EU GMP Annex 1 and ISO 14644
Prepared by Tim Sandle 1
Agenda
• What is likely to go into the revised Annex 1,
including:
– Terminal sterilisation vs aseptic processing
– WFI produced by reverse osmosis
– Guidance for media simulation trials
– This remains speculative
• Changes to cleanroom classification (ISO 14644)
– This is factual, based on the newly published standard
Prepared by Tim Sandle 2
PART 1 – WHAT TO EXPECT FROM
EU GMP ANNEX 1
May 2016 © 2016 3
Information sources
• Comments submitted on the position paper dated March 2015.
• Comments submitted by ISPE, France A3P, CEN TC243, UK PHSS.
• Presentations by Andrew Hopkins – MHRA and lead for the EMA/PICs joint
revision process.
– PHSS Annual meeting London September 2015.
– ISPE Europe Annual Meeting Frankfurt March 2016.
– Pharmig Irish Conference 2016.
– Tim Sandle ISO 14644 presentation for Pharmig.
Prepared by Tim Sandle 4
Caution – This presentation is based on Pharmig’s assessment of
information released so far – the final version might be different.
Process
• Early 2017 – a
new version of
EU GMP Annex 1
– for sterile
products
manufacture – is
expected.
May 2016 Prepared by Tim Sandle 5
Annex 1 – Last revision
• Revision completed December 2007.
• Into operation 1st March 2009
• Major changes were:
– Alignment with EN ISO 14644-1:1999 (for 5
micron particles)
– Media simulation update
– Changes to bioburden testing (in relation to
pre-final filtration – set at 10 CFU/100mL)
– Capping of vials.
Prepared by Tim Sandle 6
Minor revision 2010
• Minor update in 1st
March 2010 for the vial
capping changes.
– This was a requirement for Grade A
air supply
– This version was transferred into
PIC/S; but, required a Q&A paper to
clarify various matters (e.g. “Grade A
air supply”).
http://www.picscheme.org/publicati
on.php?id=8
Prepared by Tim Sandle 7
Annex 1 – The current revision process
• In 2012, the German (ZLG) presented a concept
statement on revision the the EMA IWG.
• Work started February 2015.
• Joint EMA & PIC/S process (first time).
• Initial joint “concept paper” issued by EMA & PIC/S
dated 20th March 2015
(EMA/INS/GMP/735037/2014).
• There was little substance about the revision in the
“concept paper”.
Prepared by Tim Sandle 8
Annex 1 – Nature of the issues/subjects
identified so far…
• Typographical errors.
• Update to accommodate revisions to ISO 14644-1 & 2:
2015.
• Update to accommodate the PIC/S Annex 1 Q&A
clarification document.
• Deal with lack of clarity in some clauses.
• Fill gaps in information.
• Update to recognize the maturing of some technologies
& practices since 2007.
• Some new areas – WFI & biofilms.
• Deal with industry & regulatory concerns.
Prepared by Tim Sandle 9
What do we know about the contents and
structure so far?
• Refresh the requirement of all GMPs
• Will only consider sterile products (no application of
Annex 1 to non-sterile products).
• The existing structure and sections will be retained.
– It will be a revision, NOT a re-write.
• Will be better organised:
– Have cleanliness classes and levels more clearly defined.
Will better explain “Grade A air supply”.
– Everything to do with environmental monitoring will be
together; and improve the definition of the approach for
lower grade areas (B, C & D).
Prepared by Tim Sandle 10
Environmental monitoring
• Will all be in one place.
• Emphasises it is an essential part of QRM.
– Viable
– Non-viable
– Media process simulations
• Large scale & campaign or “tail-
gate” simulations.
• Small scale.
• Essential to understand the risks
process/product/facility
• Description of the requirement for trending
– First time trending will be mentioned
Prepared by Tim Sandle 11
Limits
Prepared by Tim Sandle 12
 No change to limits proposed.
 BUT averaging at a location over time will no longer be OK.
 When the limit for a micro level is <1, then we need to look at frequency of
occurrence – a nod towards USP <1116>
Aseptic Processing
• Focus on keeping operators away from the product.
• Update approach to newer technologies Isolators &
RABS (restricted access barrier systems).
– RABS likely to be described as ‘open’ and ‘closed’
• Address closed process systems:
– Sterilise in place.
– Integrity proving.
• Media fills
• No longer to specify number of vials – each facility
must risk assess an appropriate number
– Small batch size issues, some guidance likely on
appropriate media process simulations.
Prepared by Tim Sandle 13
Isolators & RABS
Prepared by Tim Sandle 14
 Today, we would see Isolators and RABS as essential technology that
should at least be considered.
 Perhaps the revised Annex 1 should say?
 “The utilisation of barrier technologies, RABS and Isolators can improve the
sterility assurance during open aseptic processing, and should be
considered when selecting the environmental control solution.”
Isolators
• A view of the U.K. MHRA,
likely to be included in
Annex 1, not to accept
VHP as a sterilisation
process and only as a
sanitising process.
• This means all product
contact parts which go
into an isolator must be
sterilised (autoclave or
irradiation) prior to VHP
processing.
May 2016 © 2016 15
Maturing technology aseptic connectors
• The evolution of closed systems, including
disposables/single-use, requires some improved
guidance because the risks are different:
– CIP & SIP (clean-in-place; sterilise-in-place)
– Integrity of aseptic connection devices.
– Integrity of closed systems.
Prepared by Tim Sandle 16
Water
• Biofilms:
– Increasingly seen as high
profile by regulators.
• Need to risk assess biofilms in
water systems
• Guidance on WFI:
– New EP WFI Monograph
allowing membrane
technologies to be used.
• Means WFI can be produced
by distillation or reverse
osmosis
• MHRA have expressed
concerns with this due to
endotoxin risk.
• Interesting to see what Annex
1 says about this.
Prepared by Tim Sandle 17
Typographical errors in current Annex
1
Prepared by Tim Sandle 18
So, what does
this mean?
0.45 +/- 20%, or
a range?
Where is the
working
position?
Mix of ‘UDAF’ and
‘LAF’ throughout
Confusion examples
51. Changing rooms should be designed as airlocks and used to
provide physical separation of the different stages of changing and so
minimize microbial and particulate contamination of protective
clothing. They should be flushed effectively with filtered air. The final
stage of the changing room should , in the at-rest state, be the same
grade as the air into which it leads. The use of separate changing
rooms for entering and leaving clean areas is sometimes desirable. In
general hand washing facilities should be provided only in the first
stage of the changing rooms.
Prepared by Tim Sandle 19
Is this clear to you?
PART 2 –CHANGES TO ISO 14644
PARTS 1 AND 2
Prepared by Tim Sandle 20
ISO 14644
• New version went live in December 2015, for
two parts of the standard:
– ISO 14644-1 - Classification of air cleanliness
– ISO 14644-2 - Specifications for testing and
monitoring to prove continued compliance (i.e.
routine / on-going monitoring)
• Both parts deal with particles only
• Companies have until 31st December 2016 to
implement the changes.
Prepared by Tim Sandle 21
ISO 14644 Part 1 - purpose
• Classification is the process of qualifying the
cleanroom environment by the number of
particles using a standard method.
– Determine classification of cleanroom according
to standards e.g. Room x is ISO class y.
– Distinct from routine environmental monitoring.
– Distinct from process monitoring e.g. ongoing
assessment of aseptic filling.
