SlideShare a Scribd company logo
1 of 20
Download to read offline
APPLICATION NOTE
RESILIENT AND RELIABLE POWER SUPPLY IN A
MODERN OFFICE BUILDING: CASE STUDY
Angelo Baggini & Hans De Keulenaer
October 2015
ECI Publication No Cu0124
Available from www.leonardo-energy.org/drupal/node/3248
Publication No Cu0124
Issue Date: October 2015
Page i
Document Issue Control Sheet
Document Title: Application Note – Induction Heating
Publication No: Cu0124
Issue: 03
Release: October 2015
Author(s): Angelo Baggini & Hans De Keulenaer
Reviewer(s): Roman Targosz
Document History
Issue Date Purpose
1 June 2008 Initial publication
2 January
2012
Adapted for adoption into the Good Practice Guide
3 October
2015
Review by Roman Targosz, with minor adaptations
Disclaimer
While this publication has been prepared with care, European Copper Institute and other contributors provide
no warranty with regards to the content and shall not be liable for any direct, incidental or consequential
damages that may result from the use of the information or the data contained.
Copyright© European Copper Institute.
Reproduction is authorized providing the material is unabridged and the source is acknowledged.
Publication No Cu0124
Issue Date: October 2015
Page ii
CONTENTS
Summary ........................................................................................................................................................ 1
Introduction.................................................................................................................................................... 2
Description of existing situation ..................................................................................................................... 2
Distribution scheme................................................................................................................................................2
Lines ..................................................................................................................................................................2
Load ..................................................................................................................................................................4
Power quality..........................................................................................................................................................4
Events ..................................................................................................................................................................8
Analysis of the existing situation .................................................................................................................... 8
Distribution scheme................................................................................................................................................8
Line overheating.....................................................................................................................................................8
Co-ordination among protection devices and lines................................................................................................9
Neutral Status...........................................................................................................................................9
Design approach............................................................................................................................................. 9
Load classification...................................................................................................................................................9
Main distribution schemes ...................................................................................................................................12
Line sizing..............................................................................................................................................................15
Cost analysis ................................................................................................................................................. 16
Cost when selected at initial design stage............................................................................................................16
Cost for installation upgrade ................................................................................................................................16
Conclusion .................................................................................................................................................... 17
References.................................................................................................................................................... 17
Publication No Cu0124
Issue Date: October 2015
Page 1
SUMMARY
This Application Note describes the design of the electrical infrastructure for a modern 10-story head-office
building in Milan, Italy, housing 500 employees using IT intensively. It demonstrates how concern for resilience
and reliability at design stage can save high maintenance and renovation costs at later stage. Two design
approaches are discussed and compared, including a cost comparison. Attention goes to the choice of the
electrical distribution scheme, the choice of the earthing configuration, how to cope with harmonic currents,
the coordination of many different protection devices, and how to ensure power supply for mission critical
loads.
Publication No Cu0124
Issue Date: October 2015
Page 2
INTRODUCTION
This paper presents a design approach to assure resilient and reliable power supply in an electronics-intensive
office building. The document is a case study of a 10-floor office in Milan, Italy (hereafter referred to as “the
building” for confidentiality reasons). The building is the head office of a major financial institution and is
occupied by 500 employees using information technology equipment intensively.
After a description of the current status of the electrical installation in the building, accompanied by the results
of power quality measurements, two design proposals are presented that assure a resilient and reliable power
supply. A cost analysis completes this report.
DESCRIPTION OF EXISTING SITUATION
DISTRIBUTION SCHEME
The building is connected to the 23 kV MV public grid. The medium voltage main power supply consists of two
800 kVA transformers, 23/0.4 kV, 50 Hz. The low voltage side of the installation is designed as a TN-S system.
The load is subdivided into standard, preferential, and privileged loads, according to requirements for
continuity of supply (this is discussed in greater detail later in the text). There is a second point of common
coupling (PCC) to feed a small portion of the standard load. The two PCCs are fed from the same grid point and
so are not independent.
To assure continuity of the power supply, two UPSs (80 + 200 kVA) and a motor generator (250 kVA) are
installed according to the scheme in Fig 1. Note that in such a scheme, it is imperative that the neutral
conductor is connected to the earth only once, at the main earthing terminal, and not at each transformer.
Otherwise, the benefits of the TN-S wiring configuration – improved EMC and power quality – are lost.
The primary distribution is a compromise between radial and shunt schemes
1
. The installation has grown in a
haphazard way, without a consistent structure. This is a direct result of the many changes in power
requirements experienced during the building’s lifetime. Two distribution panels feed each floor. Each panel
has two sections (standard and privileged) corresponding to the standard and privileged sections of the main
LV power panel (Fig. 2). Final distribution uses a single radial scheme.
LINES
The 3-phase distribution is made with multi-core copper cables. Where the phase conductor cross sections
were greater than 35 mm
2
, half-sized neutral conductors had been used.
1
Shunt scheme: a rising bus bar or power line is shared for all floors; at each floor, a connection is made to the
LV panel at the floor. Radial scheme: each LV panel at each floor has a dedicated connection with its
corresponding switchgear at the main LV distribution panel in the basement.
Publication No Cu0124
Issue Date: October 2015
Page 3
Figure 1 – Initial distribution scheme, before the modifications.
Publication No Cu0124
Issue Date: October 2015
Page 4
Figure 2 –Initial distribution flow chart, before the modifications. The dark lines indicate the standard
distribution. The light lines indicate the privileged distribution.
LOAD
The rated load for the office building is typical and consists of:
- Elevators (approx. 80 kVA)
- Services (approx. 100 kVA)
- Air-conditioning (approx. 600 kVA)
- Horizontal distribution for lighting and power in the open office space (approx. 35 kVA per floor)
POWER QUALITY
To evaluate the quality of the power supply, current harmonic content was measured at the main electrical
lines feeding each floor and at the distribution panels for building services.
Figures 3 to 6 give examples of measured current and voltage waveforms and their harmonic content. We
would like to highlight the following points:
