Core kick off vaccari

608 views

Published on

Kick-off for CORE (COmmon Reference Environment) ESSnet
Eurostat - Luxembourg 17/18-1-2011

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
608
On SlideShare
0
From Embeds
0
Number of Embeds
11
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Core kick off vaccari

  1. 1. <ul>CORE ESSNet kick-off </ul>
  2. 2. <ul>this material is distributed under the Creative Commons &quot;Attribution - Share Alike – 3.0&quot; licence, available at the following website http://creativecommons.org/licenses/by-sa/3.0/ </ul>
  3. 3. <ul>CORE kick-off </ul><ul><li>note the licence
  4. 4. some idea (from CORA to CORE, CORE mental image, interface)
  5. 5. work-packages
  6. 6. agenda
  7. 7. miscellaneous </li></ul>
  8. 8. <ul>from CORA to CORE </ul><ul>E nvironment after A rchitecture: the path </ul><ul><li>from schemas to software </li></ul><ul>CORA </ul><ul>CORE </ul>
  9. 9. <ul>CORE image </ul><ul>Design </ul><ul>Build </ul><ul>Design outputs </ul><ul>Design variables </ul><ul>Design outputs </ul><ul>Design variables </ul><ul>Design outputs </ul><ul>Design variables </ul><ul>Build data collection instrument </ul><ul>Build/enhance process components </ul><ul>memo: each block -> many tools CORE as a fluid/glue between GSBPM blocks </ul>
  10. 10. <ul>interface / layers </ul><ul>each GSBPM block -> many software tools -> interface logic if “n” is the number of tools, we need 2n interface ( not n 2 ) -> each tool needs two interfaces toward CORE and NOT two interfaces toward all the other tools </ul>
  11. 11. <ul>work-packages - 1 </ul><ul>WP1: Project management (it) WP2: Design of the information model according to GSBPM and alignment with NSI's information models (nl) WP3: Generic interface design for interconnecting GSBPM sub-processes (it) WP4: Research workflow solutions for process management (fr) </ul>
  12. 12. <ul>work-packages - 2 </ul><ul>WP5: Implementation library for generic interface and production chain for .NET (nl) WP6: Implementation library for generic interface and production chain for Java (it) WP7: Project dissemination and cost reporting (se) </ul>
  13. 13. <ul>miscellaneous </ul><ul>Universities role (state-of-the-art, validation) Observers role (Australia, others?): case studies? Coordination with SDMX ESSnet: shared meetings? SDMX ↔ DDI: Athens, Australia Coordination with others: OSOR, METIS - GSBPM, MSIS, HLG, other networks Relationship with Sharing Advisory Board </ul>
  14. 14. <ul>wp1 – project management </ul><ul>M3 Meeting. in Lisbon (date?) M6 Meeting in Paris M9 Meeting in Rome Final Meeting (M13) in Luxembourg Reports: Preliminary Intermediate (M6), Final (M13) 3-months progress reports (M3,M6,M9,M12) will be sent to Eurostat. Peer review for project quality control </ul>
  15. 15. <ul>agenda - 1 </ul><ul>January 17th : 14:00-15:00 Introduction by Eurostat - G. Pongas 15:00-15:45 CORE Overview and Management (WP1) by C. Vaccari 15:45-16:45 WP2 Objectives and Workplan by J. P. Kent 16:45-17:00 Break 17:00-18:00 WP3 Objectives and Workplan (with WP5 and WP6 outlines) by M. Scannapieco 20:00 … shared dinner? ;-) Mousel Cantine? </ul>
  16. 16. <ul>agenda - 2 </ul><ul>January 18th : 9:30-10:30 WP4 Objectives and Workplan by M. Daneau 10:30-11:30 WP7 Objectives and Workplan by J. Lynnerud 11:30-11:45 Break 11:45-13:00 Discussion - Detailed To-Do Plan </ul>
  17. 17. <ul>happy working! </ul>

×