Prepared by Tim Sandle 22
Changes #1: Particles
• Allows for one or more particle sizes to be
assessed.
– The standard requires the larger particle to be at
least 1.5 times that of the smallest particle size
measured.
– But no longer features ≥5.0 µm limit for particles
for the Grade A equivalent class for classification.
– This does not replace EU GMP requirements. ≥0.5
and ≥5.0 µm need to be assessed for monitoring.
Prepared by Tim Sandle 23
Changes #2: Number of locations
• New approach to selection of locations for particle counting
• Reminder - previous approach:
NL = A
– NL is the minimum number of sampling locations (rounded up to a whole
number).
– A is the area of the cleanroom or clean zone in square metres (m2) for which
the square root is taken.
• Taking the surface of the room in square metres, assessing the square root
and using the obtained number (rounded up) to give the number of
locations, to be positioned equidistantly.
Prepared by Tim Sandle 24
Changes #2: Number of locations
The change:
– No calculations are required to determine the
number of locations - there is a ‘look-up table’ (Table
1 - the only reference for all sizes of particle from ISO
1 to ISO 9).
• This method has generally led to an increase in particle
count locations.
– Each location is treated independently and there is
95% level of confidence that at least 90% of the
cleanroom will comply with the maximum particle
limit for the intended class.
Prepared by Tim Sandle 25
Changes #2: Number of locations
Prepared by Tim Sandle 26
An example of what the changes mean:
Changes #3: Position of particle
counters in a cleanroom
• Once the number of locations has been selected, the
room is divided up into equal sectors and a particle
counter placed in each sector.
• Previous standard – counter placed in approximate centre.
• New standard - where the counter is placed within each
sector is determined by the user.
– The standard allows counters always to be placed at the same
point within the sector; randomly placed within the sector; or
evenly distributed; or by risk.
– Reason: counts no longer assumed to be homogenous within a
sector.
– Addition locations can be added at the discretion of the facility.
Prepared by Tim Sandle 27
Changes #3: Position of particle
counters in a cleanroom
• To align with GMP, the location should be
orientated to the point of greatest risk e.g. close
to fixed equipment. The standard recommends
that the following is accounted for:
• Room layout;
• Equipment layout;
• Airflow patterns;
• Position of air supply and return vents;
• Air-change rates;
• Consideration should be given to any unintended bias in the
sampling process.
Prepared by Tim Sandle 28
Changes #4: Particle counter sampling
volumes
• Volume of air to be sampled at
each location, the volume of air
must be sufficient to detect at
least 20 particles for the largest
particle size limit.
• The operative figure is ≥5.0
microns
Volume to be sampled (Vs) =
[20 x 1000 (constant)]
Class limit particles (largest size)
• For example, Grade C
• Volume to be sampled
= 20 x 1000 = 0.69 litres
29,000
• Therefore, a minimum of 1 litre
would need to be taken at each
location.
• However, ISO 14644 states that
the volume needs to be at least 2
litres, sampled over a one minute
period.
• Therefore, a minimum of 2 litres
would need to be taken at each
location.
Prepared by Tim Sandle 29
Changes #4: Particle counter sampling
volumes
• For example, EU GMP Grade B cleanroom:
• Volume to be sampled =
20 x 1000 = 6.9 litres
2,900
• Therefore, a minimum of 7 litres would need
to be taken at each location.
• Note: Grade A is more complicated (explained
later)
Prepared by Tim Sandle 30
Changes #4: Particle counter sampling
volumes
Prepared by Tim Sandle 31
For example, consider a Grade B cleanroom:
How long would this take to monitor? See over...
Changes #4: Particle counter sampling
volumes
Prepared by Tim Sandle 32
Continuing with our cleanroom example.
Changes #5: No more intermediate
classes
• What does this mean for EU GMP Grade A
cleanrooms?
• The Grade A issue
– EU GMP Grade A does not equal ISO class 5, because
of the different 5.0 µm limits
• 29 count limits for ISO 14644 class 5
• 20 count limit for EU GMP Grade A.
– Where intermediate classes are required the standard
no longer permits increments of 0.1. So, to meet EU
GMP, an ISO class of 4.5 would need to be selected in
theory.
Prepared by Tim Sandle 33
Changes #5: No more intermediate
classes
• Options:
– Just classify Grade A for 0.5 µm and use 0.5 µm / 5.0 µm
for operations,
– Or continue with 20 or 29 as a limit as an additional option
for 5.0 µm.
• Standard states: “In some situations, typically those related
to specific process requirements, alternative levels of air
cleanliness may be specified on the basis of particle populations
that are not within the size range applicable to classification.”
• This means continuing with one cubic metre per location.
• BUT attempting this for 5.0 µm size particle could be difficult due
to potential particle loss from tubing.
• Most people are attempting to classify for both particle count sizes
but much will depend on what the EU GMP Annex 1 revision says.
Prepared by Tim Sandle 34
Summary
• So the revisions mean:
– In general, the number of particle counter
locations increase in a cleanroom.
– However, the sample volumes decrease
• Except for Grade A where because of the 5.0 micron
issue, 1 cubic metre is still needed at each location
– Locations are no longer place equidistantly but
selected by risk assessment.
Prepared by Tim Sandle 35
Changes #6: Averaging is no longer
allowed
• With previous standard it was possible to fail a
location in a cleanroom but to pass the
cleanroom overall if the particle counts
averaged at a value below the class limit.
• There is no longer a ‘grand total’ for the
cleanroom, each individual sector must pass.
– A cleanroom is determined to have met the ISO
class provided that the obtained result at each
location does not exceed the desired class.
Prepared by Tim Sandle 36
Changes #6
• Example of some
results:
Grade B cleanroom,
assessed for 0.5 µm
particles using a 1-
minute counter
Prepared by Tim Sandle 37
Changes #7: Probe location & tubing
• The particle counter probe must be orientated into
the airflow (for unidirectional air) or pointed
upwards for turbulent flow air.
• There are no changes to occupancy states, the ideal
position is that cleanrooms should be classified when
occupied (at the normal occupancy level).
• Particle counter tubing length is reduced for a
maximum of 3 metres to a maximum of 1 metre.
• To avoid ‘drop out’ of particles
Prepared by Tim Sandle 38
Changes #8: Test certification
• Certification for classify a cleanroom must contain:
• Name and address of the testing organization.
• Date of testing.
• No. and year of the publication of the relevant part of ISO 14644
e.g. ISO 14644: 1 – 2015.
• Location of cleanroom (or clean zone).
• Specific representation of locations e.g. diagram.
• Designation of cleanroom:
– ISO class (plus EU GMP)
– Occupancy.
– Particle count sizes considered.
– Test method used (and any departures or deviations).
– Identification of test instrument and calibration certificate.
– Test results.
Prepared by Tim Sandle 39
Changes #9: Particle counters
• Recommendation that
particle counts that
meet ISO 21501 are
used (error rate at each
particle size of no more
than ±20%). Counters
must be certified.
Prepared by Tim Sandle 40
Thank you
Any questions?
Prepared by Tim Sandle 41

