This assignment consists of two (2) sections: a Work
Breakdown Structure (WBS) and a written paper.
You must submit both sections as separate files for the
completion of this assignment.
Label each file name according to the section of the assignment
it is written for.
Imagine you have been hired to manage a project that will
migrate a financial services legacy system to a Web-based cloud
solution. This project will allow the organization to enhance
user access from Web based clients and mobile platforms. There
are approximately 1,000 users that will be accessing this
financial services platform.
For this project, you will need to include tasks to upgrade
existing network infrastructure to support a new Web-based
cloud solution with security enhancements to maintain data
integrity and availability of application. Training for the users
that are staffed within four (4) regional offices is also assumed.
This project has a 60-day duration that must be represented at
the top of your MS Project plan. As part of this project, it is
essential that you plan the efforts required and provide
estimates on what the costs and schedule may be.
Section 1: Work Breakdown Structure (WBS)
Required Format (MS Project File)
Use MS Project or an Open Source alternative, such as Open
Project to:
Develop a Work Breakdown Structure (WBS) for the activities
of the project using a phase or deliverable approach for
determining the format of the WBS. Your WBS must:
Identify at least fifteen (15) work packages listed below five (5)
major phases / deliverables.
List a code of the accounts identifier index to describe each
work package within the WBS.
List all the activities / tasks within your WBS, using Microsoft
Project or Open Project, and:
Present the logical succession of each activity and list
predecessor and successor activities associated with each
activity.
Indent the grouped activities / tasks under each major phase /
deliverable.
Assign a milestone to represent the ending and beginning of a
new phase.
Assign realistic duration estimates for each activity. Remember
that the overall project cannot exceed 60 days.
Analyze the sequence of activities and add at least 20
predecessor and successor assignments to each activity.
List the estimates in terms of days.
Section 2: Written Paper
Required Format (MS Word File)
Write a one (1) page paper in which you:
Explain how your specific WBS could help the team in
estimating, planning, and understanding project requirements,
deliverables, and efforts required to meet the financial services
legacy system migration.
Explain at least three (3) risks in the plan and how they could
be mitigated.
Use at least one (1) quality resources in this assignment.
Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Section 2 of the assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in MS Project, or one of its
equivalents such as Open Project. The completed diagrams /
charts must be imported into the Word document before the
paper is submitted.
The specific course learning outcomes associated with this
assignment are:
Explain and apply the phases of the project management life
cycle.
Analyze and develop project schedules with appropriate
techniques and software tools.
Summarize methods to control technology projects through
information tracking and cost and change control techniques.
Use technology and information resources to research issues in
information systems.
Write clearly and concisely about Information Technology
Project Management topics using proper writing mechanics and
technical style conventions.
Click
here
to view the grading rubric.

More Related Content

More from meagantobias

This has to have references that have the web addresses. I need th.docx
This has to have references that have the web addresses. I need th.docxThis has to have references that have the web addresses. I need th.docx
This has to have references that have the web addresses. I need th.docx
meagantobias
 
THis doesnt necessarily refer to social culture as you know, rather.docx
THis doesnt necessarily refer to social culture as you know, rather.docxTHis doesnt necessarily refer to social culture as you know, rather.docx
THis doesnt necessarily refer to social culture as you know, rather.docx
meagantobias
 
This discussion is not a graded item but should be used to discuss a.docx
This discussion is not a graded item but should be used to discuss a.docxThis discussion is not a graded item but should be used to discuss a.docx
This discussion is not a graded item but should be used to discuss a.docx
meagantobias
 
This essay should be roughly 3-5 concise paragraphs. It should provi.docx
This essay should be roughly 3-5 concise paragraphs. It should provi.docxThis essay should be roughly 3-5 concise paragraphs. It should provi.docx
This essay should be roughly 3-5 concise paragraphs. It should provi.docx
meagantobias
 
This discussion provides an opportunity to evaluate a variety of dig.docx
This discussion provides an opportunity to evaluate a variety of dig.docxThis discussion provides an opportunity to evaluate a variety of dig.docx
This discussion provides an opportunity to evaluate a variety of dig.docx
meagantobias
 
