Superheros and a  leprechaun,  with Flare: A case study  in breaking  down silos
Key Pointes Moving documentation from RoboHelp to Flare Key: Buy-in and cooperation from the team The process for how we made the transition
Your questions   Please let me know if you have any questions.  My contact info will be at the end. The slide info will be at the end.
Who I Am Usability Consultant Self-employed Company is Key Pointe Usability Consulting. Started as tech writer and moved into usability
Who Is Meridian Software Company based in California with an office here in Vancouver Makes Construction Project Management Software
How I came upon the job  is a long story, but I’ll make it short.
Joe, Irish, Doc manager Theresa, consultant Marcy, writer Contract writer Brian, CTO Viktor,  Design Jay Support 3 Johns
Product 1: Proliance 4 RH projects with 2000 help topics for Proliance with 400 duplicated topics 10 bulletins, 10 white papers, installation manual, upgrade manual in Word Readmes in FrontPage Technical Library for Developers in Notepad 1000 kb items in Pivotal 1999 (no XML)
Product 2: Prolog 2500 help topics in Prolog with about 600 duplicated topics 8 online help systems RoboHelp  50 technical bulletins in Word Readmes, Installation guides, Upgrade guides in FrontPage 3000 knowledge base items in Pivotal database from 1999 (no XML capabilities)
Help Situation RH had problems with big projects No Version Control No technical writers on staff Things had reached critical mass
Things They Wanted To fix things up, bring them up to date To hire a writer Coordinate with Support Services (in California)
Coordinating with Support Too many resources meant customers couldn’t find information.  Information was out of date. Support needed to drive more people to the finding information on the website, away from emails and phone calls.
 
 
 
Helping Support Documentation was important to Support, so why not integrate with them more? New SupportLink WebHelp proposed Support Manager buys in!
Tool evaluation requirements   Technical documentation oriented Import from RH and Word  Something like RH, but have much better content reuse options
Choosing Flare   Offered the most options in terms of functionality  Worked most easily with RH Lower cost Lower perceived learning curve
Business case Reviewed why we should move from to Flare. Written for the V.P of R&D
 
Project plan Iteration 1 and 2 reviewed: Purpose Objectives Scope Resources Timeline Effort Estimate
 
 
Project estimate Gave an estimate for when the project could be accomplished with two writers vs three writers.
Writer Writer Writer
Presentation to R&D   People were curious Something fresh was happening for a stagnant department
 
 
 
 
Implementing Decided to change both products at the same time, but slightly delayed the second product so I could train the technical writer to do:  Information model Content audit Detailed   reuse model
Information model The information model gave a high level overview of the deliverables we would create.  This was more for people outside the department who wanted to know what we were doing, and easy way to see content reuse.
 
Content audit The content audit was much more in depth and looked at all the documentation and where it was duplicated.
Detailed reuse model The detailed reuse model showed on a topic-by-topic basis where the content would be reused and in which deliverables.
 
Keeping in Touch We were also in contact with: Support Services Marketing R&D
SupportLink mockups Done in Visio We asked for CSS support and graphic design support Acted as a proof of concept
 
Design Help with Flare skin The graphic designer made it look pretty And was concerned about usability and “Web 2.0” Yay!
 
Importing KB Items Worked with Support to figure out the knowledge base process. Items up to date Not duplicated
Technical Library CTO needs a Technical Library “ I want the ‘MSDN look and feel’.” I’ve seen the MSDN and it’s not that attractive, so I asked him what he meant
It was clear:  Documentation suffered from a lack of understanding in R&D.
Support relied on the documentation to be accurate and concise, but it wasn’t.
Rarely do we measure technical support efficiency in terms of useful documentation because we’re not familiar with the connection.
This transition was large for everyone: move from multiple sources, lots of browsing, to searching in one place for the necessary information.
In early releases, some Support staff panicked when information was missing. To succeed, to show our flexibility and willingness, we had to be accommodating and understanding.
By reaching out from documentation, we were able to start a team effort and build understanding. 90% of people bought in
Without the enthusiasm and excitement, the project would not have gone as well. (Link to WebSite unavailable)
Info Theresa Putkey [email_address] www.keypointe.ca
Ad

More Related Content

What's hot (9)

Grace Hopper Conference - Student opportunity lab
Grace Hopper Conference - Student opportunity labGrace Hopper Conference - Student opportunity lab
Grace Hopper Conference - Student opportunity lab
Neha Narkhede
 
CrowdFlower Product Webinar - Graphical Editor and Visual Reports
CrowdFlower Product Webinar - Graphical Editor and Visual ReportsCrowdFlower Product Webinar - Graphical Editor and Visual Reports
CrowdFlower Product Webinar - Graphical Editor and Visual Reports
CrowdFlower
 