More Related Content

What's hot

Cleaning validation
Cleaning validationCleaning validation
Cleaning validationVinay Jain
 
Aseptic processing
Aseptic processingAseptic processing
Aseptic processingdeepakiitbhu
 
Validation utility system
Validation utility systemValidation utility system
Validation utility systemArpitSuralkar
 
Container closure system and issues facing modern drug packaging
Container closure system and issues facing modern drug packagingContainer closure system and issues facing modern drug packaging
Container closure system and issues facing modern drug packagingPrathameshSarda1
 
Visual inspection of parenteral products
Visual inspection of parenteral productsVisual inspection of parenteral products
Visual inspection of parenteral productsSambhujyoti Das
 
Good Automated Manufacturing Practices
Good Automated Manufacturing PracticesGood Automated Manufacturing Practices
Good Automated Manufacturing PracticesPrashant Tomar
 
Presentation: Cleaning and Contamination Control: A regulatory perspective
Presentation: Cleaning and Contamination Control: A regulatory perspectivePresentation: Cleaning and Contamination Control: A regulatory perspective
Presentation: Cleaning and Contamination Control: A regulatory perspectiveTGA Australia
 
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter Validation
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter ValidationEU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter Validation
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter ValidationMerck Life Sciences
 
Contamination control in pharmaceutical industry
Contamination control in pharmaceutical industryContamination control in pharmaceutical industry
Contamination control in pharmaceutical industryclientscomp
 
Filter validation
Filter validationFilter validation
Filter validationVINOTH R
 
Validation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningValidation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningPrashant Tomar
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentPRANJAY PATIL
 
Cleaning validation a complete know how
Cleaning validation a complete know howCleaning validation a complete know how
Cleaning validation a complete know howSambhujyoti Das
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection modelVaishali Dandge
 

What's hot (20)

Depyrogenation by dry heat
Depyrogenation by dry heatDepyrogenation by dry heat
Depyrogenation by dry heat
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Aseptic processing
Aseptic processingAseptic processing
Aseptic processing
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Container closure system and issues facing modern drug packaging
Container closure system and issues facing modern drug packagingContainer closure system and issues facing modern drug packaging
Container closure system and issues facing modern drug packaging
 
7.specification and test procedure
7.specification and test procedure 7.specification and test procedure
7.specification and test procedure
 
Presentation on EU GMP Annex 16 - Certification by QP
Presentation on EU GMP Annex 16 - Certification by QPPresentation on EU GMP Annex 16 - Certification by QP
Presentation on EU GMP Annex 16 - Certification by QP
 
Visual inspection of parenteral products
Visual inspection of parenteral productsVisual inspection of parenteral products
Visual inspection of parenteral products
 
New EU Requirements for Qualification & Validation
New EU Requirements for Qualification & ValidationNew EU Requirements for Qualification & Validation
New EU Requirements for Qualification & Validation
 
Good Automated Manufacturing Practices
Good Automated Manufacturing PracticesGood Automated Manufacturing Practices
Good Automated Manufacturing Practices
 
Presentation: Cleaning and Contamination Control: A regulatory perspective
Presentation: Cleaning and Contamination Control: A regulatory perspectivePresentation: Cleaning and Contamination Control: A regulatory perspective
Presentation: Cleaning and Contamination Control: A regulatory perspective
 
V Model
V ModelV Model
V Model
 
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter Validation
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter ValidationEU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter Validation
EU GMP Annex 1 Draft: Implications on Sterilizing Grade Filter Validation
 
Validation of hvac system
Validation of hvac systemValidation of hvac system
Validation of hvac system
 
Contamination control in pharmaceutical industry
Contamination control in pharmaceutical industryContamination control in pharmaceutical industry
Contamination control in pharmaceutical industry
 
Filter validation
Filter validationFilter validation
Filter validation
 
Validation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningValidation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioning
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Cleaning validation a complete know how
Cleaning validation a complete know howCleaning validation a complete know how
Cleaning validation a complete know how
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection model
 

Viewers also liked

ISO 14644 - introducing the revised standard
ISO 14644 - introducing the revised standardISO 14644 - introducing the revised standard
ISO 14644 - introducing the revised standardTim Sandle, Ph.D.
 
Risk analysis in sterile operation
Risk analysis in sterile operationRisk analysis in sterile operation
Risk analysis in sterile operationTim Sandle, Ph.D.
 
Risk Management in Sterile Environments
Risk Management in Sterile Environments Risk Management in Sterile Environments
Risk Management in Sterile Environments Tim Sandle, Ph.D.
 
The Black death - a re-emerging infectious disease
The Black death - a re-emerging infectious diseaseThe Black death - a re-emerging infectious disease
The Black death - a re-emerging infectious diseaseTim Sandle, Ph.D.
 
Myths of pharmaceutical microbiology
Myths of pharmaceutical microbiologyMyths of pharmaceutical microbiology
Myths of pharmaceutical microbiologyTim Sandle, Ph.D.
 
USP &lt;1116> and its impact on Microbiology
USP &lt;1116> and its impact on MicrobiologyUSP &lt;1116> and its impact on Microbiology
USP &lt;1116> and its impact on MicrobiologyTim Sandle, Ph.D.
 
Black Death and plague: a new understanding
Black Death and plague: a new understandingBlack Death and plague: a new understanding
Black Death and plague: a new understandingTim Sandle, Ph.D.
 
Application of microbiological data
Application of microbiological dataApplication of microbiological data
Application of microbiological dataTim Sandle, Ph.D.
 
pharmaceutical clean room
pharmaceutical clean room pharmaceutical clean room
pharmaceutical clean room Kiran Thakur
 
Developments in regulatory requirements
Developments in regulatory requirements Developments in regulatory requirements
Developments in regulatory requirements Tim Sandle, Ph.D.
 
Cleanroom, Classification, Design and
Cleanroom, Classification, Design and Cleanroom, Classification, Design and
Cleanroom, Classification, Design and Ahmadreza Barazesh
 
Am Cleanroom Build and Performance Revisions to ISO 14644-1
Am Cleanroom Build and Performance Revisions to ISO 14644-1Am Cleanroom Build and Performance Revisions to ISO 14644-1
Am Cleanroom Build and Performance Revisions to ISO 14644-1AM Technical Solutions, Inc
 
Is0 14644 2and 3
Is0 14644 2and 3Is0 14644 2and 3
Is0 14644 2and 3anuroopjs
 

Viewers also liked (20)

ISO 14644 - introducing the revised standard
ISO 14644 - introducing the revised standardISO 14644 - introducing the revised standard
ISO 14644 - introducing the revised standard
 
Clean room standards
Clean room standardsClean room standards
Clean room standards
 
Risk analysis in sterile operation
Risk analysis in sterile operationRisk analysis in sterile operation
Risk analysis in sterile operation
 
Sterility assurance
Sterility assuranceSterility assurance
Sterility assurance
 
Risk Management in Sterile Environments
Risk Management in Sterile Environments Risk Management in Sterile Environments
Risk Management in Sterile Environments
 
Cleanroom sop slides
Cleanroom sop slidesCleanroom sop slides
Cleanroom sop slides
 
The Black death - a re-emerging infectious disease
The Black death - a re-emerging infectious diseaseThe Black death - a re-emerging infectious disease
The Black death - a re-emerging infectious disease
 
Myths of pharmaceutical microbiology
Myths of pharmaceutical microbiologyMyths of pharmaceutical microbiology
Myths of pharmaceutical microbiology
 
USP &lt;1116> and its impact on Microbiology
USP &lt;1116> and its impact on MicrobiologyUSP &lt;1116> and its impact on Microbiology
USP &lt;1116> and its impact on Microbiology
 
Black Death and plague: a new understanding
Black Death and plague: a new understandingBlack Death and plague: a new understanding
Black Death and plague: a new understanding
 
Application of microbiological data
Application of microbiological dataApplication of microbiological data
Application of microbiological data
 
pharmaceutical clean room
pharmaceutical clean room pharmaceutical clean room
pharmaceutical clean room
 
