Profile




www.ep-consult.co.uk
Agenda

•   EPConsult Energies overview
•   Services
    S i
•   Credentials
•   Examples
    E      l
•   Tools
Overview

•   Independent Energy Consultant
•   Oil,
    Oil Gas and Renewables
•   Specialists to the Energy Sector
•   Focus on Value
•   Modelling Strength
•   Optimisation Methodology
•   Risk Assessment Framework
•   Q-Management System, HSE-MS, Delivery-MS
            g          y    ,        ,  y
•   Excellent People
•   Strong Core Values
Core Values
Services
                                             Development Engineering
                                             Feasibility Studies

                                             Field Development Planning

                                             Concept Selection

                                             Schedule, Cost & Economics

                                             Value Engineering


                        Project Delivery                           Opportunity & Risk Management
                        Project Management                         Business Risk & Opportunity

                        Quality Management                         Project Risk & opportunity

                        Project Controls                           Risk management System

                        Project Auditing                           Crisis Management

                        Delivery Management System                 Enterprise Risk Management


Energy Optimisation     HSE & Risk Assessment                      Availability & Reliability                      Asset & Operational Studies
Energy Opportunities    HSE Management System                      Failure Modes, Effects & Criticality Analysis
                                                                                ,                     y     y      OPEX Optimisation Studies
                                                                                                                         p

Energy Mix              Safety Case Development                    Fault tree Analysis                             Asset life management Plan

Energy Audit            Hazard Identification Studies              Reliability, Availability & Maintainability     Asset integrity & Maintenance

Due Diligence           Quantitative                               Risk Based Inspection                           Lifer Extension Studies

Support & Development   Emergency Report                           Reliability Centred Maintenance                 Abandonment & Decommissioning
Organisation Chart
Credentials
Engineering Studies   Risk Analysis   Integrated Optimisation
Development Engineering - Examples
                                             Development Engineering
                                             Feasibility Studies

                                             Field Development Planning

                                             Concept Selection

                                             Schedule, Cost & Economics

                                             Value Engineering


                        Project Delivery                           Opportunity & Risk Management
                        Project Management                         Business Risk & Opportunity

                        Quality Management                         Project Risk & opportunity

                        Project Controls                           Risk management System

                        Project Auditing                           Crisis Management

                        Delivery Management System                 Enterprise Risk Management


Energy Optimisation     HSE & Risk Assessment                      Availability & Reliability                      Asset & Operational Studies
Energy Opportunities    HSE Management System                      Failure Modes, Effects & Criticality Analysis
                                                                                ,                     y     y      OPEX Optimisation Studies
                                                                                                                         p

Energy Mix              Safety Case Development                    Fault tree Analysis                             Asset life management Plan

Energy Audit            Hazard Identification Studies              Reliability, Availability & Maintainability     Asset integrity & Maintenance

Due Diligence           Quantitative                               Risk Based Inspection                           Lifer Extension Studies

Support & Development   Emergency Report                           Reliability Centred Maintenance                 Abandonment & Decommissioning
Feasibility Block 15/18A   Petro-Canada
Feasibility Block 15/18A                       Petro-Canada


 PIPER
                SALTIRE




         7 km




                          •   Value of information analysis to determine
                              the value of drilling an additional well.
                          •   Performed assessment of most attractive
                              host platform for the development
                                   p                        p
Field Development Plan                                        Heritage Oil




                                                     01/01/2009     01/01/2019        01/01/2029
                                                                   Reservoir zone 1
•   Conceptual Design                •   Performed jet-pumps versus ESP
•   Field Development Plan               economics evaluation
•   Development Schedule and Risks   •   Process plant and Power plant
•   CAPEX and OPEX                       optimisation considering petroleum
                                         policy, investment profile, logistics,
•   FEED Basis of Design                 schedule and environment
Field B8 Oil Development   Petro-Baltics
B8 Oil Field Development   Petro-Baltics
B8 Oil Field Development                       Petro-Baltics




•    Surface-subsurface tecno-economics
     evaluation of optional development
     scenarios
•    Despite client focus on production jack-up,
     demonstrated GBS with subsea storage
     d            d        ih b
     as most attractive NPV option
FEED Design Review                     Maersk Contractors




               •   EPConsult Energies performed a FEED
                   Design Review of the topside heavy oil
                   processing design.
               •   EPEn prepared a report providing a number
                   of recommendation that were mainly in the
                   areas of technology, reliability and flexibility.
Concept Input and Review   Cairn MBA Facilities
Knightsbridge Project PEER Review
                            • Members of PEER review
                              team to evaluate
                              readiness of the project
                              for sanction.
                            • Issues considered
                              included accuracy of the
                              scope, estimate and
                              schedule along with th
                                 h d l l        ith the
                              perceived risks.
Process and Flow Assurance   Total
Nexen - Buzzard