Web Development and Internet Marketing Report prepared for Abundant Life Heal...
Web Development and Internet Marketing Report prepared for Abundant Life Heal...Web Development and Internet Marketing Report prepared for Abundant Life Heal...
Web Development and Internet Marketing Report prepared for Abundant Life Heal...
Aaron Vargas
 
Implementing Structured Writing and Content Management Globally
Implementing Structured Writing and Content Management GloballyImplementing Structured Writing and Content Management Globally
Implementing Structured Writing and Content Management Globally
Pam Noreault
 
LavaCon 2013 Content Audit in Three Simple Steps
LavaCon 2013 Content Audit in Three Simple StepsLavaCon 2013 Content Audit in Three Simple Steps
LavaCon 2013 Content Audit in Three Simple Steps
Allison Joyce
 
Everything a freelancer needs to know about data entry projects
Everything a freelancer needs to know about data entry projectsEverything a freelancer needs to know about data entry projects
Everything a freelancer needs to know about data entry projects
freelancermap team
 
The future of the modern workplace and Office 365
The future of the modern workplace and Office 365The future of the modern workplace and Office 365
The future of the modern workplace and Office 365
Sam Marshall
 
How to Develop Quality Requirements for SharePoint Projects #ILTA13
How to Develop Quality Requirements for SharePoint Projects #ILTA13How to Develop Quality Requirements for SharePoint Projects #ILTA13
How to Develop Quality Requirements for SharePoint Projects #ILTA13
Dux Raymond Sy
 
SharePoint project: DOs and DON'Ts
SharePoint project: DOs and DON'TsSharePoint project: DOs and DON'Ts
SharePoint project: DOs and DON'Ts
Raman Bakanovich
 
Grace Hopper Conference - Student opportunity lab
Grace Hopper Conference - Student opportunity labGrace Hopper Conference - Student opportunity lab
Grace Hopper Conference - Student opportunity lab
Neha Narkhede
 
CrowdFlower Product Webinar - Graphical Editor and Visual Reports
CrowdFlower Product Webinar - Graphical Editor and Visual ReportsCrowdFlower Product Webinar - Graphical Editor and Visual Reports
CrowdFlower Product Webinar - Graphical Editor and Visual Reports
CrowdFlower
 
Web Development and Internet Marketing Report prepared for Abundant Life Heal...
Web Development and Internet Marketing Report prepared for Abundant Life Heal...Web Development and Internet Marketing Report prepared for Abundant Life Heal...
Web Development and Internet Marketing Report prepared for Abundant Life Heal...
Aaron Vargas
 
Implementing Structured Writing and Content Management Globally
Implementing Structured Writing and Content Management GloballyImplementing Structured Writing and Content Management Globally
Implementing Structured Writing and Content Management Globally
Pam Noreault
 
LavaCon 2013 Content Audit in Three Simple Steps
LavaCon 2013 Content Audit in Three Simple StepsLavaCon 2013 Content Audit in Three Simple Steps
LavaCon 2013 Content Audit in Three Simple Steps
Allison Joyce
 
Everything a freelancer needs to know about data entry projects
Everything a freelancer needs to know about data entry projectsEverything a freelancer needs to know about data entry projects
Everything a freelancer needs to know about data entry projects
freelancermap team
 
The future of the modern workplace and Office 365
The future of the modern workplace and Office 365The future of the modern workplace and Office 365
The future of the modern workplace and Office 365
Sam Marshall
 
How to Develop Quality Requirements for SharePoint Projects #ILTA13
How to Develop Quality Requirements for SharePoint Projects #ILTA13How to Develop Quality Requirements for SharePoint Projects #ILTA13
How to Develop Quality Requirements for SharePoint Projects #ILTA13
Dux Raymond Sy
 
SharePoint project: DOs and DON'Ts
SharePoint project: DOs and DON'TsSharePoint project: DOs and DON'Ts
SharePoint project: DOs and DON'Ts
Raman Bakanovich
 

Similar to Superheros and a Leprechaun, with Flare: A case study in breaking down silos (20)

Business in the Driver’s Seat – An Improved Model for Integration
Business in the Driver’s Seat – An Improved Model for IntegrationBusiness in the Driver’s Seat – An Improved Model for Integration
Business in the Driver’s Seat – An Improved Model for Integration
Inside Analysis
 
Lava cIt All Comes Down to Return on Investment (ROI): How Content Strategy I...
Lava cIt All Comes Down to Return on Investment (ROI): How Content Strategy I...Lava cIt All Comes Down to Return on Investment (ROI): How Content Strategy I...
Lava cIt All Comes Down to Return on Investment (ROI): How Content Strategy I...
Jack Molisani
 