Iso 14644 key changes
Iso 14644 key changesIso 14644 key changes
Iso 14644 key changes
 
Cleanroom history
Cleanroom historyCleanroom history
Cleanroom history
 
Developments in regulatory requirements
Developments in regulatory requirements Developments in regulatory requirements
Developments in regulatory requirements
 
Lal presentation
Lal presentation Lal presentation
Lal presentation
 
Cleanroom, Classification, Design and
Cleanroom, Classification, Design and Cleanroom, Classification, Design and
Cleanroom, Classification, Design and
 
Am Cleanroom Build and Performance Revisions to ISO 14644-1
Am Cleanroom Build and Performance Revisions to ISO 14644-1Am Cleanroom Build and Performance Revisions to ISO 14644-1
Am Cleanroom Build and Performance Revisions to ISO 14644-1
 
Is0 14644 2and 3
Is0 14644 2and 3Is0 14644 2and 3
Is0 14644 2and 3
 
Iso 8573
Iso 8573Iso 8573
Iso 8573
 

Similar to EU GMP Annex1 Review

Presentaion: Updates to Good Manufacturing Practices
Presentaion: Updates to Good Manufacturing PracticesPresentaion: Updates to Good Manufacturing Practices
Presentaion: Updates to Good Manufacturing PracticesTGA Australia
 
The Fundamentals of Cleaning Validation
The Fundamentals of Cleaning ValidationThe Fundamentals of Cleaning Validation
The Fundamentals of Cleaning ValidationSGS
 
Classifications: The 4 Elements of Cleanroom Construction Part 3
Classifications: The 4 Elements of Cleanroom Construction Part 3Classifications: The 4 Elements of Cleanroom Construction Part 3
Classifications: The 4 Elements of Cleanroom Construction Part 3AM Technical Solutions, Inc
 
Sterilization Standards Update: Strategies for Compliance
Sterilization Standards Update:  Strategies for ComplianceSterilization Standards Update:  Strategies for Compliance
Sterilization Standards Update: Strategies for ComplianceMedTech Review, LLC
 
Active Air Sample.pdf
Active Air Sample.pdfActive Air Sample.pdf
Active Air Sample.pdfHassanHani5
 
European packaging regulations
European packaging regulationsEuropean packaging regulations
European packaging regulationsMichael Sterling
 
Update on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulationsUpdate on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulationsHainer Martínez Cabrera
 
boccardi_analitytical-procedures.pdf
boccardi_analitytical-procedures.pdfboccardi_analitytical-procedures.pdf
boccardi_analitytical-procedures.pdfssuser796efb
 
Benchmarking large municipal WWTPs using official questionnaires: The case st...
Benchmarking large municipal WWTPs using official questionnaires: The case st...Benchmarking large municipal WWTPs using official questionnaires: The case st...
Benchmarking large municipal WWTPs using official questionnaires: The case st...Sabino De Gisi
 
A practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionA practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionEECO2
 
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global actionXVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global actionCentro Studi Galileo
 
7-4-aseptic-process-validation.pdf
7-4-aseptic-process-validation.pdf7-4-aseptic-process-validation.pdf
7-4-aseptic-process-validation.pdflinh838802
 
GOOD MANUFACTURING PRAC.pptx microbiology for pharm d
GOOD MANUFACTURING PRAC.pptx  microbiology for pharm dGOOD MANUFACTURING PRAC.pptx  microbiology for pharm d
GOOD MANUFACTURING PRAC.pptx microbiology for pharm dtehseenmalik450
 
Towards creating an extension for patch management ISO/IEC 15408 &18045
Towards creating an extension for patch management ISO/IEC 15408 &18045Towards creating an extension for patch management ISO/IEC 15408 &18045
Towards creating an extension for patch management ISO/IEC 15408 &18045Javier Tallón
 

Similar to EU GMP Annex1 Review (20)

ISO 14644.pdf
ISO 14644.pdfISO 14644.pdf
ISO 14644.pdf
 
Presentaion: Updates to Good Manufacturing Practices
Presentaion: Updates to Good Manufacturing PracticesPresentaion: Updates to Good Manufacturing Practices
Presentaion: Updates to Good Manufacturing Practices
 
The Fundamentals of Cleaning Validation
The Fundamentals of Cleaning ValidationThe Fundamentals of Cleaning Validation
The Fundamentals of Cleaning Validation
 
Classifications: The 4 Elements of Cleanroom Construction Part 3
Classifications: The 4 Elements of Cleanroom Construction Part 3Classifications: The 4 Elements of Cleanroom Construction Part 3
Classifications: The 4 Elements of Cleanroom Construction Part 3
 
ISO 14644-1
ISO 14644-1ISO 14644-1
ISO 14644-1
 
Sterilization Standards Update: Strategies for Compliance
Sterilization Standards Update:  Strategies for ComplianceSterilization Standards Update:  Strategies for Compliance
Sterilization Standards Update: Strategies for Compliance
 
Active Air Sample.pdf
Active Air Sample.pdfActive Air Sample.pdf
Active Air Sample.pdf
 
Environmental Product Declarations: the Who, What, Why, and How
Environmental Product Declarations: the Who, What, Why, and HowEnvironmental Product Declarations: the Who, What, Why, and How
Environmental Product Declarations: the Who, What, Why, and How
 
European packaging regulations
European packaging regulationsEuropean packaging regulations
European packaging regulations
 
Update on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulationsUpdate on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulations
 
boccardi_analitytical-procedures.pdf
boccardi_analitytical-procedures.pdfboccardi_analitytical-procedures.pdf
boccardi_analitytical-procedures.pdf
 
Benchmarking large municipal WWTPs using official questionnaires: The case st...
Benchmarking large municipal WWTPs using official questionnaires: The case st...Benchmarking large municipal WWTPs using official questionnaires: The case st...
Benchmarking large municipal WWTPs using official questionnaires: The case st...
 
A practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reductionA practical approach to pharmaceutical HVAC energy reduction
A practical approach to pharmaceutical HVAC energy reduction
 
Elemental analysis of soils
Elemental analysis of soilsElemental analysis of soils
Elemental analysis of soils
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global actionXVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
 
7-4-aseptic-process-validation.pdf
7-4-aseptic-process-validation.pdf7-4-aseptic-process-validation.pdf
7-4-aseptic-process-validation.pdf
 
Process Safety Management
Process Safety ManagementProcess Safety Management
Process Safety Management
 
GOOD MANUFACTURING PRAC.pptx microbiology for pharm d
GOOD MANUFACTURING PRAC.pptx  microbiology for pharm dGOOD MANUFACTURING PRAC.pptx  microbiology for pharm d
GOOD MANUFACTURING PRAC.pptx microbiology for pharm d
 
Towards creating an extension for patch management ISO/IEC 15408 &18045
Towards creating an extension for patch management ISO/IEC 15408 &18045Towards creating an extension for patch management ISO/IEC 15408 &18045
Towards creating an extension for patch management ISO/IEC 15408 &18045
 

More from Tim Sandle, Ph.D.

Reviewing environmental monitoring.ppt
Reviewing environmental monitoring.pptReviewing environmental monitoring.ppt
Reviewing environmental monitoring.pptTim Sandle, Ph.D.
 
Open discussion on rapid microbiological methods.pptx
Open discussion on rapid microbiological methods.pptxOpen discussion on rapid microbiological methods.pptx
Open discussion on rapid microbiological methods.pptxTim Sandle, Ph.D.
 