                  • H2S Process
                    assessment
                  • Pipeline analysis
                  • Reliability
                    assessment
Business Risk Value Engineering              ZADCO


                 MOL riser
                 proposed location




                                      Fender



•   Challenged concept design and brought
    about i
     b    innovative cost-effective ideas f
                 i          ff i id       from
    value engineering study
•   Reduced cost risk exposure by 5 million
    US$ after having identified and
    implemented mitigation measures
Value Engineering St d
               V l E i       i Study
               Fourth Gas Train Project - KNPC/SK Engineering


Basic Function                                                                                                                                                                                                                                                                                                  Basic Function
Compress gas                                                                                                                                                                                                                                                                                                2 Compress gas

Secondary Function
Secondary Function                                                          Secondary Function
                                                                            Secondary Function                                                          Secondary Function
                                                                                                                                                        Secondary Function                                                          Secondary Function
                                                                                                                                                                                                                                    Secondary Function                                                          Secondary Function
                                                                                                                                                                                                                                                                                                                Secondary Function
Knockout liquids                                                            Drive compression                                                           Compress stream                                                             Prevent surge                                                               Control noise / vibrations
                                                                      2.2                                                                         2.3                                                                         2.4                                                                         2.5


Solution                                                             2.2.1 Solution                                                              2.3.1 Solution                                                              2.4.1 Solution                                                              2.5.1 Solution
KO drum, scrubbers.                                                        4 x GT, 1 x variable speed (deep refrig),                                   Centrifugal.                                                                Dedicated anti surge control valve and                                      Acoustic enclosures for GTs and intake 
                                                                           1 x electrical motor, 1 x turbo                                                                                                                         loop for each stream.                                                       silencers. Comps have 3 sided hoods. 
                                                                           expander. Steam turbine (air comp).                                                                                                                                                                                                 Exhausts have HRSGs. For vib have 
                                                                                                                                                                                                                                                                                                               measures in accordance with KNPC 
                                                                                                                                                                                                                                                                                                               measures in accordance with KNPC
                                                                                                                                                                                                                                                                                                                            i i l i        i i
Cost                                                                        Cost                                                                        Cost                                                                        Cost                                                                        Cost
                                                                 1                                                                           1                                                                           1                                                                           1                                                                           1

Eng, Tech, Ope, Maint, Risks                                                Eng, Tech, Ope, Maint, Risks                                                Eng, Tech, Ope, Maint, Risks                                                Eng, Tech, Ope, Maint, Risks                                                Eng, Tech, Ope, Maint, Risks
                                                                                                                                                        High reliability, high flow. Correct 
                                                                                                                                                        application.



Solution                                                             2.2.2 Solution                                                              2.3.2 Solution                                                              2.4.2 Solution
Possibility of deleting compressor                                         Gas engine, diesel engine.                                                  Screw compressor.                                                           Achieve anti surge control in DCS.
suction drum / scrubber with high 
demister spec in upstream separator.


Cost
C t                                                                         Cost
                                                                            C t                                                                         Cost
                                                                                                                                                        C t                                                                         Cost
                                                                                                                                                                                                                                    C t
                                                            0.7                                                                                                                                                          1          Programming cost only.

Eng, Tech, Ope, Maint, Risks                                                Eng, Tech, Ope, Maint, Risks                                                Eng, Tech, Ope, Maint, Risks                                                Eng, Tech, Ope, Maint, Risks
Possible changes in compressor design                                       Restricted by size.                                                         High discharge ratio.                                                       Not fast enough response. Less 
on the way. Conferences are                                                                                                                                                                                                         reliable.
scheduled for this. Possibly too late for 
this project, but OK for 5th train. API 
only allows a certain distance.
only allows a certain distance
Availability and Reliability - Examples
                                             Development Engineering
                                             Feasibility Studies

                                             Field Development Planning

                                             Concept Selection

                                             Schedule, Cost & Economics

                                             Value Engineering


                        Project Delivery                           Opportunity & Risk Management
                        Project Management                         Business Risk & Opportunity

                        Quality Management                         Project Risk & opportunity

                        Project Controls                           Risk management System

                        Project Auditing                           Crisis Management

                        Delivery Management System                 Enterprise Risk Management


Energy Optimisation     HSE & Risk Assessment                      Availability & Reliability                      Asset & Operational Studies
Energy Opportunities    HSE Management System                      Failure Modes, Effects & Criticality Analysis
                                                                                ,                     y     y      OPEX Optimisation Studies
                                                                                                                         p

Energy Mix              Safety Case Development                    Fault tree Analysis                             Asset life management Plan

