Cotf Df

  1. 1. Authorized Independent Representatives for: Central Oregon Timber Frame Homes Doug & Leanne Smith 67775 Cloverdale Road Sisters, OR  97759 www.OregonTimberFrame.com
  2. 2. This slide show chronicles the 2008 construction of a Davis Timber Frame Home in Sisters Oregon which belongs to Doug & Leanne Smith, independent reps for Davis Frame Co in the Northwest. If you are considering building a new mountain or lake home as either a primary or secondary residence, hopefully, these slides will answer some of your questions as to the materials and processes we recommend. As you will see, Timber Frame & SIP technology are a fantastic new way to build! For more information visit our website at www.OregonTimberFrame.com   or call (541) 306-3232Cell: (541) 977-8285 Enjoy!
  3. 3. Foundation Work 1
  4. 4. Foundation Work 2
  5. 5. Laying out Posts and Beams for assembly and erecting 1
  6. 6. Laying out Posts and Beams for assembly and erecting 2
  7. 7. Laying out Posts and Beams for assembly and erecting 3
  8. 8. Timber Frame System being Erected 1
  9. 9. Timber Frame System being Erected 2
  10. 10. Timber Frame System being Erected 3
  11. 11. Timber Frame System being Erected 4
  12. 12. Timber Frame System being Erected 5
  13. 13. Timber Frame System being Erected 6
  14. 14. Timber Frame System being Erected 7
  15. 15. Timber Frame System being Erected 8
  16. 16. Timber Frame System being Erected 9
  17. 17. Timber Frame System being Erected 10
  18. 18. Timber Frame System being Erected 11
  19. 19. Timber Frame System being Erected 12
  20. 20. Timber Frame System being Erected 13
  21. 21. Timber Frame System being Erected 14
  22. 22. Wooden Peg Joinery
  23. 23. Joinery detail and support strapping 1
  24. 24. Joinery detail and support strapping 2
  25. 25. Timber Frame System being Erected 15
  26. 26. Timber Frame System being Erected 16
  27. 27. Timber Frame System being Erected 17
  28. 28. Timber Frame System being Erected 18
  29. 29. Timber Frame System being Erected 19
  30. 30. Timber Frame System being Erected 20
  31. 31. Timber Frame System being Erected 21
  32. 32. Timber Frame System being Erected 22
  33. 33. Timber Frame System being Erected 23
  34. 34. Timber Frame System being Erected 24
  35. 35. Roofing felt installed over wood ceiling panels 1
  36. 36. Roofing felt installed over wood ceiling panels 2
  37. 37. Roofing felt installed over wood ceiling panels 3
  38. 38. Timber Frame System being Erected 25
  39. 39. Timber Frame System being Erected 26
  40. 40. Timber Frame System being Erected 27
  41. 41. Installation of wood ceiling panels 1
  42. 42. Roofing felt installed over wood ceiling panels 4
  43. 43. Installation of wood ceiling panels 2
  44. 44. Installation of SIPS Panel 1
  45. 45. Installation of SIPS Panel 2
  46. 46. Installation of SIPS Panel 3
  47. 47. Installation of SIPS Panel 4
  48. 48. Installation of SIPS Panel 5
  49. 49. Installation of SIPS Panel 6
  50. 50. Installation of SIPS Panel 7
  51. 51. Drywall being installed on the exterior walls at the same time as the SIPS Panels 1
  52. 52. Installation of SIPS Panel 8
  53. 53. Installation of SIPS Panel 9
  54. 54. Drywall being installed on the exterior walls at the same time as the SIPS Panels 2
  55. 55. Drywall being installed on the exterior walls at the same time as the SIPS Panels 3
  56. 56. Installation of SIPS Panel 10
  57. 57. Installation of SIPS Panel 11
  58. 58. The house is dried in, ready for windows & exterior finishes
  59. 59. Exterior finishes being installed 1
  60. 60. Exterior finishes being installed 2
  61. 61. Exterior finishes being installed 3
  62. 62. Exterior finishes completed 1
  63. 63. Exterior finishes completed 2
  64. 64. Front view of Completed House.
  65. 65. Balcony area showing exposed wood ceiling
  66. 66. Kitchen
  67. 67. Family Room view from Kitchen, exposed posts & beams and wood ceiling panels
  68. 68. Thanks for viewing this presentation. Call us any time for additional information (541) 306-3232  Cell: (541) 977-8285 Visit our web site at www.OregonTimberFrame.com

×