Electronic Data Management Systems.ppt
Electronic Data Management Systems.pptElectronic Data Management Systems.ppt
Electronic Data Management Systems.pptTim Sandle, Ph.D.
 
Risk management and environmental monitoring
Risk management and environmental monitoringRisk management and environmental monitoring
Risk management and environmental monitoringTim Sandle, Ph.D.
 
Audit efficiency storyboard.pptx
Audit efficiency storyboard.pptxAudit efficiency storyboard.pptx
Audit efficiency storyboard.pptxTim Sandle, Ph.D.
 
Anomalies, complaints and non-compliances
Anomalies, complaints and non-compliancesAnomalies, complaints and non-compliances
Anomalies, complaints and non-compliancesTim Sandle, Ph.D.
 
Application of FMEA to a Sterility Testing Isolator: A Case Study
Application of FMEA to a Sterility Testing Isolator: A Case StudyApplication of FMEA to a Sterility Testing Isolator: A Case Study
Application of FMEA to a Sterility Testing Isolator: A Case StudyTim Sandle, Ph.D.
 
Operation of Sterility Testing Isolators and validation issues
Operation of Sterility Testing Isolators and validation issuesOperation of Sterility Testing Isolators and validation issues
Operation of Sterility Testing Isolators and validation issuesTim Sandle, Ph.D.
 
Pharmaceutical Microbiology: Current and Future Challenges
Pharmaceutical Microbiology: Current and Future Challenges Pharmaceutical Microbiology: Current and Future Challenges
Pharmaceutical Microbiology: Current and Future Challenges Tim Sandle, Ph.D.
 
The selection and use of reference materials
The selection and use of reference materialsThe selection and use of reference materials
The selection and use of reference materialsTim Sandle, Ph.D.
 
Sterility assurance and microbiology awareness
Sterility assurance and microbiology awarenessSterility assurance and microbiology awareness
Sterility assurance and microbiology awarenessTim Sandle, Ph.D.
 

More from Tim Sandle, Ph.D. (13)

Reviewing environmental monitoring.ppt
Reviewing environmental monitoring.pptReviewing environmental monitoring.ppt
Reviewing environmental monitoring.ppt
 
Open discussion on rapid microbiological methods.pptx
Open discussion on rapid microbiological methods.pptxOpen discussion on rapid microbiological methods.pptx
Open discussion on rapid microbiological methods.pptx
 
Electronic Data Management Systems.ppt
Electronic Data Management Systems.pptElectronic Data Management Systems.ppt
Electronic Data Management Systems.ppt
 
Risk management and environmental monitoring
Risk management and environmental monitoringRisk management and environmental monitoring
Risk management and environmental monitoring
 
Audit efficiency storyboard.pptx
Audit efficiency storyboard.pptxAudit efficiency storyboard.pptx
Audit efficiency storyboard.pptx
 
Anomalies, complaints and non-compliances
Anomalies, complaints and non-compliancesAnomalies, complaints and non-compliances
Anomalies, complaints and non-compliances
 
Pharma micro myths (sandle)
Pharma micro myths (sandle)Pharma micro myths (sandle)
Pharma micro myths (sandle)
 
Application of FMEA to a Sterility Testing Isolator: A Case Study
Application of FMEA to a Sterility Testing Isolator: A Case StudyApplication of FMEA to a Sterility Testing Isolator: A Case Study
Application of FMEA to a Sterility Testing Isolator: A Case Study
 
Operation of Sterility Testing Isolators and validation issues
Operation of Sterility Testing Isolators and validation issuesOperation of Sterility Testing Isolators and validation issues
Operation of Sterility Testing Isolators and validation issues
 
Pharmaceutical Microbiology: Current and Future Challenges
Pharmaceutical Microbiology: Current and Future Challenges Pharmaceutical Microbiology: Current and Future Challenges
Pharmaceutical Microbiology: Current and Future Challenges
 
The selection and use of reference materials
The selection and use of reference materialsThe selection and use of reference materials
The selection and use of reference materials
 
Sterility assurance and microbiology awareness
Sterility assurance and microbiology awarenessSterility assurance and microbiology awareness
Sterility assurance and microbiology awareness
 
Introduction to GxP
Introduction to GxPIntroduction to GxP
Introduction to GxP
 

Recently uploaded

Leading large scale change: a life at the interface between theory and practice
Leading large scale change: a life at the interface between theory and practiceLeading large scale change: a life at the interface between theory and practice
Leading large scale change: a life at the interface between theory and practiceHelenBevan4
 
Technology transfer documentation and strategies
Technology transfer documentation and strategiesTechnology transfer documentation and strategies
Technology transfer documentation and strategiesNidhi Joshi
 
Spauldings classification ppt by Dr C P PRINCE
Spauldings classification ppt by Dr C P PRINCESpauldings classification ppt by Dr C P PRINCE
Spauldings classification ppt by Dr C P PRINCEDR.PRINCE C P
 
Unlock the Secrets to Optimizing Ambulatory Operations Efficiency and Change ...
Unlock the Secrets to Optimizing Ambulatory Operations Efficiency and Change ...Unlock the Secrets to Optimizing Ambulatory Operations Efficiency and Change ...
Unlock the Secrets to Optimizing Ambulatory Operations Efficiency and Change ...Health Catalyst
 
INTERNATIONAL HEALTH AGENCIES BY ANUSHRI SRIVASTAV.pptx
INTERNATIONAL HEALTH AGENCIES BY ANUSHRI SRIVASTAV.pptxINTERNATIONAL HEALTH AGENCIES BY ANUSHRI SRIVASTAV.pptx
INTERNATIONAL HEALTH AGENCIES BY ANUSHRI SRIVASTAV.pptxAnushriSrivastav
 
POSHAN ABHIYAAN-Poshan 2.0 will concentrate on Maternal Nutrition, Infant and...
POSHAN ABHIYAAN-Poshan 2.0 will concentrate on Maternal Nutrition, Infant and...POSHAN ABHIYAAN-Poshan 2.0 will concentrate on Maternal Nutrition, Infant and...
POSHAN ABHIYAAN-Poshan 2.0 will concentrate on Maternal Nutrition, Infant and...sheeza38
 
I urgently need a love spell caster to bring back my ex. +27834335081 How can...
I urgently need a love spell caster to bring back my ex. +27834335081 How can...I urgently need a love spell caster to bring back my ex. +27834335081 How can...
I urgently need a love spell caster to bring back my ex. +27834335081 How can...BabaJohn3
 
GENETICS and KIDNEY DISEASES /
GENETICS and KIDNEY DISEASES            /GENETICS and KIDNEY DISEASES            /
GENETICS and KIDNEY DISEASES /AFFIFA HUSSAIN
 
Organisation and Management of Eye Care Programme Service Delivery Models
Organisation and Management of Eye Care Programme Service Delivery ModelsOrganisation and Management of Eye Care Programme Service Delivery Models
Organisation and Management of Eye Care Programme Service Delivery ModelsHarsh Rastogi
 
ITM HOSPITAL The hospital has also been recognised as the best emerging hosp...
ITM  HOSPITAL The hospital has also been recognised as the best emerging hosp...ITM  HOSPITAL The hospital has also been recognised as the best emerging hosp...
ITM HOSPITAL The hospital has also been recognised as the best emerging hosp...jvomprakash
 
Session-1-MBFHI-A-part-of-the-Global-Strategy.ppt
Session-1-MBFHI-A-part-of-the-Global-Strategy.pptSession-1-MBFHI-A-part-of-the-Global-Strategy.ppt
Session-1-MBFHI-A-part-of-the-Global-Strategy.pptMedidas Medical Center INC
 
