Boyabat Hydropower Plant

  1. 1. Dogus Insaat has preferred Teknik-El formwork systems for Boyabat Dam Construction
  2. 2. Teknik-El has provided heavy duty climbing formwork systems and shoring systems for Boyabat dam and Hydropower Plant construction. The production has been continued 3 months and materials have been loaded into 42 trucks. • Formwork and Shoring Systems for Intake Structure • Bridge leverage formwork systems for Penstock section • Specially designed steel bridge For further information about Boyabat Dam project please click here.
  3. 3. Dam Plant Building – Climbing Wall Formwork System
  4. 4. Dam Plant Building Sections – Climbing Wall Formwork System
  5. 5. Turbine Pre-mounting Hall
  6. 6. a b a)-b) Discharge Tunnel – Modular Wall Formwork System
  7. 7. Specially designed Steel Bridge – The bridge cam be used curved, straight or with inclination
  8. 8. For further information about Tek-Group please take a look on our online catalogues and do not hesitate to contact us • Tek Group Catalogues homepage http://www.slideshare.net/teknikel • Teknik-El Product Catalogue: Formwork, Scaffolding, Shoring Systems & accessories: http://www.slideshare.net/teknikel/teknikel-formwork-systems • Tek-Galvaniz Product Catalogue: Hot dip Galvanizing, Lighting poles, Floodlight poles, high masts, flag poles: http://www.slideshare.net/teknikel/tek-galvaniz-product-catalogue Kindest Regards, Cemile Oruç International Business Development Specialist E-mail: export@tek-galvaniz.com.tr Tel: +90 232 853 84 00 Fax: +90 232 853 84 02 www.teknik-el.com

×