- Some phase conductors, particularly those for lighting circuits, have over 75% total harmonic current
distortion (3
rd
, 5
th
, and 7
th
harmonic) – see Fig. 6. There is significant 3
rd
harmonic current distortion in
circuits serving IT and lighting equipment – see Figs. 4, 5 (neutral conductor), and 6. In some neutral
conductors, the harmonic currents are more than twice the phase current.
- Both UPS show current distortion in phase and neutral conductors – see Figures 4 and 5.
- Even-order harmonics appear in more than one measurement (approx. 30% in Figure 5). This means that
the waveform of the current does not have the usual symmetry.
- In some cases, the waveform produces more than two zero-crossings per cycle of the sine wave (Figure 5).
Publication No Cu0124
Issue Date: October 2015
Page 5
- Rather high permanent currents are detected in the ground conductor. This is a typical indication that the
TN-S configuration has not been preserved, i.e. that there are multiple connections between the neutral
conductor and earth. It must be ensured that there is only one main earthing point with a connection
between neutral and ground. On-site personnel need to be briefed to avoid making any connection
between the neutral and ground in the LV distribution.
The instrument used to make these measurements was a Fluke 43 single phase, 0 - 600 V, CT 600 A / 1 mV/A
power quality analyzer.
Figure 3 – Waveform and harmonic contents of phase current (phase L1) at main LV power panel in the line
feeding elevators 1 and 2.
Publication No Cu0124
Issue Date: October 2015
Page 6
Figure 4 – Waveform and harmonic contents of phase current (phase L1) in the 80 kVA line to the
uninterruptible Power Supply - UPS (open office space).
Publication No Cu0124
Issue Date: October 2015
Page 7
Figure 5 – Waveform and harmonic contents of neutral current in the 80 kVA UPS line (open office space).
Publication No Cu0124
Issue Date: October 2015
Page 8
Figure 6 –Harmonic contents of phase L2 current at main LV distribution panel in the line feeding ground floor
distribution panel (mainly lighting circuits).
EVENTS
The building occupant experienced a high and increasing number of events and faults, principally related to
the overheating of lines and nuisance tripping of protection devices.
ANALYSIS OF THE EXISTING SITUATION
The current installation lacks organization and rationality in its approach. This is not compatible with the
resilient design the company adopted at the start (supply low-voltage distribution through multiple
transformers, UPS, and generator).
Some elements are not in conformance with the current standards. Even full compliance to standards does not
guarantee adequate performance from a power quality and EMC viewpoint for a building with mission-critical
functions.
DISTRIBUTION SCHEME
The distribution scheme is neither systematic nor rational, probably due to the numerous modifications since
the original installation. There are important limitations relating to reserve capacity and independence. Some
bottlenecks are present, e.g. at the level of the main LV bus bar (Fig 1). The two transformers are not
independent. The floors too are not independent.
LINE OVERHEATING
The high density of information technology equipment such as PC, servers, etc. and electronic lighting
produces high levels of harmonic current in many lines.
These phenomena result in neutral overheating (elevated currents in a downsized neutral as well as nuisance
tripping of protective devices).
Publication No Cu0124
Issue Date: October 2015
Page 9
CO-ORDINATION AMONG PROTECTION DEVICES AND LINES
The current capacities of some lines are not co-ordinated with their over-currents protection devices. The
large number of lines running in the same trunking make the problem more critical because the operating
temperature is higher.
Analysis of a faulty line showed that prolonged overheating was the cause of failure, due to overheating in the
trunking. The grouping factors given in informative annexes of national and international wiring regulations
should be observed.
NEUTRAL STATUS
In case of such a multiple feed with TN-S configuration, the neutral current needs to be brought back right to
the main earthing terminal. Procedures must be in place to avoid making any additional connection between
neutral and ground. Such connections create alternative paths for the neutral current, thus eliminating all the
benefits of having a TN-S system.
DESIGN APPROACH
The building occupant, operating in the financial sector, needs to upgrade the installation since reliable power
quality is considered mission-critical. The problems shown by the analysis of the current situation and the PQ
measurements suggest consideration of an update of the electrical system at different levels:
- Rationalization of mains distribution
- Renewal of the electrical installation on the floors
LOAD CLASSIFICATION
To optimize the main distribution rationalization, the first step is the classification of the loads. All loads are
classified into 3 groups:
- Standard
- Preferential
- Privileged
Standard loads are used for daily business, but their non-availability does not result in risk of personal injury,
damage to equipment or disruption of business processes. A simple radial circuit suffices for the supply and
relatively long intervention times can be tolerated (Table 1).
Preferential loads need a redundant power supply, for example as provided by a dual radial scheme, starting
either from the risers or at the level of intermediate connections (Table 2).
Privileged loads are mission-critical. Loss of service means grave danger to personnel or severe damage to the
organization’s business processes. The level of independence needs to be determined for each load. At the
very least, these loads must be supplied from two independent feeders with automatic switching (Table 3).
Publication No Cu0124
Issue Date: October 2015
Page 10
Description of standard load Type of power supply required Timing needed for intervention
Allows regular functioning of the
building, but their unavailability
does not result in risk to
personnel or equipment:
- General services, e.g. air
conditioning (but not in
server room)
- Normal lighting
- Heating
- Power sockets
Standard radial circuits.
Resumption of service can wait
for some time without damage.
Loads can be switched off.
None
Unavailability of service for
relatively long time periods can
be tolerated.
Table 1 – Description, criteria, design, and intervention requirements for standard loads.
Description of preferential load Type of power supply required Timing needed for intervention
Regular functioning of the load is
required for comfort and security
of personnel and clients, as well
as for ensuring smooth business
operation. For example:
- Lighting of staircases,
corridors, and certain rooms
- Minimum lighting conditions
to avoid panic
- Heating or air conditioning
of certain rooms
- Elevators
- UPS
Backup
Dual radial primary supply,
ensuring the functional and
physical independence of the
risers.
Two separate risers can be
employed, supported either by a
generator or supplied from two
independent grid points.
Switching off the load is not
acceptable.
According to the norm, a 20
second intervention time for the
generator group is acceptable for
long interruptions. Typical values
for a diesel group:
- First attempt: within 5
seconds
- Second attempt within 10
seconds
- Third attempt within 15s
Table 2 – Description, criteria, design, and intervention requirements for preferential loads.
Description of privileged load Type of power supply required Timing needed for intervention
Essential services:
- Security lighting
- Servers
- Telecommunication systems
- Personnel retrieval
- Alarm & security systems
- Fire signalling and anti-fire
systems
- Closed-loop TV circuits
- Certain auxiliary services
Secure
Dual radial scheme, with
independent risers. At least one
riser has to ensure high grid
reliability
Use of UPS.
For certain loads, a dedicated
UPS can be considered.
Loads with intervention within 15
seconds.
Short-interruption loads, within
0.15 s
Some loads need continuous
supply.
Table 3 – Description, criteria, design, and intervention requirements for privileged loads.
Publication No Cu0124
Issue Date: October 2015
Page 11
Figure 7 – Flow chart of activities for selecting the right distribution scheme.
In co-operation with the building occupant, all loads have been classified as shown in Table 4.
Type of load Percentage
Standard 49%
Preferential 13%
Privileged 38%
Table 4 – Classification of type of loads.
Publication No Cu0124
Issue Date: October 2015
Page 12
Component type
# Outages per 1000
Components per Year
# Outages per
Components per Year
Failure Rate
MV/LV transformers 1-2
MV and LV circuit breakers 0,2-1
Disconnect switches 1-4
Electronic relays (single) 5-10
Electronic relay systems 30-100
Standby generators 20-75
failure to start 0,5-2%
Continuous generators 0,3-1
UPS inverter 0,5-2
UPS rectifier 30-100
Underground cable (1000 m) 13-25
Cable terminations 0,3-1
Cable joints 0,5-2
Table 5 – Electrical components used in MV-LV distribution installation dependability statistics (Source: M. H. J.
Bollen, Literature search for reliability data of components in electric distribution networks, Eindhoven
