Vanalstine Soq 2012

696 views

Published on

Statement of Qualifications

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
696
On SlideShare
0
From Embeds
0
Number of Embeds
8
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Vanalstine Soq 2012

  1. 1. Thomas Van Alstine, BBAStatement of Qualification 13/02/12
  2. 2. Van Alstine Project Examples 13/02/12
  3. 3. New Innovations – Supported UAV – Utilized for Microwave Line of Sites Saved Millions of Dollars in reducing site visit times and requirements for Cranes on Greenfield Sites for LOS activities. Safety - reduced the necessity for tower riggers required to climb and photograph. Site Acquisition - provided Panoramic Site Photos and three-Dimensional Detail on Existing Tower Structures.Carbon Fiber TowerReduced Weight (Airfreight Donefrom US to Australia), GreenEnvironmentally Friendly, SimpleErection, fast Manufacture time. 13/02/12
  4. 4. LTE - Fixed Broadband13/02/12
  5. 5. Service Capabilities & Areas of Expertise•  Project Management•  Construction Management•  Survey•  Site Acquisition•  Equipment/System Integration•  Field Technicians & Installers 13/02/12
  6. 6. A Few Companies to which Thomas has a Working History of providing Services. 13/02/12
  7. 7. Thomas Van Alstine Full Range of Knowledge and Experience Project Management Land –Use Planning Site PlanningSite and Network Turnkey System Engineering Optimization Alternatives Installation Site Acquisition & Commissioning Site Preparation 13/02/12
  8. 8. Thomas Van AlstineProject Management Perspective n  Overall Project objectives and material lists well defined and characterized n  Basis for Network Rollout established n  SOW for Services clearly delineated n  Customer communication during all phases of design and implementation n  Scheduling n  Crew Assignments n  Reporting/Tracking 13/02/12
  9. 9. Various Types of BTS Sites Rooftop Blacktop Tenant ImprovementGreenfield Co-Locate Cabinetized Antennas BTS 13/02/12
  10. 10. Photos AT&T Build 13/02/12
  11. 11. Photos Ericsson Mini-link Microwave Install 13/02/12
  12. 12. Photos Site/Tower Construction 13/02/12
  13. 13. Photos Civil Construction 13/02/12

×