Energy Audit            Hazard Identification Studies              Reliability, Availability & Maintainability     Asset integrity & Maintenance

Due Diligence           Quantitative                               Risk Based Inspection                           Lifer Extension Studies

Support & Development   Emergency Report                           Reliability Centred Maintenance                 Abandonment & Decommissioning
Production Availability Study   Reliance MA Project
Concept Selection                                 Chevron




                •   Recommended favourable option on the basis of
                    QRA, FMEA and Business Risk.
Ettrick Hot-tap Mobile North Sea
Soukhnar Refinery Production Availability
                                            SRPC

•   Performed FEED stage system review of
    early and late operational phase and
    recommended design changes
•   Optimised equipment, redundancy,
    sparing and logistical delays to meet
    target availability of 95%
HSE and Risk Assessment - Examples
                                             Development Engineering
                                             Feasibility Studies

                                             Field Development Planning

                                             Concept Selection

                                             Schedule, Cost & Economics

                                             Value Engineering


                        Project Delivery                           Opportunity & Risk Management
                        Project Management                         Business Risk & Opportunity

                        Quality Management                         Project Risk & opportunity

                        Project Controls                           Risk management System

                        Project Auditing                           Crisis Management

                        Delivery Management System                 Enterprise Risk Management


Energy Optimisation     HSE & Risk Assessment                      Availability & Reliability                      Asset & Operational Studies
Energy Opportunities    HSE Management System                      Failure Modes, Effects & Criticality Analysis
                                                                                ,                     y     y      OPEX Optimisation Studies
                                                                                                                         p

Energy Mix              Safety Case Development                    Fault tree Analysis                             Asset life management Plan

Energy Audit            Hazard Identification Studies              Reliability, Availability & Maintainability     Asset integrity & Maintenance

Due Diligence           Quantitative                               Risk Based Inspection                           Lifer Extension Studies

Support & Development   Emergency Report                           Reliability Centred Maintenance                 Abandonment & Decommissioning
Safety, Risk,
Safety Risk Reliability
BG/Burullus/Enppi - WDDM Phase VII – Gas Plant and Pipeline

•   HAZID
•   QRA
•   ESSA, HAZOP, SIL
•   Projectiles Study
HSE and QRA Studies                  Shtokman Project


                               • Operations and
                                 Maintenance Studies
                               • HSE Studies
                               • Risk Assessment
                                 Studies
        Shtokman Field


                         •   Performed detailed shipping and fishing
                                f                               f
                             assessment study, providing confidence in
                             pipeline FEED
                         •   Carried out subsea/surface gas dispersion
                             study to assess consequences of a failure
                         •   Performed construction carbon emission
                             study to identify optimum logistics and
                                  y          y p         g
                             minimise environmental footprint
                         •   Performed beach valve study resulting in
                             CAPEX savings
Burbo Bank Windfarm                                              DONG




 •   Environmental Management Plan
 •   HSE Plans          • Developed environmental management
                          plan securing minimal disturbance to the
 •   Risk Assessment      environment during execution
 •   Quality Plans      • Developed HSE plans and associated risk
                                 assessment and risk mitigation actions
                                 leading to zero LTIs during cable
                                 installation
Pipeline QRA   WAPCo
Goldeneye Project – Hazards and Risk


                      • Performance of hazard
                        identification and risk
                        assessment for the
                        installation,
                        commissioning and
                        operation phases of the
                        project.
Safety, Risk, Integrity   Galsi Pipeline Project
HIPPS                                           Statoil




•   Prepared safety analysis report including
    SIL validation for first subsea HIPPS
    system for HP/HT development
•   Having completed FMEA, worked with
    valve manufacturer to optimise design of
    HIPPS valves, leading to improved SIL
Asset and Operational Studies - Examples
                                             Development Engineering
                                             Feasibility Studies

                                             Field Development Planning

                                             Concept Selection

                                             Schedule, Cost & Economics

                                             Value Engineering


                        Project Delivery                           Opportunity & Risk Management
                        Project Management                         Business Risk & Opportunity

                        Quality Management                         Project Risk & opportunity

                        Project Controls                           Risk management System

                        Project Auditing                           Crisis Management

                        Delivery Management System                 Enterprise Risk Management


Energy Optimisation     HSE & Risk Assessment                      Availability & Reliability                      Asset & Operational Studies
Energy Opportunities    HSE Management System                      Failure Modes, Effects & Criticality Analysis
                                                                                ,                     y     y      OPEX Optimisation Studies
                                                                                                                         p

Energy Mix              Safety Case Development                    Fault tree Analysis                             Asset life management Plan

Energy Audit            Hazard Identification Studies              Reliability, Availability & Maintainability     Asset integrity & Maintenance

