NORAZUIN BT JAWARI        p55723NURAFIZA BT MOHD HASSIM     P60144NORIZZA SYAFIQAH BT BAHRIN P65408
TRANSPORTATION•Major impact on the economic development of cities and region.•Advances in transportation changes in the wa...
KAJANGPUTRAJAYA                         BANGI       NILAI               BANDAR SRI PUTRA
KTM KOMUTER                -NILAI               -BANGI                 -UKM              -KAJANG  BUS  -NILAI             ...
NILAI                               PUTRAJAYABANDAR SRI PUTRABANGI                   HIGHWAY           NILAI              ...
KTM-KOMUTER Improve on time punctualities with less delays• Longer coaches withexclusive coach forladies.• more comfortabl...
• Connected both Bandar  Baru Bangi and Kajang• More bus routes services  provided (Genting,  Johor,Kedaha and etc.• Locat...
Less public trasnportation available here.Only taxis and mini busesProvide more services with better timepunctualites
Transport Modeling   Trip generation     Determines the frequency of origins or destinations of trips in      each zone ...
Population for Each Zone       ZONE           POPULATION        ZONE       Kajang           448243          Kajang  Bandar...
Production and Attraction      ZONE           RESIDENTIAL UNIT   PRODUCTION RATE   PRODUCTION      Kajang              448...
Production and Attraction      ZONE           RESIDENTIAL UNIT   ATTRACTION RATE   ATTRACTION      Kajang              448...
Adjusted Production andAttraction       ZONE           PRODUCTION            ATTRACTION       Kajang           291358     ...
Adjusted Production andAttraction       ZONE           PRODUCTION            ATTRACTION       Kajang           306123     ...
Trip Pattern ( O – D )Matrix                        Bandar Baru               Bandar Seri           PRODUCTIO   ZONE      ...
Trip Assignment                         Bandar Baru               Bandar Seri    ZONE        Kajang                 Putraj...
Trip Distribution Diagram 125851      Kajang         111261            Bandar  93877    Baru Bangi       78827            ...
Policy ChangesAndRecommendedAction Plan
Government Funding                                 Gives funding to local                                   transport serv...
•More car parks be built at originrather than destination.•Play an important role as it canbe integrated with public trans...
Improvement on pedestrian path andwalkway    •Increase the safety of    pedestrian    • summons to be issued for    those ...
   Proposed in 2010, fully operational in 2016   Expected to serve on population of 1.2 mil   Total length of 150 km, w...
OVERALL PROPOSED ALIGNMENT OF KAJANG –    BANGI – PUTRAJAYA – BANDAR SERI PUTRA – NILAI                          3        ...
Low SpaceSPEED?                                                       Utilization?               PROPOSED LRT             ...
Maximize                                                       Passenger                  RIDERSHIP?                      ...
PROPOSED               INTEGRATED STATION                                                PUTRAJAYA STATION                ...
CONCLUSIONTHANK YOU
REFERENCEShttp://aibob.blogspot.com/2012/01/vintage-and-rare-photos-of-kuala-lumpur.htmlhttp://www.mymrt.com.my/http://www...
KAJANG URBAN TRANSPORT STUDY
KAJANG URBAN TRANSPORT STUDY
KAJANG URBAN TRANSPORT STUDY
Upcoming SlideShare
Loading in …5
×

KAJANG URBAN TRANSPORT STUDY

1,002 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,002
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
42
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

