Eurelectric Annual Conference in Bologna, June 2013

739 views

Published on

"UK Offshore Wind Projects: Innovative Learning from the Petroleum Sector". Presentation held by Statkraft CEO Christian Rynning-Tønnesen at the Eurelectric Annual Conference in Bologna, June 2013.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
739
On SlideShare
0
From Embeds
0
Number of Embeds
34
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Eurelectric Annual Conference in Bologna, June 2013

  1. 1. UK OFFSHORE WIND PROJECTS:INNOVATIVE LEARNING FROMTHE PETROLEUM SECTORChristian Rynning-Tønnesen, CEO Statkraft ASEurelectric Annual Convention and ConferenceBologna, 4th June 2013
  2. 2. Statkraft’s production2AGUA IMARASN POWERSTATKRAFTPeruChileNorwayUKSwedenFinlandTurkeyBrazilZambiaGermanyIndiaSri LankaPhilippinesLaosNepalInstalled capacity117 000 MW90%renewable energy3 600employees60 TWhPower productionPanama(project)1Including pro rata ownership in associates outside the Nordics
  3. 3. Berry Burn Wind FarmAlltwalis Wind FarmStatkraft in the UK Power generation Under construction Under development Trading activities3Baillie Wind FarmRheidolHydropowerSheringham ShoalOffshore Wind FarmDogger Bank(Forewind Ltd)Statkraft UK Ltd(London Office)Dudgeon Offshorewind project
  4. 4. 4Sheringham Shoal offshore windfarm 50/50 partnership Statoil/Statkraft 88 wind turbines 317 MW installed capacity 1.1 TWh annual production Supplying 220,000 British homes Officially opened on 27 September2012
  5. 5. 5Geo-survey, geophysics and geotechniqueFoundationVesselsMarine operationComplementary partnershipStatoil’s competenceExport cablesWind turbinesWind park layout and energy productionGrid and marketLand cablesConverter stationArray cablesConverter stationStatkraft’s competence
  6. 6. Example 1: Transferring technology from O&G businessMonopile grouted connection cracking6Sheringham Shoal Wind farm: Spring bearings installed inorder to prevent grout failure These bearings take verticalloads Well known from the Oil &Gas industrySpring bearings
  7. 7. Example 2: Transferring technology from the O&G businessInnovative foundation solution7Dogger Bank Wind Farm Suction bucket: new design foroffshore wind Developed and applied in the O&Gindustry Meteorological mast with suctionbucket installedSuction bucket
  8. 8. Advancing to lead offshore developer8Statkraft’scapabilitiesProject complexityOffshore 40 kmDudgeon- Integrated partner- Up to 560 MWinstalled capacityOffshore 150 kmLead offshoredeveloper- Minimum 7200MW- 6 projects in totalOnshoreOnshore wind- Developer- 10 projects in UK,Sweden and NorwayOffshore 20 kmSheringham Shoal- Partner in theconstruction phase- 317 MW installedcapacity
  9. 9. Commercial innovation:Providing system operation9London1000 MWDüsseldorf8000 MW Market access for renewableenergy producers Balancing services to variable,renewable production Advanced system operation oflarge, renewable fleets
  10. 10. www.statkraft.comTHANK YOUChristian Rynning-TønnesenCEO, Statkraft AS

×