Leadership Style - Code and Rapid Response Workshop
Leadership Style - Code and Rapid Response WorkshopLeadership Style - Code and Rapid Response Workshop
Leadership Style - Code and Rapid Response WorkshopBrian Locke
 
Personnel and Equipment - Code and Rapid Response Workshop
Personnel and Equipment - Code and Rapid Response WorkshopPersonnel and Equipment - Code and Rapid Response Workshop
Personnel and Equipment - Code and Rapid Response WorkshopBrian Locke
 
An overview of Muir Wood Adolescent and Family Services teen treatment progra...
An overview of Muir Wood Adolescent and Family Services teen treatment progra...An overview of Muir Wood Adolescent and Family Services teen treatment progra...
An overview of Muir Wood Adolescent and Family Services teen treatment progra...pdamico1
 
mHealth Israel_Healthcare Finance and M&A- What Comes Next
mHealth Israel_Healthcare Finance and M&A- What Comes NextmHealth Israel_Healthcare Finance and M&A- What Comes Next
mHealth Israel_Healthcare Finance and M&A- What Comes NextLevi Shapiro
 
Session-3-Promoting-Breastfeeding-During-Pregnancy.ppt
Session-3-Promoting-Breastfeeding-During-Pregnancy.pptSession-3-Promoting-Breastfeeding-During-Pregnancy.ppt
Session-3-Promoting-Breastfeeding-During-Pregnancy.pptMedidas Medical Center INC
 
Tortora PRINCIPLES OF ANATOMY AND PHYSIOLOGY - Tortora - 14th Ed.pdf
Tortora PRINCIPLES OF ANATOMY AND PHYSIOLOGY - Tortora - 14th Ed.pdfTortora PRINCIPLES OF ANATOMY AND PHYSIOLOGY - Tortora - 14th Ed.pdf
Tortora PRINCIPLES OF ANATOMY AND PHYSIOLOGY - Tortora - 14th Ed.pdfDr. Afreen Nasir
 
Adrenal Function Tests-3.pptxwhfbdqbfwwfjgwngnegenhndngssfb
Adrenal Function Tests-3.pptxwhfbdqbfwwfjgwngnegenhndngssfbAdrenal Function Tests-3.pptxwhfbdqbfwwfjgwngnegenhndngssfb
Adrenal Function Tests-3.pptxwhfbdqbfwwfjgwngnegenhndngssfbKritikaMishra43
 
Communication disorder and it's management
Communication disorder and it's managementCommunication disorder and it's management
Communication disorder and it's managementkeerti Gour (PT) Shakya
 

Recently uploaded (20)

Leading large scale change: a life at the interface between theory and practice
Leading large scale change: a life at the interface between theory and practiceLeading large scale change: a life at the interface between theory and practice
Leading large scale change: a life at the interface between theory and practice
 
Technology transfer documentation and strategies
Technology transfer documentation and strategiesTechnology transfer documentation and strategies
Technology transfer documentation and strategies
 
Spauldings classification ppt by Dr C P PRINCE
Spauldings classification ppt by Dr C P PRINCESpauldings classification ppt by Dr C P PRINCE
Spauldings classification ppt by Dr C P PRINCE
 
Unlock the Secrets to Optimizing Ambulatory Operations Efficiency and Change ...
Unlock the Secrets to Optimizing Ambulatory Operations Efficiency and Change ...Unlock the Secrets to Optimizing Ambulatory Operations Efficiency and Change ...
Unlock the Secrets to Optimizing Ambulatory Operations Efficiency and Change ...
 
INTERNATIONAL HEALTH AGENCIES BY ANUSHRI SRIVASTAV.pptx
INTERNATIONAL HEALTH AGENCIES BY ANUSHRI SRIVASTAV.pptxINTERNATIONAL HEALTH AGENCIES BY ANUSHRI SRIVASTAV.pptx
INTERNATIONAL HEALTH AGENCIES BY ANUSHRI SRIVASTAV.pptx
 
POSHAN ABHIYAAN-Poshan 2.0 will concentrate on Maternal Nutrition, Infant and...
POSHAN ABHIYAAN-Poshan 2.0 will concentrate on Maternal Nutrition, Infant and...POSHAN ABHIYAAN-Poshan 2.0 will concentrate on Maternal Nutrition, Infant and...
POSHAN ABHIYAAN-Poshan 2.0 will concentrate on Maternal Nutrition, Infant and...
 
I urgently need a love spell caster to bring back my ex. +27834335081 How can...
I urgently need a love spell caster to bring back my ex. +27834335081 How can...I urgently need a love spell caster to bring back my ex. +27834335081 How can...
I urgently need a love spell caster to bring back my ex. +27834335081 How can...
 
GENETICS and KIDNEY DISEASES /
GENETICS and KIDNEY DISEASES            /GENETICS and KIDNEY DISEASES            /
GENETICS and KIDNEY DISEASES /
 
Organisation and Management of Eye Care Programme Service Delivery Models
Organisation and Management of Eye Care Programme Service Delivery ModelsOrganisation and Management of Eye Care Programme Service Delivery Models
Organisation and Management of Eye Care Programme Service Delivery Models
 
ITM HOSPITAL The hospital has also been recognised as the best emerging hosp...
ITM  HOSPITAL The hospital has also been recognised as the best emerging hosp...ITM  HOSPITAL The hospital has also been recognised as the best emerging hosp...
ITM HOSPITAL The hospital has also been recognised as the best emerging hosp...
 
Session-1-MBFHI-A-part-of-the-Global-Strategy.ppt
Session-1-MBFHI-A-part-of-the-Global-Strategy.pptSession-1-MBFHI-A-part-of-the-Global-Strategy.ppt
Session-1-MBFHI-A-part-of-the-Global-Strategy.ppt
 
Leadership Style - Code and Rapid Response Workshop
Leadership Style - Code and Rapid Response WorkshopLeadership Style - Code and Rapid Response Workshop
Leadership Style - Code and Rapid Response Workshop
 
Personnel and Equipment - Code and Rapid Response Workshop
Personnel and Equipment - Code and Rapid Response WorkshopPersonnel and Equipment - Code and Rapid Response Workshop
Personnel and Equipment - Code and Rapid Response Workshop
 
An overview of Muir Wood Adolescent and Family Services teen treatment progra...
An overview of Muir Wood Adolescent and Family Services teen treatment progra...An overview of Muir Wood Adolescent and Family Services teen treatment progra...
An overview of Muir Wood Adolescent and Family Services teen treatment progra...
 
mHealth Israel_Healthcare Finance and M&A- What Comes Next
mHealth Israel_Healthcare Finance and M&A- What Comes NextmHealth Israel_Healthcare Finance and M&A- What Comes Next
mHealth Israel_Healthcare Finance and M&A- What Comes Next
 
Session-10-Infants-with-Special-meeds.ppt
Session-10-Infants-with-Special-meeds.pptSession-10-Infants-with-Special-meeds.ppt
Session-10-Infants-with-Special-meeds.ppt
 
Session-3-Promoting-Breastfeeding-During-Pregnancy.ppt
Session-3-Promoting-Breastfeeding-During-Pregnancy.pptSession-3-Promoting-Breastfeeding-During-Pregnancy.ppt
Session-3-Promoting-Breastfeeding-During-Pregnancy.ppt
 
