6 Massive Projects Completed Faster than the Keystone Pipeline's 6 Year Permitting Process

Download to read offline

The Keystone XL pipeline has been examined and analyzed for over six years. Throughout this process it’s been repeatedly found to be good for jobs and the economy and safe for the environment. It’s time to approve it.

  • Be the first to like this

6 Massive Projects Completed Faster than the Keystone Pipeline's 6 Year Permitting Process

  1. 1. COMPLETED FASTER THAN THE KEYSTONE PIPELINE’S 6 YEAR PERMITTING PROCESS MASSIVE 6PROJ EC T S
  2. 2. GOLDEN GATE BRIDGE (4 YEARS FOR CONSTRUCTION) There are approximately 600,000 rivets in each tower, and as of January 2014, over 2 billion vehicles have crossed the Golden Gate Bridge. www.energyxxi.org
  3. 3. HOOVER DAM (5 YEARS FOR CONSTRUCTION) At its base, the dam is as thick as two footballs fields measured end-to-end. www.energyxxi.org
  4. 4. BOEING EVERETT FACTORY (1 YEAR FOR CONSTRUCTION) The complex is recognized by the Guinness Book of World Records as the largest building in the world by volume. www.energyxxi.org
  5. 5. PENTAGON (2 YEARS FOR CONSTRUCTION) Was built to house the nearly 30,000 defense workers tasked with helping America win World War II (17 miles of corridors!). www.energyxxi.org
  6. 6. HARTSFIELD-JACKSON ATLANTA INTERNATIONAL AIRPORT (2 YEARS FOR CONSTRUCTION) The total area of the Atlanta Airport covers 4,700 acres, and has the largest passenger terminal complex in the world. www.energyxxi.org
  7. 7. BEAVER STADIUM (2 YEARS FOR CONSTRUCTION) The second largest stadium in college football. Because of its size, Beaver Stadium has been named one of the scariest places for opposing teams to play. www.energyxxi.org
  8. 8. HELP US PUT 6 YEARS INTO PERSPECTIVE! Tell us what you’ve accomplished in that time, and join us in demanding approval for Keystone XL!

The Keystone XL pipeline has been examined and analyzed for over six years. Throughout this process it’s been repeatedly found to be good for jobs and the economy and safe for the environment. It’s time to approve it.