Materials management system

  1. 1. Submitted by Group2 Arockia Navin(F11012) Ramya Chittigala(F11045) Joseph CherianSwarupa Rani Sahu(F11116)
  2. 2. Introduction• http://www.youtube.com/watch?v=YyBCM9p hIPQ
  3. 3. Project Activities A1 – Approval from Management A2 – Budget Approval A3 – Project-manager appointment A4 – Appoint Team A5 – Identify stakeholders A6 – Requirements Gathering A7 – Design system A8 – Monitor development A9 – Delivery acceptance by clients (in this case, the manufacturing company) A10 – Beta testing (at clients location) A11 – Incorporate valid suggestions A12 – Go Live A13 – Maintenance and further modifications/ updates
  4. 4. ModulesA6.1 – PurchasingA6.2 - Transportation (assembly-materials, finished goods)
  5. 5. A6.3 - Inventory Planning and Control (Assembly-materials, WIP goods and Finished goods)A6.4 - Warehousing
  6. 6. A6.5 – AssemblyA6.6 - Resources
  7. 7. A6.7 - Reverse logisticsA6.10 - MIS Control

×