SlideShare a Scribd company logo
®
Application Lifecycle Management
(ALM)
®
Helping Teams Deliver Together
How Software Development Has Changed & What That Means
®
®
The Agile Manifesto Changes Everything
Requirements
Gathering
Business
Design
Unit
Testing
Traditional Waterfall Methodology
Release Complete
Technical
Design
Systems Development
Integration
Testing
Acceptance
Testing
(UAT)
Limited
Upfront
Planning
Release #1 Release #2
Agile Methodology
It 1 It 2 It 3 It 4 It 5 It 6
Release #3
It 7 It 8 It 9
Release #4
It 10 It 11 It 12
Iteration N
Iteration
Planning
Release Complete
Development, Continuous Integration, Unit Testing,
Functional & Acceptance Testing
The agile manifesto challenged the orthodoxy around software development, freeing it
from the tyranny of process and rigidity, and embracing user feedback and change.
®
®
Agile – Led to Continuous Delivery
Iteration
Iteration
Scope
Tested,
Integrated
Working
System
Iteration
Plan
Release Plan
Organizations quickly realized how much more efficient they could be having integrated
teams that collaboratively define the requirements, plan the releases and sprints, test the
product during development and deploy the latest update in a seamless way
®
ALM Unifies Test & Dev
With the rise of agile methodologies such as Scrum, XP and Kanban,
these three separate "stove-piped" worlds could no longer exist. The
term Application Lifecycle Management (or ALM) was the unification of
development and testing into a single process
®
®
What is ALM Anyway?
Application Lifecycle Management (ALM) is really an umbrella term that covers
several different disciplines that traditionally were considered separate:
®
®
How ALM Brings It All Together
ALM is basically the fusing
together of the disciplines
concerned with all aspects of the
software delivery process.
It encompasses project
management, requirements
management, development,
testing and quality assurance, as
well as customer support and IT
service delivery
®
But What About Infrastructure &
Operations?
®
®
Development & Operations (DevOps)
ALM unified software
development and testing,
but the IT infrastructure
(Operations) was missing
from the picture…
The logical next step has
been the unification of all
three disciplines into a
single integrated process
called DevOps.
Enter SpiraTeam® to help teams work together in DevOps and Agile.
®
The SpiraTeam Difference
How are we different and what our customers say
®
®
SpiraPlan®
Agile Program & Portfolio Management
SpiraTeam®
Application Lifecycle Management (ALM)
Introducing the Inflectra® Suite
SpiraTest®
Requirements, Test Management
& Bug Tracking
KronoDesk®
IT Support & Help Desk
Rapise®
Test Automation (Web, GUI, Services)
TaraVault® - Source Code Management
SpiraCapture™
Exploratory Testing
®
®
SpiraTeam – The Integrated ALM Platform
See Spira Comparison Matrix to compare SpiraTeam vs. SpiraTest
SpiraTeam®
SpiraTest®
Requirements, Test &
Defect Management
Agile Project
Management
KronoDesk®
IT Support & Help Desk Ticketing
Rapise®
Test Automation Platform (Web, GUI, Services)
TaraVault® - Source Code Management & DevOps
+
®
®
harmony
®
®
How Do We Foster Harmony?
1. Across Disciplines
2.Through Simplicity
3.Across Ecosystems
®
®
Harmony Across the Disciplines
Testers Developers Managers
We consider each of these three stakeholders groups when
designing features for SpiraTeam, so that everyone in teams can
get the most out of the system working together.
®
Simplicity = Productivity from Day One
• Less Time Doing: • More Time Doing:
No plugins, customization or
configuration needed day one
®
®
If all you have is an ‘issue’ tracker…
Then everything is an issue…
®
®
Instead, SpiraTeam Guides Your Process
1. Create Product
2. Add Users to Product (Membership)
3. Follow Product Workflow:
Requirements
Planning
Test
Planning
Sprint
Planning
Schedule &
Resourcing
Tracking &
Execution
®
®
Harmony Across Ecosystems
We recognize that you
need to integrate
SpiraTeam with other tools
and systems
We make this easy and
straightforward so you can
get working faster & easier
®
20 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation
Inflectra Core Values
 Great Products: Build for Our Users Not Investors
 Building great software for customers, not chasing the latest fad.
 Great Team: We Just Get it Done
 Treat customers well, solve their problems, no drama or red tape.
 Great Workplace: Family and Life Flexibility
 Unlimited vacation, amazing benefits, flex/part time welcomed.
 Great Community: Enabling Second Acts
 Expanding opportunities for new/second careers in technology.
®
How SpiraTeam Works For You
Features for different industries and methodologies
®
®
Bridging Between Agile and Compliance
Support for Regulated Processes Modern, Agile Processes
• Baselining
• Risk Management
• Electronic Signatures
• Data Privacy
• Compliance
• Workflow
• Requirements Mgt
• On-Premise
• CI / CD
• Scrum
• Kanban
• Scaled Agile
• DevOps
• Distributed Teams
• Remote Working
• Cloud-Based
®
23 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation
®
Healthcare & Life Sciences
 Electronic signatures for FDA 21 Part 11 compliance
 Secure hosting with support for HIPAA BAA agreements
 End to end traceability of requirements, tests, and code
 Validated platform where you control update cadence
®
24 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation
®
Financial Services & Insurance