Due Diligence           Quantitative                               Risk Based Inspection                           Lifer Extension Studies

Support & Development   Emergency Report                           Reliability Centred Maintenance                 Abandonment & Decommissioning
Operations Optimisation                      HESS


•   Challenged maintenance activities and
    developed optional maintenance scheme
•   Presented maintenance scheme with
    reduced OPEX without compromising
    safety, risk and reliability
•   Endorsed by the HSE and is operational
Drilling Support Vessels Optimisation                                               Aramco
  Challenge
  • 22 j k
       jack-up rigs i operation
                  i in         ti
  • 43 Anchor handling tug supply and safety standby vessels
  • Drilling activity to increase by 20% in areas with increase in
    gas fields
  • Single largest item in Aramco’s marine budget




                                         Focus
                                         • Optimise the drilling and workover support fleet in the most
                                           cost effective manner. OPEX Optimisation
                                         • Enhance offshore preparedness to respond to emergencies
                                           and disasters.
                                         • Develop a software to deliver optimum solution
Siri Fairway Fields – OPEX Review                   Noreco
•   Five producing fields with significant
    Noreco ownership (30-61%).

•   Siri Facilities
     –   Installed in 1998

•   Siri platform is the host facility in the
    Fairway
     –   Provides processing, injection, gas lift and
                    processing injection
         export facilities for the Fairway fields.
     –   All fields operated by DONG.

•   Active investments in growth
     –   Active infill drilling to optimize recovery.
         (Siri 2008, Nini 2009, Nini East 2009)
     –   Nini East successfully developed in 2009.
     –   Field life time extension project
                                      p j

•   EPConsult Scope
     –   Independent OPEX Review
     –   Review asset integrity management
     –   Review maintenance management
     –   Review organisational effectiveness
Being Successful
                      create   Shareholder Value
                progress   Profitable Developments
                      sound   Business Decisions
                      implement   Risk Management
                  perform   Intelligent Engineering


Engineering Studies            Risk Analysis   Integrated Optimisation
Tools and Methodologies
Tools

 Eng Studies         Risk Analysis      Optimization
 •   HYSYS           •   EP-QRA         •   EP-Risk
 •   Pipesys         •   Lihou          •   @Risk
 •   OLGA 2000       •   M.
                         M Cad models   •   PertMaster
 •   PIPESIM         •   PHAST          •   EP-RBI
 •   EP-IOF          •   RAMP           •   EP-CorrMatch
 •   EP-Costimator   •   MAROS
                     •   FaultTree+
                     •   SILCore
                         SILC
Integrated Optimisation

               Engineering


                  Value
CAPEX Screening
CAPEX Estimation
CAPEX Estimation
      E i    i
Value Engineering Process
Risks
                       Financial           Health          Stake holders
  Surface
                                                                     Subsurface
              Security                          Safety
                                 Sharing
                                       g                      Ventures
    Technology
                                  Asset          Schedule            Operational
              Fiscal
                                   Cost      Interest rate      Financial
Environment                 IT                      Ex rate
                                                                       Market
       Reputation                                Operational
                             Competition                              Contracting
   Sabotage                      Resources               Knowledge
                                                                       Systems
                Partners                    Availability
                                                                      Security
                                                                      S    it
Community                                 Government
                 Procedures
Risk grouping
                                          Health                      Surface
  Technical Risks         Environment               Technology
                                                                       Subsurface
                         Availability        Safety           Operational
                               Asset          Schedule               Operational
 Economical Risks
                                Cost        Interest rate            Financial

                             Competition            Ex rate             Market
 Commercial Risks
                              Fiscal                  Financial       Contracting
                                                                                g

                          Security      Resources       Knowledge       Systems
O ga sa o a s s
Organisational Risks
                              IT               Procedures
                                               P    d                 Sharing
                                                                      Sh i
                       Reputation         Government                  Security
                                                 Stake holders
   Political Risks                                                    Community
                          Sabotage          Partners
Risk Framework
                       PROJECT
     Features – Environment – Details - Parameters


        Economic       Commercial           Operational
          Risk            Risk                Risk


               Exposures - Uncertainties
                 p

      Modelling - Distribution - Prob./Deter. - Analyses

                     Sensitivity Analyses

      Project Risk                          Business Risk
Quantitative Risk Assessment
Risk management Tool
EP-Risk Register
EP-Risk Matrix
Contact Details



Martin Larsen   martin.larsen@ep-consult.co.uk
Phone:          +44 (0)20 7582 5555
Fax:            +44 (0)20 7582 5533
Email:          info@ep-consult.co.uk
Web:            www.ep-consult.co.uk
Address:        7 Dryden Court, London SE11 4NH, U.K.