University of Technology Research Report 93-E-276, August 1993).
MAIN DISTRIBUTION SCHEMES
To avoid the existing bottleneck at LV main bus bar, the primary distribution must be modified as a dual radial
distribution (Fig. 8 left).
The rating of the transformers TR1 and TR2 must ensure that each can carry the full load. Considering that,
because of the nature of the loads, the load current waveform will be highly distorted, the transformers must
be sized to take account of the harmonic content.
To reduce short circuit currents, the system is normally managed with the main bus bar-breaker open, but
parallel operation between the two main transformers is possible for short time.
To feed the thermal and HVAC services, the transformer section shall be modified as shown in Figure 8 with a
new 800 kVA transformer, TR3, in addition to the existing two. The new transformer has been selected
according with the series A0Ak of the standard EN 50546-1 to minimize the losses.
Publication No Cu0124
Issue Date: October 2015
Page 13
Figure 9 – Main distribution scheme after the modifications.
Standard loads are supplied from a single grid point. The same grid power cable, riser, and radial distribution
also supplies preferential and privileged loads.
Two generator groups supply preferential and privileged loads. Standard loads are switched off through the
breakers at the extremity of the main bus bar.
Two UPS supply privileged loads, in case of failure of normal and backup power supply.
Primary supply and backup supply is wired TN-S. UPS can be wired either TN-S or IT (meaning, here, isolated
earth). Isolated earth systems are excellent for continuity of power supply, but cannot guarantee protection of
personnel. Where an IT system is installed, proper security measures have to be taken to ensure that only
authorized personnel can have access to the IT circuits.
The second LV PCC has been removed in Figure 8.
Each floor is still supplied by two distribution panels, each having three sections (standard, privileged and
preferential) corresponding to the same sections of the main LV power panel.
Final distribution could be done using a shunt (Figure 9) or single radial (Figure 10) scheme.
The shunt scheme (shared line feeding all floors for each type of loads) is cheaper and more flexible in the case
of load growth. Unfortunately it is limited by poor resilience to faults in the main line and risers.
The single radial scheme (one line for each floor for each type of load) ensures:
- Minimum interference and voltage drop caused by load
- In case of a fault, only loads supplied by the faulty line are out of service
- Reduced maintenance problems
The radial scheme is therefore the preferred scheme.
Publication No Cu0124
Issue Date: October 2015
Page 14
Figure 9 – Solution with radial scheme (10 floors with three types of load = 30 dedicated rising lines). Dark line
indicates standard distribution; grey line, preferential distribution; light line, privileged distribution.
Figure 10 – Solution with unique riser lines (three types of load = three rising lines / bus bar, shared by all
floors). Dark line indicates standard distribution; Grey, preferential distribution; Light, privileged distribution.
Publication No Cu0124
Issue Date: October 2015
Page 15
LINE SIZING
Table 6 shows the power-considered sizing all the main sections of the system.
The total installed load (Columns 2 and 3) is multiplied by utilization and contemporary factors (Columns 4 and
5) to calculate the power requirements of the load (Columns 6 and 7). As a margin for future load growth, lines
are sized (Columns 8 and 9) considering an additional factor equal to 130% and 115% for power and lighting
circuits respectively.
Load Installed load (kVA) Utilization &
Contemporary Factors
Power requirement
(kVA)
Installed power (kVA)
Power
(1)
Light
(2)
Power
(3)
Light
(4)
Power
(5)
Light
(6)
Power
(7)
Light
(8)
2nd underground 7 10 0.7 1 5 10 6.5 11.5
1st underground 114 15 0.7 1 80 15 104 17.25
Ground and general services 43 15 0.7 1 30 15 39 17.25
First floor 50 17 0.7 1 35 17 45.5 19.55
Second floor 50 17 0.7 1 35 17 45.5 19.55
Third floor 50 17 0.7 1 35 17 45.5 19.55
Fourth floor 50 17 0.7 1 35 17 45.5 19.55
Fifth floor 50 17 0.7 1 35 17 45.5 19.55
Sixth floor 50 17 0.7 1 35 17 45.5 19.55
Seventh floor 50 17 0.7 1 35 17 45.5 19.55
Eighth floor 29 12 0.7 1 20 12 26 13.8
Nine floor 3 2 0.7 1 2 2 2.6 2.3
Thermal Central 29 0 0.7 -- 20 0 26 0
HVAC main station 843 0 0.7 -- 590 0 767 0
Boxes 14 5 0.7 1 10 5 13 5.75
Elevators 114 0 0.7 1 80 0 104 0
TOTAL 1546 178 -- -- 1,082 178 1,407 204.7
Table 6 – Peak-rated and actual sizing of primary distribution system.
Considering the measured waveform of the current, all the new lines have been sized to take into account the
harmonic profile and resilience requirements:
 Neutral cross section equal to that of phase
 Derated cables
Special attention should be paid to neutral and phase conductor sizing to avoid overheating and faulty tripping
of protection devices. The adoption of a UPS or motor generator is not useful if a line fault occurs after it.
Publication No Cu0124
Issue Date: October 2015
Page 16
COST ANALYSIS
The cost of existing installation is compared with two possible alternative solutions. These alternatives differ
only for risers, and hence for the cost of the main LV panel.
Solution 1 is the shunt scheme, and Solution 2 is the simple radial scheme, which is preferable for new
buildings, but difficult to implement as an installation upgrade.
COST WHEN SELECTED AT INITIAL DESIGN STAGE
Item Existing (k€) Solution 1 (k€) Solution 2 (k€)
Main LV panel 62,949 68,850 88,522
Risers 59,015 68,850 118,029
Horizontal distribution 210,485 265,565 265,565
Generator groups 171,142 210,485 210,485
UPS 108,193 206,551 206,551
Motive power 698,339 737,682 737,682
Lighting 983,576 1032,754 1032,754
Total 2293,698 2590,738 2659,589
Total Absolute difference -- 297,040 365,890
Total Relative difference -- 13% 16%
Table 7
COST FOR INSTALLATION UPGRADE
Total absolute difference -- 830,138 1068,163
Total relative difference -- 36% 46%
Table 8
Regarding this situation, we would like to highlight the following:
 The percentages refer to the cost of the existing installation
 The extra cost of the better solutions is low, if considered at initial design stage
 The cost of the best technical solution (i.e. Solution 2 – single radial scheme at final distribution) differs
only by 3% from Solution 1 if considered at initial design stage, but the difference is much greater if
considered at refurbishment stage only
 Cost basis 2011
 The cost for the UPS considers only purchase and installation. The additional costs of maintenance must
be taken into account
Even if the evaluation of average costs related to a system designed according to good PQ practice is difficult,
we have to recognize that:
 The cost estimates include the costs related to the practical difficulties of installing and renewing a
building in the center of a major city
 The modification of the main distribution scheme is the most important and useful action to undertake
 The solution with unique riser lines is very difficult to install with the building operational
Publication No Cu0124
Issue Date: October 2015
Page 17
CONCLUSION
Initial low cost does not necessarily mean good value. A PQ compliant system, initially more expensive, can
save a great deal of money during its life. The case study analyzed in this article shows that an electrical
installation, designed without attention to PQ issues, results in a considerable amount of unnecessary
expenditure, whether to resolve the issues or to simply live with the inconvenience and downtime they cause.
The cost/benefit analysis shows that resilience should be carefully considered at design stage. A mere increase
of 16% in the installation cost (1% of the building cost) provides:
- Three lines of defense against power cuts for mission-critical loads (dual panels at each floor, generator,
UPS)
- A highly resilient system, with each floor supplied by 2 distribution panels. Each panel is independent from
the other, and from all panels on the other floors
- A highly flexible electrical system for future load growth
Expensive though it may seem, the highly resilient solution would typically add only about 1% to the cost of
the building. For commercial buildings, where the running costs amount to initial construction costs after 7-8
years, this initial investment will be paid pack by a productivity increase of 10 min per week. Once paid back,
all the rest is profit.
REFERENCES
[1] IEC 364-5-523 - Electrical installations of buildings - Part 5-52: Selection and erection of electrical
equipment - Wiring systems
[2] A. Baggini, Handbook of power quality, Jhon Wiley ans Sons Cichester 2008
[3] A.Silvestri, F.Tommazzolli, “Schemi per gli impianti di energia: semplicità, affidabilità, risparmio,
ridondanza dove e come”, Corso "Il progetto degli impianti elettrici di energia. Le norme e la regola
dell’arte", Dipartimento di Ingegneria Elettrica dell'Università degli Studi di Pavia, AEI, CNR, Pavia, 10-13
giugno 1991
[4] A. Baggini, M. Granziero Static UPS A practical Guide to selection, installation and maintenace, Amazon
2011