The Right Data Warehouse: Automation Now, Business Value Thereafter
The Right Data Warehouse: Automation Now, Business Value ThereafterThe Right Data Warehouse: Automation Now, Business Value Thereafter
The Right Data Warehouse: Automation Now, Business Value Thereafter
Inside Analysis
 
Agile presentation
Agile presentationAgile presentation
Agile presentation
BrendaNyokabi
 
Critical Success Factors: Separating Fact from Fantasy
Critical Success Factors: Separating Fact from FantasyCritical Success Factors: Separating Fact from Fantasy
Critical Success Factors: Separating Fact from Fantasy
Scott Abel
 
Abhishek Deshpande Resume- October 2023.pdf
Abhishek Deshpande Resume- October 2023.pdfAbhishek Deshpande Resume- October 2023.pdf
Abhishek Deshpande Resume- October 2023.pdf
Abhishek Deshpande
 
Need to reboot your content creation strategy? Start with "No"
Need to reboot your content creation strategy? Start with "No"Need to reboot your content creation strategy? Start with "No"
Need to reboot your content creation strategy? Start with "No"
Keith Boyd
 
IUE2009 - Lessons Learned While Integrating a New IA Tool
IUE2009 - Lessons Learned While Integrating a New IA ToolIUE2009 - Lessons Learned While Integrating a New IA Tool
IUE2009 - Lessons Learned While Integrating a New IA Tool
Chris Farnum
 
apidays London 2023 - DocOps and Automation in Fintech, Kateryna Osadchenko, ...
apidays London 2023 - DocOps and Automation in Fintech, Kateryna Osadchenko, ...apidays London 2023 - DocOps and Automation in Fintech, Kateryna Osadchenko, ...
apidays London 2023 - DocOps and Automation in Fintech, Kateryna Osadchenko, ...
apidays
 
Repurpose, Reuse and Refresh Content
Repurpose, Reuse and Refresh ContentRepurpose, Reuse and Refresh Content
Repurpose, Reuse and Refresh Content
Pam Didner
 
Going green kl presentation
Going green kl presentationGoing green kl presentation
Going green kl presentation
Peter1020
 
Repurpose, Reuse, Refresh
Repurpose, Reuse, RefreshRepurpose, Reuse, Refresh
Repurpose, Reuse, Refresh
G3 Communications
 
Share Point Project Management
Share Point  Project ManagementShare Point  Project Management
Share Point Project Management
Peter1020
 
Big Data & SQL: The On-Ramp to Hadoop
Big Data & SQL: The On-Ramp to Hadoop Big Data & SQL: The On-Ramp to Hadoop
Big Data & SQL: The On-Ramp to Hadoop
Inside Analysis
 
Open / Drupal Camp Presentation: Brent Bice
Open / Drupal Camp Presentation: Brent BiceOpen / Drupal Camp Presentation: Brent Bice
Open / Drupal Camp Presentation: Brent Bice
LevelTen Interactive
 
Report on web development
Report on web developmentReport on web development
Report on web development
AJEETKUMAR932614
 
Movin’ On Up - A #SharePoint Migration Case Study #HSPUG
Movin’ On Up - A #SharePoint Migration Case Study #HSPUGMovin’ On Up - A #SharePoint Migration Case Study #HSPUG
Movin’ On Up - A #SharePoint Migration Case Study #HSPUG
Jim Adcock
 
Collaboration Beyond Code
Collaboration Beyond CodeCollaboration Beyond Code
Collaboration Beyond Code
David E. Weekly
 
New Wave Collaboration And Enterprise 2.0
New Wave Collaboration And Enterprise 2.0New Wave Collaboration And Enterprise 2.0
New Wave Collaboration And Enterprise 2.0
Daniel Pritchett
 
Intranet 2.0 School: Building the essential staff intranet for your library
Intranet 2.0 School: Building the essential staff intranet for your libraryIntranet 2.0 School: Building the essential staff intranet for your library
Intranet 2.0 School: Building the essential staff intranet for your library
Chris Evjy
 
Business in the Driver’s Seat – An Improved Model for Integration
Business in the Driver’s Seat – An Improved Model for IntegrationBusiness in the Driver’s Seat – An Improved Model for Integration
Business in the Driver’s Seat – An Improved Model for Integration
Inside Analysis
 
Lava cIt All Comes Down to Return on Investment (ROI): How Content Strategy I...
Lava cIt All Comes Down to Return on Investment (ROI): How Content Strategy I...Lava cIt All Comes Down to Return on Investment (ROI): How Content Strategy I...
Lava cIt All Comes Down to Return on Investment (ROI): How Content Strategy I...
Jack Molisani
 