More Related Content

Similar to EPConsult Energies Profile

Mega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryMega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryStephen_Forster
 
ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving Akachidike (AkaChi) Kanu
 
Chen.tim
Chen.timChen.tim
Chen.timNASAPMC
 
Carbon manager 365 service
Carbon manager 365 serviceCarbon manager 365 service
Carbon manager 365 servicedrpaulfisher
 
Exergy Consortium Introduction
Exergy Consortium IntroductionExergy Consortium Introduction
Exergy Consortium IntroductionTarun Rathore
 
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo
 
Risk Management Paper for Kuwaiti PPP Conference
Risk Management Paper for Kuwaiti PPP ConferenceRisk Management Paper for Kuwaiti PPP Conference
Risk Management Paper for Kuwaiti PPP ConferenceRupert_Booth
 
Plg statement of qualifications nov 2012
Plg statement of qualifications nov 2012Plg statement of qualifications nov 2012
Plg statement of qualifications nov 2012PLG Consulting
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance ModelConstient
 
Risk Management of PPP
Risk Management of PPPRisk Management of PPP
Risk Management of PPPRupertBooth
 
REAL OPTIONS ANALYSIS OF MARGINAL OILFIELD DEVELOPMENT PROJECTS: THE CASE OF ...
REAL OPTIONS ANALYSIS OF MARGINAL OILFIELD DEVELOPMENT PROJECTS: THE CASE OF ...REAL OPTIONS ANALYSIS OF MARGINAL OILFIELD DEVELOPMENT PROJECTS: THE CASE OF ...
REAL OPTIONS ANALYSIS OF MARGINAL OILFIELD DEVELOPMENT PROJECTS: THE CASE OF ...Theo Acheampong
 
Experis Engineering - Energy Industry
Experis Engineering - Energy IndustryExperis Engineering - Energy Industry
Experis Engineering - Energy Industrykkathrynlee
 
Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementationITZHAK123
 

Similar to EPConsult Energies Profile (20)

Mega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryMega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas Industry
 
Qs Approach To Project Cost
Qs Approach To Project CostQs Approach To Project Cost
Qs Approach To Project Cost
 
Risk Management Framework
Risk Management FrameworkRisk Management Framework
Risk Management Framework
 
Supplyweaver
SupplyweaverSupplyweaver
Supplyweaver
 
ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving
 
ATM Marinas
ATM MarinasATM Marinas
ATM Marinas
 
Chen.tim
Chen.timChen.tim
Chen.tim
 
Carbon manager 365 service
Carbon manager 365 serviceCarbon manager 365 service
Carbon manager 365 service
 
Exergy Consortium Introduction
Exergy Consortium IntroductionExergy Consortium Introduction
Exergy Consortium Introduction
 
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
 
Risk Management Paper for Kuwaiti PPP Conference
Risk Management Paper for Kuwaiti PPP ConferenceRisk Management Paper for Kuwaiti PPP Conference
Risk Management Paper for Kuwaiti PPP Conference
 
Ibm gas analytics
Ibm gas analyticsIbm gas analytics
Ibm gas analytics
 
Plg statement of qualifications nov 2012
Plg statement of qualifications nov 2012Plg statement of qualifications nov 2012
Plg statement of qualifications nov 2012
 
Chas spradbery wgk bilbao
Chas spradbery  wgk bilbaoChas spradbery  wgk bilbao
Chas spradbery wgk bilbao
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance Model
 
Risk Management of PPP
Risk Management of PPPRisk Management of PPP
Risk Management of PPP
 
REAL OPTIONS ANALYSIS OF MARGINAL OILFIELD DEVELOPMENT PROJECTS: THE CASE OF ...
REAL OPTIONS ANALYSIS OF MARGINAL OILFIELD DEVELOPMENT PROJECTS: THE CASE OF ...REAL OPTIONS ANALYSIS OF MARGINAL OILFIELD DEVELOPMENT PROJECTS: THE CASE OF ...
REAL OPTIONS ANALYSIS OF MARGINAL OILFIELD DEVELOPMENT PROJECTS: THE CASE OF ...
 