More Related Content

What's hot

Transient overvoltages and currents: system interaction and effects on equipment
Transient overvoltages and currents: system interaction and effects on equipmentTransient overvoltages and currents: system interaction and effects on equipment
Transient overvoltages and currents: system interaction and effects on equipmentBruno De Wachter
 
Active harmonic conditioners
Active harmonic conditionersActive harmonic conditioners
Active harmonic conditionersLeonardo ENERGY
 
Introduction to power quality (PQ)
Introduction to power quality (PQ)Introduction to power quality (PQ)
Introduction to power quality (PQ)Bruno De Wachter
 
Electricity systems for hospitals
Electricity systems for hospitalsElectricity systems for hospitals
Electricity systems for hospitalsBruno De Wachter
 
Integrated earthing systems
Integrated earthing systemsIntegrated earthing systems
Integrated earthing systemsLeonardo ENERGY
 
Neutral sizing in harmonic-rich installations
Neutral sizing in harmonic-rich installationsNeutral sizing in harmonic-rich installations
Neutral sizing in harmonic-rich installationsLeonardo ENERGY
 
Application Note – Resilient and Reliable Power Supply in a Modern Office Bui...
Application Note – Resilient and Reliable Power Supply in a Modern Office Bui...Application Note – Resilient and Reliable Power Supply in a Modern Office Bui...
Application Note – Resilient and Reliable Power Supply in a Modern Office Bui...Leonardo ENERGY
 
Introduction to transients and overvoltages
Introduction to transients and overvoltagesIntroduction to transients and overvoltages
Introduction to transients and overvoltagesBruno De Wachter
 
Wind power: introduction
Wind power: introductionWind power: introduction
Wind power: introductionLeonardo ENERGY
 
Transient overvoltages and currents: mitigation and protection techniques
Transient overvoltages and currents: mitigation and protection techniquesTransient overvoltages and currents: mitigation and protection techniques
Transient overvoltages and currents: mitigation and protection techniquesBruno De Wachter
 
Transient overvoltages and currents: lightning surges
Transient overvoltages and currents: lightning surgesTransient overvoltages and currents: lightning surges
Transient overvoltages and currents: lightning surgesBruno De Wachter
 
Ieeepro techno solutions 2012 ieee embedded project - microelectromechanic...
Ieeepro techno solutions   2012 ieee embedded project  - microelectromechanic...Ieeepro techno solutions   2012 ieee embedded project  - microelectromechanic...
Ieeepro techno solutions 2012 ieee embedded project - microelectromechanic...srinivasanece7
 
Transient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effectsTransient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effectsBruno De Wachter
 
Transient overvoltages and currents: detection and measurement
Transient overvoltages and currents: detection and measurementTransient overvoltages and currents: detection and measurement
Transient overvoltages and currents: detection and measurementBruno De Wachter
 
Efficiency and Loss Evaluation of Large Power Transformers
Efficiency and Loss Evaluation of Large Power TransformersEfficiency and Loss Evaluation of Large Power Transformers
Efficiency and Loss Evaluation of Large Power TransformersLeonardo ENERGY
 
Generator set design parameters
Generator set design parametersGenerator set design parameters
Generator set design parametersBruno De Wachter
 
Cost savings by low-loss distribution transformers in wind power plants
Cost savings by low-loss distribution transformers in wind power plantsCost savings by low-loss distribution transformers in wind power plants
Cost savings by low-loss distribution transformers in wind power plantsLeonardo ENERGY
 
PROJECT REPORT ON WIRELESS POWER TRANSMISSION
PROJECT REPORT ON WIRELESS POWER TRANSMISSIONPROJECT REPORT ON WIRELESS POWER TRANSMISSION
PROJECT REPORT ON WIRELESS POWER TRANSMISSIONVipul Jangir
 

What's hot (20)

Transient overvoltages and currents: system interaction and effects on equipment
Transient overvoltages and currents: system interaction and effects on equipmentTransient overvoltages and currents: system interaction and effects on equipment
Transient overvoltages and currents: system interaction and effects on equipment
 
Active harmonic conditioners
Active harmonic conditionersActive harmonic conditioners
Active harmonic conditioners
 
Introduction to power quality (PQ)
Introduction to power quality (PQ)Introduction to power quality (PQ)
Introduction to power quality (PQ)
 
Electricity systems for hospitals
Electricity systems for hospitalsElectricity systems for hospitals
Electricity systems for hospitals
 
Integrated earthing systems
Integrated earthing systemsIntegrated earthing systems
Integrated earthing systems
 
Neutral sizing in harmonic-rich installations
Neutral sizing in harmonic-rich installationsNeutral sizing in harmonic-rich installations
Neutral sizing in harmonic-rich installations
 
Application Note – Resilient and Reliable Power Supply in a Modern Office Bui...
Application Note – Resilient and Reliable Power Supply in a Modern Office Bui...Application Note – Resilient and Reliable Power Supply in a Modern Office Bui...
Application Note – Resilient and Reliable Power Supply in a Modern Office Bui...
 
Interharmonics
InterharmonicsInterharmonics
Interharmonics
 
Introduction to transients and overvoltages
Introduction to transients and overvoltagesIntroduction to transients and overvoltages
Introduction to transients and overvoltages
 
Wind power: introduction
Wind power: introductionWind power: introduction
Wind power: introduction
 
Wireless SYSTEM
Wireless SYSTEMWireless SYSTEM
Wireless SYSTEM
 
Transient overvoltages and currents: mitigation and protection techniques
Transient overvoltages and currents: mitigation and protection techniquesTransient overvoltages and currents: mitigation and protection techniques
Transient overvoltages and currents: mitigation and protection techniques
 
Transient overvoltages and currents: lightning surges
Transient overvoltages and currents: lightning surgesTransient overvoltages and currents: lightning surges
Transient overvoltages and currents: lightning surges
 
Ieeepro techno solutions 2012 ieee embedded project - microelectromechanic...
Ieeepro techno solutions   2012 ieee embedded project  - microelectromechanic...Ieeepro techno solutions   2012 ieee embedded project  - microelectromechanic...
Ieeepro techno solutions 2012 ieee embedded project - microelectromechanic...
 
Transient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effectsTransient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effects
 
Transient overvoltages and currents: detection and measurement
Transient overvoltages and currents: detection and measurementTransient overvoltages and currents: detection and measurement
Transient overvoltages and currents: detection and measurement
 
Efficiency and Loss Evaluation of Large Power Transformers
Efficiency and Loss Evaluation of Large Power TransformersEfficiency and Loss Evaluation of Large Power Transformers
Efficiency and Loss Evaluation of Large Power Transformers
 
Generator set design parameters
Generator set design parametersGenerator set design parameters
Generator set design parameters
 
Cost savings by low-loss distribution transformers in wind power plants
Cost savings by low-loss distribution transformers in wind power plantsCost savings by low-loss distribution transformers in wind power plants
Cost savings by low-loss distribution transformers in wind power plants
 
PROJECT REPORT ON WIRELESS POWER TRANSMISSION
PROJECT REPORT ON WIRELESS POWER TRANSMISSIONPROJECT REPORT ON WIRELESS POWER TRANSMISSION
PROJECT REPORT ON WIRELESS POWER TRANSMISSION
 

Similar to Resilient and reliable power supply in a modern office building

Modeling and control of HVDC grids: a key challenge for the future power system
Modeling and control of HVDC grids: a key challenge for the future power systemModeling and control of HVDC grids: a key challenge for the future power system
Modeling and control of HVDC grids: a key challenge for the future power systemPower System Operation
 
PHOTOVOLTAIC MANAGEMENT SYSTEM USING POWER LINE COMMUNICATION METHODOLOGY
PHOTOVOLTAIC MANAGEMENT SYSTEM USING POWER LINE COMMUNICATION METHODOLOGYPHOTOVOLTAIC MANAGEMENT SYSTEM USING POWER LINE COMMUNICATION METHODOLOGY
PHOTOVOLTAIC MANAGEMENT SYSTEM USING POWER LINE COMMUNICATION METHODOLOGYEditor IJMTER
 
