01. company profile 2018 (wooil)

620 views

Published on

Perusahaan yang bergerak dibidang Konstruksi dan permesinan

Published in: Engineering
  • Be the first to comment

  • Be the first to like this

01. company profile 2018 (wooil)

  1. 1.  1  1  Head Office/ Factory Jl.Raya Pasar kemis - Rajeg Kel.Sindangsari, Pasar Kemis Tangerang – Banten Tlp : 021-59350606 Fax : 021-59350123 Email : wooilindonesia@gmail.com
  2. 2. Company Profile1 Business Fields2 Location View3 Organization of Company4  2  2  Picture of Workshop5 Experience Project7 List of Equipment6 List of Clients8
  3. 3. 1. Company Profile1. Company Profile1. Company Profile1. Company Profile Location : Tangerang, Banten, Indonesia1 Registered Name : PT. WOO IL INDONESIA2 Office Address : JL.RAYA PASAR KEMIS No. 25, SINDANGSARI PASAR KEMIS, SINDANGSARI, TANGERANG 15560, BANTEN, 3 Authorized Capital : US$ 4,200,0004 Total Asset : US$ 14,250,0005  3  3  Total Asset : US$ 14,250,0005 Tel No. : + 62 -21- 5935-0101 / Fax No. + 62 -21-5935-01236 Work Shop : Shop (8,023m2) / Yard (44,560m2)7 Established : JUNE 30, 19898 CEO & Major Share Holder : Jung, Sung-Koo9 Education & Experience : Gim Hae, South Korea Korea University, Seoul Worked for S-Oil Refinery Co., Ltd. Seoul
  4. 4. 2. Business fields2. Business fields2. Business fields2. Business fields <Business fields> 1. Steel Structure Fabricator and Erection, Machining Manufacture 2. Industrial Machinery Manufacturing & Erection for the Factory, Refinery and other processing plant. 3. Fabrication of Conveyor, Vessel, Storage tank and Silo. 4. Various Steel Structural Products. 5. Fabrication of Production line for Plywood, Tyre making Machinery 6. Ducting, Piping, Hydraulic ,Pneumatic and Electrical Work  4  4  <Business fields> 1. Steel Structure Fabricator and Erection, Machining Manufacture 2. Industrial Machinery Manufacturing & Erection for the Factory, Refinery and other processing plant. 3. Fabrication of Conveyor, Vessel, Storage tank and Silo. 4. Various Steel Structural Products. 5. Fabrication of Production line for Plywood, Tyre making Machinery 6. Ducting, Piping, Hydraulic ,Pneumatic and Electrical Work Head Office Jl.Raya Pasar kemis-Rajeg No.25, Kel.Sindangsari, Pasar Kemis Kab.Tangerang – Banten, Tlp : 021-59350606, Fax : 021-59350123 Email : wooilindonesia@gmail.com
  5. 5. 22. 1. 1 Business fieldsBusiness fields22. 1. 1 Business fieldsBusiness fields  5  5  7. Plastic Extrusion Machinery – Screw Barrel, Extrusion Mould and Electric Panel 8. Transfer Car, Ware house Drive in Rack.
