Critical Facilities Operations Framework
(OCP CFOPS)
TERMINOLOGY
AND ACRONYMS LIST
Rev 2019 v1.4
Author: Coromatic Group AB
Date: 19 May 2020 Page 2
Table of Contents
TABLE OF CONTENTS................................................................................................2
LICENSE................................................................................................................8
1 CRITICAL FACILITIES OPERATIONS TERMINOLOGY .......................................................9
1.1 AA: see Amenity Area.......................................................................................................................................................9
1.2 Access control.....................................................................................................................................................................9
1.3 Account Manager...............................................................................................................................................................9
1.4 AM: see Account Manager...............................................................................................................................................9
1.5 Amenity Area......................................................................................................................................................................9
1.6 Asset Database ...................................................................................................................................................................9
1.7 Asset List..............................................................................................................................................................................9
1.8 Audit .....................................................................................................................................................................................9
1.9 BBT: see Black Building test...........................................................................................................................................10
1.10 BCP: see Business Continuity Plan ...............................................................................................................................10
1.11 BICSI 009 ............................................................................................................................................................................10
1.12 Black Building test ...........................................................................................................................................................10
1.13 BMS: see Building Management System ....................................................................................................................10
1.14 Border list ..........................................................................................................................................................................10
1.15 BRM: see Business Relationship Manager .................................................................................................................10
1.16 Building Management System ......................................................................................................................................10
1.17 Business Continuity Plan ................................................................................................................................................10
1.18 Business Relationship Manager....................................................................................................................................10
1.19 CA: see Circulation Area .................................................................................................................................................11
1.20 CAFM: see Computer Aided Facility Management...................................................................................................11
Date: 19 May 2020 Page 3
1.21 CCTV....................................................................................................................................................................................11
1.22 CF: see Critical Facilities..................................................................................................................................................11
1.23 Change Request................................................................................................................................................................11
1.24 Circulation Area................................................................................................................................................................11
1.25 CMMS: see Computerized Maintenance Management System ............................................................................11
1.26 Compliance Review .........................................................................................................................................................11
1.27 Computer Aided Facility Management .......................................................................................................................11
1.28 Computerized Maintenance Management System..................................................................................................11
1.29 Contract Manager............................................................................................................................................................11
1.30 CR: see Change Request .................................................................................................................................................12
1.31 Critical assets ....................................................................................................................................................................12
1.32 Critical Facilities................................................................................................................................................................12
1.33 CUE......................................................................................................................................................................................12
1.34 Customer ...........................................................................................................................................................................12
1.35 Customer representative...............................................................................................................................................12
1.36 Datacenter Infrastructure Management ....................................................................................................................13
1.37 DCIM: see Datacenter Infrastructure Management.................................................................................................13
1.38 Disaster Recovery Plan ...................................................................................................................................................13
1.39 Downtime..........................................................................................................................................................................13
1.40 DR Plan: see Disaster Recovery Plan ...........................................................................................................................13
1.41 DRP: see Disaster Recovery Plan ..................................................................................................................................13
1.42 EDMS: see Electronic Document Management System ..........................................................................................13
1.43 Electronic Document Management System...............................................................................................................13
1.44 EN 15221............................................................................................................................................................................13
Date: 19 May 2020 Page 4
1.45 EN 50600............................................................................................................................................................................13
1.46 End of Life ..........................................................................................................................................................................13
1.47 EOL: see End of Life .........................................................................................................................................................14
1.48 EOP for Site Management..............................................................................................................................................14
1.49 Equipment .........................................................................................................................................................................14
1.50 ERE ......................................................................................................................................................................................14
1.51 ITIL.......................................................................................................................................................................................14
1.52 Key Performance Indicator ............................................................................................................................................14
1.53 KPI: see Key Performance Indicator.............................................................................................................................14
1.54 Maintenance, Corrective................................................................................................................................................14
1.55 Maintenance, Preventive...............................................................................................................................................15
1.56 Maintenance, Condition-based ....................................................................................................................................15
1.57 Maintenance, Predictive ................................................................................................................................................15
1.58 MCF: see Mission Critical Functions ............................................................................................................................15
1.59 Mean Time Between Failures........................................................................................................................................15
1.60 Mean Time To Repair......................................................................................................................................................15
1.61 MEST for on-site services...............................................................................................................................................15
1.62 Mission Critical Functions ..............................................................................................................................................16
1.63 ModBus..............................................................................................................................................................................16
1.64 MOP for on-site services ................................................................................................................................................16
1.65 MTBF: see Mean Time Between Failures....................................................................................................................16
1.66 MTTR: see Mean Time To Repair..................................................................................................................................16
1.67 Net Floor Area..................................................................................................................................................................16
1.68 NFA: see Net Floor Area.................................................................................................................................................16
Date: 19 May 2020 Page 5
1.69 OCP Ready™ Facility Recognition Program ................................................................................................................16
1.70 Operational Governance Meeting................................................................................................................................16
1.71 Operational Sustainability .............................................................................................................................................16
1.72 PA: see Primary Area.......................................................................................................................................................17
1.73 Partition Walls ..................................................................................................................................................................17
1.74 PDSA: see Plan-Do-Study-Act Cycle .............................................................................................................................17
1.75 Perimeter protection ......................................................................................................................................................17
1.76 Personal Protective Equipment ....................................................................................................................................17
1.77 Plan-Do-Study-Act Cycle.................................................................................................................................................17
1.78 Planned Preventive Maintenance: see Maintenance, Preventive ........................................................................17
1.79 PPE: see Personal Protective Equipment ....................................................................................................................17
1.80 PPM: see Maintenance, Preventive.............................................................................................................................17
1.81 Primary Area.....................................................................................................................................................................17
1.82 PUE......................................................................................................................................................................................17
1.83 PWA: see Partition Walls ...............................................................................................................................................18
1.84 Quality Management System........................................................................................................................................18
1.85 Reaction time....................................................................................................................................................................18
1.86 REF.......................................................................................................................................................................................18
1.87 Reference Library.............................................................................................................................................................18
1.88 Resilience...........................................................................................................................................................................18
1.89 Response time ..................................................................................................................................................................18
1.90 Robustness ........................................................................................................................................................................18
1.91 SCP: see Site Configuration Procedures ......................................................................................................................19
1.92 Service Level Agreement................................................................................................................................................19
Date: 19 May 2020 Page 6
1.93 Service Records ................................................................................................................................................................19
1.94 Service Request ................................................................................................................................................................19
1.95 Service Window................................................................................................................................................................19
1.96 SFG20..................................................................................................................................................................................19
1.97 Site Configuration Procedures ......................................................................................................................................19
1.98 Site Engineer .....................................................................................................................................................................19
1.99 Site Owner.........................................................................................................................................................................19
1.100 Site Policies ...................................................................................................................................................................19
1.101 Site Supply System: see Site System .......................................................................................................................20
1.102 Site Supply System Component: see Site System Component ..........................................................................20
1.103 Site System....................................................................................................................................................................20