Tortora PRINCIPLES OF ANATOMY AND PHYSIOLOGY - Tortora - 14th Ed.pdf
Tortora PRINCIPLES OF ANATOMY AND PHYSIOLOGY - Tortora - 14th Ed.pdfTortora PRINCIPLES OF ANATOMY AND PHYSIOLOGY - Tortora - 14th Ed.pdf
Tortora PRINCIPLES OF ANATOMY AND PHYSIOLOGY - Tortora - 14th Ed.pdf
 
Adrenal Function Tests-3.pptxwhfbdqbfwwfjgwngnegenhndngssfb
Adrenal Function Tests-3.pptxwhfbdqbfwwfjgwngnegenhndngssfbAdrenal Function Tests-3.pptxwhfbdqbfwwfjgwngnegenhndngssfb
Adrenal Function Tests-3.pptxwhfbdqbfwwfjgwngnegenhndngssfb
 
Communication disorder and it's management
Communication disorder and it's managementCommunication disorder and it's management
Communication disorder and it's management
 

EU GMP Annex1 Review

  • 1. EU GMP Annex 1 and ISO 14644 Prepared by Tim Sandle 1
  • 2. Agenda • What is likely to go into the revised Annex 1, including: – Terminal sterilisation vs aseptic processing – WFI produced by reverse osmosis – Guidance for media simulation trials – This remains speculative • Changes to cleanroom classification (ISO 14644) – This is factual, based on the newly published standard Prepared by Tim Sandle 2
  • 3. PART 1 – WHAT TO EXPECT FROM EU GMP ANNEX 1 May 2016 © 2016 3
  • 4. Information sources • Comments submitted on the position paper dated March 2015. • Comments submitted by ISPE, France A3P, CEN TC243, UK PHSS. • Presentations by Andrew Hopkins – MHRA and lead for the EMA/PICs joint revision process. – PHSS Annual meeting London September 2015. – ISPE Europe Annual Meeting Frankfurt March 2016. – Pharmig Irish Conference 2016. – Tim Sandle ISO 14644 presentation for Pharmig. Prepared by Tim Sandle 4 Caution – This presentation is based on Pharmig’s assessment of information released so far – the final version might be different.
  • 5. Process • Early 2017 – a new version of EU GMP Annex 1 – for sterile products manufacture – is expected. May 2016 Prepared by Tim Sandle 5
  • 6. Annex 1 – Last revision • Revision completed December 2007. • Into operation 1st March 2009 • Major changes were: – Alignment with EN ISO 14644-1:1999 (for 5 micron particles) – Media simulation update – Changes to bioburden testing (in relation to pre-final filtration – set at 10 CFU/100mL) – Capping of vials. Prepared by Tim Sandle 6
  • 7. Minor revision 2010 • Minor update in 1st March 2010 for the vial capping changes. – This was a requirement for Grade A air supply – This version was transferred into PIC/S; but, required a Q&A paper to clarify various matters (e.g. “Grade A air supply”). http://www.picscheme.org/publicati on.php?id=8 Prepared by Tim Sandle 7
  • 8. Annex 1 – The current revision process • In 2012, the German (ZLG) presented a concept statement on revision the the EMA IWG. • Work started February 2015. • Joint EMA & PIC/S process (first time). • Initial joint “concept paper” issued by EMA & PIC/S dated 20th March 2015 (EMA/INS/GMP/735037/2014). • There was little substance about the revision in the “concept paper”. Prepared by Tim Sandle 8
  • 9. Annex 1 – Nature of the issues/subjects identified so far… • Typographical errors. • Update to accommodate revisions to ISO 14644-1 & 2: 2015. • Update to accommodate the PIC/S Annex 1 Q&A clarification document. • Deal with lack of clarity in some clauses. • Fill gaps in information. • Update to recognize the maturing of some technologies & practices since 2007. • Some new areas – WFI & biofilms. • Deal with industry & regulatory concerns. Prepared by Tim Sandle 9
  • 10. What do we know about the contents and structure so far? • Refresh the requirement of all GMPs • Will only consider sterile products (no application of Annex 1 to non-sterile products). • The existing structure and sections will be retained. – It will be a revision, NOT a re-write. • Will be better organised: – Have cleanliness classes and levels more clearly defined. Will better explain “Grade A air supply”. – Everything to do with environmental monitoring will be together; and improve the definition of the approach for lower grade areas (B, C & D). Prepared by Tim Sandle 10
  • 11. Environmental monitoring • Will all be in one place. • Emphasises it is an essential part of QRM. – Viable – Non-viable – Media process simulations • Large scale & campaign or “tail- gate” simulations. • Small scale. • Essential to understand the risks process/product/facility • Description of the requirement for trending – First time trending will be mentioned Prepared by Tim Sandle 11
  • 12. Limits Prepared by Tim Sandle 12  No change to limits proposed.  BUT averaging at a location over time will no longer be OK.  When the limit for a micro level is <1, then we need to look at frequency of occurrence – a nod towards USP <1116>
  • 13. Aseptic Processing • Focus on keeping operators away from the product. • Update approach to newer technologies Isolators & RABS (restricted access barrier systems). – RABS likely to be described as ‘open’ and ‘closed’ • Address closed process systems: – Sterilise in place. – Integrity proving. • Media fills • No longer to specify number of vials – each facility must risk assess an appropriate number – Small batch size issues, some guidance likely on appropriate media process simulations. Prepared by Tim Sandle 13
  • 14. Isolators & RABS Prepared by Tim Sandle 14  Today, we would see Isolators and RABS as essential technology that should at least be considered.  Perhaps the revised Annex 1 should say?  “The utilisation of barrier technologies, RABS and Isolators can improve the sterility assurance during open aseptic processing, and should be considered when selecting the environmental control solution.”
  • 15. Isolators • A view of the U.K. MHRA, likely to be included in Annex 1, not to accept VHP as a sterilisation process and only as a sanitising process. • This means all product contact parts which go into an isolator must be sterilised (autoclave or irradiation) prior to VHP processing. May 2016 © 2016 15
  • 16. Maturing technology aseptic connectors • The evolution of closed systems, including disposables/single-use, requires some improved guidance because the risks are different: – CIP & SIP (clean-in-place; sterilise-in-place) – Integrity of aseptic connection devices. – Integrity of closed systems. Prepared by Tim Sandle 16
  • 17. Water • Biofilms: – Increasingly seen as high profile by regulators. • Need to risk assess biofilms in water systems • Guidance on WFI: – New EP WFI Monograph allowing membrane technologies to be used. • Means WFI can be produced by distillation or reverse osmosis • MHRA have expressed concerns with this due to endotoxin risk. • Interesting to see what Annex 1 says about this. Prepared by Tim Sandle 17
  • 18. Typographical errors in current Annex 1 Prepared by Tim Sandle 18 So, what does this mean? 0.45 +/- 20%, or a range? Where is the working position? Mix of ‘UDAF’ and ‘LAF’ throughout
  • 19. Confusion examples 51. Changing rooms should be designed as airlocks and used to provide physical separation of the different stages of changing and so minimize microbial and particulate contamination of protective clothing. They should be flushed effectively with filtered air. The final stage of the changing room should , in the at-rest state, be the same grade as the air into which it leads. The use of separate changing rooms for entering and leaving clean areas is sometimes desirable. In general hand washing facilities should be provided only in the first stage of the changing rooms. Prepared by Tim Sandle 19 Is this clear to you?
  • 20. PART 2 –CHANGES TO ISO 14644 PARTS 1 AND 2 Prepared by Tim Sandle 20
  • 21. ISO 14644 • New version went live in December 2015, for two parts of the standard: – ISO 14644-1 - Classification of air cleanliness – ISO 14644-2 - Specifications for testing and monitoring to prove continued compliance (i.e. routine / on-going monitoring) • Both parts deal with particles only • Companies have until 31st December 2016 to implement the changes. Prepared by Tim Sandle 21
