Trabalho de Prática Simulada Company Facilities & Directions Curso Inglês Comercial Módulo 5: A Comunicação Comercial e o ...
SZM – INDUSTRY ASSISTANCE
SZM – INDUSTRY ASSISTANCE <ul><li>In SZM </li></ul><ul><li>It is located in Industrial Parking – Vila Nova de Famalicão; <...
<ul><li>Near SZM </li></ul><ul><li>A Coffee </li></ul><ul><li>A BPI Bank </li></ul><ul><li>A repair station Auto Couto </l...
SZM – INDUSTRY ASSISTANCE First Floor
SZM – INDUSTRY ASSISTANCE Second Floor
<ul><li>In front of the pavillion there is a car park, on the left to staff and on the right to visitors. </li></ul><ul><l...
<ul><li>Follow the directions to Industrial Parking Vila Nova de Famalicão: </li></ul><ul><li>Go out the A3 motorway; </li...
SZM – INDUSTRY ASSISTANCE
<ul><li>Bernardo </li></ul><ul><li>José </li></ul><ul><li>Celina </li></ul>SZM – INDUSTRY ASSISTANCE
Upcoming SlideShare
Loading in …5
×

SZM - Industry Assistance: Company Facilities and Directions

404 views

Published on

Published in: Business, Travel
  • Be the first to comment

  • Be the first to like this

SZM - Industry Assistance: Company Facilities and Directions

  1. 1. Trabalho de Prática Simulada Company Facilities & Directions Curso Inglês Comercial Módulo 5: A Comunicação Comercial e o Cliente <ul><li>Formandos : </li></ul><ul><li>- José </li></ul><ul><li>- Celina </li></ul><ul><li>- Bernardo </li></ul>
  2. 2. SZM – INDUSTRY ASSISTANCE
  3. 3. SZM – INDUSTRY ASSISTANCE <ul><li>In SZM </li></ul><ul><li>It is located in Industrial Parking – Vila Nova de Famalicão; </li></ul><ul><li>It is the first pavillion on the left at Industrial Parking entrance; </li></ul><ul><li>The company exists since 1986 at the general industry. </li></ul><ul><li>IT HAS: </li></ul><ul><ul><li>A private car park for the staff and visitors; </li></ul></ul><ul><ul><li>Two administrative floors and one for production; </li></ul></ul><ul><ul><li>On the first administrative floor: </li></ul></ul><ul><ul><ul><li>Reception area; </li></ul></ul></ul><ul><ul><ul><li>Waiting room; </li></ul></ul></ul><ul><ul><ul><li>Administrative W.C. </li></ul></ul></ul><ul><ul><ul><li>Staff production W.C. and showers; </li></ul></ul></ul><ul><ul><ul><li>Bar; </li></ul></ul></ul><ul><ul><ul><li>Cellar </li></ul></ul></ul><ul><ul><ul><li>Stair for the second floor. </li></ul></ul></ul><ul><ul><li>On the second administrative floor: </li></ul></ul><ul><ul><ul><li>Conference room; </li></ul></ul></ul><ul><ul><ul><li>Administration office; </li></ul></ul></ul><ul><ul><ul><li>Developement and Research office; </li></ul></ul></ul><ul><ul><ul><li>Mini-bar with two drinks machines. </li></ul></ul></ul><ul><ul><li>On the production: </li></ul></ul><ul><ul><ul><li>Storeroom; </li></ul></ul></ul><ul><ul><ul><li>Assembly; </li></ul></ul></ul><ul><ul><ul><li>Quality control; </li></ul></ul></ul><ul><ul><ul><li>Shipping . </li></ul></ul></ul>
  4. 4. <ul><li>Near SZM </li></ul><ul><li>A Coffee </li></ul><ul><li>A BPI Bank </li></ul><ul><li>A repair station Auto Couto </li></ul><ul><li>Ponto de Encontro Restaurant </li></ul><ul><li>Dual carriageway with access to A3/A7 Motorway </li></ul>SZM – INDUSTRY ASSISTANCE
  5. 5. SZM – INDUSTRY ASSISTANCE First Floor
  6. 6. SZM – INDUSTRY ASSISTANCE Second Floor
  7. 7. <ul><li>In front of the pavillion there is a car park, on the left to staff and on the right to visitors. </li></ul><ul><li>In front of the main entrance there is a reception area and on the right there is a waiting room and the administrative and visitors W.C. On the left there is an access door to the production and the stairs to the second floor. </li></ul><ul><li>Below the stairs there is a cellar. </li></ul><ul><li>Staff production W.C’s is behind the reception. </li></ul><ul><li>The bar is between the waiting room and the production. </li></ul><ul><li>Go up the stairs and in front there are the conference room and the show room, and on the left there is a mini bar with two drink machines. </li></ul><ul><li>The Development and Research Departement is nex to the stairs on the right. </li></ul><ul><li>Go to the end of the corridor and on the right there is the administration departement and opposite there is the technical departement. </li></ul><ul><li>On the outside of the buildind on the left there is an entrance/exit shipping gate. </li></ul><ul><li>In front of the gate, at the end, there is a Storehouse. </li></ul><ul><li>On the left to the storehouse there is the Assembly. </li></ul><ul><li>Next to the Assembly, there is the Quality Control. </li></ul>SZM – INDUSTRY ASSISTANCE
  8. 8. <ul><li>Follow the directions to Industrial Parking Vila Nova de Famalicão: </li></ul><ul><li>Go out the A3 motorway; </li></ul><ul><li>Go along on the left until the first exit; </li></ul><ul><li>Go round the roundabout and turn on the fifth on the right; </li></ul><ul><li>Go along the street and SZM is the first pavillion on the left in Industrial Parking. </li></ul>SZM – INDUSTRY ASSISTANCE
  9. 9. SZM – INDUSTRY ASSISTANCE
  10. 10. <ul><li>Bernardo </li></ul><ul><li>José </li></ul><ul><li>Celina </li></ul>SZM – INDUSTRY ASSISTANCE

×