Experis Engineering - Energy Industry
Experis Engineering - Energy IndustryExperis Engineering - Energy Industry
Experis Engineering - Energy Industry
 
Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementation
 
Ssg Overview
Ssg OverviewSsg Overview
Ssg Overview
 

EPConsult Energies Profile

  • 2. Agenda • EPConsult Energies overview • Services S i • Credentials • Examples E l • Tools
  • 3. Overview • Independent Energy Consultant • Oil, Oil Gas and Renewables • Specialists to the Energy Sector • Focus on Value • Modelling Strength • Optimisation Methodology • Risk Assessment Framework • Q-Management System, HSE-MS, Delivery-MS g y , , y • Excellent People • Strong Core Values
  • 5. Services Development Engineering Feasibility Studies Field Development Planning Concept Selection Schedule, Cost & Economics Value Engineering Project Delivery Opportunity & Risk Management Project Management Business Risk & Opportunity Quality Management Project Risk & opportunity Project Controls Risk management System Project Auditing Crisis Management Delivery Management System Enterprise Risk Management Energy Optimisation HSE & Risk Assessment Availability & Reliability Asset & Operational Studies Energy Opportunities HSE Management System Failure Modes, Effects & Criticality Analysis , y y OPEX Optimisation Studies p Energy Mix Safety Case Development Fault tree Analysis Asset life management Plan Energy Audit Hazard Identification Studies Reliability, Availability & Maintainability Asset integrity & Maintenance Due Diligence Quantitative Risk Based Inspection Lifer Extension Studies Support & Development Emergency Report Reliability Centred Maintenance Abandonment & Decommissioning
  • 7. Credentials Engineering Studies Risk Analysis Integrated Optimisation
  • 8. Development Engineering - Examples Development Engineering Feasibility Studies Field Development Planning Concept Selection Schedule, Cost & Economics Value Engineering Project Delivery Opportunity & Risk Management Project Management Business Risk & Opportunity Quality Management Project Risk & opportunity Project Controls Risk management System Project Auditing Crisis Management Delivery Management System Enterprise Risk Management Energy Optimisation HSE & Risk Assessment Availability & Reliability Asset & Operational Studies Energy Opportunities HSE Management System Failure Modes, Effects & Criticality Analysis , y y OPEX Optimisation Studies p Energy Mix Safety Case Development Fault tree Analysis Asset life management Plan Energy Audit Hazard Identification Studies Reliability, Availability & Maintainability Asset integrity & Maintenance Due Diligence Quantitative Risk Based Inspection Lifer Extension Studies Support & Development Emergency Report Reliability Centred Maintenance Abandonment & Decommissioning
  • 10. Feasibility Block 15/18A Petro-Canada PIPER SALTIRE 7 km • Value of information analysis to determine the value of drilling an additional well. • Performed assessment of most attractive host platform for the development p p
  • 11. Field Development Plan Heritage Oil 01/01/2009 01/01/2019 01/01/2029 Reservoir zone 1 • Conceptual Design • Performed jet-pumps versus ESP • Field Development Plan economics evaluation • Development Schedule and Risks • Process plant and Power plant • CAPEX and OPEX optimisation considering petroleum policy, investment profile, logistics, • FEED Basis of Design schedule and environment
  • 12. Field B8 Oil Development Petro-Baltics
  • 13. B8 Oil Field Development Petro-Baltics
  • 14. B8 Oil Field Development Petro-Baltics • Surface-subsurface tecno-economics evaluation of optional development scenarios • Despite client focus on production jack-up, demonstrated GBS with subsea storage d d ih b as most attractive NPV option
  • 15. FEED Design Review Maersk Contractors • EPConsult Energies performed a FEED Design Review of the topside heavy oil processing design. • EPEn prepared a report providing a number of recommendation that were mainly in the areas of technology, reliability and flexibility.
  • 16. Concept Input and Review Cairn MBA Facilities
  • 17. Knightsbridge Project PEER Review • Members of PEER review team to evaluate readiness of the project for sanction. • Issues considered included accuracy of the scope, estimate and schedule along with th h d l l ith the perceived risks.
  • 18. Process and Flow Assurance Total
  • 19. Nexen - Buzzard • H2S Process assessment • Pipeline analysis • Reliability assessment
  • 20. Business Risk Value Engineering ZADCO MOL riser proposed location Fender • Challenged concept design and brought about i b innovative cost-effective ideas f i ff i id from value engineering study • Reduced cost risk exposure by 5 million US$ after having identified and implemented mitigation measures