  6. 6.  6  6  IPCR – Indonesia Posco Chosun Refractories Cilegon - Banten Fabrication of whole refractory making facility  Structure S/Bin for Mud, D/C & H/S Mixer  Mud Mixer, D/C Mixer & H/S Mixer  Skip Hoist for Mud Mixer, D/C Mixer & H/S Mixer  Mixer Deck Mud,D/C & H/S  Transfer Car  Tar Tank
  7. 7. KRAKATAU POSCO PROJECT Cilegon, Banten – Indonesia BLAST FURNACE  FURNACE TOP  Steel Structure, Platform & Stair  Bleeder Valve Inspection Deck  CASTHOUSE  Mould for Main Iron Runner  Mould for Tilting Runner  Main Iron Trough Cover  7  7  KRAKATAU POSCO PROJECT Cilegon, Banten – Indonesia BLAST FURNACE  FURNACE TOP  Steel Structure, Platform & Stair  Bleeder Valve Inspection Deck  CASTHOUSE  Mould for Main Iron Runner  Mould for Tilting Runner  Main Iron Trough Cover
  8. 8.  8  8  DONG SUH Chemical Project Cikande – Banten PROCESS AREA  Steel Construction  Mazzanine Floor  Stair and Deck  Handrail BOILER HOUSE  Steel Construction COMPRESSOR HOUSE  Steel Construction PIPE RACK  Steel Construction DRYER STRUCTURE  Steel Construction WARE HOUSE  Steel Construction PACKING HOUSE  Steel Construction
  9. 9.  9  9  KING POST SAMSUNG C&T INTERNATIONAL FINANCIAL CENTER II
  10. 10. RACK SYSTEM  Drive Rack Raw Material  Pallet Rack  Second Floor Rack  10  10  RACK SYSTEM  Drive Rack Raw Material  Pallet Rack  Second Floor Rack
  11. 11.  11  11  STEEL STRUCTURE CLYDE BERGERMANN Mong Duong II 2x560MW (NET) Coal Fired Power Project -Vietnam :  Internal Platform Silo # & Silo #2  Pipe Rack for Silo #1 & Silo #2  Pre – Heating hanging Platform  Pipe Bridges for Silo #1 & Silo #2  Maintenance Hoist  Roof Hoist
  12. 12.  12  12  STACKER RECLAIMER PT. CIKARANG LISTRINDO Power Plant CFPP 3 x 140 MW Fuel Handling System Scope :  Drive Truck, Portal, Slewing Platform  Boom Head & Structure, Bucket Wheel  Pylon, Counter Weight Boom  Boom Stay, Tie Rod, Luffing Drive  Tripper Structure, Electric House
  13. 13.  13  13  GRAB TYPE SHIP UNLOADER PT. CIKARANG LISTRINDO Power Plant CFPP 3 x 140 MW Fuel Handling System Scope :  Gantry & Base Rail  Land Side Frame & Water Side Frame  Girder Frame, Deflector Sheave  M-House Electric House  M-House Electric Support  Ect part for GTSU
  14. 14.  14  14  WATER BASED MIXER TANK PT. GRAND CHEMICAL - SERANG Chemicals and Glue Plant Scope :  Reactor Tank 6 Tons  Free Mixer Tank 4,5 Tons  Catalyst Tank 300 Ltr  Condensate 20M2  Ect part for Chemical Mixer
  15. 15.  15  15  TILTING TABLE FORMS PT. Ninive Casseforme S.R.L - ITALY Project PT.Adhimix Precast Cikarang Scope :  Tilting Table Forms 4000X12000  Support For Table Frame  Cross Beam  Longitudinal U Channel
  16. 16.  16  16  FALSE SEGMENT & BEAM FOR RAIL PT. COMTEC TCS – ITALY Project DDT Manggarai - Jakarta Scope :  False Segment  Beam For Rail  Suspension Spreader  Central Rail  Walkway
  17. 17.  17  17  PIER HEAD SIDE FORM PT. Ninive Casseforme S.R.L - ITALY Project PT.Adhimix Precast karawang Scope :  Side Form  Walkway Support  Side Form Parapet  Carring Trolley  Prop End Form
