  1. 1. First Hill Streetcar Project Preview Yesler Terrace Community Association June 2009
  2. 2. Background/Context • ST2 Plan Provides for Capital Contribution to “a new streetcar connector line between Downtown Seattle, First Hill and the future Capitol Hill light rail station.” • ST2 Plan-$120M in 2007 Dollars • ST2 Finance Plan-Expenditures 2010-2015 • Seattle Streetcar Network: First Hill Line Among 4 Promising Routes
  3. 3. Project Background & Purpose • Replaces First Hill Light Rail Station • Funded as Part of ST2 Ballot Measure • Purpose is to connect light rail trips from the north and south the health-care oriented jobs and services of First Hill
  4. 4. Key Opportunities • Streetcar Typologies & First Hill Streetcar
  5. 5. Emerging Streetcar Typologies Local City Circulator Shaping City Rapid Serving Streetcar
  6. 6. Emerging Streetcar Typologies Local Circulator Rapid Streetcar Stop Spacing 2-3 Blocks Up to .75 Miles Average 8-12 MPH 12-15 MPH Speed
  7. 7. Emerging Streetcar Typologies Local City Circulator Shaping South Lake Union Line Central Line First Hill Line University Line Fremont-Ballard City Line Rapid Serving Streetcar
  8. 8. Key Opportunities • Shape: Yesler Terrace, Little Saigon, First Hill, Broadway, 12th Avenue? • Serve: First Hill & Light Rail stations
  9. 9. Interlocal Agreement • ST provides $120 M ($2007) capital and funds up to $5.2 M annually ($2007) operations & maintenance. • City has all project management & delivery responsibilities • City responsible for cost overruns during construction. • City has option to reject bids, develop supplemental funding plan prior to construction.
  10. 10. Project Status/Scehdule Team: • Facilities Engineer: URS • Vehicle/Systems Engineer: LTK • Project Management: SOJ Proposed Schedule: • Environmental Review, Concept Design, Alignment Selection (2009-2010) • Preliminary & Final Design (2010-2011) • Advanced Utilities (2010 Q4) • Construction & Startup (2011-2012)
  11. 11. Initial Capital & O&M Estimates • Total Development Cost: $120M in 2011 Dollars • 20% Contingency + Allowances for Unidentified Scope, Mitigation • Funding is $120 M in 2007 Dollars=$140M=Additional $20M Contingency
  12. 12. Initial Capital & O&M Estimates • 2012 O&M Cost: $3.8 to $4.2 M • Includes Depreciation • Maximum Funding: $5.2 M in 2007 Dollars • O&M Cost Estimate Assumes 20 Minute End-to- End Time • Travel Time/Reliability Is Critical Alignment/Design Consideration
  13. 13. Alignment Alternatives
  14. 14. Alignment Alternatives
  15. 15. www.seattlestreetcar.org

×