This debate is based on the following scenarioLyone, Inc. is a no.docx
This debate is based on the following scenarioLyone, Inc. is a no.docxThis debate is based on the following scenarioLyone, Inc. is a no.docx
This debate is based on the following scenarioLyone, Inc. is a no.docx
meagantobias
 
This coures is Art history 222I am looking for someone know how to.docx
This coures is Art history 222I am looking for someone know how to.docxThis coures is Art history 222I am looking for someone know how to.docx
This coures is Art history 222I am looking for someone know how to.docx
meagantobias
 
This chapter explains how the emergent properties of water contribut.docx
This chapter explains how the emergent properties of water contribut.docxThis chapter explains how the emergent properties of water contribut.docx
This chapter explains how the emergent properties of water contribut.docx
meagantobias
 
This case was written with generous financial assistance from the .docx
This case was written with generous financial assistance from the .docxThis case was written with generous financial assistance from the .docx
This case was written with generous financial assistance from the .docx
meagantobias
 
This assignment need to be done Sunday 10, 2015 in APA format with r.docx
This assignment need to be done Sunday 10, 2015 in APA format with r.docxThis assignment need to be done Sunday 10, 2015 in APA format with r.docx
This assignment need to be done Sunday 10, 2015 in APA format with r.docx
meagantobias
 
This assignment is worth up to 12 extra points. You have your choice.docx
This assignment is worth up to 12 extra points. You have your choice.docxThis assignment is worth up to 12 extra points. You have your choice.docx
This assignment is worth up to 12 extra points. You have your choice.docx
meagantobias
 
This assignment is pertaining to Jamaica.  ( International busines.docx
This assignment is pertaining to Jamaica.  ( International busines.docxThis assignment is pertaining to Jamaica.  ( International busines.docx
This assignment is pertaining to Jamaica.  ( International busines.docx
meagantobias
 
This assignment is due saturday june 13th 2015 @ 1500 pacificTh.docx
This assignment is due saturday june 13th 2015 @ 1500 pacificTh.docxThis assignment is due saturday june 13th 2015 @ 1500 pacificTh.docx
This assignment is due saturday june 13th 2015 @ 1500 pacificTh.docx
meagantobias
 
This assignment is for A-plus Writer......The distinction betw.docx
This assignment is for A-plus Writer......The distinction betw.docxThis assignment is for A-plus Writer......The distinction betw.docx
This assignment is for A-plus Writer......The distinction betw.docx
meagantobias
 
This assignment is due today Saturday March 14th 2015. 1400 pacific.docx
This assignment is due today Saturday March 14th 2015. 1400 pacific.docxThis assignment is due today Saturday March 14th 2015. 1400 pacific.docx
This assignment is due today Saturday March 14th 2015. 1400 pacific.docx
meagantobias
 
This assignment is due on May 13. You may want to view some Yout.docx
This assignment is due on May 13. You may want to view some Yout.docxThis assignment is due on May 13. You may want to view some Yout.docx
This assignment is due on May 13. You may want to view some Yout.docx
meagantobias
 
This assignment is designed to integrate the reflection of persona.docx
This assignment is designed to integrate the reflection of persona.docxThis assignment is designed to integrate the reflection of persona.docx
This assignment is designed to integrate the reflection of persona.docx
meagantobias
 
This Assignment has two parts·Assignment C-pt 1 of 2   ( Di.docx
This Assignment has two parts·Assignment C-pt 1 of 2   ( Di.docxThis Assignment has two parts·Assignment C-pt 1 of 2   ( Di.docx
This Assignment has two parts·Assignment C-pt 1 of 2   ( Di.docx
meagantobias
 
This Assignment has two partsCS Powerpoint due 122514  @ no.docx
This Assignment has two partsCS Powerpoint due 122514  @ no.docxThis Assignment has two partsCS Powerpoint due 122514  @ no.docx
This Assignment has two partsCS Powerpoint due 122514  @ no.docx
meagantobias
 
