Ere ttf slide

7,145 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
7,145
On SlideShare
0
From Embeds
0
Number of Embeds
5,980
Actions
Shares
0
Downloads
33
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ere ttf slide

  1. 1. Old TTF Metric = 1 Requisition (Req) opened in the Database Open Position (Req)Date Req TTF (Time To Fill) Date the ReqOpened in the was FilleddatabaseNew Metrics = 2 New types of Requisitions; Souring/Pipelining and OpenDemand Req’s in the Database with 3 Key Indicators: STI, ITH & TTH Sourcing/Pipeline Req Open Demand ReqCandidate Submit to Business STI (Source to Interview) ITH (Interview to Hire) Actual Creation Business Accept Hire Date Recruiting Date Date Business Date TTH is independent of STI and ITF so it can indicate both proactive and reactive recruiting trends by Job Family, Geography, Business Unit, etc TTH (Time To Hire) on Open Demand Req Req Actual Target Recruiting + Business Hire Hire Date Date © Copyright 2011 Avanade Inc. All Rights Reserved. 1
  2. 2. Metric Timeline Examples Example A Example TSF B Req Target Start Date Hire TSF TSF Req Target Hire Start Date TSF Example C DEMAND Req Candidate STI HM Creation Review / Date Skills 1 ITF ExampleToday’s HM Review/ D date Skills 1 Hire Q1 Q2 Q3 Q4 © Copyright 2011 Avanade Inc. All Rights Reserved. 2

×