20120209 aqp h1 2012 presentation final
20120209 aqp h1 2012 presentation final20120209 aqp h1 2012 presentation final
20120209 aqp h1 2012 presentation final
 
Future wind power forecast errors, and associated costs in the Swedish power ...
Future wind power forecast errors, and associated costs in the Swedish power ...Future wind power forecast errors, and associated costs in the Swedish power ...
Future wind power forecast errors, and associated costs in the Swedish power ...
 
Merge
MergeMerge
Merge
 
Wgcme 0.6 email (2)
Wgcme 0.6 email (2)Wgcme 0.6 email (2)
Wgcme 0.6 email (2)
 
Ve modify-compact-substation
Ve modify-compact-substationVe modify-compact-substation
Ve modify-compact-substation
 
Shaft mounted gearbox from Kavitsu
Shaft mounted gearbox from KavitsuShaft mounted gearbox from Kavitsu
Shaft mounted gearbox from Kavitsu
 
CS electric Control Panel Product presentation
CS electric Control Panel Product  presentationCS electric Control Panel Product  presentation
CS electric Control Panel Product presentation
 
Hallin Marine
Hallin MarineHallin Marine
Hallin Marine
 
Maximiliano Martinhao - Rules and Procedures Related to Certification in Brazil
Maximiliano Martinhao - Rules and Procedures Related to Certification in BrazilMaximiliano Martinhao - Rules and Procedures Related to Certification in Brazil
Maximiliano Martinhao - Rules and Procedures Related to Certification in Brazil
 
APOEM PLANT LAUNCH
APOEM PLANT LAUNCHAPOEM PLANT LAUNCH
APOEM PLANT LAUNCH
 
COBRA PRESENTATION
COBRA  PRESENTATIONCOBRA  PRESENTATION
COBRA PRESENTATION
 
Torque systems mdm_stainless_steel_series_product_guide
Torque systems mdm_stainless_steel_series_product_guideTorque systems mdm_stainless_steel_series_product_guide
Torque systems mdm_stainless_steel_series_product_guide
 

More from Jogendra Yadvendu

Wheel Slide Protection System in LHB FIAT Railway Coaches
Wheel Slide Protection System in LHB FIAT Railway  CoachesWheel Slide Protection System in LHB FIAT Railway  Coaches
Wheel Slide Protection System in LHB FIAT Railway CoachesJogendra Yadvendu
 
Brake binding in Rolling Stock
Brake binding in Rolling StockBrake binding in Rolling Stock
Brake binding in Rolling StockJogendra Yadvendu
 
Electric locomotives of Indian Railways
Electric locomotives of Indian RailwaysElectric locomotives of Indian Railways
Electric locomotives of Indian RailwaysJogendra Yadvendu
 
Just do it.: A unflinching saga of change in a typical government setup
Just do it.: A unflinching saga of change in a typical government setupJust do it.: A unflinching saga of change in a typical government setup
Just do it.: A unflinching saga of change in a typical government setupJogendra Yadvendu
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduJogendra Yadvendu
 
Dignity of labour by yadvendu
Dignity of labour by yadvenduDignity of labour by yadvendu
Dignity of labour by yadvenduJogendra Yadvendu
 
You get what you want: The saga of Matunga Workshop
You get what you want: The saga of Matunga WorkshopYou get what you want: The saga of Matunga Workshop
You get what you want: The saga of Matunga WorkshopJogendra Yadvendu
 
Old & new office yadvendu lower parel yadvendu
Old & new office yadvendu lower parel yadvenduOld & new office yadvendu lower parel yadvendu
Old & new office yadvendu lower parel yadvenduJogendra Yadvendu
 
Changes at Carriage Workshop, Lower Parel, Mumbai, India
Changes at Carriage Workshop, Lower Parel, Mumbai, IndiaChanges at Carriage Workshop, Lower Parel, Mumbai, India
Changes at Carriage Workshop, Lower Parel, Mumbai, IndiaJogendra Yadvendu
 
Depot Modernisation Parel Wr
Depot Modernisation   Parel   WrDepot Modernisation   Parel   Wr
Depot Modernisation Parel WrJogendra Yadvendu
 

More from Jogendra Yadvendu (14)

Wheel Slide Protection System in LHB FIAT Railway Coaches
Wheel Slide Protection System in LHB FIAT Railway  CoachesWheel Slide Protection System in LHB FIAT Railway  Coaches
Wheel Slide Protection System in LHB FIAT Railway Coaches
 
Brake binding in Rolling Stock
Brake binding in Rolling StockBrake binding in Rolling Stock
Brake binding in Rolling Stock
 
Electric locomotives of Indian Railways
Electric locomotives of Indian RailwaysElectric locomotives of Indian Railways
Electric locomotives of Indian Railways
 