 Secure cloud platform (SOC2) or on-premise deployment
 Generate financial compliance documentation automatically
 Integration with automated testing and verification tools
 End-to-end traceability and auditability of testing
®
25 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation
®
Energy, Industrial, & Automotive
 Testing for public safety with world class test management
 Define requirements and test for compliance
 Integrate standards and regulations into your test plans
 Understand and manage risk of critical systems
®
26 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation
®
Defense, Government & Aerospace
 Manage programs and portfolios across platforms
 Test step level traceability for mission systems
 Automate testing and compliance with RemoteLaunch
 Security and privacy with on-premise and AWS GovCloud
®
27 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation
®
Representative Customers by Industry
 We have ~ 80,000 users in 5,000+ companies worldwide:
Energy & Industrial
Government & Defense
Retail & Consumer Goods
Healthcare & Bio-Technology
Financial & Business Services
Information Technology
Transportation & Hospitality
Telecommunications
®
®
Regulated Industries - Automating
Compliance
End-to-end
traceability out
of the box
Data Privacy,
Security
baked in
Generate
Documentation
from data
Workflows &
Electronic
Signatures
Integration across
the software
value chain
®
®
Compliancewith International Standards
EudraLex
Volume4
PartI&II
GuidanceonData
Integrity
®
®
Global Partner Network
Page: 30
North America
Asia
Australia
South America & Mexico
Europe
Middle East & Africa
®
®
Customer Testimonials
Great product for managing your software development projects. When evaluating solutions, it became
clear to me that the choice would be SpiraTeam. For the price to feature ratio, it could do everything and
more than we would need. With the ability to just add additional licenses as our team grew it provided the
flexibility we needed. The support team at Inflectra is also top notch. Any time I had a question/issue, they
were there to help in a quick and friendly manner.
- Brian Kratsch, Tolko Industries Ltd.
“
“
“
Inflectra’s SpiraTeam is disrupting this market. And deservedly so. If you’re in the market for an ALM tool, I
recommend you put SpiraTeam at the top of your shortlist. This is a great suite for managing the
application development life cycle. Very competitive in features and functions.
- Jim Reardan, Process1st Consulting
®
®
Awards and Recognition*
*Gartner, G2 Crowd, InfoTech
®
Feature Overview
Lets Look at the Key Features in SpiraTeam
®
®
Integrated Program & Project Dashboards
Customizable reporting dashboards at the program,
product, project, release and sprint levels
®
Managers
®
®
Requirements Management
Requirements management with end-to-end traceability
®
®
Agile Project Planning
Agile planning boards with test and task traceability that support
multiple methodologies including Scrum and Kanban.
®
®
Resource Management
Manage the people and teams on your projects with
centralized timecard submission and resource planning.
®
®
Document Management
Complete integrated document management system with
versioning, check-in/out and approval workflows.
®
®
Customizable Reporting
Library of standard and custom reports, export in various
formats including Word, PDF, Excel and PDF
®
Testers
®
®
Test Management & QA
Manage your automated and manual test cases, test suites
and testing artifacts in a central repository.
®
®
Automated Testing
Orchestrate your automated tests from SpiraTeam, with
integrated test lab management and data-driven testing
®
®
Manual & Exploratory Testing
SpiraTeam provides an easy to use testing wizard for manual
and exploratory tests, with SpiraCapture™ for session capture.
®
®
Data-Driven Testing
SpiraTeam lets you parameterize your test cases and execute
them using different data combinations for full coverage.
®
Developers
®
®
Issue & Defect Tracking
SpiraTeam includes a flexible bug and issue tracker with list
and agile board views, and integrated workflow engine.
®
®
Source Code Management
Integrated source code management using Git or Subversion
hosted in TaraVault or external. Allows code-level traceability.
&
®
®
Code Reviews & Pull Requests
Manage your development workflows including merge/pull
requests and code reviews with full traceability.
®
®
Task Tracking
Track project tasks with customizable workflows.
Measure progress against the requirements and user stories
®
®
Build Integrated with CI / CD Tools
Build Management in SpiraTeam lets you integrate with continuous
integration build servers with full traceability for each build
®
®
Integration with your Favorite IDEs
®
Everyone
®
®
Collaboration and Instant Messaging
Real-time collaboration and communication with SpiraTeam
instant messenger, artifact following, RSS Feeds and Email
®
Integration Options
SpiraTeam Fits into Your Ecosystem Seamlessly
®
®
Recap: Harmony Across Ecosystems
We recognize that you
need to integrate
SpiraTeam with other tools
and systems
We make this easy and
straightforward so you can
get working faster & easier
®
®
Import / Conversion
Automation
Load Testing
Unit Testing
IDE CI/CD
Bug-Tracking
Detailed Integration List
Open Ecosystem – Over 70 Integrations
®
58 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation
Questions?