KAJANG URBAN TRANSPORT STUDY

  1. 1. NORAZUIN BT JAWARI p55723NURAFIZA BT MOHD HASSIM P60144NORIZZA SYAFIQAH BT BAHRIN P65408
  2. 2. TRANSPORTATION•Major impact on the economic development of cities and region.•Advances in transportation changes in the way of living and great influencedin development of civilization.•Public transportation contributed in the shaping of town.•Areas with efficient public transport are economically thriving and can offeradvantageous for businesses and individuals to work or live in.
  3. 3. KAJANGPUTRAJAYA BANGI NILAI BANDAR SRI PUTRA
  4. 4. KTM KOMUTER -NILAI -BANGI -UKM -KAJANG BUS -NILAI ERL EXISTING BANGI TRANSPORTATION -NILAI KAJANG -PUTRAJAYAPUTRAJAYA TAXIS -NILAI -BANDAR SRI PUTRA -BANGI -KAJANG -PUTRAJAYA
  5. 5. NILAI PUTRAJAYABANDAR SRI PUTRABANGI HIGHWAY NILAI BANGIKAJANG KAJANGPUTRAJAYA KAJANG PUTRAJAYA KAJANG PUTRAJAYA
  6. 6. KTM-KOMUTER Improve on time punctualities with less delays• Longer coaches withexclusive coach forladies.• more comfortable totravel and providedwith wifi services
  7. 7. • Connected both Bandar Baru Bangi and Kajang• More bus routes services provided (Genting, Johor,Kedaha and etc.• Located near to UKM KTM station• Located at the center of Pekan Kajang.
  8. 8. Less public trasnportation available here.Only taxis and mini busesProvide more services with better timepunctualites
  9. 9. Transport Modeling Trip generation  Determines the frequency of origins or destinations of trips in each zone by trip purpose, as a function of land uses and household demographics, and other socio-economic factors. Trip distribution  Matches origins with destinations, often using a gravity model function, equivalent to an entropy maximizing model. Modal split  Computes the proportion of trips between each origin and destination that use a particular transportation mode. Trip assignment  Allocates trips between an origin and destination by a particular mode to a route.
  10. 10. Population for Each Zone ZONE POPULATION ZONE Kajang 448243 Kajang Bandar Baru Bangi 116745 Bandar Baru Bangi Putrajaya 62457 Putrajaya Bandar Seri Putra 71683 Bandar Seri Putra
  11. 11. Production and Attraction ZONE RESIDENTIAL UNIT PRODUCTION RATE PRODUCTION Kajang 448243 0.65 291358 Bandar Baru Bangi 116745 0.65 75884 Putrajaya 62457 0.65 40597 Bandar Seri Putra 71683 0.65 46594 Nilai 38612 0.65 25098
  12. 12. Production and Attraction ZONE RESIDENTIAL UNIT ATTRACTION RATE ATTRACTION Kajang 448243 0.75 336182 Bandar Baru Bangi 116745 0.72 84056 Putrajaya 62457 0.72 44969 Bandar Seri Putra 71683 0.49 35125
  13. 13. Adjusted Production andAttraction ZONE PRODUCTION ATTRACTION Kajang 291358 336182 Bandar Baru Bangi 75884 84056 Putrajaya 40597 44969 Bandar Seri Putra 46594 35125 Nilai 25098 27801 TOTAL 479531 528133 AVERAGE 503832
  14. 14. Adjusted Production andAttraction ZONE PRODUCTION ATTRACTION Kajang 306123 320713 Bandar Baru Bangi 79730 80189 Putrajaya 42654 42900 Bandar Seri Putra 48955 33508 Nilai 26370 26521 TOTAL 503832 503832 AVERAGE 503832
  15. 15. Trip Pattern ( O – D )Matrix Bandar Baru Bandar Seri PRODUCTIO ZONE Kajang Putrajaya Nilai Bangi Putra N Kajang 194862 48722 26066 20359 16114 306123Bandar Baru 50752 12690 6789 5303 4197 79730 Bangi Putrajaya 27152 6789 3632 2837 2245 42654 Bandar Seri 31162 7792 4168 3256 2577 48955 Putra Nilai 16786 4197 2245 1754 1388 26370ATTRACTION 320713 80189 42900 33508 26521 503832
  16. 16. Trip Assignment Bandar Baru Bandar Seri ZONE Kajang Putrajaya Nilai Bangi Putra Kajang 48722 26066 20359 16114 Bandar Baru 50752 6789 5303 4197 Bangi Putrajaya 27152 6789 2837 2245 Bandar Seri 31162 7792 4168 2577 Putra Nilai 16786 4197 2245 1754
  17. 17. Trip Distribution Diagram 125851 Kajang 111261 Bandar 93877 Baru Bangi 78827 Putrajaya 66350 51055 Bandar Seri Putra 25133 48955 Nilai
  18. 18. Policy ChangesAndRecommendedAction Plan
