1st SQD Commo Plannex

6,114 views

Published on

This is the Communications Network Planning Exercise from Signal Corps BOLC. I was Squad Leader for this exercise.

Published in: Business
0 Comments
3 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
6,114
On SlideShare
0
From Embeds
0
Number of Embeds
16
Actions
Shares
0
Downloads
0
Comments
0
Likes
3
Embeds 0
No embeds

No notes for slide

1st SQD Commo Plannex

  1. 1. 1st Squadron, 91st Cavalry SBOLC PLANNEX PRESENTATION
  2. 2. General Outline <ul><li>Paragraph 5 of the Written OPORD. </li></ul><ul><li>Matrix Version of Annex H and a COMMS Card showing PACE to both higher and subordinate units. </li></ul><ul><li>Network diagrams for both voice and data networks. </li></ul><ul><li>Running estimate for the S6. </li></ul>
  3. 3. MISSION <ul><li>NLT D-Day, 1-91 CAV secures AO SABER and conducts FSO IOT isolate insurgents from the population and facilitate the restoration and legitimization of the local government the improvement of local national security forces and essential services. </li></ul>
  4. 4. COMMAND AND SIGNAL 5. COMMAND AND SIGNAL   a. Command . (1) The SQDN TOC is located at FOB Harris.   (2) The SQDN ALOC will be located at FOB Harris.   (3) The succession of command is SQDN CDR, SQDN XO, SQDN S3, SQDN TOC, and HHT commander.   b. Signal .   (1) MEDEVAC Freq: Primary 35.250, Secondary 32.500   (2) See Annex H  
  5. 5. Overview of Operations
  6. 6. 1 – 91 CAV Scheme of Movement
  7. 7. General PACE Plan Phase 1 - Higher P BFT A TACSAT C IRIDIUM E CELL PHONES Phase 1 - Lower P BFT A FM C IRIDIUM E CELL PHONES Phase 2 - Higher P NIPR/SIPR VOIP A NIPR/SIPR E-MAIL C BFT E TACSAT Phase 2 - Lower P FM A BFT C IRIDIUM E CELL PHONES Phase 3 - Higher P BFT A FM C TACSAT E CELL PHONES Phase 3 - Lower P FM A BFT C IRIDIUM E CELL PHONES E SCPT 1394E AN/PRC 148(MBITR) Pre-Deployment / Deployment Full Spectrum Operations Transfer of Authority / Recover in Place
  8. 8. Specialized PACE Plan PACE: ABN P UHF (385.000) A VHF (123.000) C FM (38.750) E TACSAT (CHANNEL 20) PACE: CAN P FM – Fires NET (45.500) A FM – COMMAND (69.525) C FM – PLATOON (60.550) E TACSAT (CHANNEL 20) PACE: AVIATION TOC P BFT A TACSAT (CHANNEL 20) C FM (55.500) E MIRC 8(MBITR) Air Battle Net (Chopper to Chopper) Combat Air Net (Chopper to Ground Forces)
  9. 9. Commo Card FM ORG NET ID Call sign 173 BCT CMD 200 Bayonet   CMD RTN 201     A/L 202     O/I 203     Fires 204   1-91 CAV CMD 205 Saber   CMD RTN 206     A/L 207     O/I 208   1-91 CAV A Troop Primary 230 Sandman   Secondary 231   1-91 CAV B Troop Primary 232 Bulldog   Secondary 233   1-91 CAV C Troop Primary 234     Secondary 235   1-91 CAV HHT Primary 236 Cobra   Secondary 237   MANN Emergency 239   1-503 IN CMD 209 Eagle 2-503 IN CMD 213 Rock 4-319 FA CMD 213 King SC TACSAT  NET AZM ELE BAND FREQ BCT CMD 190 35 WB 100 BCT Data 190 35 NB 101 1-91 CAV 190 35 NB 102 Single Channel Plain Text Freq       1-91 CAV 50.310      