Photovoltaic Management System in Residential Areas Using Power Line Communic...
Photovoltaic Management System in Residential Areas Using Power Line Communic...Photovoltaic Management System in Residential Areas Using Power Line Communic...
Photovoltaic Management System in Residential Areas Using Power Line Communic...IJTET Journal
 
when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...theijes
 
High step up switched capacitor inductor dc voltage regulator
High step up switched capacitor inductor dc voltage regulatorHigh step up switched capacitor inductor dc voltage regulator
High step up switched capacitor inductor dc voltage regulatorIAEME Publication
 
Bidirectional full bridge dc-dc converter with flyback snubber for photovolta...
Bidirectional full bridge dc-dc converter with flyback snubber for photovolta...Bidirectional full bridge dc-dc converter with flyback snubber for photovolta...
Bidirectional full bridge dc-dc converter with flyback snubber for photovolta...IAEME Publication
 
Solid state transformer
Solid state transformerSolid state transformer
Solid state transformervivatechijri
 
Harmonic Mitigation in Distribution System by using Passive Filters
Harmonic Mitigation in Distribution System by using Passive FiltersHarmonic Mitigation in Distribution System by using Passive Filters
Harmonic Mitigation in Distribution System by using Passive Filtersijtsrd
 
Electric Field Analysis and Impact Study with Shrubbery on the 11 kV Distribu...
Electric Field Analysis and Impact Study with Shrubbery on the 11 kV Distribu...Electric Field Analysis and Impact Study with Shrubbery on the 11 kV Distribu...
Electric Field Analysis and Impact Study with Shrubbery on the 11 kV Distribu...IRJET Journal
 
A High Step Up Hybrid Switch Converter Connected With PV Array For High Volta...
A High Step Up Hybrid Switch Converter Connected With PV Array For High Volta...A High Step Up Hybrid Switch Converter Connected With PV Array For High Volta...
A High Step Up Hybrid Switch Converter Connected With PV Array For High Volta...IJNLC Int.Jour on Natural Lang computing
 
Design and Simulation of Efficient DC-DC Converter Topology for a Solar PV Mo...
Design and Simulation of Efficient DC-DC Converter Topology for a Solar PV Mo...Design and Simulation of Efficient DC-DC Converter Topology for a Solar PV Mo...
Design and Simulation of Efficient DC-DC Converter Topology for a Solar PV Mo...Sajin Ismail
 
Induction heating topology with assymetrical switching scheme
Induction heating topology with assymetrical switching schemeInduction heating topology with assymetrical switching scheme
Induction heating topology with assymetrical switching schemeeSAT Journals
 
Implementation of two inductor boost converter for an autonomous photovoltaic...
Implementation of two inductor boost converter for an autonomous photovoltaic...Implementation of two inductor boost converter for an autonomous photovoltaic...
Implementation of two inductor boost converter for an autonomous photovoltaic...IAEME Publication
 
Building Services: Project 1
Building Services: Project 1Building Services: Project 1
Building Services: Project 1Bahirah Rahman
 
Electronics 10-01761-v3
Electronics 10-01761-v3Electronics 10-01761-v3
Electronics 10-01761-v3DrDebasreeSaha
 

Similar to Resilient and reliable power supply in a modern office building (20)

electrical energy supply legrand.pdf
electrical energy supply legrand.pdfelectrical energy supply legrand.pdf
electrical energy supply legrand.pdf
 
Modeling and control of HVDC grids: a key challenge for the future power system
Modeling and control of HVDC grids: a key challenge for the future power systemModeling and control of HVDC grids: a key challenge for the future power system
Modeling and control of HVDC grids: a key challenge for the future power system
 
PHOTOVOLTAIC MANAGEMENT SYSTEM USING POWER LINE COMMUNICATION METHODOLOGY
PHOTOVOLTAIC MANAGEMENT SYSTEM USING POWER LINE COMMUNICATION METHODOLOGYPHOTOVOLTAIC MANAGEMENT SYSTEM USING POWER LINE COMMUNICATION METHODOLOGY
PHOTOVOLTAIC MANAGEMENT SYSTEM USING POWER LINE COMMUNICATION METHODOLOGY
 
Photovoltaic Management System in Residential Areas Using Power Line Communic...
Photovoltaic Management System in Residential Areas Using Power Line Communic...Photovoltaic Management System in Residential Areas Using Power Line Communic...
Photovoltaic Management System in Residential Areas Using Power Line Communic...
 
when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...
 
High step up switched capacitor inductor dc voltage regulator
High step up switched capacitor inductor dc voltage regulatorHigh step up switched capacitor inductor dc voltage regulator
High step up switched capacitor inductor dc voltage regulator
 
Bidirectional full bridge dc-dc converter with flyback snubber for photovolta...
Bidirectional full bridge dc-dc converter with flyback snubber for photovolta...Bidirectional full bridge dc-dc converter with flyback snubber for photovolta...
Bidirectional full bridge dc-dc converter with flyback snubber for photovolta...
 
Solid state transformer
Solid state transformerSolid state transformer
Solid state transformer
 
Harmonic Mitigation in Distribution System by using Passive Filters
Harmonic Mitigation in Distribution System by using Passive FiltersHarmonic Mitigation in Distribution System by using Passive Filters
Harmonic Mitigation in Distribution System by using Passive Filters
 
avi
aviavi
avi
 
Electric Field Analysis and Impact Study with Shrubbery on the 11 kV Distribu...
Electric Field Analysis and Impact Study with Shrubbery on the 11 kV Distribu...Electric Field Analysis and Impact Study with Shrubbery on the 11 kV Distribu...
Electric Field Analysis and Impact Study with Shrubbery on the 11 kV Distribu...
 
A High Step Up Hybrid Switch Converter Connected With PV Array For High Volta...
A High Step Up Hybrid Switch Converter Connected With PV Array For High Volta...A High Step Up Hybrid Switch Converter Connected With PV Array For High Volta...
A High Step Up Hybrid Switch Converter Connected With PV Array For High Volta...
 
1 elecrical systems
1 elecrical systems1 elecrical systems
1 elecrical systems
 
Design and Simulation of Efficient DC-DC Converter Topology for a Solar PV Mo...
Design and Simulation of Efficient DC-DC Converter Topology for a Solar PV Mo...Design and Simulation of Efficient DC-DC Converter Topology for a Solar PV Mo...
Design and Simulation of Efficient DC-DC Converter Topology for a Solar PV Mo...
 
High Gain Non Isolated DC-DC Step-up Converters Integrated with Active and Pa...
High Gain Non Isolated DC-DC Step-up Converters Integrated with Active and Pa...High Gain Non Isolated DC-DC Step-up Converters Integrated with Active and Pa...
High Gain Non Isolated DC-DC Step-up Converters Integrated with Active and Pa...
 
MATLAB/Simulink based simulations of KY converter for PV panels powered LED l...
MATLAB/Simulink based simulations of KY converter for PV panels powered LED l...MATLAB/Simulink based simulations of KY converter for PV panels powered LED l...
MATLAB/Simulink based simulations of KY converter for PV panels powered LED l...
 
Induction heating topology with assymetrical switching scheme
Induction heating topology with assymetrical switching schemeInduction heating topology with assymetrical switching scheme
Induction heating topology with assymetrical switching scheme
 
Implementation of two inductor boost converter for an autonomous photovoltaic...
Implementation of two inductor boost converter for an autonomous photovoltaic...Implementation of two inductor boost converter for an autonomous photovoltaic...
Implementation of two inductor boost converter for an autonomous photovoltaic...
 