More Related Content

What's hot

Azure DevOps Best Practices Webinar
Azure DevOps Best Practices WebinarAzure DevOps Best Practices Webinar
Azure DevOps Best Practices Webinar
Cambay Digital
 
What’s new in OpenText Extended ECM Platform CE 21.1 and OpenText Content Sui...
What’s new in OpenText Extended ECM Platform CE 21.1 and OpenText Content Sui...What’s new in OpenText Extended ECM Platform CE 21.1 and OpenText Content Sui...
What’s new in OpenText Extended ECM Platform CE 21.1 and OpenText Content Sui...
OpenText
 
BALASAINMA_RESUME
BALASAINMA_RESUMEBALASAINMA_RESUME
BALASAINMA_RESUME
R Every
 
Sap test center of excellence
Sap test center of excellenceSap test center of excellence
Sap test center of excellence
Infosys
 
Six Signs You Need Platform Engineering
Six Signs You Need Platform EngineeringSix Signs You Need Platform Engineering
Six Signs You Need Platform Engineering
Weaveworks
 
"Platform Engineering in practice — Why and How to start", Serg Hospodarets
"Platform Engineering in practice — Why and How to start", Serg Hospodarets "Platform Engineering in practice — Why and How to start", Serg Hospodarets
"Platform Engineering in practice — Why and How to start", Serg Hospodarets
Fwdays
 
Agile Release Management Best Practices
Agile Release Management Best PracticesAgile Release Management Best Practices
Agile Release Management Best Practices
Anmol Oberoi
 
Private Equity Value Creation Carve Outs, Divestitures and mergers
Private Equity Value Creation Carve Outs, Divestitures and mergersPrivate Equity Value Creation Carve Outs, Divestitures and mergers
Private Equity Value Creation Carve Outs, Divestitures and mergers
Tom Laszewski
 
