  1. 1. WAYNE WEATHERSON Wayne Weatherson Limited MOB: 07525 195 399 EMAIL:wweatherson@gmail.com I am responsible, an open-minded and resourceful individual with a practical approach to problem solving. I possess excellent interpersonal skills. I enjoy learning new skills, I can work well under pressure and also have the ability to communicate comfortably at all levels, therefore ensuring an excellent working environment for all. ITL – PCN November 2015 – present 2016 Beacon O2 / VF refresh / Darwin / MBNL • Risk assessment / method statement • Upgrade / swap PCN antenna • Upgrade / swap amplifier • Install new tails / jumpers • SW pole swaps • Install combiners • Assist civil workers / ducts / feeder run • Re-route and cut back feeder to demarcation point • Connect new jumpers to new feeder within SW pole • Test and label all feeder / jumpers / tails • Install main feeder • Terminate feeder / jumpers / tails • Document / record all assets new to site • Collect photographic evidence for HOP • Daily updates • Close of play statements SGC construction October 2015 – November 2015 SGC construction serve the telecom industry with decommission of sites • Risk assessment / method statement • Decommission of cabinets / cabins (street works / green fields / roof top) • Decommission of telecom towers / SW poles / stub masts • Complete strip down of cabinets / cabins • Decommission / salvage of PNC / Microwave antenna / ODU / amplifiers • Decommission / salvage of BTS cabinets / Transmission rack unit’s / PSU units and batteries • Assist crane operative / banks man with positions and carry • Rigging of ropes / hoists / shackles / chains • Photo evidence of decommission of site • Site survey • Record asset removal Profile Career Summary
  2. 2. • Uploading of survey documents / photos • Complete and make good of all sites September 2015 Microwave 2man Dael • Build microwave antenna • ODU alignment • Rigging ropes • Erect WM Antenna • Pan MW Antenna • Run cables • Studding / clamping • Health and safety / risk assessment • Connect earth cable • Weatherproofing August 2015 PCN 2/3 MAN TRIL LTD • Rigging ropes • Erecting steel work • Build / erect Antennas • Terminate feeder connections • Fit feeder • Studding / clamping • Health and safety / risk assessment • Earth connections • Weatherproofing May 2015 – August 2015 LOS & PIV Team leader (DEACOM) • Use of laptop and spreadsheets • Power survey • Cabinet / cabin survey • Provide new transmission location • Provide cable route details • Use of camera • Uploading information • Bearings • Radio frequency awareness • General inspection of site, tower, rooftop • Panning lamp on bearing to confirm line of sight (LOS) • Health and safety, risk assessments • Liaising with site managers/point of contacts April 2015 – May 2015 PPM survey (Kier) Project team leader
  3. 3. • Health and safety Risk assessment • General inspection of site, tower, rooftop • General clean up duties • Inspection of site, tower, rooftop, ladder, fall arrest system • Inspection of feeder, connections, weatherproofing, dish and antennas • Site survey • Uploading information and photos onto intercom system • Updating site contact information • Fault finding • Lightning protection testing • General site maintenance • Liaising with site managers/point of contacts March 2015 (2 weeks) DAB digital radio install (The Bridge Networks) • Health and safety • Risk assessment • Build antenna / shield • Erect dish mounting poles • Use of ropes and pulleys • Identify manageable feeder route • Install feeder • Install cleats • Install gland • Install steelwork March 2015 (2 weeks) Fault finding Police network Ireland • Police vetting / MOD cleared • Reline dish • Change LMR cable • Change ODU • Weatherproofing • Change cable / feeder • Ensure installed equipment is safe • Photo evidence of swapped equipment • End of day report and findings log February 2015 – March 2015 Huawei PCN refresh surveys LCC • Rams, method statement • Risk assessment • Collection of assets on site ( antenna / combiners / amplifiers) • Health and safety • Site drawings • Identifying site technology • Access / delivery route inspection • Proposed equipment location