Building Services: Project 1
Building Services: Project 1Building Services: Project 1
Building Services: Project 1
 
Electronics 10-01761-v3
Electronics 10-01761-v3Electronics 10-01761-v3
Electronics 10-01761-v3
 

More from Leonardo ENERGY

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceLeonardo ENERGY
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Leonardo ENERGY
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewablesLeonardo ENERGY
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalLeonardo ENERGY
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects Leonardo ENERGY
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Leonardo ENERGY
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeLeonardo ENERGY
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsLeonardo ENERGY
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EULeonardo ENERGY
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Leonardo ENERGY
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Leonardo ENERGY
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Leonardo ENERGY
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Leonardo ENERGY
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...Leonardo ENERGY
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsLeonardo ENERGY
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotorsLeonardo ENERGY
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wireLeonardo ENERGY
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesLeonardo ENERGY
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...Leonardo ENERGY
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Leonardo ENERGY
 

More from Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 

Recently uploaded

Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsapna80328
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 

Recently uploaded (20)

Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveying
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 

Resilient and reliable power supply in a modern office building

  • 1. APPLICATION NOTE RESILIENT AND RELIABLE POWER SUPPLY IN A MODERN OFFICE BUILDING: CASE STUDY Angelo Baggini & Hans De Keulenaer October 2015 ECI Publication No Cu0124 Available from www.leonardo-energy.org/drupal/node/3248
  • 2. Publication No Cu0124 Issue Date: October 2015 Page i Document Issue Control Sheet Document Title: Application Note – Induction Heating Publication No: Cu0124 Issue: 03 Release: October 2015 Author(s): Angelo Baggini & Hans De Keulenaer Reviewer(s): Roman Targosz Document History Issue Date Purpose 1 June 2008 Initial publication 2 January 2012 Adapted for adoption into the Good Practice Guide 3 October 2015 Review by Roman Targosz, with minor adaptations Disclaimer While this publication has been prepared with care, European Copper Institute and other contributors provide no warranty with regards to the content and shall not be liable for any direct, incidental or consequential damages that may result from the use of the information or the data contained. Copyright© European Copper Institute. Reproduction is authorized providing the material is unabridged and the source is acknowledged.
  • 3. Publication No Cu0124 Issue Date: October 2015 Page ii CONTENTS Summary ........................................................................................................................................................ 1 Introduction.................................................................................................................................................... 2 Description of existing situation ..................................................................................................................... 2 Distribution scheme................................................................................................................................................2 Lines ..................................................................................................................................................................2 Load ..................................................................................................................................................................4 Power quality..........................................................................................................................................................4 Events ..................................................................................................................................................................8 Analysis of the existing situation .................................................................................................................... 8 Distribution scheme................................................................................................................................................8 Line overheating.....................................................................................................................................................8 Co-ordination among protection devices and lines................................................................................................9 Neutral Status...........................................................................................................................................9 Design approach............................................................................................................................................. 9 Load classification...................................................................................................................................................9 Main distribution schemes ...................................................................................................................................12 Line sizing..............................................................................................................................................................15 Cost analysis ................................................................................................................................................. 16 Cost when selected at initial design stage............................................................................................................16 Cost for installation upgrade ................................................................................................................................16 Conclusion .................................................................................................................................................... 17 References.................................................................................................................................................... 17
  • 4. Publication No Cu0124 Issue Date: October 2015 Page 1 SUMMARY This Application Note describes the design of the electrical infrastructure for a modern 10-story head-office building in Milan, Italy, housing 500 employees using IT intensively. It demonstrates how concern for resilience and reliability at design stage can save high maintenance and renovation costs at later stage. Two design approaches are discussed and compared, including a cost comparison. Attention goes to the choice of the electrical distribution scheme, the choice of the earthing configuration, how to cope with harmonic currents, the coordination of many different protection devices, and how to ensure power supply for mission critical loads.
  • 5. Publication No Cu0124 Issue Date: October 2015 Page 2 INTRODUCTION This paper presents a design approach to assure resilient and reliable power supply in an electronics-intensive office building. The document is a case study of a 10-floor office in Milan, Italy (hereafter referred to as “the building” for confidentiality reasons). The building is the head office of a major financial institution and is occupied by 500 employees using information technology equipment intensively. After a description of the current status of the electrical installation in the building, accompanied by the results of power quality measurements, two design proposals are presented that assure a resilient and reliable power supply. A cost analysis completes this report. DESCRIPTION OF EXISTING SITUATION DISTRIBUTION SCHEME The building is connected to the 23 kV MV public grid. The medium voltage main power supply consists of two 800 kVA transformers, 23/0.4 kV, 50 Hz. The low voltage side of the installation is designed as a TN-S system. The load is subdivided into standard, preferential, and privileged loads, according to requirements for continuity of supply (this is discussed in greater detail later in the text). There is a second point of common coupling (PCC) to feed a small portion of the standard load. The two PCCs are fed from the same grid point and so are not independent. To assure continuity of the power supply, two UPSs (80 + 200 kVA) and a motor generator (250 kVA) are installed according to the scheme in Fig 1. Note that in such a scheme, it is imperative that the neutral conductor is connected to the earth only once, at the main earthing terminal, and not at each transformer. Otherwise, the benefits of the TN-S wiring configuration – improved EMC and power quality – are lost. The primary distribution is a compromise between radial and shunt schemes 1 . The installation has grown in a haphazard way, without a consistent structure. This is a direct result of the many changes in power requirements experienced during the building’s lifetime. Two distribution panels feed each floor. Each panel has two sections (standard and privileged) corresponding to the standard and privileged sections of the main LV power panel (Fig. 2). Final distribution uses a single radial scheme. LINES The 3-phase distribution is made with multi-core copper cables. Where the phase conductor cross sections were greater than 35 mm 2 , half-sized neutral conductors had been used. 1 Shunt scheme: a rising bus bar or power line is shared for all floors; at each floor, a connection is made to the LV panel at the floor. Radial scheme: each LV panel at each floor has a dedicated connection with its corresponding switchgear at the main LV distribution panel in the basement.
