The document discusses the building plan approval process for Sepang Municipal Council. It provides background on SMC's responsibilities over development and community plans. It defines building plan approval as formal authorization to construct a structure according to approved drawings and codes. The objective is to ensure structures are safely constructed in suitable locations according to by-laws. The approval process involves submitting documents, registering the application, technical review, approval or request for amendments, and final approval from the central planning board within 6 months. Required documents for building plans are also listed.
2. INTRODUCTION
• THE SEPANG MUNICIPAL COUNCIL is tasked with the responsibility of providing
services and basic amenities to all Sepang residents under the 1976 Local
Government Act (Act 171). As a local municipal council, SEPANG MUNICIPAL
COUNCIL is also responsible over the Development Plan and Community Service
Plan.
• During its infancy, Majlis Perbandaran Sepang was known as the Sepang Town
Board and was later known as Sepang District Board. Sepang District Board. On 13
November 2002 the Executive Committee of Selangor has upgraded the board's
status to Sepang Municipal Council; as certified by the Election Committee in an
official letter dated 7 May 2004 and also by the Ministry of Housing and Local
Government on 19 March 2004.
• A splendorous proclamation ceremony ensued, which was was held at the Sepang
Municipal Stadium in Bandar Baru Salak Tinggi in full Malay ceremonial regalia. This
ceremony was officiated by Sultan Sharafuddin Idris Shah, the Sultan of Selangor on
13 December 2005
3. DEFINITION BUILDING PLAN
APPROVAL
• Formal approval of building plans by the
designated government agency as meeting the
requirements of prescribed codes. It is an
authorization to proceed with the construction or
reconfiguration of a specific structure at a
particular site, in accordance with the approved
drawings and specifications
4. OBJECTIVE BUILDING PLAN APPROVAL
•
to ensure that structures are
constructed on suitable locations
and are safe,
habitable places for working
and for dwelling and in accordance to
the building by-laws.
6. check document
in order?
BUILDING APPROVAL PROCESS
YES
QUEST ADDITIONAL
INFORMATION
REGISTER APPLICATION
refer to technical department
for comment
reminder letter to be given every 7 daysquest amenments to plan as
per technical comments
check plan as per technical comment
table in town planning commitee meeting
result
approve /not approve
approve
refer to central town and
country planning board for fina
desicion
convey to application