Project Experience:
King Abdullah Specialized Children Hospital(350 beds),KAMC-WR,Jeddah
Construction of specialized children hospitals for NGHA .
Role & Responsibility:
♦ Preparation of 3D Model using Revit Architecture
♦ Presentation drawing of the overall site
♦ Coordination the model.
♦ Constructability Report.
♦ Tracking the Inputs document, RFI issues.
Tower Ctr Mililani-M J Wilkow,Hawaii,U.S.A
Largest shopping center of Hawaii USA.Project involved renovation work of the selective
Blocks and redesign of the specific landscapes.
Role & Responsibility:
♦ Preparation of 3D Model using Revit Architecture
♦ Presentation drawing of the overall site
♦ Coordination the model.
♦ Constructability Report.
♦ Tracking the Inputs document, RFI issues.
2. Farrington HS Development Phase 1,Hawaii,U.S.A
FARRINTON HIGH SCHOOL PROJECT INVOLVES MASTER PLANNING OF 26.45 ACRES &
Renovation of existing school infrastructure.
Role & Responsibility:
♦ Preparation of 3D Model using Revit Architecture & Structure.
♦ Leading team of 10 BIM modelers.
♦ Coordination with MEP.
♦ Tracking the Inputs document, RFI issues.
Previous Work Experience:
Jacobs Engineering , India & Muscat – 2011 – August 2015
Qstec – Polysilicon Plant ,QATAR
8000 MTPA Polysilicon Plant, Qatar
The Qatar Solar Technologies (QSTec) intended to build, own and operate a state of the art
Polysilicon production plant, the raw material used to build solar cells.
Initial construction was for Phase 1 consisting of Train 1 & Train 2 with a total design
capacity of 8000 MTPA of Product.
Role & Responsibility:
♦ Design of office & commercial buildings
♦ Design in accordance with IBC 2009 & ANSI(for barrier free design)
♦ Design to undergo approval from clients PMC (CH2MHILL) before execution.
♦ To embody international standards for the deliverable.
Infrastructure development of Ministry of defence ,SOHAR Oman.
Proposed development and up gradation of Oman Defence .It was 20KMsq development
which involved master planning of the area and design of several buildings including
Stadium.
♦ Master planning of 20kmsq area of Defence area
♦ Preparation of presentation drawings for client
♦ Clarence from concerned authorities(MODES)
Air base development –Panagarh (West Bengal),INDIA
Design of Terminal Building and Hangar for C-130J 30 Hercules Aircraft & other support
Buildings as well as infrastructure development of the site expanded to the area of 1 lakh sqm.
It was an ambitious project of Indian Air Force .Lockheed Martin was the client.
CH2mhll was PMC for the project .
3. Role & Responsibility:
♦ Preparation of presentation drawings for client
♦ Stage wise submission of drawings (60%,70%,90%,100%)
♦ Incorporate comments from PMC and get the clearance from PMC
♦ Coordinate with all the services
♦ Maintain ISO file of the project and coordinate monthly project status review
IT Building at Sahastradhara road Dehradun Uttarakhand ,INDIA
Design of IT Building for UP Rajkiya Nirman Nigam ltd.The project included building design and
Infrastructure development of the site. Total site area of the project was 50000 sqm.
Role & Responsibility:
♦ Preparation of presentation drawings for client
♦ Preparation of preliminary drawings for approval
♦ Coordination with all the services and local bodies
Infrastructural development of Indian Defence in Eastern India.
Design of Hangars and other support base security facilities.An ambitious project Indian
Defence upgradation .Jorhat, Chabua, Purnea, Mohanbari,Tezpur,Hasimra,Bagdogra,Kalaikunda
Are the stations which was to be upgraded ,Project cost was Rs 5000 cr for the area close to
10 Lakhs sqm.
Role & Responsibility:
♦ Prepare information regarding design, specifications, materials and equipment
♦ Preparation of presentation drawings for the client
♦ Streamline the design process in coordination with services involved
♦ Review architectural documents for potential conflict with other disciplines
♦ Generally act as the leading individual contributor and coordinator of design
problem-solving
IIE-SITARGANJ-PKG-3 SIDCUL,PHASE-II
Master planning of 530 acres of industrial land.The project involved complete
infrastructure development of the area .UP rajkiya nirman nigam ltd was the client
Role & Responsibility:
♦ Master planning of 530 acres of industrial land which in Preparing Shop Drawing
♦ Preparation of presentation drawings for client
♦ Clarence from concerned authorities.
4. Qualification:
Technical: 5 Years Bachelor of Architecture from NATIONAL INSTITUTE OF TECHNOLOGY PATNA ,BIHAR
in 2011.
Languages Known:
English, Hindi.
Personal Details:
Sex Male Marital Status Married
Date of Birth 28/01/1986 Nationality Indian