  18. 18.  18  18  Steel Frames For Job (USA) PT. Ninive Casseforme S.R.L - ITALY Project Steel Frames For Job 2017-076 Scope :  Bottom Beam  Tiltable  Beam For Tie Rod  Catwalk  Parapet
  19. 19.  19  19  Handrail & Galleries PLTU LONTAR PT. Cilegon Fabricator - Cilegon Project PLTU Lontar - Banten Scope :  Handrail  Platform  Walkway  Purlin , Post & Roof Beam  Outer Casing
  20. 20.  20  20  Multi Purpose Gas Holder 80.000 CBM PT. Angel Engineering – Cilegon Scope :  Erection Tools
  21. 21.  21  21  Plywood Factory Equipment PT. Wijaya Triutama Plywood Indonesia – Kalimantan Scope :  Auto Stacker  Outfeed Automatic  Lifting Loader Automatic
  22. 22. 3. Location View3. Location View3. Location View3. Location View PT.WOOIL INDONESIA Jl.Raya Pasar Kemis-Rajeg No.25 Kel.Sindangsari, Pasar Kemis Tangerang – Banten Tlp.021-59350101, Fax.021-59350123 TOL JAKARTA – MERAK Guard Tol Kebon Jeruk  22  22  TOL JAKARTA – MERAK Guard Tol Cikupa-Kedaton https://www.google.com/maps/place/PT.+WOO+IL+INDONESIA/@-6.152371,106.532368,17z
  23. 23. 4.4. Organization OFOrganization OF CompanyCompany4.4. Organization OFOrganization OF CompanyCompany Engineering Manager CEO  23  23  <Status of Local Manpower> • Staff : 9 Person • Full time : 25 Person • Part time : 183 Person Project Team Fabrication Team Quality Control Quality Assurance Administration Division
  24. 24. 4.14.1 Project OrganizationProject Organization4.14.1 Project OrganizationProject Organization CLIENT Project Manager FABRICATION MANAGER QA / QC MANAGER ADM MANAGER PROJECT ENGINEER SINGLE CONTACT POINT WITH FULL RESPONSIBILITY  24  24  PROJECT CONTROL MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER COMMISSIONING MANAGER SCHEDULE COST CONTROL DOCUMENT CONTROL MATERIAL CONTROL OPTIMIZATION STUDY PROCESS SIMULATION BASIC ENGINEERING DETAILED ENGINEERING OPERATION SERVICES PURCHASING EXPEDITING INSPECTION TRAFFIC CONTROL CONST.MANAGEMENT FIELD ENGINEERING PROCUREMENT SAFETY FIELD QA/AC COMMISSIONING START-UP PERFORMANCE TEST FABRICATION MANAGER QA / QC MANAGER ADM MANAGER PROJECT ENGINEER
  25. 25. KOREAN INDONESIAN Managerial Staff 1 9 Administration 10 Engineers (Graduated) - Mechanical / Piping 1 7 - Electrical 3 - I & C 1 4 Surveyor 1 Drafter 3 Field Supervisor 1 2 Summary 4 39 4.24.2 Company OrganizationCompany Organization4.24.2 Company OrganizationCompany Organization  25  25  KOREAN INDONESIAN Managerial Staff 1 9 Administration 10 Engineers (Graduated) - Mechanical / Piping 1 7 - Electrical 3 - I & C 1 4 Surveyor 1 Drafter 3 Field Supervisor 1 2 Summary 4 39