The Right Data Warehouse: Automation Now, Business Value Thereafter
The Right Data Warehouse: Automation Now, Business Value ThereafterThe Right Data Warehouse: Automation Now, Business Value Thereafter
The Right Data Warehouse: Automation Now, Business Value Thereafter
Inside Analysis
 
Critical Success Factors: Separating Fact from Fantasy
Critical Success Factors: Separating Fact from FantasyCritical Success Factors: Separating Fact from Fantasy
Critical Success Factors: Separating Fact from Fantasy
Scott Abel
 
Abhishek Deshpande Resume- October 2023.pdf
Abhishek Deshpande Resume- October 2023.pdfAbhishek Deshpande Resume- October 2023.pdf
Abhishek Deshpande Resume- October 2023.pdf
Abhishek Deshpande
 
Need to reboot your content creation strategy? Start with "No"
Need to reboot your content creation strategy? Start with "No"Need to reboot your content creation strategy? Start with "No"
Need to reboot your content creation strategy? Start with "No"
Keith Boyd
 
IUE2009 - Lessons Learned While Integrating a New IA Tool
IUE2009 - Lessons Learned While Integrating a New IA ToolIUE2009 - Lessons Learned While Integrating a New IA Tool
IUE2009 - Lessons Learned While Integrating a New IA Tool
Chris Farnum
 
apidays London 2023 - DocOps and Automation in Fintech, Kateryna Osadchenko, ...
apidays London 2023 - DocOps and Automation in Fintech, Kateryna Osadchenko, ...apidays London 2023 - DocOps and Automation in Fintech, Kateryna Osadchenko, ...
apidays London 2023 - DocOps and Automation in Fintech, Kateryna Osadchenko, ...
apidays
 
Repurpose, Reuse and Refresh Content
Repurpose, Reuse and Refresh ContentRepurpose, Reuse and Refresh Content
Repurpose, Reuse and Refresh Content
Pam Didner
 
Going green kl presentation
Going green kl presentationGoing green kl presentation
Going green kl presentation
Peter1020
 
Share Point Project Management
Share Point  Project ManagementShare Point  Project Management
Share Point Project Management
Peter1020
 
Big Data & SQL: The On-Ramp to Hadoop
Big Data & SQL: The On-Ramp to Hadoop Big Data & SQL: The On-Ramp to Hadoop
Big Data & SQL: The On-Ramp to Hadoop
Inside Analysis
 
Open / Drupal Camp Presentation: Brent Bice
Open / Drupal Camp Presentation: Brent BiceOpen / Drupal Camp Presentation: Brent Bice
Open / Drupal Camp Presentation: Brent Bice
LevelTen Interactive
 
Movin’ On Up - A #SharePoint Migration Case Study #HSPUG
Movin’ On Up - A #SharePoint Migration Case Study #HSPUGMovin’ On Up - A #SharePoint Migration Case Study #HSPUG
Movin’ On Up - A #SharePoint Migration Case Study #HSPUG
Jim Adcock
 
Collaboration Beyond Code
Collaboration Beyond CodeCollaboration Beyond Code
Collaboration Beyond Code
David E. Weekly
 
New Wave Collaboration And Enterprise 2.0
New Wave Collaboration And Enterprise 2.0New Wave Collaboration And Enterprise 2.0
New Wave Collaboration And Enterprise 2.0
Daniel Pritchett
 
Intranet 2.0 School: Building the essential staff intranet for your library
Intranet 2.0 School: Building the essential staff intranet for your libraryIntranet 2.0 School: Building the essential staff intranet for your library
Intranet 2.0 School: Building the essential staff intranet for your library
Chris Evjy
 
Ad

More from Theresa Putkey (11)

What Is Taxonomy and Why Is It Useful?
What Is Taxonomy and Why Is It Useful?What Is Taxonomy and Why Is It Useful?
What Is Taxonomy and Why Is It Useful?
Theresa Putkey
 
3 ways to improve searchability
3 ways to improve searchability3 ways to improve searchability
3 ways to improve searchability
Theresa Putkey
 
Building taxonomies lessons learned
Building taxonomies  lessons learned Building taxonomies  lessons learned
Building taxonomies lessons learned
Theresa Putkey
 
Taxonomy 101
Taxonomy 101Taxonomy 101
Taxonomy 101
Theresa Putkey
 
Diagnosing and Solving Content Problems - Information Architecture and Conten...
Diagnosing and Solving Content Problems - Information Architecture and Conten...Diagnosing and Solving Content Problems - Information Architecture and Conten...
Diagnosing and Solving Content Problems - Information Architecture and Conten...
Theresa Putkey
 
Intersections of Information Architecture and Content Strategy
Intersections of Information Architecture and Content StrategyIntersections of Information Architecture and Content Strategy
Intersections of Information Architecture and Content Strategy
Theresa Putkey
 