  10. 10. OP HELLS FURY SAT CH 25 AO SABRE AO HARRIS 385.000 385.000 CH 25 CH 25 45.500 45.500 45.500 Phase 2 (FSO) <ul><li>AATFC- Bayonet 6 </li></ul><ul><li>GTC – Sabre 6 </li></ul><ul><li>AMC- PACKERS 6 </li></ul>ABN (Air Battle Net- How the aircraft speak to each other) P- UHF 385.000 CT or PT A- VHF 120.000 CT or PT C- FM 38.750 E- TACSAT Ch 20 CAN (Combat Aviation NET-How the aircraft speak to ground forces.) P- FM 45.500 (I use the Fires Net for the unit you are supporting. Since the FSO has to be monitoring the NET to clear airspace if there is a fires mission might as well use this net) A- FM 69.525 (This is the Ground units Co. Command Net) C- FM 60.550 (This is one of the PLT Nets that are on the mission) E- TACSAT Ch 20 (This is your Tacsat NET) <ul><li>MISC </li></ul><ul><li>Fires Net </li></ul><ul><li>FM 45.500 “FLYERS 2” </li></ul><ul><li>MEDEVAC </li></ul><ul><li>Primary FM 35.250 </li></ul><ul><li>Secondary FM 32.500 </li></ul>UHF FM TACSAT RETRANS AVN TOC P- BFT A- TACSAT Ch 20 C- FM 55.500 E- MiRC (From nearest ground unit to TOC MiRC)
  11. 11. SPEED COVERAGE MAP END OF PHASE 1
  12. 12. LOS BCT TOC LOS TACSAT JNN 1-91 CAV LOS NIPR SIPR CDR 1SG NIPR/SIPR CDR 1SG NIPR/SIPR CDR 1SG NIPR/SIPR TDMA <ul><li>1-503 IN & </li></ul><ul><li>2-503 IN </li></ul>STEP SITE KU terminal-TDMA KU terminal-FDMA HUB BN CDR HHC CDR BN XO BN S3 Network Diagrams for both Voice and Data Networks HHT 1-91 A TRP 1-91 B TRP 1-91 C TRP 1-91
  13. 13. S6 1 st Squad 6 Dec 2010 <ul><li>1-91 CAV secures AO Saber </li></ul><ul><li>MEDEVAC SC/PT, Primary 35.25, Alt 32.50 </li></ul><ul><li>All nets FH/CT using Zulu time </li></ul><ul><li>FM key change Thurs. 1600, challenge/reply daily at 1600 </li></ul><ul><li>Bump Plan: If compromise, Call “Budweiser” </li></ul><ul><li>x3 and change Julian date to +3 and get </li></ul><ul><li>new COMSEC from BDE TOC </li></ul><ul><li>LOS needs Retrans </li></ul><ul><li>Necessary to maintain redundancy for all comms </li></ul><ul><li>Weather may/may not effect operations </li></ul><ul><li>Supplied adequate means of transportation for personnel during each phase of the operation. </li></ul><ul><li>Provide redundant, reliable CNR X </li></ul><ul><li>Establish TOC for C4 support, establish ABCS X </li></ul><ul><li>Provide redundant reliable CPN, voice and data X X </li></ul><ul><li>Ensure proper COMSEC procedures in place X </li></ul><ul><li>Conduct BN COMMEX X </li></ul><ul><li>Identify key terrain effecting retrans placement X </li></ul><ul><li>S6 will get new COMSEC keys monthly, NLT 2 days prior to changeover X </li></ul><ul><li>Identify TACSAT azimuth and elevation X </li></ul><ul><li>Provide redundant power for generators X </li></ul><ul><li>Limited TACSAT </li></ul><ul><li>Thick Vegetation effects FM </li></ul><ul><li>ROE </li></ul><ul><li>OE-254 41 </li></ul><ul><li>ELECT KEY GEN TSEC/KG-84 1 </li></ul><ul><li>AN/VRC-89F (C) 5 </li></ul><ul><li>AN/VRC-92F (C) 40 </li></ul><ul><li>AN/VRC-104A 8 </li></ul><ul><li>AN/PSC-5 7 </li></ul><ul><li>AN/VRC-88F (C) 4 </li></ul><ul><li>AN/VRC-90F (C) 21 </li></ul><ul><li>AN/VRC-91F (C) 30 </li></ul><ul><li>AN/PRC-119F (C) 55 </li></ul><ul><li>AN/VRC-104 (V)3 32 </li></ul><ul><li>AN/PRC-148 (V)4 44 </li></ul><ul><li>Availability of TACSAT </li></ul><ul><li>Need Load sets for Freq hop </li></ul>Staff Section: Prepared By: DTG: Tasks: S I E Assumptions: Facts: Issues / Outstanding Key RFIs (Submit Thru Deputy BTL CPT) Assets Available Constraints

×