  26. 26. Description Maximum Mobilization 1. Pipe Fitters 100 2. Steel Fabricator 100 3. Millwright or Mechanical 150 4. Riggers 40 5. Welders 80 6. Insulators 130 7. Painters 50 8. Vehicle Mechanics 20 9. Electricians 40 Total 710 4.34.3 Company OrganizationCompany Organization -- WORKER MobilizationWORKER Mobilization4.34.3 Company OrganizationCompany Organization -- WORKER MobilizationWORKER Mobilization  26  26  Description Maximum Mobilization 1. Pipe Fitters 100 2. Steel Fabricator 100 3. Millwright or Mechanical 150 4. Riggers 40 5. Welders 80 6. Insulators 130 7. Painters 50 8. Vehicle Mechanics 20 9. Electricians 40 Total 710
  27. 27. 55.. Picture of Work ShopPicture of Work Shop55.. Picture of Work ShopPicture of Work Shop Milling M/CBending M/C Radial Drill M/C Scraf M/C  27  27  Plano Miller Gun drill M/C Sharing Lathe M/C Bending M/C CNC Plasma & Flame Cutting M/C Multi Iron Work Machine (Punching,Shearing,Notch)
  28. 28. 5.5.1.1. Picture of Work ShopPicture of Work Shop5.5.1.1. Picture of Work ShopPicture of Work Shop  28  28  Band Saw Machine With Infeed Roller Conveyor and Outfeed Roller Conveyor For Cutting H-Beam, UNP, Angle, Pipe Lip Channal
  29. 29. 5.5.2.2. Picture of Work ShopPicture of Work Shop5.5.2.2. Picture of Work ShopPicture of Work Shop  29  29  CNC Plasma Cutting M/C- Hypertherm
  30. 30. Work Shop Work Shop 5.5.3.3. Picture of Work ShopPicture of Work Shop5.5.3.3. Picture of Work ShopPicture of Work Shop  30  30  Work Shop Factory Guard Work Shop
  31. 31. SHOT / SAND BLASTING AND PAINTING AREA 5.5.4.4. Picture of Work ShopPicture of Work Shop5.5.4.4. Picture of Work ShopPicture of Work Shop  31  31  SHOT / SAND BLASTING AND PAINTING AREA
  32. 32. No. Descriptions Qty. Unit 1. Overhead Crane 5 Ton 3 Unit 2. Overhead Crane 3 Ton 2 Unit 3. Gantry Crane 10 Ton 1 Unit 4. Fork Lift 5 Ton 1 Unit 5. Fork Lift 3 Ton 2 Unit 6. Milling Machine # 10. 1 Unit 7. Milling Machine # 5. 3 Unit No. Descriptions Qty. Unit 15. Portable Flame Cutting Machine 6 Unit 16. Automatic Flame Cutting Machine 3 Unit 17. Bench Grinder 3 Unit 18. Air Compressor, 100 HP, 50 HP, 15 HP 3 Unit 19. Cutting Wheel Machine 2 Unit 20. Level Automatic 2 Unit 21. Lathe Machine Max 6 Mtr, Swing 1.5 Mtr 5 Unit 66.. List of EquipmentList of Equipment66.. List of EquipmentList of Equipment  32  32  7. Milling Machine # 5. 3 Unit 8. Table Drill 2 Unit 9. Radial Drilling Machine 3 Unit 10. Plate Roll Bending Machine 15 T 2 Unit 11. Bending Machine 1 Unit 12. Magnetic Drill 13 Unit 13. Shearing Machine 6T 2 Unit 14. Scraf Machine 2 Unit 21. Lathe Machine Max 6 Mtr, Swing 1.5 Mtr 5 Unit 22. Planer Miller, width 1,8 mtr, length 15 mtr 1 Unit 23. Band Sawing Machine, H650, Armada 1 Unit 24. Band Sawing Machine, H350, Armada 1 Unit 25. CNC Cutting 2 Unit 26. CNC Plasma Cutting Machine, Hypertherm 1 Unit 27. Cutting M/C Automatic Rail 7 Unit 28. Multi Iron Work machine (Punching,Shearing,Notch) 1 Unit
