Gb500.apex mc businessplan.portfolio

484 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
484
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Gb500.apex mc businessplan.portfolio

  1. 1. Manufacturing<br /><ul><li>Stage of Development
  2. 2. Production method
  3. 3. Advantages and Disadvantages
  4. 4. Production Assessment
  5. 5. First year capacity utilization
  6. 6. Four year production projections
  7. 7. Quality Management
  8. 8. Quality control standards
  9. 9. Establishing efficient quality control </li></li></ul><li>Manufacturing<br />Our method of production is batch production. Batch production will allow modifications to be made to products that are otherwise the same. <br />PRODUCTION METHOD<br />Batch 1: Form and finish desktop/portable designs<br />Batch 2: Assemble base components <br />Batch 3: Form and finish desktop/portable designs<br />Quality control is applied at every stage<br />Batch 4: Assemble keyboard for the appropriate design<br />Batch 5: Load all fundamental software <br />Batch 6: Test computing power <br />Batch 7: Check networking and internet capabilities<br />Batch 8: Ready to package and ship first batch<br />
  10. 10. Manufacturing<br />Batch Production<br />Advantages: <br />Employees will become more expert at their tasks<br />Better quality products due to employee familiarity<br />Batch can adapt to customer needs<br />Disadvantages:<br />Difficult to modify a batch in production<br />Switching batch mid-production = loss in output<br />Increase in “work in progress” stock<br />
  11. 11. Manufacturing<br />Production Growth<br />Apex MC prides itself on adapting to the market and basing decisions on real numbers. The chart represents growth and adapting decisions to market outlook.<br />By the 4th Quarter ApexMC optimized its production capacity<br />
  12. 12. Manufacturing<br />Current Year<br />In the 16th quarter we project the quantity demanded to more than double. The result would be an operating capacity just over 12,000 units. This would equate to 83% operating capacity utilization.<br />4 Years (16th Qtr) Projection<br />
  13. 13. Manufacturing<br />Quality Control: The following procedures will be applied to each batch:<br />Quality assurance:<br />P.D.C.A or Shewhart Cycle<br />Stress Test<br />Statistical Process Control<br />

×