Agile UX integration

1,118 views

Published on

This presentation is about the challenges of integrating Agile and UX and why it is worth to face them.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,118
On SlideShare
0
From Embeds
0
Number of Embeds
21
Actions
Shares
0
Downloads
19
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Agile UX integration

  1. 1. AGILE/UX integration: suggested procedure
  2. 2. AGILE/UX integration UX DevelopmentS P R I N T S Sprint 0 Sprint 1 Sprint 2 Final sprint … 0.1 0.2 1.1 1.2 2.1 2.2 F.1 F.2 UX ACTIVITIES 1. Scope of the project from a UX standpoint 0.1 2. Competitive analysis from a UX standpoint 3. Analysis of the UI environmental constraints 4. Analysis of the existing UI assets
  3. 3. AGILE/UX integration UX DevelopmentS P R I N T S Sprint 0 Sprint 1 Sprint 2 Final sprint … 0.1 0.2 1.1 1.2 2.1 2.2 F.1 F.2 UX ACTIVITIES 1. Sitemap / Flow diagram (initial draft) 0.2 2. Measured wireframes of legacy elements 3. Measured wireframes of canvas and – if possible – templates
  4. 4. AGILE/UX integration UX DevelopmentS P R I N T S Sprint 0 Sprint 1 Sprint 2 Final sprint … 0.1 0.2 1.1 1.2 2.1 2.2 F.1 F.2 UX ACTIVITIES 1. Identification of the UI constraints 1.1 2. Identification of the UI options
  5. 5. AGILE/UX integration UX DevelopmentS P R I N T S Sprint 0 Sprint 1 Sprint 2 Final sprint … 0.1 0.2 1.1 1.2 2.1 2.2 F.1 F.2 UX ACTIVITIES 1.2 Measured and commented wireframes for the next sprint
  6. 6. AGILE/UX integration UX DevelopmentS P R I N T S Sprint 0 Sprint 1 Sprint 2 Final sprint … 0.1 0.2 1.1 1.2 2.1 2.2 F.1 F.2 UX ACTIVITIES 2.1 UX/UI review of the elements developed during the previous sprint
  7. 7. AGILE/UX integration UX DevelopmentS P R I N T S Sprint 0 Sprint 1 Sprint 2 Final sprint … 0.1 0.2 1.1 1.2 2.1 2.2 F.1 F.2 UX ACTIVITIES 2.2 Measured and commented wireframes for the next sprint, etc. etc.
  8. 8. AGILE/UX integration UX DevelopmentS P R I N T S Sprint 0 Sprint 1 Sprint 2 Final sprint … 0.1 0.2 1.1 1.2 2.1 2.2 F.1 F.2 UX ACTIVITIES F.1 UX/UI review of the elements developed during the previous sprint
  9. 9. AGILE/UX integration UX DevelopmentS P R I N T S Sprint 0 Sprint 1 Sprint 2 Final sprint … 0.1 0.2 1.1 1.2 2.1 2.2 F.1 F.2 UX ACTIVITIES 1. Last-minute amendments F.2 2. Consistency check of all the interfaces 3. UX recommendations for the maintenance of the project outcome

×