Process Heat Equipment Testimonials

120 views

Published on

“Because of S&B’s upgrades,
our equipment is more reliable
and we have considerably less
downtime. In fact, since S&B’s
upgrades, our shutdowns and
downtime has decreased by
over 70%”

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
120
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Process Heat Equipment Testimonials

  1. 1. Stelter & Brinck Since 1956 Process Heat Equipment Testimonials… “When we hand our projects “S&B worked with us to “Since the installation of S&B’sover to S&B, we know we don’t ensure we met our deadline.” equipment, we’ve had a 65% have to worry about anything! energy savings over the old “S&B’s equipment has cut “We rely on S&B’s machinery maintenance expenses at this oven; we have the numbersand staff to keep things running plant considerably.” recorded to prove it!” and they do- therefore, we “Because of S&B’s upgrades, “Stelter & Brinck’s engineeringdon’t have the frustrations and our equipment is more reliable department is top-notch. The costs of downtime. This and we have considerably less engineering support during this enables us to satisfy our project was, as always, downtime. In fact, since S&B’s customers.” absolutely incredible!” upgrades, our shutdowns and“Anyone looking for the type of downtime has decreased by “I’ve been dealing with Stelterequipment S&B provides would over 70%” & Brinck for 20 years; they be making a mistake to look have provided the highest “Due to S&B upgrades, ouranywhere else for their needs.” quality work, year after year.” lines are now more efficient.” - Mack Brown, Plant Manager - Bill Wirtley, Electrical Design - Mike Gasaway, CCPI’s Director of Maintenance Supervisor Engineering513-367-9300 www.stelterbrinck.com

×