  4. 4. • Identifying power outages • Use of laptop / spreadsheets • Uploading data to server • Use of camera December 2014 February 2015 – Metro survey, LCC • Health and safety • Risk assessment • Site inspection • Site drawings • Identifying technology • Collection of data • Feeder / fibre details collection • Identify / collect antenna details • Identify / collect MHA / splitter / combiner details • Propose antenna location • Propose RRU location • Check feeder / fibre route free from obstruction • Use of laptop • Use of camera • Uploading surveys August 2014- December 2014 PSU power survey, LCC • Site inspection • Site survey • Power inspection • Breaker inspection • Breaker details collection • Identifying backup power resources • Identifying technology • Data logging • Site drawings • Use of laptop • Use of camera • Health and safety, risk assessments • Liaising with site managers/point of contacts • Use of online portals / servers July 2014 – August 2014- Microwave, LCC (Telecoms dish installation) 2nd man • Equipment inspection • Health and safety inspection • Risk assessment
  5. 5. • Dish erection • Dish positioning • Dish panning • Ensure dish is correctly installed • Install feeder / fibre • Establish connection • Use of laptop • Use of camera • Data collection May 2014 – July 2014 – Light of sight surveys Airwave (through LCC) Team Leader • Use of laptop and spreadsheets • Use of camera • Uploading information • Bearings • Radio frequency awareness • General inspection of site, tower, rooftop • Panning lamp on bearing to confirm line of sight (LOS) • Health and safety, risk assessments • Liaising with site managers/point of contacts February 2014 – May 2014 PPM project through Fuel Recruitment (Clarke telecoms) PPM project Team leader • Health and safety Risk assessment • General inspection of site, tower, rooftop • General clean up duties • Inspection of site, tower, rooftop, ladder, fall arrest system • Inspection of feeder, connections, weatherproofing, dish and antennas • Site survey • Uploading information and photos onto intercom system • Updating site contact information • Fault finding • Lightning protection testing • General site maintenance • Liaising with site managers/point of contacts November 2013 – February 2014 PPM project Fuel / Mansell Recruitment PPM project Team leader • Health and safety Risk assessment • General inspection of site, tower, rooftop • General clean up duties • Inspection of site, tower, rooftop, ladder, fall arrest system • Inspection of feeder, connections, weatherproofing, dish and antennas • Site survey • Uploading information and photos onto intercom system • Updating site contact information
  6. 6. • Fault finding • Lightning protection testing • General site maintenance • Liaising with site managers/point of contacts October 2013 PCN install (3rd Man) PM Technical • Beacon / PCN • Weatherproofing • Connections • Earths • Cable tray • Instillation of feeder • Assist with antenna install May 2013 – October 2013 PM Technical LTD – LOS surveys (Airwaves / Sitec) • Health and safety Risk assessment • General knowledge of Telecoms cabin • Use of laptop and spreadsheets • Use of camera • Uploading information • Bearings • Radio frequency awareness • General inspection of site, tower, rooftop • Panning lamp on bearing to confirm line of sight (LOS) SEASONAL November-January 2011/ 2012 to Present: The Snow Globe – Owner of a giant snow globe over the festive period. • CRB checked as required • Construction and dismantle of the globe • Intermediate photography skills • Knowledge of Picasa software • Advertising and promotion • Bookings and day events • Cash handling • Staff Rota October 2011 – February 2013: The Gold Room – Whitefield and Wilmslow – Owner of business for precious metal and jewelry buying shops. • Buying and selling of jewelry/medals/watches • Cash handling • Advertising • Customer service
  7. 7. • Interviewing skills i.e. new staff members • Daily targets and weekly stock take January 2009-September 2011: Northwest Bullion Ltd. Area Manager • Extensive knowledge of precious metals, gems, medals and high end watches. • Cash handling of large amounts of money on a daily basis. • Customer service • Dealing with enquires and complaints • Banking • Advertising and liaising with local newspapers • Creating new artwork for the business i.e. booklets and leaflets • Key holder to all shops 1996 – 2000 Cramlington community high school – All subjects 2000 – 2001 Cramlington community 6th form – Sport/ PE, IT and Drama 2001 – 2002 Northumberland college – NVQ engineering mechanical & electrical 2011- Present BG Trampoline level 1 coach • IT Profiency: Microsoft word, Excel, internet and email, Picasa • British Gymnastics Trampolining level 1 coach • Full current clean driving license • Advanced climber • First aid at heights • Rooftop access • Radio frequency awareness • Police clearance (2018) • MOD clearance (2018) Education Further Skills
  8. 8. Available on request

×