  • 21. Value Engineering St d V l E i i Study Fourth Gas Train Project - KNPC/SK Engineering Basic Function Basic Function Compress gas 2 Compress gas Secondary Function Secondary Function Secondary Function Secondary Function Secondary Function Secondary Function Secondary Function Secondary Function Secondary Function Secondary Function Knockout liquids Drive compression Compress stream Prevent surge Control noise / vibrations 2.2 2.3 2.4 2.5 Solution 2.2.1 Solution 2.3.1 Solution 2.4.1 Solution 2.5.1 Solution KO drum, scrubbers. 4 x GT, 1 x variable speed (deep refrig),  Centrifugal. Dedicated anti surge control valve and  Acoustic enclosures for GTs and intake  1 x electrical motor, 1 x turbo  loop for each stream. silencers. Comps have 3 sided hoods.  expander. Steam turbine (air comp). Exhausts have HRSGs. For vib have  measures in accordance with KNPC  measures in accordance with KNPC i i l i i i Cost Cost Cost Cost Cost                                                                  1                                                                  1                                                                  1                                                                  1                                                                  1 Eng, Tech, Ope, Maint, Risks Eng, Tech, Ope, Maint, Risks Eng, Tech, Ope, Maint, Risks Eng, Tech, Ope, Maint, Risks Eng, Tech, Ope, Maint, Risks High reliability, high flow. Correct  application. Solution 2.2.2 Solution 2.3.2 Solution 2.4.2 Solution Possibility of deleting compressor  Gas engine, diesel engine. Screw compressor. Achieve anti surge control in DCS. suction drum / scrubber with high  demister spec in upstream separator. Cost C t Cost C t Cost C t Cost C t 0.7                                                                  1 Programming cost only. Eng, Tech, Ope, Maint, Risks Eng, Tech, Ope, Maint, Risks Eng, Tech, Ope, Maint, Risks Eng, Tech, Ope, Maint, Risks Possible changes in compressor design  Restricted by size. High discharge ratio. Not fast enough response. Less  on the way. Conferences are  reliable. scheduled for this. Possibly too late for  this project, but OK for 5th train. API  only allows a certain distance. only allows a certain distance
  • 22. Availability and Reliability - Examples Development Engineering Feasibility Studies Field Development Planning Concept Selection Schedule, Cost & Economics Value Engineering Project Delivery Opportunity & Risk Management Project Management Business Risk & Opportunity Quality Management Project Risk & opportunity Project Controls Risk management System Project Auditing Crisis Management Delivery Management System Enterprise Risk Management Energy Optimisation HSE & Risk Assessment Availability & Reliability Asset & Operational Studies Energy Opportunities HSE Management System Failure Modes, Effects & Criticality Analysis , y y OPEX Optimisation Studies p Energy Mix Safety Case Development Fault tree Analysis Asset life management Plan Energy Audit Hazard Identification Studies Reliability, Availability & Maintainability Asset integrity & Maintenance Due Diligence Quantitative Risk Based Inspection Lifer Extension Studies Support & Development Emergency Report Reliability Centred Maintenance Abandonment & Decommissioning
  • 23. Production Availability Study Reliance MA Project
  • 24. Concept Selection Chevron • Recommended favourable option on the basis of QRA, FMEA and Business Risk.
  • 26. Soukhnar Refinery Production Availability SRPC • Performed FEED stage system review of early and late operational phase and recommended design changes • Optimised equipment, redundancy, sparing and logistical delays to meet target availability of 95%
  • 27. HSE and Risk Assessment - Examples Development Engineering Feasibility Studies Field Development Planning Concept Selection Schedule, Cost & Economics Value Engineering Project Delivery Opportunity & Risk Management Project Management Business Risk & Opportunity Quality Management Project Risk & opportunity Project Controls Risk management System Project Auditing Crisis Management Delivery Management System Enterprise Risk Management Energy Optimisation HSE & Risk Assessment Availability & Reliability Asset & Operational Studies Energy Opportunities HSE Management System Failure Modes, Effects & Criticality Analysis , y y OPEX Optimisation Studies p Energy Mix Safety Case Development Fault tree Analysis Asset life management Plan Energy Audit Hazard Identification Studies Reliability, Availability & Maintainability Asset integrity & Maintenance Due Diligence Quantitative Risk Based Inspection Lifer Extension Studies Support & Development Emergency Report Reliability Centred Maintenance Abandonment & Decommissioning
  • 28. Safety, Risk, Safety Risk Reliability BG/Burullus/Enppi - WDDM Phase VII – Gas Plant and Pipeline • HAZID • QRA • ESSA, HAZOP, SIL • Projectiles Study
  • 29. HSE and QRA Studies Shtokman Project • Operations and Maintenance Studies • HSE Studies • Risk Assessment Studies Shtokman Field • Performed detailed shipping and fishing f f assessment study, providing confidence in pipeline FEED • Carried out subsea/surface gas dispersion study to assess consequences of a failure • Performed construction carbon emission study to identify optimum logistics and y y p g minimise environmental footprint • Performed beach valve study resulting in CAPEX savings
