2. FORWARD-LOOKING STATEMENTS
NOTE:
Some of the statements contained herein may be forward-looking
statements which involve known and unknown risks and uncertainties.
Without limitation, statements regarding potential mineralization and
resources, exploration results, and future plans and objectives of the
Company are forward-looking statements that involve various risks. The
following are important factors that could cause the Company’s actual
results to differ materially from those expressed or implied by such
forward-looking statements: changes in the world wide price of mineral
commodities, general market conditions, risks inherent in mineral
exploration, risks associated with development, construction and mining
operations, the uncertainty of future profitability and the uncertainty of
access to additional capital. There can be no assurance that forward-looking
statements will prove to be accurate as actual results and future
events may differ materially from those anticipated in such statements.
VMS Ventures Inc. undertakes no obligation to update such forward-looking
statements if circumstances or management’s estimates or opinions
should change. The reader is cautioned not to place undue reliance on
such forward-looking statements.
2 2
1
3. Discovering High Grade Copper
Deposits in Manitoba, Canada
Introduction to VMS Ventures Inc.
Flin Flon – Snow Lake Belt - a World Class VMS Camp
Discovery – The Reed Lake Deposit
HudBay Minerals JV and 4 Option Agreements
Future Base Metal Discoveries: 2011 – 2012 Work Plan
Continuous drilling January – May 2011
Gold Discovery at the Sails Lake Project, January 10 2011
3 3
4. VMS VENTURES INC. (VMS:TSX.V)
QUICK FACTS
Well funded junior with approximately $17 M treasury.
Geological Team With Proven Track Record of
Success.
2007 Discovered the Copper-rich Reed Lake Deposit
in Manitoba, Canada.
• JV Partner HudBay Minerals (T.HBM) is project
operator and financiers of Reed Lake
development. Reed Lake Project ownership is
70% HBM & 30% VMS.
Large, 100% held, highly prospective land package in
the prolific Flin Flon – Snow Lake Greenstone Belt of
Manitoba.
Aggressive Drill Program now underway ($5 million in
CAPITAL STRUCTURE
drill and other exploration activities planned for 2011)
(as at February 8, 2011)
testing for high grade copper-zinc-gold-silver deposits
Issued & Outstanding: 122,668,955 in the mining friendly Province of Manitoba, Canada.
Options: 10,104,800 Record metal prices and growing interest in the
Fully Diluted: 132,773,755 resource sector!
Debt: $0.0
Capital: $17,000,000
4 4
5. MANAGEMENT
Rick Mark, CEO & Chair – Rick has 24 years experience in the public marketplace and has been
CEO of VMS Ventures since 2005. VMS, and the three affiliated exploration companies in the North
Shore Mining Group, have raised over $45,000,000 since 2007.
John Roozendaal, President – John is the founding director of VMS Ventures Inc. He has been
involved in the mineral exploration industry for over 18 years, focusing on precious, base and
specialty metals in North America. John has been President of VMS since 2001.
Neil Richardson, COO – Neil has over 22 years experience in mineral exploration and mining
operations of base metal and precious metal deposits throughout Canada. Recently, Neil was the
Exploration Manager of Murgor Resources Inc., where he was involved in the delineation of three
projects to NI 43-101 compliant mineral resource estimates, project generation and process
discipline. Prior to joining Murgor in 2006, Neil worked for HudBay Minerals Inc. as a Senior
Exploration Geologist responsible for greenfield and brownfield projects in the Flin Flon – Snow Lake
area. He consulted to VMS since September 2009, and became COO in September, 2010.
Mark Fedikow, VP Exploration and Technical Services – Mark has 34 years of industry and
government experience as an exploration geochemist and mineral deposits geologist. He has worked
for major and junior mining companies and the Manitoba Geological Survey, completing his
employment at the Survey as Chief Geologist of the Mineral Deposits Section. In 2001, Mark was the
recipient of the Provincial Geologists Medal, a Canadian national award for outstanding geoscientific
achievement. Mark has been with VMS since 2008.
5 5
6. FLIN FLON GREENSTONE BELT
A WORLD CLASS VMS CAMP • At current metal prices
(to 2009) as produced
MAP AREA approx $54 billion in
Base and Precious
metals produced.
• Most prolific
SNOW LAKE BELT greenstone belt in
Canada in terms of $
value of
production/km2.
• Continuous production
Lalor Lake for past 80 years. 36
(Hudbay) copper-zinc and gold
mines operated in the
belt
Exposed Flin Flon Belt
4,442 sq km
Covered portion
Reed Lake
15128 sq km
(VMS Ventures Inc.)
The Covered Part of the
Belt is the New Frontier!
7. LAND HOLDINGS IN THE SNOW LAKE BELT
DOMINANT LAND
POSITION
• More than 105,000
hectares of 100%
owned ground
acquired before
the rush into base
metals.
RIGHT GEOLOGY
• Focused on
juvenile arc
(seafloor volcanic)
rocks (shown in
medium green).
These rocks host
all the mined VMS
deposits in the Flin
Flon - Snow Lake
camp.
02/02/11
8
8. VTEM AIRBORNE GEOPHYSICAL COVERAGE OVER
VMS’ SNOW LAKE, MANITOBA PROJECTS
• Many recent
discoveries,
including VMS’s
Reed Lake
Deposit, were
made with VTEM
• VMS Ventures
has flown over
13,000 line-km of
VTEM over its
projects, majority
flown at 100 m
line spacing.