Guiding Others Through the Maze: Working with Stakeholders to Build a Taxonomy
Guiding Others Through the Maze: Working with Stakeholders to Build a TaxonomyGuiding Others Through the Maze: Working with Stakeholders to Build a Taxonomy
Guiding Others Through the Maze: Working with Stakeholders to Build a Taxonomy
Theresa Putkey
 
Principles of Taxonomies
Principles of TaxonomiesPrinciples of Taxonomies
Principles of Taxonomies
Theresa Putkey
 
Using your mlis skills in information architecture
Using your mlis skills in information architectureUsing your mlis skills in information architecture
Using your mlis skills in information architecture
Theresa Putkey
 
Transitioning from Technical Communicator to User Experience Professional
Transitioning from Technical Communicator to User Experience ProfessionalTransitioning from Technical Communicator to User Experience Professional
Transitioning from Technical Communicator to User Experience Professional
Theresa Putkey
 
Technical Communicator Resources
Technical Communicator Resources Technical Communicator Resources
Technical Communicator Resources
Theresa Putkey
 
What Is Taxonomy and Why Is It Useful?
What Is Taxonomy and Why Is It Useful?What Is Taxonomy and Why Is It Useful?
What Is Taxonomy and Why Is It Useful?
Theresa Putkey
 
3 ways to improve searchability
3 ways to improve searchability3 ways to improve searchability
3 ways to improve searchability
Theresa Putkey
 
Building taxonomies lessons learned
Building taxonomies  lessons learned Building taxonomies  lessons learned
Building taxonomies lessons learned
Theresa Putkey
 
Diagnosing and Solving Content Problems - Information Architecture and Conten...
Diagnosing and Solving Content Problems - Information Architecture and Conten...Diagnosing and Solving Content Problems - Information Architecture and Conten...
Diagnosing and Solving Content Problems - Information Architecture and Conten...
Theresa Putkey
 
Intersections of Information Architecture and Content Strategy
Intersections of Information Architecture and Content StrategyIntersections of Information Architecture and Content Strategy
Intersections of Information Architecture and Content Strategy
Theresa Putkey
 
Guiding Others Through the Maze: Working with Stakeholders to Build a Taxonomy
Guiding Others Through the Maze: Working with Stakeholders to Build a TaxonomyGuiding Others Through the Maze: Working with Stakeholders to Build a Taxonomy
Guiding Others Through the Maze: Working with Stakeholders to Build a Taxonomy
Theresa Putkey
 
Principles of Taxonomies
Principles of TaxonomiesPrinciples of Taxonomies
Principles of Taxonomies
Theresa Putkey
 
Using your mlis skills in information architecture
Using your mlis skills in information architectureUsing your mlis skills in information architecture
Using your mlis skills in information architecture
Theresa Putkey
 
Transitioning from Technical Communicator to User Experience Professional
Transitioning from Technical Communicator to User Experience ProfessionalTransitioning from Technical Communicator to User Experience Professional
Transitioning from Technical Communicator to User Experience Professional
Theresa Putkey
 
Technical Communicator Resources
Technical Communicator Resources Technical Communicator Resources
Technical Communicator Resources
Theresa Putkey
 
Ad

Recently uploaded (20)

TrsLabs Consultants - DeFi, WEb3, Token Listing
TrsLabs Consultants - DeFi, WEb3, Token ListingTrsLabs Consultants - DeFi, WEb3, Token Listing
TrsLabs Consultants - DeFi, WEb3, Token Listing
Trs Labs
 
Transcript: Canadian book publishing: Insights from the latest salary survey ...
Transcript: Canadian book publishing: Insights from the latest salary survey ...Transcript: Canadian book publishing: Insights from the latest salary survey ...
Transcript: Canadian book publishing: Insights from the latest salary survey ...
BookNet Canada
 
TrsLabs - Fintech Product & Business Consulting
TrsLabs - Fintech Product & Business ConsultingTrsLabs - Fintech Product & Business Consulting
TrsLabs - Fintech Product & Business Consulting
Trs Labs
 
Generative Artificial Intelligence (GenAI) in Business
Generative Artificial Intelligence (GenAI) in BusinessGenerative Artificial Intelligence (GenAI) in Business
Generative Artificial Intelligence (GenAI) in Business
Dr. Tathagat Varma
 
Webinar - Top 5 Backup Mistakes MSPs and Businesses Make .pptx
Webinar - Top 5 Backup Mistakes MSPs and Businesses Make   .pptxWebinar - Top 5 Backup Mistakes MSPs and Businesses Make   .pptx
Webinar - Top 5 Backup Mistakes MSPs and Businesses Make .pptx
MSP360
 