  33. 33. No. Descriptions Qty. Unit Capacity 1. DIESEL ENGINE , ENGINE DEUTZ F3L-912 TAHUN 1997 45 Set MILLER BIG BLUE TYPE : 500DX - 500A / Weld output range : 45 - 500Amp / Rated welding output : 500A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz 2. DIESEL ENGINE, ENGINE DEUTZ F3L-912 TAHUN 2002 12 Set MILLER BIG BLUE TYPE : 602DX - 600A / Weld output range : 45 - 600Amp / Rated welding output : 600A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz 3. DIESEL ENGINE, ENGINE DEUTZ F3L-912 TAHUN 2002 1 Set MILLER BIG BLUE TYPE : 401DX - 400A / Weld output range : 45 - 400Amp / Rated welding output : 400A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz 4. DIESEL ENGINE, ENGINE DEUTZ F3L-912 2 Set MILLER BIG BLUE TYPE : 300A / Weld output range : 45 - 300Amp / Rated welding output : 300A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz DIESEL ENGINE, THERMAL ARC TA 20/500PS, TAHUN 2000 PERKINS 3.1524-500A / Welding current max : 500Amp / Duty cycle : 60 - 100% / Power : 36 HP (26KW) – 1500 RPM / Voltage : 230V/50Hz, 1 Phase, 12 KVA 66..11 List of EquipmentList of Equipment66..11 List of EquipmentList of Equipment  33  33  5. DIESEL ENGINE, THERMAL ARC TA 20/500PS, TAHUN 2000 12 Set PERKINS 3.1524-500A / Welding current max : 500Amp / Duty cycle : 60 - 100% / Power : 36 HP (26KW) – 1500 RPM / Voltage : 230V/50Hz, 1 Phase, 12 KVA 6. WELDING RECTIFIER , TAHUN 2001 60 Set DC Rectifier SRH 444 - 500A / Merk MILLER / 3 Phase, 220V/380V - 50Hz / Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding 7. AUTOMATIC WELDING, TAHUN 2005 1 Set Merk ESAB / Double Side Horizontal 8. WELDING RECTIFIER Year 2013 50 Unit DC Rectifier SRH 444 - 500A / MILLER / 3 Phase, 220V/380V - 50Hz / Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding 9. WELDING MACHINE Co2 50 Unit INVERTER, MIG Welding Riland 350 A 10. WELDING RECTIFIER 4 Unit MILLER Delta Weld 402 11. WELDING RECTIFIER, TAHUN 1998 7 Unit DC Rectifier 300 - 400A / AECO/DAIHEN/ESAB LHF 400 / 3 Phase, 220V/380V - 50Hz Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding
  34. 34. No. Descriptions Qty. Unit Capacity 12. WELDING RECTIFIER TAHUN 1998 1 Unit DC Rectifier 400A / THERMAL ARC 400 GTS / 3 Phase, 220V/380V - 50Hz Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) / Titanium Welding 13. WIRE FEEDER (CO) TAHUN 2000 2 Unit DC ARC VOLTAGE 15 - 40V - 400A / LINCOLN - LN 25 / 3 Phase, 220V/380V - 50Hz MIG Welding 14. WIRE FEEDER (CO) TAHUN 2000 2 Unit DC ARC VOLTAGE 15 – 40V - 400A / MILLER / 3 Phase, 220V/380V - 50Hz MIG Welding 15. PLASMA CUTTING MACHINE 1 Unit ESAB - PCM 875 / Max. Carbon Steel : 25mm / SUS Max. : 15mm 16. GENERATOR SET SOUND PROOF 1 1 Unit Unit DENYO - 180 SPK Mitsubishi – 100 KVA 66..22 List of EquipmentList of Equipment66..22 List of EquipmentList of Equipment  34  34  GENERATOR SET SOUND PROOF 1 1 Unit Unit DENYO - 180 SPK Mitsubishi – 100 KVA 17. GENERATOR SET , SOUND PROOF 2 Unit HOKUETSU / Cap. : PDG - 35KVA 18. SANDPOT 4 Set GRACO – USA / Cap. : 1M3 19. PAINTING 2 Set Cap. : 10 Liter