This Assignment has two partsAssignment B-pt 1 of 2   ( Discuss.docx
This Assignment has two partsAssignment B-pt 1 of 2   ( Discuss.docxThis Assignment has two partsAssignment B-pt 1 of 2   ( Discuss.docx
This Assignment has two partsAssignment B-pt 1 of 2   ( Discuss.docx
meagantobias
 

More from meagantobias (20)

This has to have references that have the web addresses. I need th.docx
This has to have references that have the web addresses. I need th.docxThis has to have references that have the web addresses. I need th.docx
This has to have references that have the web addresses. I need th.docx
 
THis doesnt necessarily refer to social culture as you know, rather.docx
THis doesnt necessarily refer to social culture as you know, rather.docxTHis doesnt necessarily refer to social culture as you know, rather.docx
THis doesnt necessarily refer to social culture as you know, rather.docx
 
This discussion is not a graded item but should be used to discuss a.docx
This discussion is not a graded item but should be used to discuss a.docxThis discussion is not a graded item but should be used to discuss a.docx
This discussion is not a graded item but should be used to discuss a.docx
 
This essay should be roughly 3-5 concise paragraphs. It should provi.docx
This essay should be roughly 3-5 concise paragraphs. It should provi.docxThis essay should be roughly 3-5 concise paragraphs. It should provi.docx
This essay should be roughly 3-5 concise paragraphs. It should provi.docx
 
This discussion provides an opportunity to evaluate a variety of dig.docx
This discussion provides an opportunity to evaluate a variety of dig.docxThis discussion provides an opportunity to evaluate a variety of dig.docx
This discussion provides an opportunity to evaluate a variety of dig.docx
 
This debate is based on the following scenarioLyone, Inc. is a no.docx
This debate is based on the following scenarioLyone, Inc. is a no.docxThis debate is based on the following scenarioLyone, Inc. is a no.docx
This debate is based on the following scenarioLyone, Inc. is a no.docx
 
This coures is Art history 222I am looking for someone know how to.docx
This coures is Art history 222I am looking for someone know how to.docxThis coures is Art history 222I am looking for someone know how to.docx
This coures is Art history 222I am looking for someone know how to.docx
 
This chapter explains how the emergent properties of water contribut.docx
This chapter explains how the emergent properties of water contribut.docxThis chapter explains how the emergent properties of water contribut.docx
This chapter explains how the emergent properties of water contribut.docx
 
This case was written with generous financial assistance from the .docx
This case was written with generous financial assistance from the .docxThis case was written with generous financial assistance from the .docx
This case was written with generous financial assistance from the .docx
 
This assignment need to be done Sunday 10, 2015 in APA format with r.docx
This assignment need to be done Sunday 10, 2015 in APA format with r.docxThis assignment need to be done Sunday 10, 2015 in APA format with r.docx
This assignment need to be done Sunday 10, 2015 in APA format with r.docx
 
This assignment is worth up to 12 extra points. You have your choice.docx
This assignment is worth up to 12 extra points. You have your choice.docxThis assignment is worth up to 12 extra points. You have your choice.docx
This assignment is worth up to 12 extra points. You have your choice.docx
 
This assignment is pertaining to Jamaica.  ( International busines.docx
This assignment is pertaining to Jamaica.  ( International busines.docxThis assignment is pertaining to Jamaica.  ( International busines.docx
This assignment is pertaining to Jamaica.  ( International busines.docx
 
This assignment is due saturday june 13th 2015 @ 1500 pacificTh.docx
This assignment is due saturday june 13th 2015 @ 1500 pacificTh.docxThis assignment is due saturday june 13th 2015 @ 1500 pacificTh.docx
This assignment is due saturday june 13th 2015 @ 1500 pacificTh.docx
 
This assignment is for A-plus Writer......The distinction betw.docx
This assignment is for A-plus Writer......The distinction betw.docxThis assignment is for A-plus Writer......The distinction betw.docx
This assignment is for A-plus Writer......The distinction betw.docx
 
