1               Implementing VDC            for Building Sitework                        John Prince, P.E.                ...
2                             VDC for Building Sitework       Introduction       Internal Impacts of VDC Implementation   ...
7                                             3D Surveying     3D Laser     Scanning         3D    Site Survey • Tradition...
8                       3D Surveying     3D Laser     Scanning         3D    Site Survey    3D Existing      Utility     M...
9                                          RBF Experiences/Services       3D         −Dynamic 3D    Surveying      Environ...
3D Site Design                    Fire Science/EMT Training FacilityMesa College SBSBCSUSM Ballfields
3D Site Design
RBF Experiences/Services    3D Surveying     3D                    CampSite Design              Pendleton                 ...
RBF Experiences/Services    3D Surveying                         .NWD                                 from each     3D    ...
Key DifferencesDesign & Technology                                              Civil Engineering with Sitework― Real-Worl...
VDC for Building SiteworkIntroductionInternal VDC Implementation ImpactsExternal VDC Implementation ImpactsResults, Lesson...
So, WhyDifferences of Sitework     Key VDC for RBF?
Internal Impacts RBF?                                                         So, Why BIM for― Better documentation of exi...
Internal ImpactsComplete shift in QA/QC process using collaboration software   ― General Visual QC/Layers   ― Utility Clas...
Internal ImpactsComplete shift in QA/QC process using collaboration software   ― Grading Impacts on Existing Utilities or ...
VDC for Building SiteworkIntroductionInternal Impacts of VDC ImplementationExternal Impacts of VDC ImplementationResults, ...
External Impacts   Increased Project Understanding through more comprehensive model
External Impacts― Tighter/More Detailed Design = Less RFI’s― Increased Clarify of Design Changes― Use of different authori...
External Impacts           Coordination Using VDC Methods            (collaboration software, BIM tools, etc.)―Vertical Ut...
External Impacts   Grading Impacts to Early Utilities
External Impacts           Coordination Using VDC Methods            (collaboration software, BIM tools, etc.)―Vertical Ut...
External Impacts   Formation/Soil Layer Analysis
External Impacts          Coordination Using VDC Methods           (collaboration software, BIM tools, etc.)―Vertical Util...
External Impacts   Structural Load Influence Conflicts
External Impacts        Coordination Still Using Traditional Methods              (overlays, coordination print review)―Ar...
VDC for Building SiteworkIntroductionInternal Impacts of VDC ImplementationExternal Impacts of VDC ImplementationResults, ...
Results, Lessons Learned, Suggestions― File/Building Alignment is Very Important    ― Need Building Consultants Align with...
Take-AwaysVDC Implementation has proven beneficialThe effect of VDC on Sitework needs attentionThe VDC Process needs to fo...
Implementing VDC for Building Sitework                                     John Prince, P.E.Thank You, Any Questions?
Upcoming SlideShare
Loading in …5
×

BIM for Building Sitework

764 views

Published on

  • John,
    Just looked at your slides on slide share.
    I am interested in gaining some basic knowledge in the next 48 hours. What software are you building your sub-grade utilities, roads, etc? 3D Laser Scanning has been the main path of all of my modeling experience however I have recently been requested to create a BIM of a site in MD that includes every site element but the building. We designed the civil portion of the project and have access to most of the dry utilities. Would you have an half an hour or so to discuss this topic? 301-916-4100 or jprice@vika.com in maryland.
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