  • 22. ISO 14644 Part 1 - purpose • Classification is the process of qualifying the cleanroom environment by the number of particles using a standard method. – Determine classification of cleanroom according to standards e.g. Room x is ISO class y. – Distinct from routine environmental monitoring. – Distinct from process monitoring e.g. ongoing assessment of aseptic filling. Prepared by Tim Sandle 22
  • 23. Changes #1: Particles • Allows for one or more particle sizes to be assessed. – The standard requires the larger particle to be at least 1.5 times that of the smallest particle size measured. – But no longer features ≥5.0 µm limit for particles for the Grade A equivalent class for classification. – This does not replace EU GMP requirements. ≥0.5 and ≥5.0 µm need to be assessed for monitoring. Prepared by Tim Sandle 23
  • 24. Changes #2: Number of locations • New approach to selection of locations for particle counting • Reminder - previous approach: NL = A – NL is the minimum number of sampling locations (rounded up to a whole number). – A is the area of the cleanroom or clean zone in square metres (m2) for which the square root is taken. • Taking the surface of the room in square metres, assessing the square root and using the obtained number (rounded up) to give the number of locations, to be positioned equidistantly. Prepared by Tim Sandle 24
  • 25. Changes #2: Number of locations The change: – No calculations are required to determine the number of locations - there is a ‘look-up table’ (Table 1 - the only reference for all sizes of particle from ISO 1 to ISO 9). • This method has generally led to an increase in particle count locations. – Each location is treated independently and there is 95% level of confidence that at least 90% of the cleanroom will comply with the maximum particle limit for the intended class. Prepared by Tim Sandle 25
  • 26. Changes #2: Number of locations Prepared by Tim Sandle 26 An example of what the changes mean:
  • 27. Changes #3: Position of particle counters in a cleanroom • Once the number of locations has been selected, the room is divided up into equal sectors and a particle counter placed in each sector. • Previous standard – counter placed in approximate centre. • New standard - where the counter is placed within each sector is determined by the user. – The standard allows counters always to be placed at the same point within the sector; randomly placed within the sector; or evenly distributed; or by risk. – Reason: counts no longer assumed to be homogenous within a sector. – Addition locations can be added at the discretion of the facility. Prepared by Tim Sandle 27
  • 28. Changes #3: Position of particle counters in a cleanroom • To align with GMP, the location should be orientated to the point of greatest risk e.g. close to fixed equipment. The standard recommends that the following is accounted for: • Room layout; • Equipment layout; • Airflow patterns; • Position of air supply and return vents; • Air-change rates; • Consideration should be given to any unintended bias in the sampling process. Prepared by Tim Sandle 28
  • 29. Changes #4: Particle counter sampling volumes • Volume of air to be sampled at each location, the volume of air must be sufficient to detect at least 20 particles for the largest particle size limit. • The operative figure is ≥5.0 microns Volume to be sampled (Vs) = [20 x 1000 (constant)] Class limit particles (largest size) • For example, Grade C • Volume to be sampled = 20 x 1000 = 0.69 litres 29,000 • Therefore, a minimum of 1 litre would need to be taken at each location. • However, ISO 14644 states that the volume needs to be at least 2 litres, sampled over a one minute period. • Therefore, a minimum of 2 litres would need to be taken at each location. Prepared by Tim Sandle 29
  • 30. Changes #4: Particle counter sampling volumes • For example, EU GMP Grade B cleanroom: • Volume to be sampled = 20 x 1000 = 6.9 litres 2,900 • Therefore, a minimum of 7 litres would need to be taken at each location. • Note: Grade A is more complicated (explained later) Prepared by Tim Sandle 30
  • 31. Changes #4: Particle counter sampling volumes Prepared by Tim Sandle 31 For example, consider a Grade B cleanroom: How long would this take to monitor? See over...
  • 32. Changes #4: Particle counter sampling volumes Prepared by Tim Sandle 32 Continuing with our cleanroom example.
  • 33. Changes #5: No more intermediate classes • What does this mean for EU GMP Grade A cleanrooms? • The Grade A issue – EU GMP Grade A does not equal ISO class 5, because of the different 5.0 µm limits • 29 count limits for ISO 14644 class 5 • 20 count limit for EU GMP Grade A. – Where intermediate classes are required the standard no longer permits increments of 0.1. So, to meet EU GMP, an ISO class of 4.5 would need to be selected in theory. Prepared by Tim Sandle 33
  • 34. Changes #5: No more intermediate classes • Options: – Just classify Grade A for 0.5 µm and use 0.5 µm / 5.0 µm for operations, – Or continue with 20 or 29 as a limit as an additional option for 5.0 µm. • Standard states: “In some situations, typically those related to specific process requirements, alternative levels of air cleanliness may be specified on the basis of particle populations that are not within the size range applicable to classification.” • This means continuing with one cubic metre per location. • BUT attempting this for 5.0 µm size particle could be difficult due to potential particle loss from tubing. • Most people are attempting to classify for both particle count sizes but much will depend on what the EU GMP Annex 1 revision says. Prepared by Tim Sandle 34
  • 35. Summary • So the revisions mean: – In general, the number of particle counter locations increase in a cleanroom. – However, the sample volumes decrease • Except for Grade A where because of the 5.0 micron issue, 1 cubic metre is still needed at each location – Locations are no longer place equidistantly but selected by risk assessment. Prepared by Tim Sandle 35
  • 36. Changes #6: Averaging is no longer allowed • With previous standard it was possible to fail a location in a cleanroom but to pass the cleanroom overall if the particle counts averaged at a value below the class limit. • There is no longer a ‘grand total’ for the cleanroom, each individual sector must pass. – A cleanroom is determined to have met the ISO class provided that the obtained result at each location does not exceed the desired class. Prepared by Tim Sandle 36
  • 37. Changes #6 • Example of some results: Grade B cleanroom, assessed for 0.5 µm particles using a 1- minute counter Prepared by Tim Sandle 37
  • 38. Changes #7: Probe location & tubing • The particle counter probe must be orientated into the airflow (for unidirectional air) or pointed upwards for turbulent flow air. • There are no changes to occupancy states, the ideal position is that cleanrooms should be classified when occupied (at the normal occupancy level). • Particle counter tubing length is reduced for a maximum of 3 metres to a maximum of 1 metre. • To avoid ‘drop out’ of particles Prepared by Tim Sandle 38
  • 39. Changes #8: Test certification • Certification for classify a cleanroom must contain: • Name and address of the testing organization. • Date of testing. • No. and year of the publication of the relevant part of ISO 14644 e.g. ISO 14644: 1 – 2015. • Location of cleanroom (or clean zone). • Specific representation of locations e.g. diagram. • Designation of cleanroom: – ISO class (plus EU GMP) – Occupancy. – Particle count sizes considered. – Test method used (and any departures or deviations). – Identification of test instrument and calibration certificate. – Test results. Prepared by Tim Sandle 39
  • 40. Changes #9: Particle counters • Recommendation that particle counts that meet ISO 21501 are used (error rate at each particle size of no more than ±20%). Counters must be certified. Prepared by Tim Sandle 40