• 3 years and $3
million in work –
ready to drill.
6 8
9. VMS’ REED LAKE DISCOVERY
History
• Discovery hole by VMS Ventures
Inc. RD-07-02 October 4, 2007:
43.05 m @ 4.38% Cu
1.56% Zn
0.85 g/t Au
13.09 g/t Ag
High Grade Cu Intercepts By VMS
• 72 holes drilled from July, 2007 to
September, 2008. (2007 - 2008)
RD-08-36: 81.07 m @ 3.54% Cu
RD-08-41: 33.46 m @ 10.36% Cu
Incl. 28.08 m @ 13.03% Cu
Incl. 5.00 m @ 16.30% Cu
RD-08-53: 61.96 m @ 5.96% Cu
RD-08-61: 100.19 m @ 3.59% Cu
11 9
10. AERIAL VIEW OF THE REED LAKE DEPOSIT
Located 1 hour's drive from mill and concentrator facilities 500 feet (150 metres) from a paved Provincial Highway
Flin Flon 115 km
Provincial Road # 39
Reed Lake Deposit
Snow Lake 75 km
(projected to surface)
Reed Lake Joint Venture
Tower Zone Option
10
12
11. HUDBAY PHASE 1 PLAN
Purpose:
• Confirm / refine current model.
• Produce NI 43-101 compliant Plan
resource calculation (est. March
2011).
• Follow mineralization to depth.
Phase 1 Program Highlights:
• Drill holes on section
lines 50 m apart.
• 32 holes completed as
of Jan 31, 2011.
• Results up to drill hole
22 released to date. N
• Down hole EM surveys 100 m
on every hole looking
approximately 100m in 100 m
Credit: HBED September, 2010
all directions for
additional deposits or Composite
mineralization. Cross Section
Section
(Looking 315°) 11
14
13. Reed Lake Deposit Longitudinal View
RLD015 LONGITUDINAL SECTION
LOOKING NORTH
Zone 30
Zone 20
Zone 10
10.09 m @ 2.39% Cu
02/02/11
16
14. VMS VENTURES – HUDBAY JV & OPTION
PROJECTS
VMS-Hudbay JV
• 30-70 joint venture, VMS
carried to production.
• Hudbay is operator.
4 Option Agreements
• Hudbay is operator.
• $2.6 M in cumulative
expenditures to earn 70%.
• Upon discovery VMS is
carried on first $50 million
of expenditures.
• Cumulative $2.8 M paid to
VMS in July, 2010.
15. MANY TARGETS READY TO DRILL ON THE JV AND
OPTION PROJECTS
Lens C
Lens A Lens B
HIGHWAY ZONE
NORTHWEST SUPER ZONE
ZONE OPTION
OPTION
TOWER ZONE
REED LAKE OPTION
JOINT
REED
VENTURE
TOWER ZONE LAKE
REED LAKE DEPOSIT PROJECT
NORTHEAST
ZONE OPTION
• Reed Lake Deposit produces a strong, coincident VTEM EM and
magnetic anomaly.
• Numerous untested targets each with potential to be new mines or
zones of copper-zinc-gold-silver mineralization
02/02/11 • Aggressive exploration and development activity now underway.
17
16. SAILS LAKE UPDATE: DRILLED FALL 2010
Project Background
• 25 km east of Snow
Lake - a major base
metal and gold
mining camp.
• Data compilation
indicated potential for
gold and base metal
deposits.
• Drilling by VMS in
2010 intersected
significant gold
mineralization over
long intervals in hole
SA-10-007.
18 16
18. NORTH AMERICAN NICKEL
VMS owns ~45% of
North American
Nickel.
Dr. Mark Fedikow,
President and COO.
TSX Venture
application pending.
Projects situated in
Thompson and
Sudbury, the two
most productive
mining camps in the
world class Circum-
Superior Nickel Belt.
OTCBB: WSCRF
19. SUDBURY PROJECTS
Sudbury
projects are
focused on
highly
prospective
offset dykes.
Whistle Offset at FNX’s
Podolsky Mine
21. VMS VENTURES INC. (VMS:TSX.V)
QUICK FACTS
Well funded junior with approximately $17 M treasury.
Geological Team With Proven Track Record of
Success.
2007 Discovered the Copper-rich Reed Lake Deposit
in Manitoba, Canada.
• JV Partner HudBay Minerals (T.HBM) is project
operator and financiers of Reed Lake
development. Reed Lake Project ownership is
70% HBM & 30% VMS.
Large, 100% held, highly prospective land package in
the prolific Flin Flon – Snow Lake Greenstone Belt of
Manitoba.
Aggressive Drill Program now underway ($5 million in
CAPITAL STRUCTURE
drill and other exploration activities planned for 2011)
(as at February 8, 2011)
testing for high grade copper-zinc-gold-silver deposits
Issued & Outstanding: 122,668,955 in the mining friendly Province of Manitoba, Canada.
Options: 10,104,800 Record metal prices and growing interest in the
Fully Diluted: 132,773,755 resource sector!
Debt: $0.0
Capital: $17,000,000
4 21