2. Space research agency in 1969
First rocket in 1963 by Dr.Vikram
Sarabhai
Communication satellites,remote
sensing satellites and launch vehicles
One of the seven nations to have
satellite launching capability
INCOSPAR(Indian National Committee
for Space Researh ) in 1962
INTRODUCTION
3. PROJECT MODE OF WORKING
Resources redeployed for the ongoing
projects
Matrix management structure,optimum
utilization of resources
Time and Cost limits
Result oriented approach
Two tier structure
PMC(Project management council)
Lead centre director
Technical and resource allocation
PMB(Project management board)
Project Director
Resolving the issues
4. India’s space program,two stages of development
• Infrastructure
• Building and flight testing
Frameworks designed to provide effective user interface for the space programs.
• INSAT(The Indian national satellite system)
• PC-NNRMS(the planning committee-National natural resource management
system)
• ADCOS(advisory committee on space research
ISRO Decade profile
Five year plans and Annual plans
5. Lead centre
Government of India
allocated an expenditure
budget of Rs.57.78
billion(2010-2011)
Ground segments(3-5yrs)
Complex projects(8-10yrs)
Investment share
Launch vehicles(39%)
Satellite technology(19%)
Launch support,tracking
network and range facility(9%)
Space applications(14%)
Space sciences and others(7%)
6. Foreign Travel/ITAR
01.07
Facilities
01.06
R eview S upport
01.05
P roject P lng S pt
01.04
R isk M gm nt
01.03
B usiness Mgm nt
0 1.02
P roject M gm nt
01.01
P roject Managem ent
01
P ro je ct V &V
02.08
Launch S ys E ng
02.07
P lanetary P rotection
02.06
C onfig Mgm nt
02.05
Inform ation S ystem s
02.04
P roject S W E ng
02.03
M ission & N av D esign
0 2.02
P roject S ys E ng
02.01
P roject S ys E ng
02
S W IV &V
03.09
C o n ta m ina tion C on trol
03.08
S W Q &A
03.07
H W Q &A
03.06
E E E P arts E ng
03.05
R eliability
03.04
E nvironm ents
03.03
S ystem Safety
0 3.02
M A M gm nt
03.01
M ission Assurance
03
E ducation & Outreach
04.06
S ci E nvironm ent
C haracterization
04.05
S ci Investigatio
& Ops S pt
04.04
S ci Data S upport
04.03
S cience Team
0 4.02
S cience Mgm nt
04.01
S cience
04
P /L I&T
05.06
C om m on P/L S ystem s
05.05
Instrum ent N
05.04
Instrum ent 1
05.03
P /L S ys E ng
0 5.02
P /L Mgm nt
05.01
P ayload
05
S pacecraft assem bly
test & verification
06.12
Testbeds
06.11
S pacecraft Flt SW
06.10
G N & C S ubsys
06.09
P ropulsion Subsys
06.08
Th e rm al S u b sys
06.07
M echanical Subsys
06.06
Telecom m Subsys
06.05
C om m and & D ata S /s
06.04
P ow er S ubsys
06.03
Flt S ys - S ys E ng
06.02
Flt S ys M gm nt
0 6.01
S pacecraft C ontract
06.00
Flight S ystem
06
M O S V &V
07.05
O perations
07.04
G round D ata S ys
07.03
M O S Sys E ng
0 7.02
M ission O ps M gm nt
07.01
M ission Ops S ystem
07
Launch S ervices
08.01
Launch S ystem
08
P roject N am e
WORK BREAKDOWN STRUCTURE
7. SLV(satellite launch vehicle)
ASLV(Augmented satellite launch vehicle)
PSLV(Polar satellite launch vehicle)
GSLV(Geosynchronous satellite launch vehicle)
Lunar Spacecraft Program
Space Capsule Recovery Program
LAUNCH VEHICLE PROGRAM
14. Scope management- further development is not
possible
Time management- 10years
Cost management- 57 billion US $
Quality management- 89% assured quality
Integration management- all the subsidiaries are
well related and regularly updated with
information
Human resource management- well trained
Communication management- all the institutes
are well connected
Risk management - cant assess the risk
Procurement management – procured before
time for optimizing the time taken
KNOWLEDGE AREAS RELATED TO ISRO:
15. The Product Breakdow n
Structure show s the
components from w hich
the system w as formed.
The PBS reflects the
w ork to produce
the individual
system components.
The W ork Breakdow n
Structure show s all
w ork components necessary
to produce a complete
system.
The W BS reflects the
w ork to integrate
the components
into a system .
Subsystem A Subsystem B Subsystem C M anagem ent System s
Engineering
Integration,
Test & Verification
Logistics
Support
S ystem
WBS
PBS
The WBS helps to organize the project costs.
When detailed with cost information per element,
WBS becomes the CBS - Cost Breakdown Structure.
16. • Well organised
• Follows a decade profile
• Preliminary designing
• Co-ordination committee,
planning committee
• Project and mission mode
• Lead centre