1.104 Site System Category ..................................................................................................................................................20
1.105 Site System Component.............................................................................................................................................20
1.106 Site Technician: see Site Engineer............................................................................................................................20
1.107 SLA: see Service Level Agreement ...........................................................................................................................20
1.108 SNMP..............................................................................................................................................................................20
1.109 SOP for Site Management .........................................................................................................................................20
1.110 SOW: see Statement of Work...................................................................................................................................21
1.111 SR: see Service Request..............................................................................................................................................21
1.112 Statement of Work......................................................................................................................................................21
1.113 Strategic Governance Meeting .................................................................................................................................21
1.114 Supply System: see Site System ...............................................................................................................................21
1.115 Supply System Component: see Site System Component ..................................................................................21
1.116 TA: see Technical Area................................................................................................................................................21
Date: 19 May 2020 Page 7
1.117 Tactical Governance Meeting ...................................................................................................................................21
1.118 Technical Area..............................................................................................................................................................21
1.119 Technical Redundancy ................................................................................................................................................21
1.120 Technical Risk Review.................................................................................................................................................21
1.121 Thermal Imaging ..........................................................................................................................................................21
1.122 Tier Classification System ..........................................................................................................................................22
1.123 Transition ......................................................................................................................................................................22
1.124 TRR: see Technical Risk Review ................................................................................................................................22
1.125 Uptime ...........................................................................................................................................................................22
1.126 Uptime Institute's Tier Standard: Operational Sustainability ...........................................................................22
1.127 WIP: see Work In Progress ........................................................................................................................................22
1.128 Work In Progress .........................................................................................................................................................22
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 8
License
This Work is licensed under the Creative Commons Attribution-
ShareAlike4.0 International Licenseby:
Coromatic Group AB
The Work is based on an original conceptby D Gjetrang and L Cardholm. Usage is governed by the terms and
conditions setforth in the Creative Commons Attribution-ShareAlike 4.0 International License.
To view a copy of this license,visithttp://creativecommons.org/licenses/by-sa/4.0/ or send a letter to Creative
Commons, PO Box 1866,Mountain View, CA 94042,USA.
Your use of this Work may be subject to other third-party rights.THIS WORK IS PROVIDED "AS IS." The contributors
expressly disclaimany warranties (express,implied,or otherwise), includingimplied warranties of merchantability,
non-infringement, fitness for a particularpurpose,or title, related to the Work. The entire risk as to implementing
or otherwise usingthe Work is assumed by the implementer and user. IN NO EVENT WILL ANY PARTY BE LIABLE TO
ANY OTHER PARTY FOR LOST PROFITS OR ANY FORM OF INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL
DAMAGES OF ANY CHARACTER FROM ANY CAUSES OF ACTION OF ANY KIND WITH RESPECT TO THIS WORK OR ITS
GOVERNING LICENSE, WHETHER BASED ON BREACH OF CONTRACT, TORT (INCLUDING NEGLIGENCE), OR
OTHERWISE, AND WHETHER OR NOT THE OTHER PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH
DAMAGE.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 9
1 Critical Facilities Operations Terminology
This document summarizes the most common terms and acronyms, with a purpose to minimize risks for
misunderstanding between stakeholders.
1.1 AA: see Amenity Area
1.2 Access control
Secure areas need to be protected by the appropriate entry controls to ensure only authorized persons
are allowed access. The processes for authorization, i.e. approving who to grant access, and for
authentication, i.e. validating a person’s identity, need to be tested, monitored, logged and audited.
1.3 Account Manager
Role for person responsible for maintaining a positive relationship with the customer, identifying customer
needs and ensuring maximum success to both parties through technology and process improvement
initiatives that drive business value.
AM and BRM are used interchangeably in the market.
1.4 AM: see Account Manager
1.5 Amenity Area
Amenity Area (AA) is designed to support particular non-work activities, e.g. employee dining rooms,
vending areas, lounges. It can be with restricted or unrestricted access and is part of the Net Floor Area.
1.6 Asset Database
A database containing multiple data points for installed site supply systems and components, e.g.
manufacturer, model, serial number, install date, warranty periods, End of Life, operating condition and
financial information.
Asset Database and Asset List are used interchangeably in the market.
1.7 Asset List
A list containing multiple data points for installed site supply systems and components, e.g. manufacturer,
model, serial number, install date, warranty periods, End of Life, operating condition and financial
information.
Asset List and Asset Database are used interchangeably in the market.
1.8 Audit
Audits are performed by qualified subject matter experts, entitled to review and audit the execution in
relation to the Services, for the purpose of controlling that Service obligations are fulfilled.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 10
1.9 BBT: see BICSI 009
BICSI 009 is an open-consensus standard developed by a global volunteer base, the material within
reflects operational experience and lessons from a wide variety of data center owners, operators,
designers, and consultants covering data centers from the small enterprise to the large hyperscale
colocation data center.
1.10 Black Building test
1.11 BCP: see Business Continuity Plan
1.12 BICSI 009
BICSI 009 is an open-consensus standard developed by a global volunteer base, the material within
reflects operational experience and lessons from a wide variety of data center owners, operators,
designers, and consultants covering data centers from the small enterprise to the large hyperscale
colocation data center.
1.13 Black Building test
Black Building Test (BBT) is a common test to simulate a total external power outage, by shutting down
incoming grid power to the critical facility completely.
Normally used for testing high availability, performance, business continuity plans and recovery
capabilities in a disaster-like scenario.
1.14 BMS: see Building Management System
1.15 Border list
A Border List clarifies responsibilities between different stakeholders to ensure there are no gaps or
overlaps in performing services, managing risks or handling of financial aspects. It should be
unambiguous regarding accountabilities, responsibilities, and who to consult or inform.
1.16 BRM: see Business Relationship Manager
1.17 Building Management System
Computer-based control system installed in buildings that controls and monitors the building’s mechanical
and electrical equipment. The BMS consists of software and hardware typically using protocols e.g.
BACnet, LonWorks and Modbus.
1.18 Business Continuity Plan
A disaster recovery plan (DRP) is a documented, structured approach which includes how to respond to
unplanned incidents.
1.19 Business Relationship Manager
Role for person responsible for maintaining a positive relationship with the customer, identifying customer
needs and ensuring maximum success to both parties through technology and process improvement
initiatives that drive business value.
AM and BRM are used interchangeably in the market.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 11
1.20 CA: see Circulation Area
1.21 CAFM: see Compliance Review
Compliance Reviews are performed by independent subject matter experts entitled to review and audit
the execution in relation to regulatory and statutory requirements as well as specified standards and
frameworks.
1.22 Computer Aided Facility Management
1.23 CCTV
Closed-circuit television, a system of remote surveillance using cameras. The data may or may not be
stored locally or remotely.
1.24 CF: see Critical Facilities
1.25 Change Request
Change Requests (CR) work orders are changes that affect the scope of service levels or border list, and
therefore require contractual changes.
The CR is approved at appropriate governance level and when the contract has been adjusted, a Service
Request may be created and approved accordingly.
1.26 Circulation Area
Circulation Area (CA) is the portion of the building required for physical access to various divisions and
subdivisions of space. It can be with restricted or unrestricted access and is part of the Net Floor Area.
1.27 CMMS: see Computerized Maintenance Management System
1.28 Compliance Review
Compliance Reviews are performed by independent subject matter experts entitled to review and audit
the execution in relation to regulatory and statutory requirements as well as specified standards and
frameworks.
1.29 Computer Aided Facility Management
Program that organizes and stores all site work. The system schedules preventive service and tasks
corrective actions.
The term CAFM and CMMS is used interchangeably in the market and should not be confused with
EDMS.
1.30 Computerized Maintenance Management System
Program that organizes and stores all site work. The system schedules preventive service and tasks
corrective actions.
The term CAFM and CMMS is used interchangeably in the market and should not be confused with
EDMS.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 12
1.31 Contract Manager
A role that is supporting in improving the financials and service quality of the contracted deliveries. This
includes validating change request consequences and collaborating with the customer on Tactical level.
Corrective maintenance can be either planned or unplanned, also known as deferred or immediate
corrective maintenance.
1.32 CR: see Change Request
1.33 Critical assets
Critical assets are defined as assets that sustain your water or wastewater systems performance.
Determining the criticality of assets is based on an asset having a high risk of failure, and, major
consequences if it does fail. Here are five questions that will help you determine the criticality of a unique
asset:
Five questions to help determine asset criticality
1. How old is the asset?
2. What is the asset’s condition?
3. What is the asset’s failure history or how is it likely to fail?
4. What are the consequences of the failure (environmental, social, etc.)?
5. How much would it cost to repair or replace the asset (including cost related to collateral
damage such as street repairs)?
Answers to these five questions will help you determine which assets are critical.
1.34 Critical Facilities
The requirement to defined as critical facilities (CF) is that an unavailability of function will have adverse
effect on revenues, corporate image, regulatory compliance, safety, or any other mission critical objective
as defined by the organization.
The CF can be a complete building or facility, e.g. a data center. It may also be a combination of technical
supply systems providing Mission Critical Functions (MCF) within a larger facility, such as a hospital,
office or power plant.
1.35 CUE
CUE (Carbon usage effectiveness) is a metric for measuring the carbon gas a site emits. The output is
measured in kilograms of carbon dioxide per kilowatt-hour. The perfect CUE score is 0.0, meaning that no
carbon use is associated with the site’s operations.
1.36 Customer
Owner and user of Equipment located at the site.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 13
1.37 Customer representative
Customer representative is the interface for delivery of services to the customer on operational level.
1.38 Datacenter Infrastructure Management
This is a category of solutions that integrates information technology (IT) and facility management
disciplines to centralize monitoring, management and intelligent capacity planning specifically for critical
facilities’ mission critical systems. Full DCIM deployments will involve specialized software, hardware and
sensors based on protocols e.g. BACnet/IP and SNMP for data collection. This enables monitoring of
datacenter performance measurement metrics, including industry standard metrics like PUE.
1.39 DCIM: see Datacenter Infrastructure Management
1.40 Disaster Recovery Plan
The disaster recovery plan (DRP or DR Plan) is a documented, structured approach with instructions for
responding to incidents. This step-by-step plan consists of the precautions to minimize the effects of a
disaster so the organization can continue to operate or quickly resume mission-critical functions.
1.41 Downtime
Downtime is a measure of system failure, expressed as the percentage of time a service level has been
breached by being unavailable. Downtime is the opposite of uptime.
1.42 DR Plan: see Disaster Recovery Plan
1.43 DRP: see Disaster Recovery Plan
1.44 EDMS: see Electronic Document Management System
1.45 Electronic Document Management System
An Electronic Document Management System is a software that typically can scan, store, retrieve and tag
documents with keywords in order to support an organization.
This is not to be confused with CAFM or CMMS.
1.46 EN 15221
The collective of standards of EN 15221 refer to the facility management (Facility Management, FM)
focusing on the FM as a product and the budget of FM, with the aim of unifying the operation of business
with service processes.
1.47 EN 50600
The Series of Standards EN 50600 aim to meet the European requirements for data center facilities and
critical infrastructures, including design, construction, operations and maintenance with a strong focus on
lowering environmental impact.
1.48 End of Life
At time of purchase of a site system, the lifecycle management rely on the vendors’ specifications for End
of Life (EOL).
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 14
EOL indicates that the product is at the end of its useful life (from the vendor's point of view).
Nevertheless, these specifications are based on laboratory measurements and there can be a significant
deviation from the specification and operation in a real site.
Therefore, EOL should not be confused with a change-out forecast for these items.
1.49 EOL: see End of Life
1.50 EOP for Site Management
EOP means Emergency Operating Procedures for Site Management Function.
These procedures define how the site is controlled and operated during abnormal circumstances or
emergency situations. It is a set of information that describes the characteristics of a process in terms that
will enable its effective execution, control and improvement until it fulfils the criteria to return to normal
operating conditions.
The term EOP is used interchangeably with Emergency Process Description for in the market.
This should not be confused with MEST or MOP which regulates on-site work practices.
1.51 Equipment
Equipment is used by the customer of a site. The equipment is typically used for work activities performed
in the Primary Area, where its function relies on the site capacity and site performance.
This is not to be confused with Site Systems (see ref) that is part of the site functionality that enable the
intended use of customer equipment.
1.52 ERE
ERE (Energy Re-use Efficiency) is a metric for measuring the efficiency of a site in measuring the benefits
of reusing waste to energy. Saving energy means not just saving money; the reduction also can make a
significant contribution to a site owner’s sustainability strategy in the form of emissions reductions.
1.53 ITIL
ITIL, formerly an acronym for Information Technology Infrastructure Library, is a set of detailed practices
for IT service management (ITSM) that focuses on aligning IT services with the needs of business. Even if
ITIL underpins ISO/IEC 20000, the International Service Management Standard for IT service
management, there are some differences between the ISO 20000 standard and the ITIL framework.
1.54 Key Performance Indicator
A Key Performance Indicator (KPI) is a quantifiable measure used to evaluate the success of how well a
service meets the objectives for its performance.
1.55 KPI: see ITIL
