Palm Jumeirah Monorail                         DMCI GLOBAL, LTD
Palm Jumeirah Monorail                         DMCI GLOBAL, LTD
Aerial View ofPalm Jumeirah  DMCI GLOBAL, LTD
Aerial View ofAtlantis Station(Atlantis Hotel in thebackground)                         DMCI GLOBAL, LTD
Aerial View ofAtlantis Station(Atlantis Aquaventure waterpark at left)                              DMCI GLOBAL, LTD
Atlantis Station     DMCI GLOBAL, LTD
Atlantis Station    DMCI GLOBAL, LTD
Atlantis SwitchBridge                  DMCI GLOBAL, LTD
Village CenterStation     DMCI GLOBAL, LTD
Village Center Station                         DMCI GLOBAL, LTD
Trump TowerStation    DMCI GLOBAL, LTD
Trump Tower Station                      DMCI GLOBAL, LTD
Rebar Fabrication                    DMCI GLOBAL, LTD
Inner Form Fabrication           DMCI GLOBAL, LTD
Soffit Form Setting                      DMCI GLOBAL, LTD
End Form Setting                   DMCI GLOBAL, LTD
Rebar Assembly                 DMCI GLOBAL, LTD
Rebar Assembly                 DMCI GLOBAL, LTD
Inner Form and Sheath         Installation               inner formsheath                        DMCI GLOBAL, LTD
Side Form Preparation beforeinserting rebar cage                 DMCI GLOBAL, LTD
Side Form Setting                    DMCI GLOBAL, LTD
Concrete Placing           DMCI GLOBAL, LTD
Concrete Placing         DMCI GLOBAL, LTD
Curing         DMCI GLOBAL, LTD
Stressing            DMCI GLOBAL, LTD
Lifting to Stock Area         DMCI GLOBAL, LTD
Retouching    DMCI GLOBAL, LTD
Stocking Area    DMCI GLOBAL, LTD
Placing ofCHALLENGESStitching Concrete                       DMCI GLOBAL, LTD
DMCI GLOBAL, LTD
Palm Jumeirah MonorailGuideway BeamProduction & StitchingPrecasting of 428 beams  each beam is 28m long x 1m wide x 2m hi...
Palm Jumeirah MonorailAtlantis Station3 floors2100 sq mContract Amount (Structural): AED 3.6 MillionContract Amount (Fin...
Palm Jumeirah MonorailVillage Center Station5 floors2200 sq mContract Amount (Structural): AED 3.9 MillionContract Amoun...
Palm Jumeirah MonorailTrump Tower Station3 floors1700 sq mContract Amount (Structural): AED 2.6 MillionContract Amount (...
Project FeaturesMonorail Guideway Beams32 cu m concrete per beam (typical)80 tons beam weight (typical)2 beams per day ave...
Benefits Derived : Profit realized Retention of human resource Capability enhancement – through this experience the com...
Upcoming SlideShare
Loading in …5
×

Dubai monorail, Ronaldo R. Elepaño, ACF

1,474 views

Published on

Published in: Technology, Business
  • Be the first to comment

Dubai monorail, Ronaldo R. Elepaño, ACF

  1. 1. Palm Jumeirah Monorail DMCI GLOBAL, LTD
  2. 2. Palm Jumeirah Monorail DMCI GLOBAL, LTD
  3. 3. Aerial View ofPalm Jumeirah DMCI GLOBAL, LTD
  4. 4. Aerial View ofAtlantis Station(Atlantis Hotel in thebackground) DMCI GLOBAL, LTD
  5. 5. Aerial View ofAtlantis Station(Atlantis Aquaventure waterpark at left) DMCI GLOBAL, LTD
  6. 6. Atlantis Station DMCI GLOBAL, LTD
  7. 7. Atlantis Station DMCI GLOBAL, LTD
  8. 8. Atlantis SwitchBridge DMCI GLOBAL, LTD
  9. 9. Village CenterStation DMCI GLOBAL, LTD
  10. 10. Village Center Station DMCI GLOBAL, LTD
  11. 11. Trump TowerStation DMCI GLOBAL, LTD
  12. 12. Trump Tower Station DMCI GLOBAL, LTD
  13. 13. Rebar Fabrication DMCI GLOBAL, LTD
  14. 14. Inner Form Fabrication DMCI GLOBAL, LTD
  15. 15. Soffit Form Setting DMCI GLOBAL, LTD
  16. 16. End Form Setting DMCI GLOBAL, LTD
  17. 17. Rebar Assembly DMCI GLOBAL, LTD
  18. 18. Rebar Assembly DMCI GLOBAL, LTD
  19. 19. Inner Form and Sheath Installation inner formsheath DMCI GLOBAL, LTD
  20. 20. Side Form Preparation beforeinserting rebar cage DMCI GLOBAL, LTD
  21. 21. Side Form Setting DMCI GLOBAL, LTD
  22. 22. Concrete Placing DMCI GLOBAL, LTD
  23. 23. Concrete Placing DMCI GLOBAL, LTD
  24. 24. Curing DMCI GLOBAL, LTD
  25. 25. Stressing DMCI GLOBAL, LTD
  26. 26. Lifting to Stock Area DMCI GLOBAL, LTD
  27. 27. Retouching DMCI GLOBAL, LTD
  28. 28. Stocking Area DMCI GLOBAL, LTD
  29. 29. Placing ofCHALLENGESStitching Concrete DMCI GLOBAL, LTD
  30. 30. DMCI GLOBAL, LTD
  31. 31. Palm Jumeirah MonorailGuideway BeamProduction & StitchingPrecasting of 428 beams each beam is 28m long x 1m wide x 2m high and weighs 80 tonsJoining of beams to columns at site beams are “stitched” to other beams and columns by concreteContract Amount: AED 11.3 Million DMCI GLOBAL, LTD
  32. 32. Palm Jumeirah MonorailAtlantis Station3 floors2100 sq mContract Amount (Structural): AED 3.6 MillionContract Amount (Finishing): AED 11.0 Million DMCI GLOBAL, LTD
  33. 33. Palm Jumeirah MonorailVillage Center Station5 floors2200 sq mContract Amount (Structural): AED 3.9 MillionContract Amount (Finishing): AED 7.9 Million DMCI GLOBAL, LTD
  34. 34. Palm Jumeirah MonorailTrump Tower Station3 floors1700 sq mContract Amount (Structural): AED 2.6 MillionContract Amount (Finishing): AED 9.5 Million DMCI GLOBAL, LTD
  35. 35. Project FeaturesMonorail Guideway Beams32 cu m concrete per beam (typical)80 tons beam weight (typical)2 beams per day average productionHollow sectionPre-stressed, post-tensionedVertically & horizontally curved and canted beamsCurved soffitMonorail StationsStructural: Concrete: 5900 cu m Rebar: 1160 tonsFinishes: (1) Custom glass and aluminum external envelope (2) Spray tile finish to exterior concrete surfaces (3) Granite interior walls and floors (4) Perforated aluminum ceiling finish DMCI GLOBAL, LTD
  36. 36. Benefits Derived : Profit realized Retention of human resource Capability enhancement – through this experience the company was able to win two more projects in the Philippines.

×