  • 6. Publication No Cu0124 Issue Date: October 2015 Page 3 Figure 1 – Initial distribution scheme, before the modifications.
  • 7. Publication No Cu0124 Issue Date: October 2015 Page 4 Figure 2 –Initial distribution flow chart, before the modifications. The dark lines indicate the standard distribution. The light lines indicate the privileged distribution. LOAD The rated load for the office building is typical and consists of: - Elevators (approx. 80 kVA) - Services (approx. 100 kVA) - Air-conditioning (approx. 600 kVA) - Horizontal distribution for lighting and power in the open office space (approx. 35 kVA per floor) POWER QUALITY To evaluate the quality of the power supply, current harmonic content was measured at the main electrical lines feeding each floor and at the distribution panels for building services. Figures 3 to 6 give examples of measured current and voltage waveforms and their harmonic content. We would like to highlight the following points: - Some phase conductors, particularly those for lighting circuits, have over 75% total harmonic current distortion (3 rd , 5 th , and 7 th harmonic) – see Fig. 6. There is significant 3 rd harmonic current distortion in circuits serving IT and lighting equipment – see Figs. 4, 5 (neutral conductor), and 6. In some neutral conductors, the harmonic currents are more than twice the phase current. - Both UPS show current distortion in phase and neutral conductors – see Figures 4 and 5. - Even-order harmonics appear in more than one measurement (approx. 30% in Figure 5). This means that the waveform of the current does not have the usual symmetry. - In some cases, the waveform produces more than two zero-crossings per cycle of the sine wave (Figure 5).
  • 8. Publication No Cu0124 Issue Date: October 2015 Page 5 - Rather high permanent currents are detected in the ground conductor. This is a typical indication that the TN-S configuration has not been preserved, i.e. that there are multiple connections between the neutral conductor and earth. It must be ensured that there is only one main earthing point with a connection between neutral and ground. On-site personnel need to be briefed to avoid making any connection between the neutral and ground in the LV distribution. The instrument used to make these measurements was a Fluke 43 single phase, 0 - 600 V, CT 600 A / 1 mV/A power quality analyzer. Figure 3 – Waveform and harmonic contents of phase current (phase L1) at main LV power panel in the line feeding elevators 1 and 2.
  • 9. Publication No Cu0124 Issue Date: October 2015 Page 6 Figure 4 – Waveform and harmonic contents of phase current (phase L1) in the 80 kVA line to the uninterruptible Power Supply - UPS (open office space).
  • 10. Publication No Cu0124 Issue Date: October 2015 Page 7 Figure 5 – Waveform and harmonic contents of neutral current in the 80 kVA UPS line (open office space).
  • 11. Publication No Cu0124 Issue Date: October 2015 Page 8 Figure 6 –Harmonic contents of phase L2 current at main LV distribution panel in the line feeding ground floor distribution panel (mainly lighting circuits). EVENTS The building occupant experienced a high and increasing number of events and faults, principally related to the overheating of lines and nuisance tripping of protection devices. ANALYSIS OF THE EXISTING SITUATION The current installation lacks organization and rationality in its approach. This is not compatible with the resilient design the company adopted at the start (supply low-voltage distribution through multiple transformers, UPS, and generator). Some elements are not in conformance with the current standards. Even full compliance to standards does not guarantee adequate performance from a power quality and EMC viewpoint for a building with mission-critical functions. DISTRIBUTION SCHEME The distribution scheme is neither systematic nor rational, probably due to the numerous modifications since the original installation. There are important limitations relating to reserve capacity and independence. Some bottlenecks are present, e.g. at the level of the main LV bus bar (Fig 1). The two transformers are not independent. The floors too are not independent. LINE OVERHEATING The high density of information technology equipment such as PC, servers, etc. and electronic lighting produces high levels of harmonic current in many lines. These phenomena result in neutral overheating (elevated currents in a downsized neutral as well as nuisance tripping of protective devices).
  • 12. Publication No Cu0124 Issue Date: October 2015 Page 9 CO-ORDINATION AMONG PROTECTION DEVICES AND LINES The current capacities of some lines are not co-ordinated with their over-currents protection devices. The large number of lines running in the same trunking make the problem more critical because the operating temperature is higher. Analysis of a faulty line showed that prolonged overheating was the cause of failure, due to overheating in the trunking. The grouping factors given in informative annexes of national and international wiring regulations should be observed. NEUTRAL STATUS In case of such a multiple feed with TN-S configuration, the neutral current needs to be brought back right to the main earthing terminal. Procedures must be in place to avoid making any additional connection between neutral and ground. Such connections create alternative paths for the neutral current, thus eliminating all the benefits of having a TN-S system. DESIGN APPROACH The building occupant, operating in the financial sector, needs to upgrade the installation since reliable power quality is considered mission-critical. The problems shown by the analysis of the current situation and the PQ measurements suggest consideration of an update of the electrical system at different levels: - Rationalization of mains distribution - Renewal of the electrical installation on the floors LOAD CLASSIFICATION To optimize the main distribution rationalization, the first step is the classification of the loads. All loads are classified into 3 groups: - Standard - Preferential - Privileged Standard loads are used for daily business, but their non-availability does not result in risk of personal injury, damage to equipment or disruption of business processes. A simple radial circuit suffices for the supply and relatively long intervention times can be tolerated (Table 1). Preferential loads need a redundant power supply, for example as provided by a dual radial scheme, starting either from the risers or at the level of intermediate connections (Table 2). Privileged loads are mission-critical. Loss of service means grave danger to personnel or severe damage to the organization’s business processes. The level of independence needs to be determined for each load. At the very least, these loads must be supplied from two independent feeders with automatic switching (Table 3).
  • 13. Publication No Cu0124 Issue Date: October 2015 Page 10 Description of standard load Type of power supply required Timing needed for intervention Allows regular functioning of the building, but their unavailability does not result in risk to personnel or equipment: - General services, e.g. air conditioning (but not in server room) - Normal lighting - Heating - Power sockets Standard radial circuits. Resumption of service can wait for some time without damage. Loads can be switched off. None Unavailability of service for relatively long time periods can be tolerated. Table 1 – Description, criteria, design, and intervention requirements for standard loads. Description of preferential load Type of power supply required Timing needed for intervention Regular functioning of the load is required for comfort and security of personnel and clients, as well as for ensuring smooth business operation. For example: - Lighting of staircases, corridors, and certain rooms - Minimum lighting conditions to avoid panic - Heating or air conditioning of certain rooms - Elevators - UPS Backup Dual radial primary supply, ensuring the functional and physical independence of the risers. Two separate risers can be employed, supported either by a generator or supplied from two independent grid points. Switching off the load is not acceptable. According to the norm, a 20 second intervention time for the generator group is acceptable for long interruptions. Typical values for a diesel group: - First attempt: within 5 seconds - Second attempt within 10 seconds - Third attempt within 15s Table 2 – Description, criteria, design, and intervention requirements for preferential loads. Description of privileged load Type of power supply required Timing needed for intervention Essential services: - Security lighting - Servers - Telecommunication systems - Personnel retrieval - Alarm & security systems - Fire signalling and anti-fire systems - Closed-loop TV circuits - Certain auxiliary services Secure Dual radial scheme, with independent risers. At least one riser has to ensure high grid reliability Use of UPS. For certain loads, a dedicated UPS can be considered. Loads with intervention within 15 seconds. Short-interruption loads, within 0.15 s Some loads need continuous supply. Table 3 – Description, criteria, design, and intervention requirements for privileged loads.
  • 14. Publication No Cu0124 Issue Date: October 2015 Page 11 Figure 7 – Flow chart of activities for selecting the right distribution scheme. In co-operation with the building occupant, all loads have been classified as shown in Table 4. Type of load Percentage Standard 49% Preferential 13% Privileged 38% Table 4 – Classification of type of loads.