This assignment is due today Saturday March 14th 2015. 1400 pacific.docx
This assignment is due today Saturday March 14th 2015. 1400 pacific.docxThis assignment is due today Saturday March 14th 2015. 1400 pacific.docx
This assignment is due today Saturday March 14th 2015. 1400 pacific.docx
 
This assignment is due on May 13. You may want to view some Yout.docx
This assignment is due on May 13. You may want to view some Yout.docxThis assignment is due on May 13. You may want to view some Yout.docx
This assignment is due on May 13. You may want to view some Yout.docx
 
This assignment is designed to integrate the reflection of persona.docx
This assignment is designed to integrate the reflection of persona.docxThis assignment is designed to integrate the reflection of persona.docx
This assignment is designed to integrate the reflection of persona.docx
 
This Assignment has two parts·Assignment C-pt 1 of 2   ( Di.docx
This Assignment has two parts·Assignment C-pt 1 of 2   ( Di.docxThis Assignment has two parts·Assignment C-pt 1 of 2   ( Di.docx
This Assignment has two parts·Assignment C-pt 1 of 2   ( Di.docx
 
This Assignment has two partsCS Powerpoint due 122514  @ no.docx
This Assignment has two partsCS Powerpoint due 122514  @ no.docxThis Assignment has two partsCS Powerpoint due 122514  @ no.docx
This Assignment has two partsCS Powerpoint due 122514  @ no.docx
 
This Assignment has two partsAssignment B-pt 1 of 2   ( Discuss.docx
This Assignment has two partsAssignment B-pt 1 of 2   ( Discuss.docxThis Assignment has two partsAssignment B-pt 1 of 2   ( Discuss.docx
This Assignment has two partsAssignment B-pt 1 of 2   ( Discuss.docx
 

Recently uploaded

ENGLISH-7-CURRICULUM MAP- MATATAG CURRICULUM
ENGLISH-7-CURRICULUM MAP- MATATAG CURRICULUMENGLISH-7-CURRICULUM MAP- MATATAG CURRICULUM
ENGLISH-7-CURRICULUM MAP- MATATAG CURRICULUM
HappieMontevirgenCas
 
How to Create Sequence Numbers in Odoo 17
How to Create Sequence Numbers in Odoo 17How to Create Sequence Numbers in Odoo 17
How to Create Sequence Numbers in Odoo 17
Celine George
 
How to Store Data on the Odoo 17 Website
How to Store Data on the Odoo 17 WebsiteHow to Store Data on the Odoo 17 Website
How to Store Data on the Odoo 17 Website
Celine George
 
Howe Writing Center - Orientation Summer 2024
Howe Writing Center - Orientation Summer 2024Howe Writing Center - Orientation Summer 2024
Howe Writing Center - Orientation Summer 2024
Elizabeth Walsh
 
Configuring Single Sign-On (SSO) via Identity Management | MuleSoft Mysore Me...
Configuring Single Sign-On (SSO) via Identity Management | MuleSoft Mysore Me...Configuring Single Sign-On (SSO) via Identity Management | MuleSoft Mysore Me...
Configuring Single Sign-On (SSO) via Identity Management | MuleSoft Mysore Me...
MysoreMuleSoftMeetup
 
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptxChapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Brajeswar Paul
 
Kesadaran_Berbangsa_dan_Bernegara_Nasion.pptx
Kesadaran_Berbangsa_dan_Bernegara_Nasion.pptxKesadaran_Berbangsa_dan_Bernegara_Nasion.pptx
Kesadaran_Berbangsa_dan_Bernegara_Nasion.pptx
artenzmartenkai
 
New Features in Odoo 17 Sign - Odoo 17 Slides
New Features in Odoo 17 Sign - Odoo 17 SlidesNew Features in Odoo 17 Sign - Odoo 17 Slides
New Features in Odoo 17 Sign - Odoo 17 Slides
Celine George
 
Neuroimaging Mastery Project: Presentation #6 Subarachnoid Hemorrhage
Neuroimaging Mastery Project: Presentation #6 Subarachnoid HemorrhageNeuroimaging Mastery Project: Presentation #6 Subarachnoid Hemorrhage
Neuroimaging Mastery Project: Presentation #6 Subarachnoid Hemorrhage
Sean M. Fox
 