  35. 35. No. Descriptions Qty. Unit Capacity 21. FORKLIFT 3 Unit KOMATSU/MITSUBISHI Cap. : 3 Ton 22. CRANE TELESCOPIC, TAHUN 1982 1 Unit KATO, Cap. : 30T 23. CRANE TELESCOPIC, TAHUN 1997 1 Unit P & H, Cap. : 35T 24. CARGO CRANE, TAHUN 1997 1 Unit TADANO, Cap. : 3T 25. KOBELCO, TAHUN 1998 1 Unit YUTANI, Cap. : 0.8 M3 26. STONE WALES 1 Unit Tahun 1992 27. VEHICLE’S TRUCK ISUZU ELF 135 PS TRUCK MITSUBISHI PICK UP PANTHER PICK UP KIJANG DAIHATSU ROCKY 4WD HINO TRONTON (Blue) 4 2 2 1 1 1 Unit Unit Unit Unit Unit Unit Tahun 1997 Tahun 1997 Tahun 1997 Tahun 2003 Tahun 1995 Tahun 1998 66..3 List of Equipment3 List of Equipment66..3 List of Equipment3 List of Equipment  35  35  VEHICLE’S TRUCK ISUZU ELF 135 PS TRUCK MITSUBISHI PICK UP PANTHER PICK UP KIJANG DAIHATSU ROCKY 4WD HINO TRONTON (Blue) 4 2 2 1 1 1 Unit Unit Unit Unit Unit Unit Tahun 1997 Tahun 1997 Tahun 1997 Tahun 2003 Tahun 1995 Tahun 1998
  36. 36. CLIENT / LOCATION PROJECT NAME PROJECT PERIOD REMARK PT. SK KERIS 1) Fabrication & Erection Quenching Stack 1992. 06 ~ 1993.07 TANGERANG 2) Mechanical & Piping Work For Utility Area 1993. 09 ~ 1994.02 -WEST JAVAINDONESIA 3) Fabrication & Erection Work For Steel Structure , Piping & Equipment For ISBL Area 1994. 02 ~ 1995.11 4) Erection ISP- 4 Polyester Spinning M/C Piping Work 1995. 12 ~ 1997.04 5) Modification Cp-1 & Overhaul 1997. 09 ~ 1998.02 6) Sm#2 For ISP-7a Project 1998.10 ~ 1999.05 HYUNDAI DUTA GRAHA 1) Fabrication & Erection Steel Structure Work 1996.11 ~ 1997.05 PT. CHEIL JEDANG 1) Equipment Erection & Piping Installation 1997.07 ~ 2010.12 77.. Experience ProjectsExperience Projects77.. Experience ProjectsExperience Projects  36  36  PT. CHEIL JEDANG 1) Equipment Erection & Piping Installation 1997.07 ~ 2010.12 2) DISMANTLING & ERECTION OF PADDLE MIXER 2003.07 ~ 2009.12 PT. GARUDA TWIN JAYA 1) Fabrication & Erection Tape Coating Machine 1997.09, 2004.07 BOSOWA CEMENT PROJECT 1) Fabrication & Erection Work For Steel Structure 1997.09 ~ 2010.04 PT. SAMICK INDONESIA 1) Fabrication & Erection Water Painting System 1996.04 ~ 2003.02 2) Fabrication & Erection Duct Line 2003.02 ~ 2010.05 PT. ASPEX KUMBONG 1) Fabrication & Erection Auto Welding System for Container Line 1998.06 ~ 2011.01 PT. SEPARINDO INDUSTRY 1) Fabrication & Erection Equipment & Piping Work 2001.08 ~ 2008.03 PT. DOOSAN HEAVY INDUSTY 1) SIPAT AIR DUCT PROJECT 2005.07 ~ 2006.02 2) PSA - RTGC PROJECT 2006.3 ~ 2006.11 PT. GOLD STAR PAPERTECH 1) Installation Press System 2006.09 ~ 2007.12
  37. 37. CLIENT / LOCATION PROJECT NAME PROJECT PERIOD REMARK PT. Hankook Tyre 1) Tyre Making machinery 2011 ~ 2012 Cikarang, West Java 2) Hydraulic Trans machine 3) Fabrication & Erection Work 4) Transfer Car 5) Catridge Roller POCSO E&C Cilegon, Banten 1) Steel Structure Fabrication for Krakatau Steel 2) COG, Gas Holder Tank 3) Inspection Deck, Handrail for Blast Furnace 4) Iron Runner Mould Fabrication 5) Iron Runner Trough Fabrication 6) Mould Cover Fabriation 7) Duct, Flange, etc. 2012 .11~ 2013.12 77. 1. 1 Experience ProjectsExperience Projects77. 