Just do it.: A unflinching saga of change in a typical government setup
Just do it.: A unflinching saga of change in a typical government setupJust do it.: A unflinching saga of change in a typical government setup
Just do it.: A unflinching saga of change in a typical government setup
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Dignity of labour by yadvendu
Dignity of labour by yadvenduDignity of labour by yadvendu
Dignity of labour by yadvendu
 
You get what you want: The saga of Matunga Workshop
You get what you want: The saga of Matunga WorkshopYou get what you want: The saga of Matunga Workshop
You get what you want: The saga of Matunga Workshop
 
Old & new office yadvendu lower parel yadvendu
Old & new office yadvendu lower parel yadvenduOld & new office yadvendu lower parel yadvendu
Old & new office yadvendu lower parel yadvendu
 
Changes at Carriage Workshop, Lower Parel, Mumbai, India
Changes at Carriage Workshop, Lower Parel, Mumbai, IndiaChanges at Carriage Workshop, Lower Parel, Mumbai, India
Changes at Carriage Workshop, Lower Parel, Mumbai, India
 
Rfid Basics Qed
Rfid Basics QedRfid Basics Qed
Rfid Basics Qed
 
Amrs
AmrsAmrs
Amrs
 
Peb
PebPeb
Peb
 
Pre Bid Conference
Pre Bid ConferencePre Bid Conference
Pre Bid Conference
 
Depot Modernisation Parel Wr
Depot Modernisation   Parel   WrDepot Modernisation   Parel   Wr
Depot Modernisation Parel Wr
 