ITIL, formerly an acronym for Information Technology Infrastructure Library, is a set of detailed practices
for IT service management (ITSM) that focuses on aligning IT services with the needs of business. Even if
ITIL underpins ISO/IEC 20000, the International Service Management Standard for IT service
management, there are some differences between the ISO 20000 standard and the ITIL framework.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 15
1.56 Key Performance Indicator
1.57 Maintenance, Corrective
Maintenance carried out following detection of an anomaly and aimed at restoring normal operating
conditions.
1.58 Maintenance, Preventive
Maintenance carried out at predetermined intervals or according to prescribed criteria, aimed at reducing
the failure risk or performance degradation of the assets.
1.59 Maintenance, Condition-based
Maintenance is carried out by performing Technical Risk Reviews and asset condition tests to define the
appropriate planned preventive maintenance and change-out forecast of site supply systems.
1.60 Maintenance, Predictive
Continuous online monitoring of actual site supply system condition and automatic comparison with
average values and expected performance. Maintenance is carried out when failure probability indicators
are increasing.
1.61 MCF: see Mission Critical Functions
1.62 Mean Time Between Failures
The definition of MTBF depends on the definition of what is considered a failure. For complex, repairable
systems, failures are those out of design conditions which place the system out of service and into a state
for repair. Failures which occur that can be left or maintained in an unrepaired condition, and do not place
the system out of service, are not considered failures under this definition.
In addition, units that are taken down for routine scheduled maintenance or inventory control are not
considered within the definition of failure.
1.63 Mean Time To Repair
Mean time to repair (MTTR) is a basic measure of the maintainability of repairable items. It is the total
corrective maintenance time for failures divided by the total number of corrective maintenance actions for
failures during a given period of time. It generally does not include lead time for parts not readily available
or other Administrative or Logistic Downtime.
It is be important to distinguish whether MTTR is meant to be a measure of the mean time between the
point at which the failure is first discovered until the point at which the equipment returns to operation
(usually termed "mean time to recovery"), or only a measure of the elapsed time between the point where
repairs actually begin until the point at which the equipment returns to operation (usually termed "mean
time to repair").
1.64 MEST for on-site services
MEST means Method Statement.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 16
It refers to detailed instructions for on-site services, e.g. recurring monthly tests. Its basic purpose is to
ensure the desired outcome by controlling actions. The level of detail depends on the complexity of the
activity that is to be conducted and the impact of the failure in its execution. These methods can be pre-
authorized to improve efficiency in in delivery of services.
The term MEST is used interchangeably with MOP in the market.
1.65 Mission Critical Functions
A combination of technical supply systems within a larger facility, that secure the availability of power and
communications for that facility. The mission critical function (MCF) includes all underlying supply
systems that may be required to meet its functionality, e.g. batteries are required for UPS and
environmental controls are required for power distribution.
1.66 ModBus
Modbus is a serial communications protocol originally published in 1979 for use with programmable logic
controllers (PLCs). It is openly published, royalty-free and comes in several different protocol versions,
including support for TCP/IP.
1.67 MOP for on-site services
MOP means Method of Procedure.
It refers to detailed instructions for on-site services, e.g. recurring monthly tests. Its basic purpose is to
ensure the desired outcome by controlling actions. The level of detail depends on the complexity of the
activity that is to be conducted and the impact of the failure in its execution. These methods can be pre-
authorized to improve efficiency in in delivery of services.
The term MEST is used interchangeably with MOP in the market.
1.68 MTBF: see Mean Time Between Failures
1.69 MTTR: see Mean Time To Repair
1.70 Net Floor Area
Net Floor Area (NFA) is the part of a building that contains rentable floor area. It consists of Partition
Walls and Net Room Area (which contains Technical Area, Circulation Area, Amenity Area and Primary
Area). It can be with restricted or unrestricted access.
1.71 NFA: see MTBF: see Mean Time Between Failures
1.72 MTTR: see Mean Time To Repair
1.73 Net Floor Area
1.74 OCP Ready™ Facility Recognition Program
The OCP Facility Recognition program serve as a reference for data center operators and tenants who
want to understand the fundamental facility requirements to deploy this gear into their IT space. Facilities
that meet these guidelines and approved by the OCP DC Facilities Project receive the certification as an
OCP Ready™ facility.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 17
1.75 Operational Governance Meeting
Recurring meetings on operational level between the customer representative and the site management
function.
1.76 Operational Sustainability
Defines the behaviors and risks beyond the technical robustness of a site that impact the ability to meet
its uptime objectives over a long term. The uptime is the resultant combination of both technical
robustness of the site infrastructure and Operational Sustainability.
1.77 PA: see Primary Area
1.78 Partition Walls
Partition Wall (PWA) is an interior wall which subdivides a part of a building into sections, rooms or
spaces. It may or may not support load other than its own weight and it may or may not be classified for
protection against unauthorized access.
1.79 PDSA: see Plan-Do-Study-Act Cycle
1.80 Perimeter protection
A physical security perimeter is defined as “any transition boundary between two areas of differing
security protection requirements”. This might be quite specific, e.g. the outermost boundaries of a site.
A critical facility should be appropriately protected against threats that may break the perimeter. By
protecting against external and environmental threats, i.e. man-made or natural disasters, it is focused on
ensuring that only designated access points can be used to gain entry to the critical facility.
1.81 Personal Protective Equipment
Personal Protective Equipment (PPE) is equipment that will protect the user against health or safety risks
at work. It can include items such as safety helmets, gloves, eye protection, high-visibility clothing, safety
footwear and safety harnesses. It also includes respiratory protective equipment (RPE).
1.82 Plan-Do-Study-Act Cycle
The PDSA cycle (or Deming cycle) is a model for developing, testing and implementing changes leading
to improvement.
It is based in scientific method and moderates the impulse to take immediate action without proper study
of facts. This way, the process of change is safer and less disruptive for site operations.
1.83 Planned Preventive Maintenance: see Maintenance, Preventive
1.84 PPE: see Personal Protective Equipment
1.85 PPM: see Maintenance, Preventive
1.86 Primary Area
Primary Area (PA) is the enclosed space used for work activity dependent on site capacity, e.g. white
space in a data center or operating theatre in a hospital. It can be with restricted or unrestricted access.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 18
1.87 PUE
PUE (Power Usage Efficiency) is the ratio of the energy used by the customer computing Equipment to
the total energy consumption for the site (including site supply systems, e.g. environmental controls).
This term is sometimes incorrectly referred to as Power Usage Effectiveness.
1.88 PWA: see Partition Walls
1.89 Quality Management System
A quality management system (QMS) is defined as a formalized system that documents processes,
procedures, and responsibilities for achieving quality policies and objectives. A QMS helps coordinate
and direct an organization’s activities to meet customer and regulatory requirements and improve its
effectiveness and efficiency on a continuous basis.
1.90 Reaction time
Reaction Time is calculated from the time the Supplier’s service desk logs the call-out and is deemed to
be achieved when the Supplier is given access to the customer site and is recorded on the Customer’s
security system.
1.91 REF
REF (Renewable Energy Factor) is the ratio of the renewable energy owned and controlled by a critical
facility to its total energy consumption.
1.92 Reference Library
The purpose of the Reference Library is ensuring access to critical documentation to support site
management processes and on-site services. The materials in the reference library are identified
recorded and provided to site management from the providers of related services or systems. Gaps in the
reference library affect the effectiveness of all other site management processes and inaccurate or
obsolete documents can lead to wrong decisions.
1.93 Resilience
Resilience is the capacity to prevent a crisis occurrence, and when a crisis occurs, the capacity to absorb
the impact and recover rapidly to the normal state of operations. It is by adding this capability on top of
technical robustness that a site operations team make a difference.
This is not to be confused with robustness.
1.94 Response time
Response Time is the time it takes for the Supplier Service Desk to respond to a call made by telephone
or other agreed communications channels.
1.95 Robustness
Robustness refers to the ability to absorb and withstand disturbances and crises. For data centers and
other mission critical facilities different Tiers or Classes are used to classify this. This is based on
redundancy in supply systems and their components.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 19
This is not to be confused with resilience.
1.96 SCP: see Site Configuration Procedures
1.97 Service Level Agreement
Agreement between customer and supplier addressing service requirement and delivery standards. with
defined penalties and escalations in case of failure to meet agreed Service Levels.
1.98 Service Records
A service record is a collection of electronic or printed materials which provides a documentary history of
on-site activities performed on a specific site system or function ensuring an audit trail and an up-to-date
status of the asset.
1.99 Service Request
Service Requests (SR) work orders are changes to normal operating configurations within the scope of
service levels and border list, and therefore do not require contractual changes.
These should be planned to enable proper coordination and use pre-authorized method statements or
project plans. The results should be reviewed by the creator to analyze the desired effect.
1.100 Service Window
A service window is a period designated in advance, during which on-site site works, e.g. maintenance,
that could cause disruption of services may be performed.
1.101 SFG20
Standard Maintenance Specification for Mechanical Services in Buildings
1.102 Site Configuration Procedures
Defines how the site infrastructure is configured for normal operations
1.103 Site Engineer
Is a role that is focused on specific named sites. This is the local “go to person” for understanding the
technical aspects of the site, handling of customer equipment or having third parties escorted in the
premises.
1.104 Site Owner
Owner and accountable for the site performance
1.105 Site Policies
The purpose of the Site Policies is ensuring access to critical documentation to support site management
processes and control on-site services.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 20
Gaps in the site policies affect the effectiveness of all other site management processes and inaccurate
or obsolete documents can lead to wrong decisions.
The materials in the site policies are managed by the site management function.
1.106 Site Supply System: see Error! Not a valid bookmark self-reference.
1.107 Site Supply System Component: see Site System Component
A Site System Component is a sub-part of a Site System, e.g. the batteries as a sub-part of a full power
distribution.
1.108
1.109 Site System
This refers to the full scope of technical supply systems within one infrastructure element to provide the
site functionality that enable the use of customer equipment, e.g. the full power distribution as defined in
the SLD (Single Line Diagram)
The term Site Supply System is used interchangeably with Site System in the market.
1.110 Site System Category
Site systems fall into five different categories; Building construction, Power distribution, Environmental
control, Telecommunications cabling infrastructure, and finally Security systems.
1.111 Site System Component
A Site System Component is a sub-part of a Site System, e.g. the batteries as a sub-part of a full power
distribution.
The term Site Supply System Component is used interchangeably with Site System Component in the
market.
1.112 Site Technician: see Site Engineer
1.113 SLA: see Service Level Agreement
1.114 SNMP
Simple Network Management Protocol (SNMP) is an Internet Standard protocol for collecting and
organizing information about managed devices on IP networks and for modifying that information to
change device behavior.
Site Systems like UPS, BMS, CRAH etc. supports SNMP for management. Furthermore, customer
Equipment may also support SNMP.
1.115 SOP for Site Management
Standard Operating Procedures for Site Management Function.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 21
These procedures define how the site is controlled and operated during normal circumstances. It is a set
of information that describes the characteristics of a process in terms that will enable its effective
execution, control and improvement.
The term SOP is used interchangeably with Standard Process Description in the market.
This should not be confused with MEST or MOP which regulates on-site work practices.
1.116 SOW: see Statement of Work
1.117 SR: see Service Request
1.118 Statement of Work
A statement of work (SoW) is a document routinely employed in the field. It defines specific activities,
deliverables and timelines for a vendor providing services to the client.
The SOW typically includes detailed requirements and pricing, with governance terms and practical
appendices, e.g. border list and asset list. It is often supported by a master service agreement or general
Terms & Conditions.
1.119 Strategic Governance Meeting
Recurring meetings on strategic level between the customer and the supplier of site services. This is the
escalation level for tactical meetings.
1.120 Supply System: see Site Supply System: see Error! Not a valid bookmark self-reference.
1.121 Site Supply System Component: see Site System Component
A Site System Component is a sub-part of a Site System, e.g. the batteries as a sub-part of a full power
distribution.
1.122
1.123 Site System
1.124 Supply System Component: see Site System Component
A Site System Component is a sub-part of a Site System, e.g. the batteries as a sub-part of a full power
distribution.
1.125
1.126 TA: see Technical Area
1.127 Tactical Governance Meeting
Recurring meetings on tactical level between the customer and the supplier of site services. This is the
escalation level for operational meetings.
1.128 Technical Area
Technical Area (TA) is designed to house site supply systems for provisioning of site capacity, e.g. UPS
rooms, Generator rooms and cables corridors or tunnels. It is normally with restricted access. It is part of
the Net Floor Area.
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 22
1.129 Technical Redundancy
Redundancy provides improved robustness by including extra infrastructure components, which are not
strictly necessary to standard operations; there is a fallback solution in case of failures of components
used for standard operations.
1.130 Technical Risk Review
This is a professional walk-through of a site. This is performed by one or several qualified service
technicians to ensure that technical risks are noted and reported to the site owner. The report includes
recommendations and possible ways to mitigate the risks.
The Technical Risk Review is tailored to the site that is being reviewed so that relevant tools are being
used.
1.131 Thermal Imaging
Thermal imaging is the use of special equipment that can detect the heat produced by supply systems or
equipment, e.g. bus bars or switch gear, and produce images of them to identify risks or faults.
1.132 Tier Classification System
Uptime Institute created the standard Tier Classification System as a means to effectively evaluate data
center infrastructure in terms of a business’ requirements for system availability.
1.133 Transition
Transition is to plan and manage the change of state of a site in its lifecycle.
It encompasses managing risk for new, changed and retired services or suppliers while protecting the site
performance during the transition.
Some areas handled in transition from one supplier of site operations to another are border lists,
processes to be integrated or separated and also KPI monitoring and reporting.
1.134 TRR: see Technical Risk Review
1.135 Uptime
Uptime is a measure of system reliability, expressed as the percentage of time a service level has been
fulfilled and available. Uptime is the opposite of downtime.
1.136 Uptime Institute's Tier Standard: Operational Sustainability
Uptime Institute's Tier Standard: Operational Sustainability establishes the behaviors and risks beyond
the Tier Classification System (I, II, III, IV) that impact long-term data center performance. This Standard
unifies the site management behaviors with the Tier functionality of the site infrastructure in order to
achieve the organization's business objectives or mission imperatives.
1.137 WIP: see Work In Progress
Open Compute Project  Critical Facilities Operations Framework  Terminology
Date: 19 May 2020 Page 23
1.138 Work In Progress
Work In Progress (WIP) is the number of task items that a is currently being executed, but has not yet
been completed. It is used in monitoring and reporting of site operations.
This should not be confused with the financial (or accounting) term of Work-In-Progress (WIP).