  • 30. Burbo Bank Windfarm DONG • Environmental Management Plan • HSE Plans • Developed environmental management plan securing minimal disturbance to the • Risk Assessment environment during execution • Quality Plans • Developed HSE plans and associated risk assessment and risk mitigation actions leading to zero LTIs during cable installation
  • 31. Pipeline QRA WAPCo
  • 32. Goldeneye Project – Hazards and Risk • Performance of hazard identification and risk assessment for the installation, commissioning and operation phases of the project.
  • 33. Safety, Risk, Integrity Galsi Pipeline Project
  • 34. HIPPS Statoil • Prepared safety analysis report including SIL validation for first subsea HIPPS system for HP/HT development • Having completed FMEA, worked with valve manufacturer to optimise design of HIPPS valves, leading to improved SIL
  • 35. Asset and Operational Studies - Examples Development Engineering Feasibility Studies Field Development Planning Concept Selection Schedule, Cost & Economics Value Engineering Project Delivery Opportunity & Risk Management Project Management Business Risk & Opportunity Quality Management Project Risk & opportunity Project Controls Risk management System Project Auditing Crisis Management Delivery Management System Enterprise Risk Management Energy Optimisation HSE & Risk Assessment Availability & Reliability Asset & Operational Studies Energy Opportunities HSE Management System Failure Modes, Effects & Criticality Analysis , y y OPEX Optimisation Studies p Energy Mix Safety Case Development Fault tree Analysis Asset life management Plan Energy Audit Hazard Identification Studies Reliability, Availability & Maintainability Asset integrity & Maintenance Due Diligence Quantitative Risk Based Inspection Lifer Extension Studies Support & Development Emergency Report Reliability Centred Maintenance Abandonment & Decommissioning
  • 36. Operations Optimisation HESS • Challenged maintenance activities and developed optional maintenance scheme • Presented maintenance scheme with reduced OPEX without compromising safety, risk and reliability • Endorsed by the HSE and is operational
  • 37. Drilling Support Vessels Optimisation Aramco Challenge • 22 j k jack-up rigs i operation i in ti • 43 Anchor handling tug supply and safety standby vessels • Drilling activity to increase by 20% in areas with increase in gas fields • Single largest item in Aramco’s marine budget Focus • Optimise the drilling and workover support fleet in the most cost effective manner. OPEX Optimisation • Enhance offshore preparedness to respond to emergencies and disasters. • Develop a software to deliver optimum solution
  • 38. Siri Fairway Fields – OPEX Review Noreco • Five producing fields with significant Noreco ownership (30-61%). • Siri Facilities – Installed in 1998 • Siri platform is the host facility in the Fairway – Provides processing, injection, gas lift and processing injection export facilities for the Fairway fields. – All fields operated by DONG. • Active investments in growth – Active infill drilling to optimize recovery. (Siri 2008, Nini 2009, Nini East 2009) – Nini East successfully developed in 2009. – Field life time extension project p j • EPConsult Scope – Independent OPEX Review – Review asset integrity management – Review maintenance management – Review organisational effectiveness
  • 39. Being Successful create Shareholder Value progress Profitable Developments sound Business Decisions implement Risk Management perform Intelligent Engineering Engineering Studies Risk Analysis Integrated Optimisation
  • 41. Tools Eng Studies Risk Analysis Optimization • HYSYS • EP-QRA • EP-Risk • Pipesys • Lihou • @Risk • OLGA 2000 • M. M Cad models • PertMaster • PIPESIM • PHAST • EP-RBI • EP-IOF • RAMP • EP-CorrMatch • EP-Costimator • MAROS • FaultTree+ • SILCore SILC
  • 42. Integrated Optimisation Engineering Value
  • 47. Risks Financial Health Stake holders Surface Subsurface Security Safety Sharing g Ventures Technology Asset Schedule Operational Fiscal Cost Interest rate Financial Environment IT Ex rate Market Reputation Operational Competition Contracting Sabotage Resources Knowledge Systems Partners Availability Security S it Community Government Procedures
  • 48. Risk grouping Health Surface Technical Risks Environment Technology Subsurface Availability Safety Operational Asset Schedule Operational Economical Risks Cost Interest rate Financial Competition Ex rate Market Commercial Risks Fiscal Financial Contracting g Security Resources Knowledge Systems O ga sa o a s s Organisational Risks IT Procedures P d Sharing Sh i Reputation Government Security Stake holders Political Risks Community Sabotage Partners
  • 49. Risk Framework PROJECT Features – Environment – Details - Parameters Economic Commercial Operational Risk Risk Risk Exposures - Uncertainties p Modelling - Distribution - Prob./Deter. - Analyses Sensitivity Analyses Project Risk Business Risk
  • 54. Contact Details Martin Larsen martin.larsen@ep-consult.co.uk Phone: +44 (0)20 7582 5555 Fax: +44 (0)20 7582 5533 Email: info@ep-consult.co.uk Web: www.ep-consult.co.uk Address: 7 Dryden Court, London SE11 4NH, U.K.