Unlocking Educational Synergy-DIKSHA & Google Classroom.pptx
Unlocking Educational Synergy-DIKSHA & Google Classroom.pptxUnlocking Educational Synergy-DIKSHA & Google Classroom.pptx
Unlocking Educational Synergy-DIKSHA & Google Classroom.pptx
bipin95
 
BRIGADA ESKWELA OPENING PROGRAM KICK OFF.pptx
BRIGADA ESKWELA OPENING PROGRAM KICK OFF.pptxBRIGADA ESKWELA OPENING PROGRAM KICK OFF.pptx
BRIGADA ESKWELA OPENING PROGRAM KICK OFF.pptx
kambal1234567890
 
Edukasyong Pantahanan at Pangkabuhayan 1: Personal Hygiene
Edukasyong Pantahanan at  Pangkabuhayan 1: Personal HygieneEdukasyong Pantahanan at  Pangkabuhayan 1: Personal Hygiene
Edukasyong Pantahanan at Pangkabuhayan 1: Personal Hygiene
MJDuyan
 
How To Create a Transient Model in Odoo 17
How To Create a Transient Model in Odoo 17How To Create a Transient Model in Odoo 17
How To Create a Transient Model in Odoo 17
Celine George
 
How to Handle the Separate Discount Account on Invoice in Odoo 17
How to Handle the Separate Discount Account on Invoice in Odoo 17How to Handle the Separate Discount Account on Invoice in Odoo 17
How to Handle the Separate Discount Account on Invoice in Odoo 17
Celine George
 
Bedok NEWater Photostory - COM322 Assessment (Story 2)
Bedok NEWater Photostory - COM322 Assessment (Story 2)Bedok NEWater Photostory - COM322 Assessment (Story 2)
Bedok NEWater Photostory - COM322 Assessment (Story 2)
Liyana Rozaini
 
1-NLC-MATH7-Consolidation-Lesson1 2024.pptx
1-NLC-MATH7-Consolidation-Lesson1 2024.pptx1-NLC-MATH7-Consolidation-Lesson1 2024.pptx
1-NLC-MATH7-Consolidation-Lesson1 2024.pptx
AnneMarieJacildo
 
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Murugan Solaiyappan
 
Year-to-Date Filter in Odoo 17 Dashboard
Year-to-Date Filter in Odoo 17 DashboardYear-to-Date Filter in Odoo 17 Dashboard
Year-to-Date Filter in Odoo 17 Dashboard
Celine George
 
"DANH SÁCH THÍ SINH XÉT TUYỂN SỚM ĐỦ ĐIỀU KIỆN TRÚNG TUYỂN ĐẠI HỌC CHÍNH QUY ...
"DANH SÁCH THÍ SINH XÉT TUYỂN SỚM ĐỦ ĐIỀU KIỆN TRÚNG TUYỂN ĐẠI HỌC CHÍNH QUY ..."DANH SÁCH THÍ SINH XÉT TUYỂN SỚM ĐỦ ĐIỀU KIỆN TRÚNG TUYỂN ĐẠI HỌC CHÍNH QUY ...
"DANH SÁCH THÍ SINH XÉT TUYỂN SỚM ĐỦ ĐIỀU KIỆN TRÚNG TUYỂN ĐẠI HỌC CHÍNH QUY ...
thanhluan21
 
NLC English 7 Consolidation Lesson plan for teacher
NLC English 7 Consolidation Lesson plan for teacherNLC English 7 Consolidation Lesson plan for teacher
NLC English 7 Consolidation Lesson plan for teacher
AngelicaLubrica
 

Recently uploaded (20)

ENGLISH-7-CURRICULUM MAP- MATATAG CURRICULUM
ENGLISH-7-CURRICULUM MAP- MATATAG CURRICULUMENGLISH-7-CURRICULUM MAP- MATATAG CURRICULUM
ENGLISH-7-CURRICULUM MAP- MATATAG CURRICULUM
 