More Related Content

What's hot

OLED Encapsulation Markets
OLED Encapsulation MarketsOLED Encapsulation Markets
OLED Encapsulation Marketsn-tech Research
 
Benefits of share_point_2010_as_a_product_platform
Benefits of share_point_2010_as_a_product_platformBenefits of share_point_2010_as_a_product_platform
Benefits of share_point_2010_as_a_product_platformApimuk Siripitupum
 
Sample global car roof racks market report 2021
Sample global car roof racks market report 2021  Sample global car roof racks market report 2021
Sample global car roof racks market report 2021 Cognitive Market Research
 
Markets for OLED Encapsulation Materials
Markets for OLED Encapsulation Materials Markets for OLED Encapsulation Materials
Markets for OLED Encapsulation Materials n-tech Research
 
Sample global 3 d printed technical ceramics market research report 2020
Sample global 3 d printed technical ceramics market research report 2020Sample global 3 d printed technical ceramics market research report 2020
Sample global 3 d printed technical ceramics market research report 2020Cognitive Market Research
 
Sample global msp software market report 2021
Sample global msp software market report 2021    Sample global msp software market report 2021
Sample global msp software market report 2021 Cognitive Market Research
 
Sample global hr service market research report 2020
Sample global hr service market research report 2020Sample global hr service market research report 2020
Sample global hr service market research report 2020Cognitive Market Research
 
Sample global automotive metal and plastic parts market research report 2020 ...
Sample global automotive metal and plastic parts market research report 2020 ...Sample global automotive metal and plastic parts market research report 2020 ...
Sample global automotive metal and plastic parts market research report 2020 ...Cognitive Market Research
 
Global Point-of-Care Imaging Devices Market
 Global Point-of-Care Imaging Devices Market Global Point-of-Care Imaging Devices Market
Global Point-of-Care Imaging Devices MarketBIS Research Inc.
 
110906 ps-ritc-skills australia interim report resources industry
110906 ps-ritc-skills australia interim report resources industry110906 ps-ritc-skills australia interim report resources industry
110906 ps-ritc-skills australia interim report resources industryRITCWA
 
A global and regional analysis of the advanced space composites market
A global and regional analysis of the advanced space composites marketA global and regional analysis of the advanced space composites market
A global and regional analysis of the advanced space composites marketsidbisresearch
 
Sample global appointment scheduling software market research report 2020
Sample global appointment scheduling software market research report 2020Sample global appointment scheduling software market research report 2020
Sample global appointment scheduling software market research report 2020Cognitive Market Research
 
Business case channel financing ver 1.5
Business case   channel financing ver 1.5Business case   channel financing ver 1.5
Business case channel financing ver 1.5Partho Chakraborty
 

What's hot (15)

OLED Encapsulation Markets
OLED Encapsulation MarketsOLED Encapsulation Markets
OLED Encapsulation Markets
 
Benefits of share_point_2010_as_a_product_platform
Benefits of share_point_2010_as_a_product_platformBenefits of share_point_2010_as_a_product_platform
Benefits of share_point_2010_as_a_product_platform
 
Sample global car roof racks market report 2021
Sample global car roof racks market report 2021  Sample global car roof racks market report 2021
Sample global car roof racks market report 2021
 
Markets for OLED Encapsulation Materials
Markets for OLED Encapsulation Materials Markets for OLED Encapsulation Materials
Markets for OLED Encapsulation Materials
 
Sample global 3 d printed technical ceramics market research report 2020
Sample global 3 d printed technical ceramics market research report 2020Sample global 3 d printed technical ceramics market research report 2020
Sample global 3 d printed technical ceramics market research report 2020
 
Sample global msp software market report 2021
Sample global msp software market report 2021    Sample global msp software market report 2021
Sample global msp software market report 2021
 
Sample global hr service market research report 2020
Sample global hr service market research report 2020Sample global hr service market research report 2020
Sample global hr service market research report 2020
 
Sample global automotive metal and plastic parts market research report 2020 ...
Sample global automotive metal and plastic parts market research report 2020 ...Sample global automotive metal and plastic parts market research report 2020 ...
Sample global automotive metal and plastic parts market research report 2020 ...
 
Global Point-of-Care Imaging Devices Market
 Global Point-of-Care Imaging Devices Market Global Point-of-Care Imaging Devices Market
Global Point-of-Care Imaging Devices Market
 
110906 ps-ritc-skills australia interim report resources industry
110906 ps-ritc-skills australia interim report resources industry110906 ps-ritc-skills australia interim report resources industry
110906 ps-ritc-skills australia interim report resources industry
 
A global and regional analysis of the advanced space composites market
A global and regional analysis of the advanced space composites marketA global and regional analysis of the advanced space composites market
A global and regional analysis of the advanced space composites market
 
121cash mgmt
121cash mgmt121cash mgmt
121cash mgmt
 
Sample global appointment scheduling software market research report 2020
Sample global appointment scheduling software market research report 2020Sample global appointment scheduling software market research report 2020
Sample global appointment scheduling software market research report 2020
 
Global Lidar Market
Global Lidar MarketGlobal Lidar Market
Global Lidar Market
 
Business case channel financing ver 1.5
Business case   channel financing ver 1.5Business case   channel financing ver 1.5
Business case channel financing ver 1.5
 

Similar to Ocp cfops-terminology 2019v1.4

Sample Global Paper Shredding Services Market Report 2021 - Cognitive Market ...
Sample Global Paper Shredding Services Market Report 2021 - Cognitive Market ...Sample Global Paper Shredding Services Market Report 2021 - Cognitive Market ...
Sample Global Paper Shredding Services Market Report 2021 - Cognitive Market ...Cognitive Market Research
 
Sample Global Paper Shredding Services Market Report 2022
Sample Global Paper Shredding Services Market Report 2022Sample Global Paper Shredding Services Market Report 2022
Sample Global Paper Shredding Services Market Report 2022Cognitive Market Research
 
Sample Global Over the Top OTT Services Market Report 2021 - Cognitive Market...
Sample Global Over the Top OTT Services Market Report 2021 - Cognitive Market...Sample Global Over the Top OTT Services Market Report 2021 - Cognitive Market...
Sample Global Over the Top OTT Services Market Report 2021 - Cognitive Market...Cognitive Market Research
 
Sample Global Over the Top OTT Services Market Report 2022
Sample Global Over the Top OTT Services Market Report 2022Sample Global Over the Top OTT Services Market Report 2022
Sample Global Over the Top OTT Services Market Report 2022Cognitive Market Research
 
PostgreSQL 12 Beta 1 New Features with Examples (English)
PostgreSQL 12 Beta 1 New Features with Examples (English)PostgreSQL 12 Beta 1 New Features with Examples (English)
PostgreSQL 12 Beta 1 New Features with Examples (English)Noriyoshi Shinoda
 
Cpuc financing report_hb&c_jul8v2
Cpuc financing report_hb&c_jul8v2Cpuc financing report_hb&c_jul8v2
Cpuc financing report_hb&c_jul8v2HarcourtBrownEF
 
Agriculture and food security
Agriculture and food securityAgriculture and food security
Agriculture and food securityMondoloka
 
Shareholders Agreement Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Shareholders Agreement Sample (Purchase this doc, Text: 08118887270 (Whatsapp))Shareholders Agreement Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Shareholders Agreement Sample (Purchase this doc, Text: 08118887270 (Whatsapp))GLC
 
Trade Sector Briefs, 2015 Edition
Trade Sector Briefs, 2015 EditionTrade Sector Briefs, 2015 Edition
Trade Sector Briefs, 2015 EditionDCFTAProject_2014
 
Emergent Nagpur
Emergent NagpurEmergent Nagpur
Emergent NagpurgrowIT.in
 

Similar to Ocp cfops-terminology 2019v1.4 (20)

Sample Global Paper Shredding
Sample Global Paper Shredding Sample Global Paper Shredding
Sample Global Paper Shredding
 
Sample Global Paper Shredding Services Market Report 2021 - Cognitive Market ...
Sample Global Paper Shredding Services Market Report 2021 - Cognitive Market ...Sample Global Paper Shredding Services Market Report 2021 - Cognitive Market ...
Sample Global Paper Shredding Services Market Report 2021 - Cognitive Market ...
 
