Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Shift left shift-right performance testing for superior end-user by Arun Dutta

190 views

Published on

Shift left shift-right performance testing for superior end-user by Arun Dutta.

To see the recorded presentation, read here.
https://softwaretestingboard.com/meetups/2018/02/26/software-testing-hangout-mar-31-2018

Published in: Software
  • Be the first to comment

  • Be the first to like this

Shift left shift-right performance testing for superior end-user by Arun Dutta

  1. 1. ARUN KUMAR DUTTA 31st Mar,2018
  2. 2. 2 Author  12+ Yrs. of Perf Test Experience  Working as a PT Manager in Atos-NAO  Keen interest in reading and writing different technical papers  Selected as a speaker for multiple International Conferences, Webinars, Published papers
  3. 3. 3 Index  Introduction  Shift-left and Shift-right Performance Testing  Traditional Performance Testing vs Shift-left and right Performance Testing  Shift-left and Shift-right Performance Testing:  Superior End-user satisfaction  As a Process
  4. 4. 4 Shift-left & Shift-right PT for superior End-user satisfaction Introduction High Performance Time to Market Pressure Performance Testing-Crucial Mandatory Utter Importance
  5. 5. 5 Shift-left & Shift-right PT for superior End-user satisfaction Shift-left & Shift-Right Performance Testing
  6. 6. 6 Shift-left & Shift-right PT for superior End-user satisfaction Shift-left & Shift-right Performance Testing Left Right Starting Early in SDLC Late Testing Since Requirement Gathering In Production Delivering Quality Software at Speed Better Quality Software by Real user Feedback
  7. 7. 7 Shift-left & Shift-right PT for superior End-user satisfaction Traditional Performance Testing Only for Major Release Not Much Time Always Short Window Mimic Environment Not Early-Costlier
  8. 8. 8 Shift-left & Shift-right PT for superior End-user satisfaction Comprehensive Continuous Performance Testing Covers both Shift-left & Shift-right Continuous Activity: Requirement to Post Deploy  E2E Monitor  Analyze Prod Log Quickly and Repetitively Assurance
  9. 9. 9 Shift-left & Shift-right PT for superior End-user satisfaction Comprehensive Continuous Performance Testing
  10. 10. 10 Shift-left & Shift-right PT for superior End-user satisfaction Superior End-user Satisfaction Bad Performance- Unsatisfied Users No Performance- Business Disaster Comprehensive Continuous Performance-Business Applicable for All Projects Performance throughout Organizations
  11. 11. 11 Shift-left & Shift-right PT for superior End-user satisfaction Shift-left & Shift-right Performance Testing Early- mandatory Even after Post-Deployment Proactively Environment Data Size
  12. 12. 12 Shift-left & Shift-right PT for superior End-user satisfaction Shift-left & Shift-right Performance Testing Functionally Stable Real Life Conditions Load Generator Business Critical Scenarios & Work Load Model Mandatory- even for a small change
  13. 13. 13 Shift-left & Shift-right PT for superior End-user satisfaction Shift-left & Shift-right Performance Testing Interfaces, Background Process Conduct Quickly Data Randomization/Caching Load – Incrementally Iterative Tests-One Parameter
  14. 14. 14 Shift-left & Shift-right PT for superior End-user satisfaction Shift-left & Shift-right Performance Testing Continuously Track Extreme Condition SLA, Benchmark- Future Reference Monitoring Collaborative work & Build a Culture
  15. 15. 15 Shift-left & Shift-right PT for superior End-user satisfaction Questions
  16. 16. For more information please contact: M+ 1-585-500-0597 arun2005413@gmail.com

×