  • 15. Publication No Cu0124 Issue Date: October 2015 Page 12 Component type # Outages per 1000 Components per Year # Outages per Components per Year Failure Rate MV/LV transformers 1-2 MV and LV circuit breakers 0,2-1 Disconnect switches 1-4 Electronic relays (single) 5-10 Electronic relay systems 30-100 Standby generators 20-75 failure to start 0,5-2% Continuous generators 0,3-1 UPS inverter 0,5-2 UPS rectifier 30-100 Underground cable (1000 m) 13-25 Cable terminations 0,3-1 Cable joints 0,5-2 Table 5 – Electrical components used in MV-LV distribution installation dependability statistics (Source: M. H. J. Bollen, Literature search for reliability data of components in electric distribution networks, Eindhoven University of Technology Research Report 93-E-276, August 1993). MAIN DISTRIBUTION SCHEMES To avoid the existing bottleneck at LV main bus bar, the primary distribution must be modified as a dual radial distribution (Fig. 8 left). The rating of the transformers TR1 and TR2 must ensure that each can carry the full load. Considering that, because of the nature of the loads, the load current waveform will be highly distorted, the transformers must be sized to take account of the harmonic content. To reduce short circuit currents, the system is normally managed with the main bus bar-breaker open, but parallel operation between the two main transformers is possible for short time. To feed the thermal and HVAC services, the transformer section shall be modified as shown in Figure 8 with a new 800 kVA transformer, TR3, in addition to the existing two. The new transformer has been selected according with the series A0Ak of the standard EN 50546-1 to minimize the losses.
  • 16. Publication No Cu0124 Issue Date: October 2015 Page 13 Figure 9 – Main distribution scheme after the modifications. Standard loads are supplied from a single grid point. The same grid power cable, riser, and radial distribution also supplies preferential and privileged loads. Two generator groups supply preferential and privileged loads. Standard loads are switched off through the breakers at the extremity of the main bus bar. Two UPS supply privileged loads, in case of failure of normal and backup power supply. Primary supply and backup supply is wired TN-S. UPS can be wired either TN-S or IT (meaning, here, isolated earth). Isolated earth systems are excellent for continuity of power supply, but cannot guarantee protection of personnel. Where an IT system is installed, proper security measures have to be taken to ensure that only authorized personnel can have access to the IT circuits. The second LV PCC has been removed in Figure 8. Each floor is still supplied by two distribution panels, each having three sections (standard, privileged and preferential) corresponding to the same sections of the main LV power panel. Final distribution could be done using a shunt (Figure 9) or single radial (Figure 10) scheme. The shunt scheme (shared line feeding all floors for each type of loads) is cheaper and more flexible in the case of load growth. Unfortunately it is limited by poor resilience to faults in the main line and risers. The single radial scheme (one line for each floor for each type of load) ensures: - Minimum interference and voltage drop caused by load - In case of a fault, only loads supplied by the faulty line are out of service - Reduced maintenance problems The radial scheme is therefore the preferred scheme.
  • 17. Publication No Cu0124 Issue Date: October 2015 Page 14 Figure 9 – Solution with radial scheme (10 floors with three types of load = 30 dedicated rising lines). Dark line indicates standard distribution; grey line, preferential distribution; light line, privileged distribution. Figure 10 – Solution with unique riser lines (three types of load = three rising lines / bus bar, shared by all floors). Dark line indicates standard distribution; Grey, preferential distribution; Light, privileged distribution.
  • 18. Publication No Cu0124 Issue Date: October 2015 Page 15 LINE SIZING Table 6 shows the power-considered sizing all the main sections of the system. The total installed load (Columns 2 and 3) is multiplied by utilization and contemporary factors (Columns 4 and 5) to calculate the power requirements of the load (Columns 6 and 7). As a margin for future load growth, lines are sized (Columns 8 and 9) considering an additional factor equal to 130% and 115% for power and lighting circuits respectively. Load Installed load (kVA) Utilization & Contemporary Factors Power requirement (kVA) Installed power (kVA) Power (1) Light (2) Power (3) Light (4) Power (5) Light (6) Power (7) Light (8) 2nd underground 7 10 0.7 1 5 10 6.5 11.5 1st underground 114 15 0.7 1 80 15 104 17.25 Ground and general services 43 15 0.7 1 30 15 39 17.25 First floor 50 17 0.7 1 35 17 45.5 19.55 Second floor 50 17 0.7 1 35 17 45.5 19.55 Third floor 50 17 0.7 1 35 17 45.5 19.55 Fourth floor 50 17 0.7 1 35 17 45.5 19.55 Fifth floor 50 17 0.7 1 35 17 45.5 19.55 Sixth floor 50 17 0.7 1 35 17 45.5 19.55 Seventh floor 50 17 0.7 1 35 17 45.5 19.55 Eighth floor 29 12 0.7 1 20 12 26 13.8 Nine floor 3 2 0.7 1 2 2 2.6 2.3 Thermal Central 29 0 0.7 -- 20 0 26 0 HVAC main station 843 0 0.7 -- 590 0 767 0 Boxes 14 5 0.7 1 10 5 13 5.75 Elevators 114 0 0.7 1 80 0 104 0 TOTAL 1546 178 -- -- 1,082 178 1,407 204.7 Table 6 – Peak-rated and actual sizing of primary distribution system. Considering the measured waveform of the current, all the new lines have been sized to take into account the harmonic profile and resilience requirements:  Neutral cross section equal to that of phase  Derated cables Special attention should be paid to neutral and phase conductor sizing to avoid overheating and faulty tripping of protection devices. The adoption of a UPS or motor generator is not useful if a line fault occurs after it.
  • 19. Publication No Cu0124 Issue Date: October 2015 Page 16 COST ANALYSIS The cost of existing installation is compared with two possible alternative solutions. These alternatives differ only for risers, and hence for the cost of the main LV panel. Solution 1 is the shunt scheme, and Solution 2 is the simple radial scheme, which is preferable for new buildings, but difficult to implement as an installation upgrade. COST WHEN SELECTED AT INITIAL DESIGN STAGE Item Existing (k€) Solution 1 (k€) Solution 2 (k€) Main LV panel 62,949 68,850 88,522 Risers 59,015 68,850 118,029 Horizontal distribution 210,485 265,565 265,565 Generator groups 171,142 210,485 210,485 UPS 108,193 206,551 206,551 Motive power 698,339 737,682 737,682 Lighting 983,576 1032,754 1032,754 Total 2293,698 2590,738 2659,589 Total Absolute difference -- 297,040 365,890 Total Relative difference -- 13% 16% Table 7 COST FOR INSTALLATION UPGRADE Total absolute difference -- 830,138 1068,163 Total relative difference -- 36% 46% Table 8 Regarding this situation, we would like to highlight the following:  The percentages refer to the cost of the existing installation  The extra cost of the better solutions is low, if considered at initial design stage  The cost of the best technical solution (i.e. Solution 2 – single radial scheme at final distribution) differs only by 3% from Solution 1 if considered at initial design stage, but the difference is much greater if considered at refurbishment stage only  Cost basis 2011  The cost for the UPS considers only purchase and installation. The additional costs of maintenance must be taken into account Even if the evaluation of average costs related to a system designed according to good PQ practice is difficult, we have to recognize that:  The cost estimates include the costs related to the practical difficulties of installing and renewing a building in the center of a major city  The modification of the main distribution scheme is the most important and useful action to undertake  The solution with unique riser lines is very difficult to install with the building operational
  • 20. Publication No Cu0124 Issue Date: October 2015 Page 17 CONCLUSION Initial low cost does not necessarily mean good value. A PQ compliant system, initially more expensive, can save a great deal of money during its life. The case study analyzed in this article shows that an electrical installation, designed without attention to PQ issues, results in a considerable amount of unnecessary expenditure, whether to resolve the issues or to simply live with the inconvenience and downtime they cause. The cost/benefit analysis shows that resilience should be carefully considered at design stage. A mere increase of 16% in the installation cost (1% of the building cost) provides: - Three lines of defense against power cuts for mission-critical loads (dual panels at each floor, generator, UPS) - A highly resilient system, with each floor supplied by 2 distribution panels. Each panel is independent from the other, and from all panels on the other floors - A highly flexible electrical system for future load growth Expensive though it may seem, the highly resilient solution would typically add only about 1% to the cost of the building. For commercial buildings, where the running costs amount to initial construction costs after 7-8 years, this initial investment will be paid pack by a productivity increase of 10 min per week. Once paid back, all the rest is profit. REFERENCES [1] IEC 364-5-523 - Electrical installations of buildings - Part 5-52: Selection and erection of electrical equipment - Wiring systems [2] A. Baggini, Handbook of power quality, Jhon Wiley ans Sons Cichester 2008 [3] A.Silvestri, F.Tommazzolli, “Schemi per gli impianti di energia: semplicità, affidabilità, risparmio, ridondanza dove e come”, Corso "Il progetto degli impianti elettrici di energia. Le norme e la regola dell’arte", Dipartimento di Ingegneria Elettrica dell'Università degli Studi di Pavia, AEI, CNR, Pavia, 10-13 giugno 1991 [4] A. Baggini, M. Granziero Static UPS A practical Guide to selection, installation and maintenace, Amazon 2011