Sample Global Paper Shredding Services Market Report 2022
Sample Global Paper Shredding Services Market Report 2022Sample Global Paper Shredding Services Market Report 2022
Sample Global Paper Shredding Services Market Report 2022
 
Sample Global Over the Top OTT Services Market Report 2021 - Cognitive Market...
Sample Global Over the Top OTT Services Market Report 2021 - Cognitive Market...Sample Global Over the Top OTT Services Market Report 2021 - Cognitive Market...
Sample Global Over the Top OTT Services Market Report 2021 - Cognitive Market...
 
Sample Global Over the Top OTT Services Market Report 2022
Sample Global Over the Top OTT Services Market Report 2022Sample Global Over the Top OTT Services Market Report 2022
Sample Global Over the Top OTT Services Market Report 2022
 
Sample Global Over the Top OTT
Sample Global Over the Top OTT Sample Global Over the Top OTT
Sample Global Over the Top OTT
 
PostgreSQL 12 Beta 1 New Features with Examples (English)
PostgreSQL 12 Beta 1 New Features with Examples (English)PostgreSQL 12 Beta 1 New Features with Examples (English)
PostgreSQL 12 Beta 1 New Features with Examples (English)
 
Cpuc financing report_hb&c_jul8v2
Cpuc financing report_hb&c_jul8v2Cpuc financing report_hb&c_jul8v2
Cpuc financing report_hb&c_jul8v2
 
IPI-IBS-Guidelines.pdf
IPI-IBS-Guidelines.pdfIPI-IBS-Guidelines.pdf
IPI-IBS-Guidelines.pdf
 
Agriculture and food security
Agriculture and food securityAgriculture and food security
Agriculture and food security
 
CEI China Port Development Report 210
CEI China Port Development Report 210CEI China Port Development Report 210
CEI China Port Development Report 210
 
Shareholders Agreement Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Shareholders Agreement Sample (Purchase this doc, Text: 08118887270 (Whatsapp))Shareholders Agreement Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Shareholders Agreement Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
 
Trade Sector Briefs, 2015 Edition
Trade Sector Briefs, 2015 EditionTrade Sector Briefs, 2015 Edition
Trade Sector Briefs, 2015 Edition
 
Sample Global Niobium
Sample Global Niobium  Sample Global Niobium
Sample Global Niobium
 
Sample Global Niobium Market Report 2022
Sample Global Niobium  Market Report 2022Sample Global Niobium  Market Report 2022
Sample Global Niobium Market Report 2022
 
Ind ii npmp revision final report
Ind ii npmp revision final reportInd ii npmp revision final report
Ind ii npmp revision final report
 
China electronic parts market report sample pages
China electronic parts market report   sample pagesChina electronic parts market report   sample pages
China electronic parts market report sample pages
 
Report on the Implementation of the derogation to the standard rules of orig...
 Report on the Implementation of the derogation to the standard rules of orig... Report on the Implementation of the derogation to the standard rules of orig...
Report on the Implementation of the derogation to the standard rules of orig...
 
Emergent Nagpur
Emergent NagpurEmergent Nagpur
Emergent Nagpur
 
Sample Global Industrial Hose
Sample Global Industrial Hose Sample Global Industrial Hose
Sample Global Industrial Hose
 

More from ssusereb347d

16. Process: ocp cfops delivery support
16. Process: ocp cfops delivery support16. Process: ocp cfops delivery support
16. Process: ocp cfops delivery supportssusereb347d
 
13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspectionsssusereb347d
 
17. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.117. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.1ssusereb347d
 
15. Process: ocp cfops: site assistance
15. Process: ocp cfops: site assistance15. Process: ocp cfops: site assistance
15. Process: ocp cfops: site assistancessusereb347d
 
14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviewsssusereb347d
 
12. Process: ocp cfops indoor outdoor fm
12. Process: ocp cfops indoor outdoor fm12. Process: ocp cfops indoor outdoor fm
12. Process: ocp cfops indoor outdoor fmssusereb347d
 
11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenancessusereb347d
 
10. Process: ocp cfops security and access
10. Process: ocp cfops security and access10. Process: ocp cfops security and access
10. Process: ocp cfops security and accessssusereb347d
 
9. Process: ocp cfops team and suppliers mgmt
9. Process: ocp cfops team and suppliers mgmt9. Process: ocp cfops team and suppliers mgmt
9. Process: ocp cfops team and suppliers mgmtssusereb347d
 
8. Process: ocp cfops document mgmt
8. Process: ocp cfops document mgmt8. Process: ocp cfops document mgmt
8. Process: ocp cfops document mgmtssusereb347d
 
8. ocp cfops.document mgmt.guideline.2019.2
8. ocp cfops.document mgmt.guideline.2019.28. ocp cfops.document mgmt.guideline.2019.2
8. ocp cfops.document mgmt.guideline.2019.2ssusereb347d
 
7. Process: ocp cfops compliance mgmt
7. Process: ocp cfops compliance mgmt7. Process: ocp cfops compliance mgmt
7. Process: ocp cfops compliance mgmtssusereb347d
 
6. Process: ocp cfops capacity mgmt and optimization
6. Process: ocp cfops capacity mgmt and optimization6. Process: ocp cfops capacity mgmt and optimization
6. Process: ocp cfops capacity mgmt and optimizationssusereb347d
 
5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmt5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmtssusereb347d
 
4. Process: ocp cfops monitoring and reporting
4. Process: ocp cfops monitoring and reporting4. Process: ocp cfops monitoring and reporting
4. Process: ocp cfops monitoring and reportingssusereb347d
 
4. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.54. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.5ssusereb347d
 
3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmt3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmtssusereb347d
 
2. Process: ocp cfops service level mgmt
2. Process: ocp cfops service level mgmt2. Process: ocp cfops service level mgmt
2. Process: ocp cfops service level mgmtssusereb347d
 
1. Process: ocp cfops incident mgmt
1. Process: ocp cfops incident mgmt1. Process: ocp cfops incident mgmt
1. Process: ocp cfops incident mgmtssusereb347d
 
0. ocp cfops flyby
0. ocp cfops flyby0. ocp cfops flyby
0. ocp cfops flybyssusereb347d
 

More from ssusereb347d (20)

16. Process: ocp cfops delivery support
16. Process: ocp cfops delivery support16. Process: ocp cfops delivery support
16. Process: ocp cfops delivery support
 
13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections13. Process: ocp cfops site inspections
13. Process: ocp cfops site inspections
 
17. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.117. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.1
 
15. Process: ocp cfops: site assistance
15. Process: ocp cfops: site assistance15. Process: ocp cfops: site assistance
15. Process: ocp cfops: site assistance
 
14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews
 
12. Process: ocp cfops indoor outdoor fm
12. Process: ocp cfops indoor outdoor fm12. Process: ocp cfops indoor outdoor fm
12. Process: ocp cfops indoor outdoor fm
 
11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance
 
10. Process: ocp cfops security and access
10. Process: ocp cfops security and access10. Process: ocp cfops security and access
10. Process: ocp cfops security and access
 
9. Process: ocp cfops team and suppliers mgmt
9. Process: ocp cfops team and suppliers mgmt9. Process: ocp cfops team and suppliers mgmt
9. Process: ocp cfops team and suppliers mgmt
 
8. Process: ocp cfops document mgmt
8. Process: ocp cfops document mgmt8. Process: ocp cfops document mgmt
8. Process: ocp cfops document mgmt
 
8. ocp cfops.document mgmt.guideline.2019.2
8. ocp cfops.document mgmt.guideline.2019.28. ocp cfops.document mgmt.guideline.2019.2
8. ocp cfops.document mgmt.guideline.2019.2
 
7. Process: ocp cfops compliance mgmt
7. Process: ocp cfops compliance mgmt7. Process: ocp cfops compliance mgmt
7. Process: ocp cfops compliance mgmt
 
6. Process: ocp cfops capacity mgmt and optimization
6. Process: ocp cfops capacity mgmt and optimization6. Process: ocp cfops capacity mgmt and optimization
6. Process: ocp cfops capacity mgmt and optimization
 
5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmt5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmt
 
4. Process: ocp cfops monitoring and reporting
4. Process: ocp cfops monitoring and reporting4. Process: ocp cfops monitoring and reporting
4. Process: ocp cfops monitoring and reporting
 
4. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.54. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.5
 
3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmt3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmt
 
2. Process: ocp cfops service level mgmt
2. Process: ocp cfops service level mgmt2. Process: ocp cfops service level mgmt
2. Process: ocp cfops service level mgmt
 
1. Process: ocp cfops incident mgmt
1. Process: ocp cfops incident mgmt1. Process: ocp cfops incident mgmt
1. Process: ocp cfops incident mgmt
 
0. ocp cfops flyby
0. ocp cfops flyby0. ocp cfops flyby
0. ocp cfops flyby
 

Recently uploaded

"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 

Recently uploaded (20)

POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 

Ocp cfops-terminology 2019v1.4

  • 1. Critical Facilities Operations Framework (OCP CFOPS) TERMINOLOGY AND ACRONYMS LIST Rev 2019 v1.4 Author: Coromatic Group AB
  • 2. Date: 19 May 2020 Page 2 Table of Contents TABLE OF CONTENTS................................................................................................2 LICENSE................................................................................................................8 1 CRITICAL FACILITIES OPERATIONS TERMINOLOGY .......................................................9 1.1 AA: see Amenity Area.......................................................................................................................................................9 1.2 Access control.....................................................................................................................................................................9 1.3 Account Manager...............................................................................................................................................................9 1.4 AM: see Account Manager...............................................................................................................................................9 1.5 Amenity Area......................................................................................................................................................................9 1.6 Asset Database ...................................................................................................................................................................9 1.7 Asset List..............................................................................................................................................................................9 1.8 Audit .....................................................................................................................................................................................9 1.9 BBT: see Black Building test...........................................................................................................................................10 1.10 BCP: see Business Continuity Plan ...............................................................................................................................10 1.11 BICSI 009 ............................................................................................................................................................................10 1.12 Black Building test ...........................................................................................................................................................10 1.13 BMS: see Building Management System ....................................................................................................................10 1.14 Border list ..........................................................................................................................................................................10 1.15 BRM: see Business Relationship Manager .................................................................................................................10 1.16 Building Management System ......................................................................................................................................10 1.17 Business Continuity Plan ................................................................................................................................................10 1.18 Business Relationship Manager....................................................................................................................................10 1.19 CA: see Circulation Area .................................................................................................................................................11 1.20 CAFM: see Computer Aided Facility Management...................................................................................................11
  • 3. Date: 19 May 2020 Page 3 1.21 CCTV....................................................................................................................................................................................11 1.22 CF: see Critical Facilities..................................................................................................................................................11 1.23 Change Request................................................................................................................................................................11 1.24 Circulation Area................................................................................................................................................................11 1.25 CMMS: see Computerized Maintenance Management System ............................................................................11 1.26 Compliance Review .........................................................................................................................................................11 1.27 Computer Aided Facility Management .......................................................................................................................11 1.28 Computerized Maintenance Management System..................................................................................................11 1.29 Contract Manager............................................................................................................................................................11 1.30 CR: see Change Request .................................................................................................................................................12 1.31 Critical assets ....................................................................................................................................................................12 1.32 Critical Facilities................................................................................................................................................................12 1.33 CUE......................................................................................................................................................................................12 1.34 Customer ...........................................................................................................................................................................12 1.35 Customer representative...............................................................................................................................................12 1.36 Datacenter Infrastructure Management ....................................................................................................................13 1.37 DCIM: see Datacenter Infrastructure Management.................................................................................................13 1.38 Disaster Recovery Plan ...................................................................................................................................................13 1.39 Downtime..........................................................................................................................................................................13 1.40 DR Plan: see Disaster Recovery Plan ...........................................................................................................................13 1.41 DRP: see Disaster Recovery Plan ..................................................................................................................................13 1.42 EDMS: see Electronic Document Management System ..........................................................................................13 1.43 Electronic Document Management System...............................................................................................................13 1.44 EN 15221............................................................................................................................................................................13
  • 4. Date: 19 May 2020 Page 4 1.45 EN 50600............................................................................................................................................................................13 1.46 End of Life ..........................................................................................................................................................................13 1.47 EOL: see End of Life .........................................................................................................................................................14 1.48 EOP for Site Management..............................................................................................................................................14 1.49 Equipment .........................................................................................................................................................................14 1.50 ERE ......................................................................................................................................................................................14 1.51 ITIL.......................................................................................................................................................................................14 1.52 Key Performance Indicator ............................................................................................................................................14 1.53 KPI: see Key Performance Indicator.............................................................................................................................14 1.54 Maintenance, Corrective................................................................................................................................................14 1.55 Maintenance, Preventive...............................................................................................................................................15 1.56 Maintenance, Condition-based ....................................................................................................................................15 1.57 Maintenance, Predictive ................................................................................................................................................15 1.58 MCF: see Mission Critical Functions ............................................................................................................................15 1.59 Mean Time Between Failures........................................................................................................................................15 1.60 Mean Time To Repair......................................................................................................................................................15 1.61 MEST for on-site services...............................................................................................................................................15 1.62 Mission Critical Functions ..............................................................................................................................................16 1.63 ModBus..............................................................................................................................................................................16 1.64 MOP for on-site services ................................................................................................................................................16 1.65 MTBF: see Mean Time Between Failures....................................................................................................................16 1.66 MTTR: see Mean Time To Repair..................................................................................................................................16 1.67 Net Floor Area..................................................................................................................................................................16 1.68 NFA: see Net Floor Area.................................................................................................................................................16
  • 5. Date: 19 May 2020 Page 5 1.69 OCP Ready™ Facility Recognition Program ................................................................................................................16 1.70 Operational Governance Meeting................................................................................................................................16 1.71 Operational Sustainability .............................................................................................................................................16 1.72 PA: see Primary Area.......................................................................................................................................................17 1.73 Partition Walls ..................................................................................................................................................................17 1.74 PDSA: see Plan-Do-Study-Act Cycle .............................................................................................................................17 1.75 Perimeter protection ......................................................................................................................................................17 1.76 Personal Protective Equipment ....................................................................................................................................17 1.77 Plan-Do-Study-Act Cycle.................................................................................................................................................17 1.78 Planned Preventive Maintenance: see Maintenance, Preventive ........................................................................17 1.79 PPE: see Personal Protective Equipment ....................................................................................................................17 1.80 PPM: see Maintenance, Preventive.............................................................................................................................17 1.81 Primary Area.....................................................................................................................................................................17 1.82 PUE......................................................................................................................................................................................17 1.83 PWA: see Partition Walls ...............................................................................................................................................18 1.84 Quality Management System........................................................................................................................................18 1.85 Reaction time....................................................................................................................................................................18 1.86 REF.......................................................................................................................................................................................18 1.87 Reference Library.............................................................................................................................................................18 1.88 Resilience...........................................................................................................................................................................18 1.89 Response time ..................................................................................................................................................................18 1.90 Robustness ........................................................................................................................................................................18 1.91 SCP: see Site Configuration Procedures ......................................................................................................................19 1.92 Service Level Agreement................................................................................................................................................19