1. 1 Experience ProjectsExperience Projects  37  37  POCSO E&C Cilegon, Banten 1) Steel Structure Fabrication for Krakatau Steel 2) COG, Gas Holder Tank 3) Inspection Deck, Handrail for Blast Furnace 4) Iron Runner Mould Fabrication 5) Iron Runner Trough Fabrication 6) Mould Cover Fabriation 7) Duct, Flange, etc. IPCR (Refractory making Factory) 1) Storage Tank 72 Set 2) Steel Structure 3) Mud Making machinery 4) Hoist Crane 2013 .02~ 2013.09 Cilegon, Banten Dong Suh Chemical Cikande, Banten 1) Steel Structure for Chemical Plant 2) Process Are Building 3) Boiler House Constrution 4) Compressor House Construction 5) Ware House Constructoin 6) Packing House Construction 7) Pipe Rack Construction 2013 .06~ 2013.09
  38. 38. CLYDE BERGEMANN Mong Duong II wx560MW (NET) Coal Fired Power Project Vietnam 1) Internal Platform Silo #1 & Silo #2 2) Steel Structure & Pipe Rack 3) Silo 1 & 2 Maintenance Hoist 4) Silo 1 & 2 Roof Hoist 5) Pipe Support & Hangers 6) Cast Plates, Pipe Support, Hangers 7) Pre-Heater Hanging Platform Unit 1 & 2 2013 .09~ 2013.12 PT. CIKARANG LISTRINDO CFPP 3x140MW Power Plant Fuel Handling System Indonesia STACKER RECLAIMER = 2 Unit 1) Drive Truck, Portal, Slewing Platform 2) Boom Head & Structure, Bucket Wheel 3) Pylon, Counter Weight Boom 4) Boom Stay, Tie Rod, Luffing Drive 5) Tripper Structure, Electric House 6) Ect part for STRE 2014 .08~ 2015.07 77. 2. 2 Experience ProjectsExperience Projects77. 2. 2 Experience ProjectsExperience Projects  38  38  PT. CIKARANG LISTRINDO CFPP 3x140MW Power Plant Fuel Handling System Indonesia GRAP TYPE SHIP UNLOADER = 2 Unit 1) Gantry, Base Rail 2) Land Side Frame, Water Side Frame 3) Girder Frame, Deflector Sheave 4) M-House Electric House 5) M-House Electric Support 6) Ect part for GTSU 2014 .08~ 2015.07 PT. GRAND CHEMICAL INDONESIA Industrial Chemicals Serang, Banten - Indonesia WATER BASED MIXER TANK 1) Reactor Tank 6 Tons 2) Free Mixer 4,5 Tons 3) Catalyst Tank 300 Ltr 4) Condensate 20M2 5) Duct Exchaust for Area 2015 .12~ 2016.03
  39. 39. Tilting Table Forms PT. Ninive Casseforme S.R.L - ITALY Project PT.Adhimix Precast Cikarang 1) Tilting Table Forms 4000x12000 2) Support For Table Frame 3) Cross Beam 4) Longitudinal U Chanell 2016 .06~ 2016.12 FALSE SEGMENT & BEAM FOR RAIL PT. Comtec TCS – ITALY Project DDT Manggarai - Jakarta 1) False Segment 2) Beam For Rail 3) Suspension Spreader 4) Central Rail 5) Walkway 2017 .03~ 2017.09 77. 3. 3 Experience ProjectsExperience Projects77. 3. 3 Experience ProjectsExperience Projects  39  39  PIER HEAD SIDE FORM PT. Ninive Casseforme S.R.L - ITALY Project PT.Adhimix Precast karawang 1) Side Form 2) Walkway Support 3) Side Form Parapet 4) Carring Trolley 5) Prop End Form 2017 .10~ 2018.01 Steel Frames For Job (USA) PT. Ninive Casseforme S.R.L - ITALY Project Steel Frames For Job 2017-076 1) Bottom Beam 2) Tiltable 3) Beam For Tie Rod 4) Catwalk 5) Parapet 2017 .10~ 2018.03