Q1 2025 Dropbox Earnings and Investor Presentation
Q1 2025 Dropbox Earnings and Investor PresentationQ1 2025 Dropbox Earnings and Investor Presentation
Q1 2025 Dropbox Earnings and Investor Presentation
Dropbox
 
UiPath Agentic Automation: Community Developer Opportunities
UiPath Agentic Automation: Community Developer OpportunitiesUiPath Agentic Automation: Community Developer Opportunities
UiPath Agentic Automation: Community Developer Opportunities
DianaGray10
 
Vibe Coding_ Develop a web application using AI (1).pdf
Vibe Coding_ Develop a web application using AI (1).pdfVibe Coding_ Develop a web application using AI (1).pdf
Vibe Coding_ Develop a web application using AI (1).pdf
Baiju Muthukadan
 
The Microsoft Excel Parts Presentation.pdf
The Microsoft Excel Parts Presentation.pdfThe Microsoft Excel Parts Presentation.pdf
The Microsoft Excel Parts Presentation.pdf
YvonneRoseEranista
 
Canadian book publishing: Insights from the latest salary survey - Tech Forum...
Canadian book publishing: Insights from the latest salary survey - Tech Forum...Canadian book publishing: Insights from the latest salary survey - Tech Forum...
Canadian book publishing: Insights from the latest salary survey - Tech Forum...
BookNet Canada
 
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Raffi Khatchadourian
 
AI Agents at Work: UiPath, Maestro & the Future of Documents
AI Agents at Work: UiPath, Maestro & the Future of DocumentsAI Agents at Work: UiPath, Maestro & the Future of Documents
AI Agents at Work: UiPath, Maestro & the Future of Documents
UiPathCommunity
 
The Future of Cisco Cloud Security: Innovations and AI Integration
The Future of Cisco Cloud Security: Innovations and AI IntegrationThe Future of Cisco Cloud Security: Innovations and AI Integration
The Future of Cisco Cloud Security: Innovations and AI Integration
Re-solution Data Ltd
 
Reimagine How You and Your Team Work with Microsoft 365 Copilot.pptx
Reimagine How You and Your Team Work with Microsoft 365 Copilot.pptxReimagine How You and Your Team Work with Microsoft 365 Copilot.pptx
Reimagine How You and Your Team Work with Microsoft 365 Copilot.pptx
John Moore
 
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Raffi Khatchadourian
 
Unlocking Generative AI in your Web Apps
Unlocking Generative AI in your Web AppsUnlocking Generative AI in your Web Apps
Unlocking Generative AI in your Web Apps
Maximiliano Firtman
 
Challenges in Migrating Imperative Deep Learning Programs to Graph Execution:...
Challenges in Migrating Imperative Deep Learning Programs to Graph Execution:...Challenges in Migrating Imperative Deep Learning Programs to Graph Execution:...
Challenges in Migrating Imperative Deep Learning Programs to Graph Execution:...
Raffi Khatchadourian
 
AI You Can Trust: The Critical Role of Governance and Quality.pdf
AI You Can Trust: The Critical Role of Governance and Quality.pdfAI You Can Trust: The Critical Role of Governance and Quality.pdf
AI You Can Trust: The Critical Role of Governance and Quality.pdf
Precisely
 
TrsLabs - AI Agents for All - Chatbots to Multi-Agents Systems
TrsLabs - AI Agents for All - Chatbots to Multi-Agents SystemsTrsLabs - AI Agents for All - Chatbots to Multi-Agents Systems
TrsLabs - AI Agents for All - Chatbots to Multi-Agents Systems
Trs Labs
 
Play It Safe: Manage Security Risks - Google Certificate
Play It Safe: Manage Security Risks - Google CertificatePlay It Safe: Manage Security Risks - Google Certificate
Play It Safe: Manage Security Risks - Google Certificate
VICTOR MAESTRE RAMIREZ
 
TrsLabs Consultants - DeFi, WEb3, Token Listing
TrsLabs Consultants - DeFi, WEb3, Token ListingTrsLabs Consultants - DeFi, WEb3, Token Listing
TrsLabs Consultants - DeFi, WEb3, Token Listing
Trs Labs
 
Transcript: Canadian book publishing: Insights from the latest salary survey ...
Transcript: Canadian book publishing: Insights from the latest salary survey ...Transcript: Canadian book publishing: Insights from the latest salary survey ...
Transcript: Canadian book publishing: Insights from the latest salary survey ...
BookNet Canada
 
TrsLabs - Fintech Product & Business Consulting
TrsLabs - Fintech Product & Business ConsultingTrsLabs - Fintech Product & Business Consulting
TrsLabs - Fintech Product & Business Consulting
Trs Labs
 