  • 6. Date: 19 May 2020 Page 6 1.93 Service Records ................................................................................................................................................................19 1.94 Service Request ................................................................................................................................................................19 1.95 Service Window................................................................................................................................................................19 1.96 SFG20..................................................................................................................................................................................19 1.97 Site Configuration Procedures ......................................................................................................................................19 1.98 Site Engineer .....................................................................................................................................................................19 1.99 Site Owner.........................................................................................................................................................................19 1.100 Site Policies ...................................................................................................................................................................19 1.101 Site Supply System: see Site System .......................................................................................................................20 1.102 Site Supply System Component: see Site System Component ..........................................................................20 1.103 Site System....................................................................................................................................................................20 1.104 Site System Category ..................................................................................................................................................20 1.105 Site System Component.............................................................................................................................................20 1.106 Site Technician: see Site Engineer............................................................................................................................20 1.107 SLA: see Service Level Agreement ...........................................................................................................................20 1.108 SNMP..............................................................................................................................................................................20 1.109 SOP for Site Management .........................................................................................................................................20 1.110 SOW: see Statement of Work...................................................................................................................................21 1.111 SR: see Service Request..............................................................................................................................................21 1.112 Statement of Work......................................................................................................................................................21 1.113 Strategic Governance Meeting .................................................................................................................................21 1.114 Supply System: see Site System ...............................................................................................................................21 1.115 Supply System Component: see Site System Component ..................................................................................21 1.116 TA: see Technical Area................................................................................................................................................21
  • 7. Date: 19 May 2020 Page 7 1.117 Tactical Governance Meeting ...................................................................................................................................21 1.118 Technical Area..............................................................................................................................................................21 1.119 Technical Redundancy ................................................................................................................................................21 1.120 Technical Risk Review.................................................................................................................................................21 1.121 Thermal Imaging ..........................................................................................................................................................21 1.122 Tier Classification System ..........................................................................................................................................22 1.123 Transition ......................................................................................................................................................................22 1.124 TRR: see Technical Risk Review ................................................................................................................................22 1.125 Uptime ...........................................................................................................................................................................22 1.126 Uptime Institute's Tier Standard: Operational Sustainability ...........................................................................22 1.127 WIP: see Work In Progress ........................................................................................................................................22 1.128 Work In Progress .........................................................................................................................................................22
  • 8. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 8 License This Work is licensed under the Creative Commons Attribution- ShareAlike4.0 International Licenseby: Coromatic Group AB The Work is based on an original conceptby D Gjetrang and L Cardholm. Usage is governed by the terms and conditions setforth in the Creative Commons Attribution-ShareAlike 4.0 International License. To view a copy of this license,visithttp://creativecommons.org/licenses/by-sa/4.0/ or send a letter to Creative Commons, PO Box 1866,Mountain View, CA 94042,USA. Your use of this Work may be subject to other third-party rights.THIS WORK IS PROVIDED "AS IS." The contributors expressly disclaimany warranties (express,implied,or otherwise), includingimplied warranties of merchantability, non-infringement, fitness for a particularpurpose,or title, related to the Work. The entire risk as to implementing or otherwise usingthe Work is assumed by the implementer and user. IN NO EVENT WILL ANY PARTY BE LIABLE TO ANY OTHER PARTY FOR LOST PROFITS OR ANY FORM OF INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES OF ANY CHARACTER FROM ANY CAUSES OF ACTION OF ANY KIND WITH RESPECT TO THIS WORK OR ITS GOVERNING LICENSE, WHETHER BASED ON BREACH OF CONTRACT, TORT (INCLUDING NEGLIGENCE), OR OTHERWISE, AND WHETHER OR NOT THE OTHER PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.
  • 9. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 9 1 Critical Facilities Operations Terminology This document summarizes the most common terms and acronyms, with a purpose to minimize risks for misunderstanding between stakeholders. 1.1 AA: see Amenity Area 1.2 Access control Secure areas need to be protected by the appropriate entry controls to ensure only authorized persons are allowed access. The processes for authorization, i.e. approving who to grant access, and for authentication, i.e. validating a person’s identity, need to be tested, monitored, logged and audited. 1.3 Account Manager Role for person responsible for maintaining a positive relationship with the customer, identifying customer needs and ensuring maximum success to both parties through technology and process improvement initiatives that drive business value. AM and BRM are used interchangeably in the market. 1.4 AM: see Account Manager 1.5 Amenity Area Amenity Area (AA) is designed to support particular non-work activities, e.g. employee dining rooms, vending areas, lounges. It can be with restricted or unrestricted access and is part of the Net Floor Area. 1.6 Asset Database A database containing multiple data points for installed site supply systems and components, e.g. manufacturer, model, serial number, install date, warranty periods, End of Life, operating condition and financial information. Asset Database and Asset List are used interchangeably in the market. 1.7 Asset List A list containing multiple data points for installed site supply systems and components, e.g. manufacturer, model, serial number, install date, warranty periods, End of Life, operating condition and financial information. Asset List and Asset Database are used interchangeably in the market. 1.8 Audit Audits are performed by qualified subject matter experts, entitled to review and audit the execution in relation to the Services, for the purpose of controlling that Service obligations are fulfilled.
  • 10. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 10 1.9 BBT: see BICSI 009 BICSI 009 is an open-consensus standard developed by a global volunteer base, the material within reflects operational experience and lessons from a wide variety of data center owners, operators, designers, and consultants covering data centers from the small enterprise to the large hyperscale colocation data center. 1.10 Black Building test 1.11 BCP: see Business Continuity Plan 1.12 BICSI 009 BICSI 009 is an open-consensus standard developed by a global volunteer base, the material within reflects operational experience and lessons from a wide variety of data center owners, operators, designers, and consultants covering data centers from the small enterprise to the large hyperscale colocation data center. 1.13 Black Building test Black Building Test (BBT) is a common test to simulate a total external power outage, by shutting down incoming grid power to the critical facility completely. Normally used for testing high availability, performance, business continuity plans and recovery capabilities in a disaster-like scenario. 1.14 BMS: see Building Management System 1.15 Border list A Border List clarifies responsibilities between different stakeholders to ensure there are no gaps or overlaps in performing services, managing risks or handling of financial aspects. It should be unambiguous regarding accountabilities, responsibilities, and who to consult or inform. 1.16 BRM: see Business Relationship Manager 1.17 Building Management System Computer-based control system installed in buildings that controls and monitors the building’s mechanical and electrical equipment. The BMS consists of software and hardware typically using protocols e.g. BACnet, LonWorks and Modbus. 1.18 Business Continuity Plan A disaster recovery plan (DRP) is a documented, structured approach which includes how to respond to unplanned incidents. 1.19 Business Relationship Manager Role for person responsible for maintaining a positive relationship with the customer, identifying customer needs and ensuring maximum success to both parties through technology and process improvement initiatives that drive business value. AM and BRM are used interchangeably in the market.
  • 11. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 11 1.20 CA: see Circulation Area 1.21 CAFM: see Compliance Review Compliance Reviews are performed by independent subject matter experts entitled to review and audit the execution in relation to regulatory and statutory requirements as well as specified standards and frameworks. 1.22 Computer Aided Facility Management 1.23 CCTV Closed-circuit television, a system of remote surveillance using cameras. The data may or may not be stored locally or remotely. 1.24 CF: see Critical Facilities 1.25 Change Request Change Requests (CR) work orders are changes that affect the scope of service levels or border list, and therefore require contractual changes. The CR is approved at appropriate governance level and when the contract has been adjusted, a Service Request may be created and approved accordingly. 1.26 Circulation Area Circulation Area (CA) is the portion of the building required for physical access to various divisions and subdivisions of space. It can be with restricted or unrestricted access and is part of the Net Floor Area. 1.27 CMMS: see Computerized Maintenance Management System 1.28 Compliance Review Compliance Reviews are performed by independent subject matter experts entitled to review and audit the execution in relation to regulatory and statutory requirements as well as specified standards and frameworks. 1.29 Computer Aided Facility Management Program that organizes and stores all site work. The system schedules preventive service and tasks corrective actions. The term CAFM and CMMS is used interchangeably in the market and should not be confused with EDMS. 1.30 Computerized Maintenance Management System Program that organizes and stores all site work. The system schedules preventive service and tasks corrective actions. The term CAFM and CMMS is used interchangeably in the market and should not be confused with EDMS.
  • 12. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 12 1.31 Contract Manager A role that is supporting in improving the financials and service quality of the contracted deliveries. This includes validating change request consequences and collaborating with the customer on Tactical level. Corrective maintenance can be either planned or unplanned, also known as deferred or immediate corrective maintenance. 1.32 CR: see Change Request 1.33 Critical assets Critical assets are defined as assets that sustain your water or wastewater systems performance. Determining the criticality of assets is based on an asset having a high risk of failure, and, major consequences if it does fail. Here are five questions that will help you determine the criticality of a unique asset: Five questions to help determine asset criticality 1. How old is the asset? 2. What is the asset’s condition? 3. What is the asset’s failure history or how is it likely to fail? 4. What are the consequences of the failure (environmental, social, etc.)? 5. How much would it cost to repair or replace the asset (including cost related to collateral damage such as street repairs)? Answers to these five questions will help you determine which assets are critical. 1.34 Critical Facilities The requirement to defined as critical facilities (CF) is that an unavailability of function will have adverse effect on revenues, corporate image, regulatory compliance, safety, or any other mission critical objective as defined by the organization. The CF can be a complete building or facility, e.g. a data center. It may also be a combination of technical supply systems providing Mission Critical Functions (MCF) within a larger facility, such as a hospital, office or power plant. 1.35 CUE CUE (Carbon usage effectiveness) is a metric for measuring the carbon gas a site emits. The output is measured in kilograms of carbon dioxide per kilowatt-hour. The perfect CUE score is 0.0, meaning that no carbon use is associated with the site’s operations. 1.36 Customer Owner and user of Equipment located at the site.
  • 13. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 13 1.37 Customer representative Customer representative is the interface for delivery of services to the customer on operational level. 1.38 Datacenter Infrastructure Management This is a category of solutions that integrates information technology (IT) and facility management disciplines to centralize monitoring, management and intelligent capacity planning specifically for critical facilities’ mission critical systems. Full DCIM deployments will involve specialized software, hardware and sensors based on protocols e.g. BACnet/IP and SNMP for data collection. This enables monitoring of datacenter performance measurement metrics, including industry standard metrics like PUE. 1.39 DCIM: see Datacenter Infrastructure Management 1.40 Disaster Recovery Plan The disaster recovery plan (DRP or DR Plan) is a documented, structured approach with instructions for responding to incidents. This step-by-step plan consists of the precautions to minimize the effects of a disaster so the organization can continue to operate or quickly resume mission-critical functions. 1.41 Downtime Downtime is a measure of system failure, expressed as the percentage of time a service level has been breached by being unavailable. Downtime is the opposite of uptime. 1.42 DR Plan: see Disaster Recovery Plan 1.43 DRP: see Disaster Recovery Plan 1.44 EDMS: see Electronic Document Management System 1.45 Electronic Document Management System An Electronic Document Management System is a software that typically can scan, store, retrieve and tag documents with keywords in order to support an organization. This is not to be confused with CAFM or CMMS. 1.46 EN 15221 The collective of standards of EN 15221 refer to the facility management (Facility Management, FM) focusing on the FM as a product and the budget of FM, with the aim of unifying the operation of business with service processes. 1.47 EN 50600 The Series of Standards EN 50600 aim to meet the European requirements for data center facilities and critical infrastructures, including design, construction, operations and maintenance with a strong focus on lowering environmental impact. 1.48 End of Life At time of purchase of a site system, the lifecycle management rely on the vendors’ specifications for End of Life (EOL).
  • 14. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 14 EOL indicates that the product is at the end of its useful life (from the vendor's point of view). Nevertheless, these specifications are based on laboratory measurements and there can be a significant deviation from the specification and operation in a real site. Therefore, EOL should not be confused with a change-out forecast for these items. 1.49 EOL: see End of Life 1.50 EOP for Site Management EOP means Emergency Operating Procedures for Site Management Function. These procedures define how the site is controlled and operated during abnormal circumstances or emergency situations. It is a set of information that describes the characteristics of a process in terms that will enable its effective execution, control and improvement until it fulfils the criteria to return to normal operating conditions. The term EOP is used interchangeably with Emergency Process Description for in the market. This should not be confused with MEST or MOP which regulates on-site work practices. 1.51 Equipment Equipment is used by the customer of a site. The equipment is typically used for work activities performed in the Primary Area, where its function relies on the site capacity and site performance. This is not to be confused with Site Systems (see ref) that is part of the site functionality that enable the intended use of customer equipment. 1.52 ERE ERE (Energy Re-use Efficiency) is a metric for measuring the efficiency of a site in measuring the benefits of reusing waste to energy. Saving energy means not just saving money; the reduction also can make a significant contribution to a site owner’s sustainability strategy in the form of emissions reductions. 1.53 ITIL ITIL, formerly an acronym for Information Technology Infrastructure Library, is a set of detailed practices for IT service management (ITSM) that focuses on aligning IT services with the needs of business. Even if ITIL underpins ISO/IEC 20000, the International Service Management Standard for IT service management, there are some differences between the ISO 20000 standard and the ITIL framework. 1.54 Key Performance Indicator A Key Performance Indicator (KPI) is a quantifiable measure used to evaluate the success of how well a service meets the objectives for its performance. 1.55 KPI: see ITIL ITIL, formerly an acronym for Information Technology Infrastructure Library, is a set of detailed practices for IT service management (ITSM) that focuses on aligning IT services with the needs of business. Even if ITIL underpins ISO/IEC 20000, the International Service Management Standard for IT service management, there are some differences between the ISO 20000 standard and the ITIL framework.
