PROFILE
Udaykumar .B. Pattedar
Assistant Executive Engineer
O/o Chief Engineer -Thermal Designs.
Karnataka Power Corporati...
 Powerful analytical and decision making skills, able to perform best under pressure.
 Highly competitive and goal orien...
 Inspection of equipment/systems prior to dispatch to site (FAT).
 Preparation of design basis reports for the proposed ...
 Established a structure and programs to implement the policy and achieve
objectives and targets.
 Facilitate planning, ...
Upcoming SlideShare
Loading in …5
×

udaykumar Pattedar Profile

120 views

Published on

  • Be the first to comment

  • Be the first to like this

udaykumar Pattedar Profile

  1. 1. PROFILE Udaykumar .B. Pattedar Assistant Executive Engineer O/o Chief Engineer -Thermal Designs. Karnataka Power Corporation Limited, udaybp_rtps@yahoo.com Contact No: +919448585355  Bachelor of Engineering (Instrumentation Technology) - 1995.  Diploma in Environmental Management- 2012. Project: Environmentally sound Technologies for sustainable development in Thermal Power Generation.  Environmental Management - Indian Institute of science (IISc), Bangalore-2015. Certifications  ISO 14001 LEAD AUDITOR COURSE certificate: Issued by Environmental Management & Policy Research Institute, Bangalore.  Environmental Management system auditor conversion training course: Issued by Moody International certification. Bate of Birth: 03.02.1971  Design and Engineering of 250MW, 500MW, 700 MW and 800MW of coal fired power plant.  Erection, commissioning and Maintenance in thermal Power projects of 210MW and 800MW.  Implementation of Environmental Management system (EMS) ISO-14001: 2004  Environmental auditing.  18 years experience in power plant engineering and Environmental domain. Academic Experience
  2. 2.  Powerful analytical and decision making skills, able to perform best under pressure.  Highly competitive and goal oriented with a career orientation towards Environmental and control and automation domain knowledge with IDEAS of implementation of systems with latest technologies.  Quest for challenging work  Team player, Team leader. Areas of interest  Environmental Management.  Development of Renewable Energy Technology and its implementation.  Sustainable development and engineering in Renewable and thermal power generation with environmental sound technologies.  Environment assessment and Environmental auditing.  Life cycle analysis and Environmental management system.  Environmental design and Environmental Economics.  Solid waste management: Composition and collection; Disposal and processing; Recycling, recovery and waste to energy.  Project management. Employment history Karnataka power corporation Limited Engineering Office : Chief Engineer Thermal Designs, Bangalore. Present Position : Assistant Executive Engineer. Projects handled : RTPS Unit#8 1X 250MW, BTPS-2 1X500MW, BTPS-3-1X700MW, YTPS -2X800MW (Supercritical) Broad responsibility profile: Control & Instrumentation packages for Boiler, Turbine, 400 KV switch yard (SCADA), Generator Monitoring and control, Coal handling, Ash handling System, Reverse osmosis and De-mineralization Plant, cooling water treatment, Performance analysis and diagnostic optimizations of power plant, Induced Draft cooling tower package, Plant water and treatment systems & CCTV.  Preparation of Bid specifications, drawings, control and logic, bills of quantities, etc., technical and commercial bid review and bid negotiations.  Independent handling of projects including contractor/ consultant interaction, planning & scheduling, progress review, work allocation among team members, quality check, etc.  Preparation of design basis reports for the proposed control system based on discussions with contractor/vendor to understand their requirements.  Co-ordination among various suppliers and other disciplines for inputs /integration of various systems. Key Soft
  3. 3.  Inspection of equipment/systems prior to dispatch to site (FAT).  Preparation of design basis reports for the proposed control system based on discussions with contractor/vendor to understand their requirements.  Review of engineering documents such as instrumentation P&ID diagrams, I/O lists, logic diagrams, control schemes, control room design, interconnection schedules, etc.  Review and approval of vendor’s documentation.  Co-ordination amongst various suppliers and other disciplines for inputs /integration of various systems. Office :Raichur Thermal power Station, Shaktinagar, Raichur. Position : Assistant Engineer. Projects : RTPS Unit#5&6 -2 X 210 MW. Broad responsibility profile: Supervision of installation, testing and commissioning & maintenance of 2 X 210MW.  Interaction and co-ordination with Consultant and supplier for smooth completion of project works. We have created a new national record by completing the unit 5&6 erection and commissioning works in 28 months.  Independent handling of works related to station control and instrumentation& Boiler controls maintenance including planning & scheduling of maintenance, progress review, work allocation among team members. Envirnomental Environmental Management System (EMS) :ISO 14001:2004 at RTPS Broad responsibility profile: Associated in the following activities for ISO 14001:2004 certification process as a task force member. Description : This international standard specifies requirements for an environmental management system to enable an organization to develop and implement a policy and objectives, which take into account legal requirements and information about significant environmental aspects. This international standard is based on the methodology known as Plan –Do- Check – Act (PDAC).  Established an appropriate environmental policy.  Identification of environmental aspects from past, existing or planned activities in RTPS, in order to determine the significant environmental impacts, those associated with normal operating condition, abnormal conditions, including start-up, shut down, emergency and accidents.  Identified the applicable legal requirements and other requirements to which the organization subscribes.  Identification of priorities and set appropriate environmental objectives and targets.
  4. 4.  Established a structure and programs to implement the policy and achieve objectives and targets.  Facilitate planning, control, monitoring, preventive and corrective action, auditing and review activities to ensure both that the policy are complied with the overall environmental management system. Achievements:  Working as a Task force member of EMS team (ISO14001: 2004), to implement the Environmental Management program at RTPS- Shaktinagar and internal auditor for the same.  Actively associated during ISO 14001:2004 certification processes, which was awarded to RTPS on 28.12.2005. References: Sri. Shivaraj Channappalli Chief Engineer Karnataka Power Corporation Limited Yermarus Thermal Power Station, Raichur. Cell No: 9480830561 Sri. HARISH R. BHAT Energy & Wetlands Research Group, Centre for Ecological Sciences, Indian Institute of Science, Bangalore - 560012 Email id: harishrbhat@gmail.com

×