SREL Biogas.Pdf

  1. 1. BIOGAS – The future of energy SPECTRUM RENEWABLE ENERGY LTD. HYDERABAD - PUNE - NEW JERSEY - BRISBANE www.srel.in www.srela.com.au A JOINT VENTURE OF GREENLEAF RENEWABLE ENERGY PVT. LTD AND SPRECTRUM RENEWABLE ENERGY PVT. LTD.
  2. 2. BIO- DEGRADABLE WASTE FROM HOTEL & KITCHEN SPECTRUM RENEWABLE ENERGY LTD.
  3. 3. EXISTING SYSTEM OF WASTE DISPOSAL SPECTRUM RENEWABLE ENERGY LTD.
  4. 4. SAD STATE OF GARBAGE DISPOSAL SPECTRUM RENEWABLE ENERGY LTD.
  5. 5. UNFORTUNATE STATE OF GARBAGE SEPERATION AND UNHYGENIC CONDITIONS OF WASTE MANAGEMENT SPECTRUM RENEWABLE ENERGY LTD.
  6. 6. Energy Value of kitchen/canteen waste • 15 Kg’s of kitchen waste = 1 m3 Biogas • 1 m3 Biogas = 5500 KCal worth of heat energy • 1 m3 Biogas = 0.54 Kg’s worth of L.P.G. • 0.54 Kg Propane/Day = 0.76 Tons CO2/Year • 15 Kg Kitchen waste/Day = 5.17 Tons CO2/Year • 2.5 Tons waste/Day Biogas Plant = 862 Tons CO2 Emissions saved/Year SPECTRUM RENEWABLE ENERGY LTD.
  7. 7. SPECTRUM – GREENLEAF 3EBT-1 TECHNOLOGY UNIQUENESS • Fixed Dome CSTR Model – 100% Gas collection • Sulphur degrading bacteria – H2S < 0.2% • Advanced Process controls – Gas meters, Digital pH indicators, thermostats for efficient data collection • Safety equipments – Gas Flares/Flame Traps etc. • Enclosed processing - Odour Free operations • 2.5 Tons Kitchen Waste/Day – 180 m3 Biogas – 90 Kg’s L.P.G. replaced + 150 Kg Organic Manure • Organic Manure – N:3, P:1.5, K:1, Organic Carbon:20% (necessary for water retention) SPECTRUM RENEWABLE ENERGY LTD.
  8. 8. BIOGAS PLANT ECONOMICS Per Day Cost Savings from 2.5 TPD Biogas Plant Particulars Qty. Rate (Rs.) Amount (Rs.) L.P.G. Replaced 90 Kg's 54.00 4860.00 Organic Manure 150 Kg's 2.00 300.00 Dumping Expenses 2500 Kg's 0.50 1250.00 Dumping Manpower Cost 300.00 Gross Savings 6710.00 Less: Biogas Plant Operating Expenses 1200.00 Net Savings/Day 5071.00 SPECTRUM RENEWABLE ENERGY LTD.
  9. 9. Emergency Gas Flaring Unit Flame Moisture To Trap Trap Kitchen Gas storage Balloon Gas Blower Biogas Waste Processing Methanogenic Digester Overflow Area Hydrolytic Digester Crusher Manure Pit CONCRETE DIGESTER BIOGAS SYSTEM PROCESS FLOW DIAGRAM SPECTRUM RENEWABLE ENERGY LTD.
  10. 10. Bio Bowser Process Flow Diagram To Burner/Generator H2S Scrubber Segregated waste Biogas storage Balloon Clean Gas Biogas Blower CO2 Scrubber Raw Crusher Biogas Gas-Fluid Separation T Unit BIO BOWSER Feed Buffer Tank Liquid Manure Feed Pump Solar powered Submersible Heat Exchanger Agitator Thermal Solar Panels Controller Tank
  11. 11. SPECTRUM (EcoSolutions) INSTALLATIONS 1 TPD Canteen waste plant at Tata Consultancy Services, Thane. SPECTRUM RENEWABLE ENERGY LTD.
  12. 12. Latest Peshawe Udyan Plant done for Pune Municipal Corporation
  13. 13. 3EBT Fixed Dome Installation at Ashish Cans and Containers Pvt. Ltd., Talegaon
  14. 14. BIO BOWSER ® Installed at Pratibha International School Chinchwad, Pune
  15. 15. 3EBT Industrial Application Industrial Burner High Methane Content CH4 > 72%
  16. 16. GREEN LEAF – PROUD WINNER OF IIT INDIA ASSOCIATION INNOVATIONS 2009 AWARD FOR 3EBT
  17. 17. Latest SPECTRUM Projects Under Construction 1. Warana Sugar Industry ltd., 100 Ton Press Mud/Day – Bio CNG Project Approx CNG expected/day – 7200 Kg’s 2. Bio Bowser 1000 – To be installed at Albany, U.S.A. SPECTRUM RENEWABLE ENERGY PVT. LTD.
  18. 18. FINANCIAL OPTIONS Option 1 = As per our Proposal. Entire CAPEX to be invested by TCS. Option 2 Financial Model – a) SREL will Invest and construct the Entire Plant b) Land, Water & Electricity requirement will be TCS Responsibility c) TCS will pay Rs.1/- per Kg of Waste equal to the Designed Capacity of the Plant i.e. 2,500 Kg’s. of Waste per Day X Rs.1/- per Kg. = Rs.2500/- X 365 Days X 10 Years d) TCS will pay the O & M Cost (Man Power Cost only) of Rs.3,84,000/- per Annum for 10 Years SPECTRUM RENEWABLE ENERGY PVT. LTD.
  19. 19. FINANCIAL OPTIONS Option 3 a) SREL will Invest and construct the Entire Plant b) Land, Water & Electricity requirement will be Clients Responsibility c) TCS will buy the entire gas @ Rs.45/- per Kg equal to the Designed Capacity of the Plant i.e. 85 Kgs. of Gas / Day X 10 Years irrespective of the gas used or not used by the Client. Option 4 a) SREL will Invest 50% of the Project Cost & Client will invest 50% of the balance of Project Cost b) Land, Water & Electricity requirement will be Clients Responsibility c) TCS will pay Rs.0.50 / Kg of Waste equal to the Designed Capacity of the Plant i.e. 2,500 Kgs. of Waste per Day X Rs.0.50/- per Kg. = Rs.1250/- X 365 Days X 10 Years d) TCS will pay the O & M Cost (Man Power Cost only) of Rs.3,84,000/- per Annum for 10 Years SPECTRUM RENEWABLE ENERGY PVT. LTD.
  20. 20. THANK YOU SPECTRUM RENEWABLE ENERGY PVT. LTD. PUNE BRISBANE HYDERABAD NEW JERSEY www.srel.in www.srela.com.au

×