How to Create Sequence Numbers in Odoo 17
How to Create Sequence Numbers in Odoo 17How to Create Sequence Numbers in Odoo 17
How to Create Sequence Numbers in Odoo 17
 
How to Store Data on the Odoo 17 Website
How to Store Data on the Odoo 17 WebsiteHow to Store Data on the Odoo 17 Website
How to Store Data on the Odoo 17 Website
 
Howe Writing Center - Orientation Summer 2024
Howe Writing Center - Orientation Summer 2024Howe Writing Center - Orientation Summer 2024
Howe Writing Center - Orientation Summer 2024
 
Configuring Single Sign-On (SSO) via Identity Management | MuleSoft Mysore Me...
Configuring Single Sign-On (SSO) via Identity Management | MuleSoft Mysore Me...Configuring Single Sign-On (SSO) via Identity Management | MuleSoft Mysore Me...
Configuring Single Sign-On (SSO) via Identity Management | MuleSoft Mysore Me...
 
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptxChapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
Chapter-2-Era-of-One-party-Dominance-Class-12-Political-Science-Notes-2 (1).pptx
 
Kesadaran_Berbangsa_dan_Bernegara_Nasion.pptx
Kesadaran_Berbangsa_dan_Bernegara_Nasion.pptxKesadaran_Berbangsa_dan_Bernegara_Nasion.pptx
Kesadaran_Berbangsa_dan_Bernegara_Nasion.pptx
 
New Features in Odoo 17 Sign - Odoo 17 Slides
New Features in Odoo 17 Sign - Odoo 17 SlidesNew Features in Odoo 17 Sign - Odoo 17 Slides
New Features in Odoo 17 Sign - Odoo 17 Slides
 
Neuroimaging Mastery Project: Presentation #6 Subarachnoid Hemorrhage
Neuroimaging Mastery Project: Presentation #6 Subarachnoid HemorrhageNeuroimaging Mastery Project: Presentation #6 Subarachnoid Hemorrhage
Neuroimaging Mastery Project: Presentation #6 Subarachnoid Hemorrhage
 
Unlocking Educational Synergy-DIKSHA & Google Classroom.pptx
Unlocking Educational Synergy-DIKSHA & Google Classroom.pptxUnlocking Educational Synergy-DIKSHA & Google Classroom.pptx
Unlocking Educational Synergy-DIKSHA & Google Classroom.pptx
 
BRIGADA ESKWELA OPENING PROGRAM KICK OFF.pptx
BRIGADA ESKWELA OPENING PROGRAM KICK OFF.pptxBRIGADA ESKWELA OPENING PROGRAM KICK OFF.pptx
BRIGADA ESKWELA OPENING PROGRAM KICK OFF.pptx
 
Edukasyong Pantahanan at Pangkabuhayan 1: Personal Hygiene
Edukasyong Pantahanan at  Pangkabuhayan 1: Personal HygieneEdukasyong Pantahanan at  Pangkabuhayan 1: Personal Hygiene
Edukasyong Pantahanan at Pangkabuhayan 1: Personal Hygiene
 
How To Create a Transient Model in Odoo 17
How To Create a Transient Model in Odoo 17How To Create a Transient Model in Odoo 17
How To Create a Transient Model in Odoo 17
 
How to Handle the Separate Discount Account on Invoice in Odoo 17
How to Handle the Separate Discount Account on Invoice in Odoo 17How to Handle the Separate Discount Account on Invoice in Odoo 17
How to Handle the Separate Discount Account on Invoice in Odoo 17
 
Bedok NEWater Photostory - COM322 Assessment (Story 2)
Bedok NEWater Photostory - COM322 Assessment (Story 2)Bedok NEWater Photostory - COM322 Assessment (Story 2)
Bedok NEWater Photostory - COM322 Assessment (Story 2)
 
1-NLC-MATH7-Consolidation-Lesson1 2024.pptx
1-NLC-MATH7-Consolidation-Lesson1 2024.pptx1-NLC-MATH7-Consolidation-Lesson1 2024.pptx
1-NLC-MATH7-Consolidation-Lesson1 2024.pptx
 
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
Lecture_Notes_Unit4_Chapter_8_9_10_RDBMS for the students affiliated by alaga...
 