Presentation

  • 1. Modernization of Stores Depot Lower Parel through Intelligent Warehousing with Automated Storage and retrieval System Jogendra Yadvendu Dy.CMM-II,CCG, WR
  • 2. Modernization of Carriage Stores Depot at Carriage Repair Workshop, Lower Parel, Western Railway Carriage Stores Depot at Lower Parel is the biggest Stores  Depot on Western Railway. Annual material issues value of Rs. 600 Million.  Accounts for approximately 25 % of the annual issues on  Western Railway. Caters to Carriage Workshop & Divisional Consignees (29).  It stocks around 1200 stock items out of which 167 are  safety, 257 are vital, 38 passenger amenity items . LHB Coach is a new technology with many items being  imported and limited indigenous vendors
  • 3. Major activity at Parel Workshop Activity Type 2006-07 07-08 (estimate) POH ICF 1531 1550 LHB 62 36 Refurbishment of toilets, Laying of RSP ICF Stainless Steel Inlay, changing LP Sheet, Limpet Sheet Refurbishment of toilets, changing the LHB main door
  • 4. What does modernization involve ? Pragmatic mix of IW-ASRS, Drive in Pallet System,  Selective Pallet System, conveyor systems etc. Structurally strong building with adequate free  height for vertical storage. Adequate material handling equipments and  transportation facilities such as platform trucks, forklifts , LMV, HMV . RDBMS based IT application for purchase &  Inventory management with adequate Hardware resources.
  • 5. Estimated cost of the project Sanctioned in M&P Program for the year 2007-08  under plan head 42. Cost: Rs. 138 Million.  Components involved;  IW-ASRS;  Drive in Pallet & Selective Pallet System.  3 & 5 Ton Forklift  5 Ton Road Crane  Truck 9 & 16 Ton  Multi-utility Vehicle  Platform Trucks & Others.  3 Ton EOT Crane. 
  • 6. Why use IW-ASRS at Parel Depot Parel workshop has one of the smallest footprint to  Coach POH ratio. Located in the heart of Metropolitan city-Mumbai  with costly land where lateral expansion is not an option. POH target of ICF, LHB increasing.  Area can be released for workshop modernization &  expansion activities only by releasing the dead space being occupied by multifarious stores godowns. This is where IW-ASRS comes into play.  IW-ASRS utilizes vertical storage capacity leading to  efficient storage & retrieval
  • 7. Proposed site at Lower Parel Central ward of Parel Depot  Measures 50m * 45 m  50% area with mezzanine floor  Max. free height available 6 m.  Free height available in mezzanine area  is 3 m. Cemented flooring. 
  • 8. General Specifications of IW-ASRS S/R Machine:  Construction: Modular component design. All parts designed  for 100% duty cycle. Welded steel frame. Single mast tube, strut braced. Structural steel base. Drive and Idler Wheels: Flanged forged alloy steel. Case  Hardened to 55 Rockwell C. Reground for concentricity. Heavy-duty pillow block bearing support. Fork Extractor Mechanism:  • Construction: Precession fabricated steel  • Load Capacity: 1500 Kg.  • Load Support: Industrial Standard Forks  • Extractor Drive: Patented ball screw and rotator with  variable frequency drives, industrial gear reducers, and brake.
  • 9. Crane Rail with V-H Drives Crane Rail:  • Floor mounted , Rail mounted .  Vertical & Horizontal Drives:  High performance sine-coded, pulse width modulated AC  vector motor drives which generates an adjustable voltage/ frequency three phase output for complete speed control. Automatic stall prevention and voltage boost prevents  nuisance tripping during load or line side transient conditions. The drives will not induce any voltage or distortion back  into the utility line and maintains a displacement power factor of not less than 0.98 throughout its speed range.
  • 10. Communication & Controls Communication:  • Infrared Modem  S/R Machine Controls:  Electrical Components: IEEE code compliance  throughout. IEEE rated enclosure, sensors, and wiring. Panel-mounted diagnostic indicator lights. Panel-mounted maintenance controls. Logistics and Positioning: Onboard  programmable controller A-B SLC-500® communication by infrared modem. Steel code bar, optical address readers. Fine positioning, motor-mounted resolvers with 1/16'' accuracy or 1 deg. Accurate positioning on start-up.
  • 11. Rack & Pallets Safeguards:  Front and rear aisle-obstruction detectors. Onboard  and off-board emergency stops. Load and centering sensors and interlocks. Rack Structure:  Virtually any post and beam (conventional) existing or  new racks capable of safely bearing the pallet loads (pushback and flow rack). Continuity of vertical shelf distance from floor not required. Common depth dimension recommended, but differing depths can often be accommodated. Racks must be attached to the floor but no shimming is needed except with extreme floor conditions. Maximum Height: 100 ft.  Pallets:  Any two or four way pallet capable of being used. 
  • 12. Activities involved in ASRS Civil Engineering work of site preparation  Leveled flooring with adequate bearing  capacity Adequate free height for 15-20 m for  vertical storage & movement of vertical crane. New light weigh roof  Power requirements 
  • 13. Modus Operandi of execution Prepare detailed sub estimate of electrical, civil & mechanical  portion . Obtain sanction of respective HOD.  Prepare STR & DPR.  Obtain sanction of GM.  Prepare material schedules for purchase components .  Prepare tender schedule for works portion.  Obtain dispensation from COFMOW.  Float only one works tender to take care of mechanical, civil as  well as electrical work to be carried out by a single agency on a turn key basis. Have provision for operation for 2 years by the contracting  agency along with training to be followed by five years comprehensive AMC.
  • 14. 0 100 200 300 400 500 600 700 Preliminary 07 Work JULY- Detailed 3030 30 60 Estimate 15 7 AUG-07 DPR & STR 75 Associate 15 07 15 finance vetting 90 HOD’s 10 07 30 Approval 100 HQ finance 10 07 20 SEPT - SEPT OCT vetting 110 GM’s Sanction 10 120 COFMOW 30 OCT 07 Dispensation Material 30 07 30 NOV schedule 150 5 Works Tender 155 FEB 08 Advertised 45 tender 200 Tender 90 deliberations 290 Placement of 15 08 15 DEC 071 1 MAY 15 08 MAY work order 305 Engineering 180 08 Construction 485 ASRS 90 Assembly & 575 Testing 15 15 15 FEB 1 Commissioning 09 NOV 09 APRIL 590
  • 15. Management of stores functions during construction in central ward Shift the employees to the new office  building coming up under GM’s Power. Shift bogie items to bogie sub stores.  Create sub stores in paint shop for paint  items & use the released space for bogie components. Create sub store in furnishing for  furnishing items. Use timber ward for large & costly stores.  Use jumbo siding for heavy, big stores. 
  • 16. !
  • 17. PLAN, ELEVATION & SECTION OF PAREL STORES DEPOT
  • 18. FRONT VIEW OF IW-ASRS AT PAREL STORES DEPOT
  • 19. TOP VIEW OF PAREL STORES DEPOT WITH IW-ASRS
  • 20. PALLET & SECTION AT “C”
  • 21. Generation of Barcode at Purchaser’s Premises Barcode Components •Vendor ID •Item Code •Consignee Code •Order No, Date
  • 22. ADC Technologies Voice systems  RFID  OCR  pick-to-light  laser scanners  Bar-coding  CCD scanners  hand-held batch and RF terminals  vehicle-mounted computers  wearable computers 

Editor's Notes

  1. <number><number>
  2. <number>
  3. <number>
  4. <number>
  5. <number>
  6. <number>
  7. <number>
  8. <number>
  9. <number>
  10. <number>
  11. <number>
  12. <number>
  13. <number>
  14. <number>
  15. <number>
  16. <number>
  17. <number>
  18. <number>