BIM for Building Sitework

  1. 1. 1 Implementing VDC for Building Sitework John Prince, P.E. April 24, 2012 2012 San Antonio, TX4/24/2012
  2. 2. 2 VDC for Building Sitework Introduction Internal Impacts of VDC Implementation External Impacts of VDC Implementation Results, Lessons Learned, Suggestions4/24/2012
  3. 3. 7 3D Surveying 3D Laser Scanning 3D Site Survey • Traditional Surveying with 3D Processing • Site Features Generated Automatically • Accurate Surface Model Ready for VDC • Detailed Site Culture to Meet Needs Miramar College Interim Library Topo4/24/2012
  4. 4. 8 3D Surveying 3D Laser Scanning 3D Site Survey 3D Existing Utility Modeling • Various Reference Sources • Ready for VDC • Embedded System Information4/24/2012
  5. 5. 9 RBF Experiences/Services 3D −Dynamic 3D Surveying Environment −Detailed Surface 3D Integral with Site Site Design Plan −Data-Rich Utilities and Structures Alpine Blvd Widening Miramar College Student Union4/24/2012
  6. 6. 3D Site Design Fire Science/EMT Training FacilityMesa College SBSBCSUSM Ballfields
  7. 7. 3D Site Design
  8. 8. RBF Experiences/Services 3D Surveying 3D CampSite Design Pendleton BEQ 8 Conversion Modeling−Model any Site Utility System−Phase Utilities or Grading to meet Contractors Need−Staking of Dry Utilities−Up-To-Date Model with Construction Changes/As-Built
  9. 9. RBF Experiences/Services 3D Surveying .NWD from each 3D DisciplineSite Design .NWF Conversion Repeat Master Model Modeling Site BIMManagement Design Clash Revisions and Analysis Coordination BIM Coordination Meeting
  10. 10. Key DifferencesDesign & Technology Civil Engineering with Sitework― Real-World Coordinates― Tied by existing conditions/constraints― Design includes existing and proposed conditions, not just all new― Different authoring software than building design― Authoring software is geared more toward public works type projects― Less prefabricated elements or “system” components― Site BIM Management techniques differ
  11. 11. VDC for Building SiteworkIntroductionInternal VDC Implementation ImpactsExternal VDC Implementation ImpactsResults, Lessons Learned, Suggestions
  12. 12. So, WhyDifferences of Sitework Key VDC for RBF?
  13. 13. Internal Impacts RBF? So, Why BIM for― Better documentation of existing utility conditions― Detailed surface improves fine grading and ADA design― Model Based/Dynamic Design and Plan Production = Increased Efficiency, Fewer Errors, and Better Quality End Product
  14. 14. Internal ImpactsComplete shift in QA/QC process using collaboration software ― General Visual QC/Layers ― Utility Clashes ― Utility Cover ― Utility Structure at Grade
  15. 15. Internal ImpactsComplete shift in QA/QC process using collaboration software ― Grading Impacts on Existing Utilities or Early Install Utilities ― Water/Sewer/Recycled Water separation ― Pipe/Structure Connections
  16. 16. VDC for Building SiteworkIntroductionInternal Impacts of VDC ImplementationExternal Impacts of VDC ImplementationResults, Lessons Learned, Suggestions
  17. 17. External Impacts Increased Project Understanding through more comprehensive model
  18. 18. External Impacts― Tighter/More Detailed Design = Less RFI’s― Increased Clarify of Design Changes― Use of different authoring software between site and building consultants requires some traditional 2D coordination (for now)…
  19. 19. External Impacts Coordination Using VDC Methods (collaboration software, BIM tools, etc.)―Vertical Utility Coordination―Grading Impacts to Early Utilities NEXT
  20. 20. External Impacts Grading Impacts to Early Utilities
  21. 21. External Impacts Coordination Using VDC Methods (collaboration software, BIM tools, etc.)―Vertical Utility Coordination―Grading Impacts to Early Utilities―Formation/Soil Layer Analysis NEXT
  22. 22. External Impacts Formation/Soil Layer Analysis
  23. 23. External Impacts Coordination Using VDC Methods (collaboration software, BIM tools, etc.)―Vertical Utility Coordination―Grading Impacts to Early Utilities―Formation/Soil Layer Analysis―Utility Equipment Sizing―Structural Footing Conflicts―Structural Load Influence Conflicts NEXT
  24. 24. External Impacts Structural Load Influence Conflicts
  25. 25. External Impacts Coordination Still Using Traditional Methods (overlays, coordination print review)―Architectural Site Plan―Horizontal Site Utility Coordination―Building Utility POC Info―Discipline References across Plan Sheets―Pavement Types and Sections―Existing Utility Accuracy and Potholing―Dissemination of Changes
  26. 26. VDC for Building SiteworkIntroductionInternal Impacts of VDC ImplementationExternal Impacts of VDC ImplementationResults, Lessons Learned, Suggestions
  27. 27. Results, Lessons Learned, Suggestions― File/Building Alignment is Very Important ― Need Building Consultants Align with Civil Site― Building/Site Coordination Tools ― Efficient/Repetitive File Sharing/Overlay ― Building Doors and Utility POC’s ― Site Utilities ― Surfaces ― Confident Alignment in Collaboration
  28. 28. Take-AwaysVDC Implementation has proven beneficialThe effect of VDC on Sitework needs attentionThe VDC Process needs to follow the Design Process/ScheduleFull Buy-in from all consultants is needed for successWell developed processes/execution are necessary forbenefits to be realized
  29. 29. Implementing VDC for Building Sitework John Prince, P.E.Thank You, Any Questions?

×