Year-to-Date Filter in Odoo 17 Dashboard
Year-to-Date Filter in Odoo 17 DashboardYear-to-Date Filter in Odoo 17 Dashboard
Year-to-Date Filter in Odoo 17 Dashboard
 
"DANH SÁCH THÍ SINH XÉT TUYỂN SỚM ĐỦ ĐIỀU KIỆN TRÚNG TUYỂN ĐẠI HỌC CHÍNH QUY ...
"DANH SÁCH THÍ SINH XÉT TUYỂN SỚM ĐỦ ĐIỀU KIỆN TRÚNG TUYỂN ĐẠI HỌC CHÍNH QUY ..."DANH SÁCH THÍ SINH XÉT TUYỂN SỚM ĐỦ ĐIỀU KIỆN TRÚNG TUYỂN ĐẠI HỌC CHÍNH QUY ...
"DANH SÁCH THÍ SINH XÉT TUYỂN SỚM ĐỦ ĐIỀU KIỆN TRÚNG TUYỂN ĐẠI HỌC CHÍNH QUY ...
 
NLC English 7 Consolidation Lesson plan for teacher
NLC English 7 Consolidation Lesson plan for teacherNLC English 7 Consolidation Lesson plan for teacher
NLC English 7 Consolidation Lesson plan for teacher
 

This assignment consists of two (2) sections a Work Breakdown Struc.docx

  • 1. This assignment consists of two (2) sections: a Work Breakdown Structure (WBS) and a written paper. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Imagine you have been hired to manage a project that will migrate a financial services legacy system to a Web-based cloud solution. This project will allow the organization to enhance user access from Web based clients and mobile platforms. There are approximately 1,000 users that will be accessing this financial services platform. For this project, you will need to include tasks to upgrade existing network infrastructure to support a new Web-based cloud solution with security enhancements to maintain data integrity and availability of application. Training for the users that are staffed within four (4) regional offices is also assumed. This project has a 60-day duration that must be represented at the top of your MS Project plan. As part of this project, it is essential that you plan the efforts required and provide estimates on what the costs and schedule may be. Section 1: Work Breakdown Structure (WBS) Required Format (MS Project File) Use MS Project or an Open Source alternative, such as Open Project to: Develop a Work Breakdown Structure (WBS) for the activities of the project using a phase or deliverable approach for determining the format of the WBS. Your WBS must: Identify at least fifteen (15) work packages listed below five (5) major phases / deliverables. List a code of the accounts identifier index to describe each work package within the WBS. List all the activities / tasks within your WBS, using Microsoft Project or Open Project, and: Present the logical succession of each activity and list
  • 2. predecessor and successor activities associated with each activity. Indent the grouped activities / tasks under each major phase / deliverable. Assign a milestone to represent the ending and beginning of a new phase. Assign realistic duration estimates for each activity. Remember that the overall project cannot exceed 60 days. Analyze the sequence of activities and add at least 20 predecessor and successor assignments to each activity. List the estimates in terms of days. Section 2: Written Paper Required Format (MS Word File) Write a one (1) page paper in which you: Explain how your specific WBS could help the team in estimating, planning, and understanding project requirements, deliverables, and efforts required to meet the financial services legacy system migration. Explain at least three (3) risks in the plan and how they could be mitigated. Use at least one (1) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Section 2 of the assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Include charts or diagrams created in MS Project, or one of its equivalents such as Open Project. The completed diagrams /
  • 3. charts must be imported into the Word document before the paper is submitted. The specific course learning outcomes associated with this assignment are: Explain and apply the phases of the project management life cycle. Analyze and develop project schedules with appropriate techniques and software tools. Summarize methods to control technology projects through information tracking and cost and change control techniques. Use technology and information resources to research issues in information systems. Write clearly and concisely about Information Technology Project Management topics using proper writing mechanics and technical style conventions. Click here to view the grading rubric.