  40. 40. Handrail & Galleries PLTU LONTAR PT. Cilegon Fabricator - Cilegon Project PLTU Lontar - Banten 1) Handrail 2) Platform 3) Walkway 4) Purlin , Post & Roof Beam 5) Outer Casing 2017 .11~ Present Multi Purpose Gas Holder 80.000 CBM PT. Angel Engineering - Cilegon 1) Erection Tools 2018.02 ~ 2018.04 77. 4. 4 Experience ProjectsExperience Projects77. 4. 4 Experience ProjectsExperience Projects  40  40  Plywood Factory Equipment PT. Wijaya Triutama Plywood Indonesia – Kalimantan 1) Auto Stacker 2) Outfeed Automatic 3) Lifting Loader Automatic 2018.01 ~ 2018.04
  41. 41. List of CLIENT List of CLIENT PT. KRAKATAU STEEL PT. ASPEX KUMBONG PT. CHEIL JEDANG PT. HANKOOK CERAMIC PT. DOOSAN HEAVY INDUSTRY PT. SAMICK INDONESIA PT. HYUNDAI HEAVY INDUSTRY PT. INNE DONGHWA PT. KALIMAS PLYWOOD PT. INDAH KIAT PT. INTI INDORAYON UTAMA PT. KAYU LAPIS PT. RIMBUNAN HIJAU PT. DONG INNE PT. WAENIBE PT. WIJAYA GROUP PT. SUMBER GRAHA SEJAHTERA PT. KOSTRAMAS JAYA PT. BASIRIH INDUSTRI PT. PUTRA SUMBER UTAMA PT.SK KERIS PT. POSCO E&C PT. HANJUNG Heavy Industry PT. HASKO JAYA PT. TIRTA MAHAKAM PT. HANKOOK TYRE PT. PANCA USAHA PALOPO PT. SEPARINDO PT. LEEWON PT. BOSUNG INDONESIA PT. FEDERAL TIRE PT. GARUDA TWINJAYA PT. DONGSUNG CHEMICAL PT. DAESHIN PT. EURASIA WOOD PT. ABHIRAMA KRESNA PT. OMEGA PRIMAWOOD PT. BALIKPAPAN FOREST PT. BADE MAKMUR ORISSA PT. PRATAMA ABADI PT. KRAKATAU POSCO PT. TEKNIKO INDONESIA PT. CIKARANG LISTRINDO PT. GRAND CHEMICAL INDONESIA 8.8. List of ClientsList of Clients8.8. List of ClientsList of Clients  41  41  PT. KRAKATAU STEEL PT. ASPEX KUMBONG PT. CHEIL JEDANG PT. HANKOOK CERAMIC PT. DOOSAN HEAVY INDUSTRY PT. SAMICK INDONESIA PT. HYUNDAI HEAVY INDUSTRY PT. INNE DONGHWA PT. KALIMAS PLYWOOD PT. INDAH KIAT PT. INTI INDORAYON UTAMA PT. KAYU LAPIS PT. RIMBUNAN HIJAU PT. DONG INNE PT. WAENIBE PT. WIJAYA GROUP PT. SUMBER GRAHA SEJAHTERA PT. KOSTRAMAS JAYA PT. BASIRIH INDUSTRI PT. PUTRA SUMBER UTAMA PT.SK KERIS PT. POSCO E&C PT. HANJUNG Heavy Industry PT. HASKO JAYA PT. TIRTA MAHAKAM PT. HANKOOK TYRE PT. PANCA USAHA PALOPO PT. SEPARINDO PT. LEEWON PT. BOSUNG INDONESIA PT. FEDERAL TIRE PT. GARUDA TWINJAYA PT. DONGSUNG CHEMICAL PT. DAESHIN PT. EURASIA WOOD PT. ABHIRAMA KRESNA PT. OMEGA PRIMAWOOD PT. BALIKPAPAN FOREST PT. BADE MAKMUR ORISSA PT. PRATAMA ABADI PT. KRAKATAU POSCO PT. TEKNIKO INDONESIA PT. CIKARANG LISTRINDO PT. GRAND CHEMICAL INDONESIA
  42. 42. List of CLIENT List of CLIENT PT. NINIVE CASSEFORME S.R.L – ITALY PT. COMTEC TCS – ITALY PT. CILEGON FABRICATOR PT. ANGEL ENGINEERING PT. WIJAYA TRIUTAMA PLYWOOD INDONESIA 8. 18. 1 List of ClientsList of Clients8. 18. 1 List of ClientsList of Clients  42  42 
  43. 43.  43  43  JL.RAYA PASAR KEMIS NO.25, KEC.PASAR KEMIS, DESA SINDANGSARI, TANGERANG 15560, BANTEN, INDONESIA Tel : + 62 - 21 - 5935 - 0606, Fax: + 62 - 21 - 5935 - 0123, Mobile : + 62 - 812 - 100 - 7151 Email: wooilskj@hotmail.com jesijames9@gmail.com

×