  1. 1. MANAGEMENT INSTRUCTIONS DOC.NO. MI.2.05 ISSUE/02 DATE/01/03/2003 izsl e’khuph dk;Zlqpuk ISSUED BY APPROVED BY PAGE 1 OF 2
  2. 2. • okij.;k iqohZe’khuyk vkWbfyax dsysys vkgs vkf.k rh LoPN vkgs dk ;kph [kk=h djk- • MkbZps o fQDpjps loZ Hkkx lqfLFkfrr vkgsr ;kph [kk=h djk- • izR;sd uohu izfdz;s lkBh iqoZhZph MkbZ dk<k o O;ofLFkr LoPN d#u BjoysY;k tkxh Bsok- • izksMD’klkBh BjoysY;k fnolkP;k dk;Zdzekph dkxni=s feGok- • e’khu pkyq dj.;kiqohZ daVzksy IyWu igk o R;kizek.ks estfjax baLBzqesaV o MkbZ xksGk djk- • tj daVzksy IyWu fdaok Vqfyax cnny dkgh ‘kadk vlsy rj izksMD’ku ,fD>D;qVho’kh laiZd lk/kk- • MkbZ dk<rkuk fQDpjojhy uacj gk daVzksy IyWu ojhy uacjizek.ks vkgs ;kph [kk=h djk- • MkbZ O;ofLFkr DyWEi >kys vkgs ;kph [kk=h djk- • ‘kV gkbZV] vko’;drsuqlkj lsV djk- • daVzksy iWuyojhy fgjos cVu nkcqu e’khu pkyq djk- • ifgyk tkWc r;kj >kY;kuarj vkWijsVjus rks bULisD’kulkBh
  3. 3. MANAGEMENT INSTRUCTIONS DOC.NO. MI.2.05 ISSUE/02 DATE/01/03/2003 izsl e’khuph dk;Zlqpuk ISSUED BY APPROVED BY PAGE 2 OF 2 • dke >kY;kuarj tkWc VWx ykoqu ;ksX;fjrhus chu fdaok Mze e/;s Bsok- • dke >kY;kuarj vkWijsVjus estfjax baLVzqesaV o Vqfyax BjoysY;k tkxh Bsokoh- • daVzksy iWuy ojhy yky cVu nkcqu e’khu can djk- • e’khu O;ofLFkr LoPN djk-
  4. 4. MANAGEMENT INSTRUCTIONS DOC.NO. MI.2.05 ISSUE/02 DATE/01/03/2003 WORK INSTRUCTION PRESS MACHINE ISSUED BY APPROVED BY PAGE 1 OF 1 1. Before use, ensure that machine is oiled properly and it is cleaned. 2. Ensure that all parts of die and fixture are in proper condition. 3. Before every new process, remove the existing fixture and keep it at the Proper specified location. 4. Collect all relevant papers for production plan. 5. Before starting a machine,see the control plan and collect proper Measuring instruments and fixtures. 6. In case any doubt about control plan or tooling, contact Production Executive immediately. 7. While taking die, ensure that no. on die and on control plan are same. 8. Ensure that, fixture is properly clamped. 9. Adjust the shut height as per requirement. 10. Start machine by pressing the green button on the control panel. 11. Operator should give first piece for inspection. 12. In case of any problem in job, inform Production Executive immediately. 13. After completion of work, keep job properly in bin or drum alongwith proper tag. 14. After completion of work, operator should keep measuring instruments and tooling at proper specified location. 15. Stop the machine by pressing the red button on the control panel

    Be the first to comment

    Login to see the comments

wi

Views

Total views

311

On Slideshare

0

From embeds

0

Number of embeds

13

Actions

Downloads

4

Shares

0

Comments

0

Likes

0

×