  • 15. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 15 1.56 Key Performance Indicator 1.57 Maintenance, Corrective Maintenance carried out following detection of an anomaly and aimed at restoring normal operating conditions. 1.58 Maintenance, Preventive Maintenance carried out at predetermined intervals or according to prescribed criteria, aimed at reducing the failure risk or performance degradation of the assets. 1.59 Maintenance, Condition-based Maintenance is carried out by performing Technical Risk Reviews and asset condition tests to define the appropriate planned preventive maintenance and change-out forecast of site supply systems. 1.60 Maintenance, Predictive Continuous online monitoring of actual site supply system condition and automatic comparison with average values and expected performance. Maintenance is carried out when failure probability indicators are increasing. 1.61 MCF: see Mission Critical Functions 1.62 Mean Time Between Failures The definition of MTBF depends on the definition of what is considered a failure. For complex, repairable systems, failures are those out of design conditions which place the system out of service and into a state for repair. Failures which occur that can be left or maintained in an unrepaired condition, and do not place the system out of service, are not considered failures under this definition. In addition, units that are taken down for routine scheduled maintenance or inventory control are not considered within the definition of failure. 1.63 Mean Time To Repair Mean time to repair (MTTR) is a basic measure of the maintainability of repairable items. It is the total corrective maintenance time for failures divided by the total number of corrective maintenance actions for failures during a given period of time. It generally does not include lead time for parts not readily available or other Administrative or Logistic Downtime. It is be important to distinguish whether MTTR is meant to be a measure of the mean time between the point at which the failure is first discovered until the point at which the equipment returns to operation (usually termed "mean time to recovery"), or only a measure of the elapsed time between the point where repairs actually begin until the point at which the equipment returns to operation (usually termed "mean time to repair"). 1.64 MEST for on-site services MEST means Method Statement.
  • 16. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 16 It refers to detailed instructions for on-site services, e.g. recurring monthly tests. Its basic purpose is to ensure the desired outcome by controlling actions. The level of detail depends on the complexity of the activity that is to be conducted and the impact of the failure in its execution. These methods can be pre- authorized to improve efficiency in in delivery of services. The term MEST is used interchangeably with MOP in the market. 1.65 Mission Critical Functions A combination of technical supply systems within a larger facility, that secure the availability of power and communications for that facility. The mission critical function (MCF) includes all underlying supply systems that may be required to meet its functionality, e.g. batteries are required for UPS and environmental controls are required for power distribution. 1.66 ModBus Modbus is a serial communications protocol originally published in 1979 for use with programmable logic controllers (PLCs). It is openly published, royalty-free and comes in several different protocol versions, including support for TCP/IP. 1.67 MOP for on-site services MOP means Method of Procedure. It refers to detailed instructions for on-site services, e.g. recurring monthly tests. Its basic purpose is to ensure the desired outcome by controlling actions. The level of detail depends on the complexity of the activity that is to be conducted and the impact of the failure in its execution. These methods can be pre- authorized to improve efficiency in in delivery of services. The term MEST is used interchangeably with MOP in the market. 1.68 MTBF: see Mean Time Between Failures 1.69 MTTR: see Mean Time To Repair 1.70 Net Floor Area Net Floor Area (NFA) is the part of a building that contains rentable floor area. It consists of Partition Walls and Net Room Area (which contains Technical Area, Circulation Area, Amenity Area and Primary Area). It can be with restricted or unrestricted access. 1.71 NFA: see MTBF: see Mean Time Between Failures 1.72 MTTR: see Mean Time To Repair 1.73 Net Floor Area 1.74 OCP Ready™ Facility Recognition Program The OCP Facility Recognition program serve as a reference for data center operators and tenants who want to understand the fundamental facility requirements to deploy this gear into their IT space. Facilities that meet these guidelines and approved by the OCP DC Facilities Project receive the certification as an OCP Ready™ facility.
  • 17. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 17 1.75 Operational Governance Meeting Recurring meetings on operational level between the customer representative and the site management function. 1.76 Operational Sustainability Defines the behaviors and risks beyond the technical robustness of a site that impact the ability to meet its uptime objectives over a long term. The uptime is the resultant combination of both technical robustness of the site infrastructure and Operational Sustainability. 1.77 PA: see Primary Area 1.78 Partition Walls Partition Wall (PWA) is an interior wall which subdivides a part of a building into sections, rooms or spaces. It may or may not support load other than its own weight and it may or may not be classified for protection against unauthorized access. 1.79 PDSA: see Plan-Do-Study-Act Cycle 1.80 Perimeter protection A physical security perimeter is defined as “any transition boundary between two areas of differing security protection requirements”. This might be quite specific, e.g. the outermost boundaries of a site. A critical facility should be appropriately protected against threats that may break the perimeter. By protecting against external and environmental threats, i.e. man-made or natural disasters, it is focused on ensuring that only designated access points can be used to gain entry to the critical facility. 1.81 Personal Protective Equipment Personal Protective Equipment (PPE) is equipment that will protect the user against health or safety risks at work. It can include items such as safety helmets, gloves, eye protection, high-visibility clothing, safety footwear and safety harnesses. It also includes respiratory protective equipment (RPE). 1.82 Plan-Do-Study-Act Cycle The PDSA cycle (or Deming cycle) is a model for developing, testing and implementing changes leading to improvement. It is based in scientific method and moderates the impulse to take immediate action without proper study of facts. This way, the process of change is safer and less disruptive for site operations. 1.83 Planned Preventive Maintenance: see Maintenance, Preventive 1.84 PPE: see Personal Protective Equipment 1.85 PPM: see Maintenance, Preventive 1.86 Primary Area Primary Area (PA) is the enclosed space used for work activity dependent on site capacity, e.g. white space in a data center or operating theatre in a hospital. It can be with restricted or unrestricted access.
  • 18. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 18 1.87 PUE PUE (Power Usage Efficiency) is the ratio of the energy used by the customer computing Equipment to the total energy consumption for the site (including site supply systems, e.g. environmental controls). This term is sometimes incorrectly referred to as Power Usage Effectiveness. 1.88 PWA: see Partition Walls 1.89 Quality Management System A quality management system (QMS) is defined as a formalized system that documents processes, procedures, and responsibilities for achieving quality policies and objectives. A QMS helps coordinate and direct an organization’s activities to meet customer and regulatory requirements and improve its effectiveness and efficiency on a continuous basis. 1.90 Reaction time Reaction Time is calculated from the time the Supplier’s service desk logs the call-out and is deemed to be achieved when the Supplier is given access to the customer site and is recorded on the Customer’s security system. 1.91 REF REF (Renewable Energy Factor) is the ratio of the renewable energy owned and controlled by a critical facility to its total energy consumption. 1.92 Reference Library The purpose of the Reference Library is ensuring access to critical documentation to support site management processes and on-site services. The materials in the reference library are identified recorded and provided to site management from the providers of related services or systems. Gaps in the reference library affect the effectiveness of all other site management processes and inaccurate or obsolete documents can lead to wrong decisions. 1.93 Resilience Resilience is the capacity to prevent a crisis occurrence, and when a crisis occurs, the capacity to absorb the impact and recover rapidly to the normal state of operations. It is by adding this capability on top of technical robustness that a site operations team make a difference. This is not to be confused with robustness. 1.94 Response time Response Time is the time it takes for the Supplier Service Desk to respond to a call made by telephone or other agreed communications channels. 1.95 Robustness Robustness refers to the ability to absorb and withstand disturbances and crises. For data centers and other mission critical facilities different Tiers or Classes are used to classify this. This is based on redundancy in supply systems and their components.
  • 19. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 19 This is not to be confused with resilience. 1.96 SCP: see Site Configuration Procedures 1.97 Service Level Agreement Agreement between customer and supplier addressing service requirement and delivery standards. with defined penalties and escalations in case of failure to meet agreed Service Levels. 1.98 Service Records A service record is a collection of electronic or printed materials which provides a documentary history of on-site activities performed on a specific site system or function ensuring an audit trail and an up-to-date status of the asset. 1.99 Service Request Service Requests (SR) work orders are changes to normal operating configurations within the scope of service levels and border list, and therefore do not require contractual changes. These should be planned to enable proper coordination and use pre-authorized method statements or project plans. The results should be reviewed by the creator to analyze the desired effect. 1.100 Service Window A service window is a period designated in advance, during which on-site site works, e.g. maintenance, that could cause disruption of services may be performed. 1.101 SFG20 Standard Maintenance Specification for Mechanical Services in Buildings 1.102 Site Configuration Procedures Defines how the site infrastructure is configured for normal operations 1.103 Site Engineer Is a role that is focused on specific named sites. This is the local “go to person” for understanding the technical aspects of the site, handling of customer equipment or having third parties escorted in the premises. 1.104 Site Owner Owner and accountable for the site performance 1.105 Site Policies The purpose of the Site Policies is ensuring access to critical documentation to support site management processes and control on-site services.
  • 20. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 20 Gaps in the site policies affect the effectiveness of all other site management processes and inaccurate or obsolete documents can lead to wrong decisions. The materials in the site policies are managed by the site management function. 1.106 Site Supply System: see Error! Not a valid bookmark self-reference. 1.107 Site Supply System Component: see Site System Component A Site System Component is a sub-part of a Site System, e.g. the batteries as a sub-part of a full power distribution. 1.108 1.109 Site System This refers to the full scope of technical supply systems within one infrastructure element to provide the site functionality that enable the use of customer equipment, e.g. the full power distribution as defined in the SLD (Single Line Diagram) The term Site Supply System is used interchangeably with Site System in the market. 1.110 Site System Category Site systems fall into five different categories; Building construction, Power distribution, Environmental control, Telecommunications cabling infrastructure, and finally Security systems. 1.111 Site System Component A Site System Component is a sub-part of a Site System, e.g. the batteries as a sub-part of a full power distribution. The term Site Supply System Component is used interchangeably with Site System Component in the market. 1.112 Site Technician: see Site Engineer 1.113 SLA: see Service Level Agreement 1.114 SNMP Simple Network Management Protocol (SNMP) is an Internet Standard protocol for collecting and organizing information about managed devices on IP networks and for modifying that information to change device behavior. Site Systems like UPS, BMS, CRAH etc. supports SNMP for management. Furthermore, customer Equipment may also support SNMP. 1.115 SOP for Site Management Standard Operating Procedures for Site Management Function.
  • 21. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 21 These procedures define how the site is controlled and operated during normal circumstances. It is a set of information that describes the characteristics of a process in terms that will enable its effective execution, control and improvement. The term SOP is used interchangeably with Standard Process Description in the market. This should not be confused with MEST or MOP which regulates on-site work practices. 1.116 SOW: see Statement of Work 1.117 SR: see Service Request 1.118 Statement of Work A statement of work (SoW) is a document routinely employed in the field. It defines specific activities, deliverables and timelines for a vendor providing services to the client. The SOW typically includes detailed requirements and pricing, with governance terms and practical appendices, e.g. border list and asset list. It is often supported by a master service agreement or general Terms & Conditions. 1.119 Strategic Governance Meeting Recurring meetings on strategic level between the customer and the supplier of site services. This is the escalation level for tactical meetings. 1.120 Supply System: see Site Supply System: see Error! Not a valid bookmark self-reference. 1.121 Site Supply System Component: see Site System Component A Site System Component is a sub-part of a Site System, e.g. the batteries as a sub-part of a full power distribution. 1.122 1.123 Site System 1.124 Supply System Component: see Site System Component A Site System Component is a sub-part of a Site System, e.g. the batteries as a sub-part of a full power distribution. 1.125 1.126 TA: see Technical Area 1.127 Tactical Governance Meeting Recurring meetings on tactical level between the customer and the supplier of site services. This is the escalation level for operational meetings. 1.128 Technical Area Technical Area (TA) is designed to house site supply systems for provisioning of site capacity, e.g. UPS rooms, Generator rooms and cables corridors or tunnels. It is normally with restricted access. It is part of the Net Floor Area.
  • 22. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 22 1.129 Technical Redundancy Redundancy provides improved robustness by including extra infrastructure components, which are not strictly necessary to standard operations; there is a fallback solution in case of failures of components used for standard operations. 1.130 Technical Risk Review This is a professional walk-through of a site. This is performed by one or several qualified service technicians to ensure that technical risks are noted and reported to the site owner. The report includes recommendations and possible ways to mitigate the risks. The Technical Risk Review is tailored to the site that is being reviewed so that relevant tools are being used. 1.131 Thermal Imaging Thermal imaging is the use of special equipment that can detect the heat produced by supply systems or equipment, e.g. bus bars or switch gear, and produce images of them to identify risks or faults. 1.132 Tier Classification System Uptime Institute created the standard Tier Classification System as a means to effectively evaluate data center infrastructure in terms of a business’ requirements for system availability. 1.133 Transition Transition is to plan and manage the change of state of a site in its lifecycle. It encompasses managing risk for new, changed and retired services or suppliers while protecting the site performance during the transition. Some areas handled in transition from one supplier of site operations to another are border lists, processes to be integrated or separated and also KPI monitoring and reporting. 1.134 TRR: see Technical Risk Review 1.135 Uptime Uptime is a measure of system reliability, expressed as the percentage of time a service level has been fulfilled and available. Uptime is the opposite of downtime. 1.136 Uptime Institute's Tier Standard: Operational Sustainability Uptime Institute's Tier Standard: Operational Sustainability establishes the behaviors and risks beyond the Tier Classification System (I, II, III, IV) that impact long-term data center performance. This Standard unifies the site management behaviors with the Tier functionality of the site infrastructure in order to achieve the organization's business objectives or mission imperatives. 1.137 WIP: see Work In Progress
  • 23. Open Compute Project  Critical Facilities Operations Framework  Terminology Date: 19 May 2020 Page 23 1.138 Work In Progress Work In Progress (WIP) is the number of task items that a is currently being executed, but has not yet been completed. It is used in monitoring and reporting of site operations. This should not be confused with the financial (or accounting) term of Work-In-Progress (WIP).