  19. 19. Government Funding Gives funding to local transport services. In order to maintain and improve the infrastructure. Mobility and Traffic Laws Management To ensure to be Aims that by 2025,more successfully than half commuting trip implemented.made via public transport.Mobility centers will be set Policy Ensure all buses uses NGV or non up to coordinate all transportation Changes polluting and low emission fuel to infrastructure. minimized pollutant. Improving road signage Parking Management and and road safety. Park-And-Ride System More be built at origins rather than destination. Parking tickets at a very minimum and reasonable price to maintain continuous support. Safe and secure environment for parked vehicle.
  20. 20. •More car parks be built at originrather than destination.•Play an important role as it canbe integrated with public transportpark-and-ride system•Provide real time information onparking space availability•Safe and secure environment inthe parking spaces • Urban areas classified as traffic restrain zone • entering fee will be charged to ensure those who choose will Can drive in stress free environment Discourage private car use Reducing road congestion
  21. 21. Improvement on pedestrian path andwalkway •Increase the safety of pedestrian • summons to be issued for those who cross zebra crossing without stopping (enforce law) •Beautify and add in more landscape with it •Implement green pedestrian •Latest improvement was air conditioned KLCC-Bukit Bintang Walkway
  22. 22.  Proposed in 2010, fully operational in 2016 Expected to serve on population of 1.2 mil Total length of 150 km, with 31 stations and 16 incorporating with park-and- ride system Integration with existing Kajang Komuter Station
  23. 23. OVERALL PROPOSED ALIGNMENT OF KAJANG – BANGI – PUTRAJAYA – BANDAR SERI PUTRA – NILAI 3 Park FEEDER FEEDER N BUS BUS Ride KAJANG 15 KM Integrated with KTM KOMUTER Park FEEDER N BUS 13 KM Ride PUTRAJAYA Integrated with KLIA (ERL) FEEDER BUS 28 KM BANGI FEEDER Park LRT Monorail Integrate with BUS N Elevated BRT Ride LEGENDS BANDAR SERI PUTRAX LRT MONORAILX ELEVATED BRT LINE INTEGRATED STATION FEEDER NILAI 3 BUS STATION NILAI Integrated with KTM KOMUTER
  24. 24. Low SpaceSPEED? Utilization? PROPOSED LRT MONORAILMINIMAL LAND OPERATEACQUISITION? WITHOUT A DRIVER?SAFETY? LESS Sources : Dean Heaton Mobile Hairdressing, 2008 Environmental STOP? High Capacity? Quality And Conservation?
  25. 25. Maximize Passenger RIDERSHIP? Demand?MINIMAL LAND Sources : Elevated BRT Sunway Line, 2012ACQUISITION? Constructability Aesthetic Value? PROPOSED ELEVATED BUS RAPID TRANSIT (BRT)
  26. 26. PROPOSED INTEGRATED STATION PUTRAJAYA STATION KLIA ERL INTEGRATED WITH PROPOSED LRT MONORAIL & ELEVATED BRT Sources : Elevated BRT Sunway Line, 2012 KAJANG STATION PROPOSED LRT MONORAIL INTEGRATED WITH PROPOSED ELEVATED BRT BANGI STATION PROPOSED ELEVATED BRT INTEGRATED WITH PROPOSED LRT MONORAIL NILAI STATION KTM KOMUTER INTEGRATED WITHSources : Elevated BRT Sunway Line, 2012 PROPOSED LRT MONORAIL
  27. 27. CONCLUSIONTHANK YOU
  28. 28. REFERENCEShttp://aibob.blogspot.com/2012/01/vintage-and-rare-photos-of-kuala-lumpur.htmlhttp://www.mymrt.com.my/http://www.mrt.com.my/http://malaysiafactbook.com/Maju_Expresswayhttp://tripwow.tripadvisor.com/slideshow-photo/shaded-walkway-san-michele-anacapri-by-travelpod-member-everardt-curinga-italy.html?sid=10970492&fid=tp-14http://www.jpm.gov.my/post/modules/pajpm/vbulletin.php?page=19&bulletin_id=150http://www.nst.com.my/streets/central/driving-through-zebra-crossings-1.67695Sources : Elevated BRT Sunway Line, 2012Bus Rapid Transit Design Guidelines via transit sustainability policiesTHAMIZH ARASAN &VEDAGIRI- Modelling Modal Shift from Personal Vehicles to Buson Introduction ofBus Priority Measure.K.Fedra-Sustainable Urban Transportation:A model-based approach.Masanobu &Hanaoka: COMPARISON OF SUSTAINABILITY BETWEENPRIVATE AND PUBLIC TRANSPORT CONSIDERING URBAN STRUCTURE-2003Parsons Brincker- Improving The Pedestrian EnvironmentNikki Laffel- Promoting Public Transportation for Sustainable Development,May 2006NPTEL-Role of transportation in society-May 2004Reid Ewig-Pedestrian And Transit Friendly DesignHiroya Fujimoto-The Modal Shift to Environmentally Sustainble Transport prospects ofUrban Transport Systems: LRT,BRT and Buses.

×