Generative Artificial Intelligence (GenAI) in Business
Generative Artificial Intelligence (GenAI) in BusinessGenerative Artificial Intelligence (GenAI) in Business
Generative Artificial Intelligence (GenAI) in Business
Dr. Tathagat Varma
 
Webinar - Top 5 Backup Mistakes MSPs and Businesses Make .pptx
Webinar - Top 5 Backup Mistakes MSPs and Businesses Make   .pptxWebinar - Top 5 Backup Mistakes MSPs and Businesses Make   .pptx
Webinar - Top 5 Backup Mistakes MSPs and Businesses Make .pptx
MSP360
 
Q1 2025 Dropbox Earnings and Investor Presentation
Q1 2025 Dropbox Earnings and Investor PresentationQ1 2025 Dropbox Earnings and Investor Presentation
Q1 2025 Dropbox Earnings and Investor Presentation
Dropbox
 
UiPath Agentic Automation: Community Developer Opportunities
UiPath Agentic Automation: Community Developer OpportunitiesUiPath Agentic Automation: Community Developer Opportunities
UiPath Agentic Automation: Community Developer Opportunities
DianaGray10
 
Vibe Coding_ Develop a web application using AI (1).pdf
Vibe Coding_ Develop a web application using AI (1).pdfVibe Coding_ Develop a web application using AI (1).pdf
Vibe Coding_ Develop a web application using AI (1).pdf
Baiju Muthukadan
 
The Microsoft Excel Parts Presentation.pdf
The Microsoft Excel Parts Presentation.pdfThe Microsoft Excel Parts Presentation.pdf
The Microsoft Excel Parts Presentation.pdf
YvonneRoseEranista
 
Canadian book publishing: Insights from the latest salary survey - Tech Forum...
Canadian book publishing: Insights from the latest salary survey - Tech Forum...Canadian book publishing: Insights from the latest salary survey - Tech Forum...
Canadian book publishing: Insights from the latest salary survey - Tech Forum...
BookNet Canada
 
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Raffi Khatchadourian
 
AI Agents at Work: UiPath, Maestro & the Future of Documents
AI Agents at Work: UiPath, Maestro & the Future of DocumentsAI Agents at Work: UiPath, Maestro & the Future of Documents
AI Agents at Work: UiPath, Maestro & the Future of Documents
UiPathCommunity
 
The Future of Cisco Cloud Security: Innovations and AI Integration
The Future of Cisco Cloud Security: Innovations and AI IntegrationThe Future of Cisco Cloud Security: Innovations and AI Integration
The Future of Cisco Cloud Security: Innovations and AI Integration
Re-solution Data Ltd
 
Reimagine How You and Your Team Work with Microsoft 365 Copilot.pptx
Reimagine How You and Your Team Work with Microsoft 365 Copilot.pptxReimagine How You and Your Team Work with Microsoft 365 Copilot.pptx
Reimagine How You and Your Team Work with Microsoft 365 Copilot.pptx
John Moore
 
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Hybridize Functions: A Tool for Automatically Refactoring Imperative Deep Lea...
Raffi Khatchadourian
 
Unlocking Generative AI in your Web Apps
Unlocking Generative AI in your Web AppsUnlocking Generative AI in your Web Apps
Unlocking Generative AI in your Web Apps
Maximiliano Firtman
 
Challenges in Migrating Imperative Deep Learning Programs to Graph Execution:...
Challenges in Migrating Imperative Deep Learning Programs to Graph Execution:...Challenges in Migrating Imperative Deep Learning Programs to Graph Execution:...
Challenges in Migrating Imperative Deep Learning Programs to Graph Execution:...
Raffi Khatchadourian
 
AI You Can Trust: The Critical Role of Governance and Quality.pdf
AI You Can Trust: The Critical Role of Governance and Quality.pdfAI You Can Trust: The Critical Role of Governance and Quality.pdf
AI You Can Trust: The Critical Role of Governance and Quality.pdf
Precisely
 
TrsLabs - AI Agents for All - Chatbots to Multi-Agents Systems
TrsLabs - AI Agents for All - Chatbots to Multi-Agents SystemsTrsLabs - AI Agents for All - Chatbots to Multi-Agents Systems
TrsLabs - AI Agents for All - Chatbots to Multi-Agents Systems
Trs Labs
 
Play It Safe: Manage Security Risks - Google Certificate
Play It Safe: Manage Security Risks - Google CertificatePlay It Safe: Manage Security Risks - Google Certificate
Play It Safe: Manage Security Risks - Google Certificate
VICTOR MAESTRE RAMIREZ
 

