Virtual Server Implementation Presented by  HYUN
The Project objects <ul><li>Power saving server environment </li></ul><ul><li>Server resource  utilization </li></ul>
Virtual Server <ul><li>d </li></ul>
Virtual Networking implementation
Electricity power calculation <ul><li>A fluorescent light power consumption </li></ul><ul><ul><li>30 – 40 W </li></ul></ul>
Electricity power calculation <ul><li>General desktop/server’s power consumption </li></ul><ul><ul><ul><li>CPU :  100W </l...
Electricity power calculation <ul><li>General server power consumption </li></ul><ul><li>(per day) </li></ul><ul><li>230W ...
Electricity power calculation <ul><li>A fluorescent light power consumption </li></ul><ul><ul><li>30 – 40 W </li></ul></ul...
Power consumption comparison <ul><li>  VS </li></ul><ul><li>5 Physical    Virtual Server </li></ul><ul><li>servers </li></ul>
Power consumption comparison <ul><li>230W </li></ul><ul><li>x </li></ul><ul><li>5 </li></ul><ul><li>x </li></ul><ul><li>24...
Virtual Server Advantages <ul><li>Power saving  over multiple physical servers </li></ul><ul><li>Simplify  system administ...
Virtual Server disadvantages <ul><li>When host server machine crash, all virtual servers embedded in the server crash too....
Extra considerations for power saving <ul><li>General SATA HDD </li></ul><ul><li>13W </li></ul><ul><li>NAND flash memory –...
Extra considerations for power saving <ul><li>External USB HDD </li></ul><ul><li>3W – 5W </li></ul>
Extra considerations for power saving <ul><li>Power saving application </li></ul><ul><ul><li>Turning off the monitor </li>...
Design Overview <ul><li>e </li></ul>
Hardware List $8,990 Total equipment cost for the project $700 $700 HP T1500 XR UPS G2 1 $200 $200 17” LCD Monitor 1 $15 $...
Software List $5,591 Total software cost for the project $38 $38 Power saving application 1 $0 $0 Recording power consumpt...
MS Project 1day? Audit 15 7DAY Total 0.5 days Closeout Report 14 1.5 days? Closing 0.3 days Sketch of Change 13 0.5 days C...
Budget $17,590 Total $8,990 Hardware $5,600 Software Tools $3,000 Internal Staff Labor Expenditures
<ul><li>THANK YOU </li></ul>
Upcoming SlideShare
Loading in …5
×

Virtual Server Implementation

671 views

Published on

  • Be the first to comment

  • Be the first to like this

Virtual Server Implementation

  1. 1. Virtual Server Implementation Presented by HYUN
  2. 2. The Project objects <ul><li>Power saving server environment </li></ul><ul><li>Server resource utilization </li></ul>
  3. 3. Virtual Server <ul><li>d </li></ul>
  4. 4. Virtual Networking implementation
  5. 5. Electricity power calculation <ul><li>A fluorescent light power consumption </li></ul><ul><ul><li>30 – 40 W </li></ul></ul>
  6. 6. Electricity power calculation <ul><li>General desktop/server’s power consumption </li></ul><ul><ul><ul><li>CPU : 100W </li></ul></ul></ul><ul><ul><ul><li>RAM : 8W </li></ul></ul></ul><ul><ul><ul><li>Graphic card : 30W </li></ul></ul></ul><ul><ul><ul><li>Mother board : 20W </li></ul></ul></ul><ul><ul><ul><li>CD-ROM : 20W </li></ul></ul></ul><ul><ul><ul><li>HDD : 13W </li></ul></ul></ul><ul><ul><ul><li>Monitor : 40W </li></ul></ul></ul><ul><ul><li>------------------------------------------------------------------- </li></ul></ul><ul><ul><li>Total = 230W </li></ul></ul>
  7. 7. Electricity power calculation <ul><li>General server power consumption </li></ul><ul><li>(per day) </li></ul><ul><li>230W x 24(hours) = 5,520 Wh </li></ul><ul><li> = 5.5 KWh </li></ul><ul><li>5.5kWh  $ ? </li></ul>
  8. 8. Electricity power calculation <ul><li>A fluorescent light power consumption </li></ul><ul><ul><li>30 – 40 W </li></ul></ul><ul><ul><li>230W / 35W ≒ 6.5 </li></ul></ul><ul><ul><li> = </li></ul></ul>
  9. 9. Power consumption comparison <ul><li> VS </li></ul><ul><li>5 Physical Virtual Server </li></ul><ul><li>servers </li></ul>
  10. 10. Power consumption comparison <ul><li>230W </li></ul><ul><li>x </li></ul><ul><li>5 </li></ul><ul><li>x </li></ul><ul><li>24h </li></ul><ul><li>= </li></ul><ul><li>27.6kwh + a </li></ul>230W x 24h = 5.5kwh + a
  11. 11. Virtual Server Advantages <ul><li>Power saving over multiple physical servers </li></ul><ul><li>Simplify system administration by integrating all servers into one physical machine </li></ul><ul><li>Server hardware resource optimization </li></ul>
  12. 12. Virtual Server disadvantages <ul><li>When host server machine crash, all virtual servers embedded in the server crash too. </li></ul>
  13. 13. Extra considerations for power saving <ul><li>General SATA HDD </li></ul><ul><li>13W </li></ul><ul><li>NAND flash memory – SSD </li></ul><ul><li>1W </li></ul>
  14. 14. Extra considerations for power saving <ul><li>External USB HDD </li></ul><ul><li>3W – 5W </li></ul>
  15. 15. Extra considerations for power saving <ul><li>Power saving application </li></ul><ul><ul><li>Turning off the monitor </li></ul></ul><ul><ul><li>Turning off the HDD </li></ul></ul><ul><ul><li>CPU power control etc. </li></ul></ul>150W 230W Saving Mode Full load
  16. 16. Design Overview <ul><li>e </li></ul>
  17. 17. Hardware List $8,990 Total equipment cost for the project $700 $700 HP T1500 XR UPS G2 1 $200 $200 17” LCD Monitor 1 $15 $15 Halogen light(USB) 1 $1,875 $1,875 SSD Flash memory(64GB) 1 $200 $100 External HDD 320G(USB) 2 $6,000 $6,000 Standalone Server (HP Prolian ML 370 G5) CPU: Quad Core Processor 2 GHz RAM: 2G 1 Total cost Unit cost Description Quantity Equipment needed Timing
  18. 18. Software List $5,591 Total software cost for the project $38 $38 Power saving application 1 $0 $0 Recording power consumption software 1 $1,583 $1,583 Windows Server 2003(5CAL) 1 $0 $0 Ubuntu Server 1 $570 $570 Windows2000 Advanced Server(5CAL) 1 $3,400 $3,400 VMware GSX 1 Total cost Unit cost Description Quantity Software needed Timing
  19. 19. MS Project 1day? Audit 15 7DAY Total 0.5 days Closeout Report 14 1.5 days? Closing 0.3 days Sketch of Change 13 0.5 days Change Control 12 0.8 days Control 1 day? Training 11 0.5 days Test 10 1 day? Installation 9 2.5 days? Executing 0.3 days Service 8 0.3 days Software 7 0.3 days Hardware 6 0.2 days Sketch 5 0.1 days MS Project 4 0.5 days WBS 3 1.7 days Planning 0.2 days Feasibility study 2 0.3 days Project Charter 1 0.5 days Initiate Duration Task_Name ID
  20. 20. Budget $17,590 Total $8,990 Hardware $5,600 Software Tools $3,000 Internal Staff Labor Expenditures
  21. 21. <ul><li>THANK YOU </li></ul>

×