Superheros and a Leprechaun, with Flare: A case study in breaking down silos

  • 1. Superheros and a leprechaun, with Flare: A case study in breaking down silos
  • 2. Key Pointes Moving documentation from RoboHelp to Flare Key: Buy-in and cooperation from the team The process for how we made the transition
  • 3. Your questions Please let me know if you have any questions. My contact info will be at the end. The slide info will be at the end.
  • 4. Who I Am Usability Consultant Self-employed Company is Key Pointe Usability Consulting. Started as tech writer and moved into usability
  • 5. Who Is Meridian Software Company based in California with an office here in Vancouver Makes Construction Project Management Software
  • 6. How I came upon the job is a long story, but I’ll make it short.
  • 7. Joe, Irish, Doc manager Theresa, consultant Marcy, writer Contract writer Brian, CTO Viktor, Design Jay Support 3 Johns
  • 8. Product 1: Proliance 4 RH projects with 2000 help topics for Proliance with 400 duplicated topics 10 bulletins, 10 white papers, installation manual, upgrade manual in Word Readmes in FrontPage Technical Library for Developers in Notepad 1000 kb items in Pivotal 1999 (no XML)
  • 9. Product 2: Prolog 2500 help topics in Prolog with about 600 duplicated topics 8 online help systems RoboHelp 50 technical bulletins in Word Readmes, Installation guides, Upgrade guides in FrontPage 3000 knowledge base items in Pivotal database from 1999 (no XML capabilities)
  • 10. Help Situation RH had problems with big projects No Version Control No technical writers on staff Things had reached critical mass
  • 11. Things They Wanted To fix things up, bring them up to date To hire a writer Coordinate with Support Services (in California)
  • 12. Coordinating with Support Too many resources meant customers couldn’t find information. Information was out of date. Support needed to drive more people to the finding information on the website, away from emails and phone calls.
  • 13.  
  • 14.  
  • 15.  
  • 16. Helping Support Documentation was important to Support, so why not integrate with them more? New SupportLink WebHelp proposed Support Manager buys in!
  • 17. Tool evaluation requirements Technical documentation oriented Import from RH and Word Something like RH, but have much better content reuse options
  • 18. Choosing Flare Offered the most options in terms of functionality Worked most easily with RH Lower cost Lower perceived learning curve
  • 19. Business case Reviewed why we should move from to Flare. Written for the V.P of R&D
  • 20.  
  • 21. Project plan Iteration 1 and 2 reviewed: Purpose Objectives Scope Resources Timeline Effort Estimate
  • 22.  
  • 23.  
  • 24. Project estimate Gave an estimate for when the project could be accomplished with two writers vs three writers.
  • 26. Presentation to R&D People were curious Something fresh was happening for a stagnant department
  • 27.  
  • 28.  
  • 29.  
  • 30.  
  • 31. Implementing Decided to change both products at the same time, but slightly delayed the second product so I could train the technical writer to do: Information model Content audit Detailed reuse model
  • 32. Information model The information model gave a high level overview of the deliverables we would create. This was more for people outside the department who wanted to know what we were doing, and easy way to see content reuse.
  • 33.  
  • 34. Content audit The content audit was much more in depth and looked at all the documentation and where it was duplicated.
  • 35. Detailed reuse model The detailed reuse model showed on a topic-by-topic basis where the content would be reused and in which deliverables.
  • 36.  
  • 37. Keeping in Touch We were also in contact with: Support Services Marketing R&D
  • 38. SupportLink mockups Done in Visio We asked for CSS support and graphic design support Acted as a proof of concept
  • 39.  
  • 40. Design Help with Flare skin The graphic designer made it look pretty And was concerned about usability and “Web 2.0” Yay!
  • 41.  
  • 42. Importing KB Items Worked with Support to figure out the knowledge base process. Items up to date Not duplicated
  • 43. Technical Library CTO needs a Technical Library “ I want the ‘MSDN look and feel’.” I’ve seen the MSDN and it’s not that attractive, so I asked him what he meant
  • 44. It was clear: Documentation suffered from a lack of understanding in R&D.
  • 45. Support relied on the documentation to be accurate and concise, but it wasn’t.
  • 46. Rarely do we measure technical support efficiency in terms of useful documentation because we’re not familiar with the connection.
  • 47. This transition was large for everyone: move from multiple sources, lots of browsing, to searching in one place for the necessary information.
  • 48. In early releases, some Support staff panicked when information was missing. To succeed, to show our flexibility and willingness, we had to be accommodating and understanding.
  • 49. By reaching out from documentation, we were able to start a team effort and build understanding. 90% of people bought in
  • 50. Without the enthusiasm and excitement, the project would not have gone as well. (Link to WebSite unavailable)
  • 51. Info Theresa Putkey [email_address] www.keypointe.ca