Mohamed_Resume
Mohamed_ResumeMohamed_Resume
Mohamed_Resume
Mohamed Khan
 
Introduction to Scrum@Scale
Introduction to Scrum@ScaleIntroduction to Scrum@Scale
Introduction to Scrum@Scale
Smidigkonferansen
 
Simple cloud migration with OpenText Migrate
Simple cloud migration with OpenText MigrateSimple cloud migration with OpenText Migrate
Simple cloud migration with OpenText Migrate
OpenText
 
The Ideal Approach to Application Modernization; Which Way to the Cloud?
The Ideal Approach to Application Modernization; Which Way to the Cloud?The Ideal Approach to Application Modernization; Which Way to the Cloud?
The Ideal Approach to Application Modernization; Which Way to the Cloud?
Codit
 
Reduce Costs and Build a Strong Operational Foundation with the AWS Migration...
Reduce Costs and Build a Strong Operational Foundation with the AWS Migration...Reduce Costs and Build a Strong Operational Foundation with the AWS Migration...
Reduce Costs and Build a Strong Operational Foundation with the AWS Migration...
Amazon Web Services
 
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
Amazon Web Services
 
Office 365 Migration Planning
Office 365 Migration PlanningOffice 365 Migration Planning
Office 365 Migration Planning
Credera
 
Indhu G_M&AT
Indhu G_M&ATIndhu G_M&AT
Indhu G_M&AT
Indhu Ella
 
Agile at Salesforce From theory to practice, how to be agile at scale
Agile at Salesforce From theory to practice, how to be agile at scaleAgile at Salesforce From theory to practice, how to be agile at scale
Agile at Salesforce From theory to practice, how to be agile at scale
Salesforce Engineering
 
Modern Workplace with Microsoft 365
Modern Workplace with Microsoft 365Modern Workplace with Microsoft 365
Modern Workplace with Microsoft 365
Ravikumar Sathyamurthy
 
Salesforce: CI,CD & CT
Salesforce: CI,CD & CTSalesforce: CI,CD & CT
Salesforce: CI,CD & CT
Agile Testing Alliance
 
Agile Test Management Using Jira and Zephyr
Agile Test Management Using Jira and ZephyrAgile Test Management Using Jira and Zephyr
Agile Test Management Using Jira and Zephyr
XBOSoft
 

What's hot (20)

Azure DevOps Best Practices Webinar
Azure DevOps Best Practices WebinarAzure DevOps Best Practices Webinar
Azure DevOps Best Practices Webinar
 
What’s new in OpenText Extended ECM Platform CE 21.1 and OpenText Content Sui...
What’s new in OpenText Extended ECM Platform CE 21.1 and OpenText Content Sui...What’s new in OpenText Extended ECM Platform CE 21.1 and OpenText Content Sui...
What’s new in OpenText Extended ECM Platform CE 21.1 and OpenText Content Sui...
 
BALASAINMA_RESUME
BALASAINMA_RESUMEBALASAINMA_RESUME
BALASAINMA_RESUME
 
Sap test center of excellence
Sap test center of excellenceSap test center of excellence
Sap test center of excellence
 
Six Signs You Need Platform Engineering
Six Signs You Need Platform EngineeringSix Signs You Need Platform Engineering
Six Signs You Need Platform Engineering
 
"Platform Engineering in practice — Why and How to start", Serg Hospodarets
"Platform Engineering in practice — Why and How to start", Serg Hospodarets "Platform Engineering in practice — Why and How to start", Serg Hospodarets
"Platform Engineering in practice — Why and How to start", Serg Hospodarets
 
Agile Release Management Best Practices
Agile Release Management Best PracticesAgile Release Management Best Practices
Agile Release Management Best Practices
 
Private Equity Value Creation Carve Outs, Divestitures and mergers
Private Equity Value Creation Carve Outs, Divestitures and mergersPrivate Equity Value Creation Carve Outs, Divestitures and mergers
Private Equity Value Creation Carve Outs, Divestitures and mergers
 
Mohamed_Resume
Mohamed_ResumeMohamed_Resume
Mohamed_Resume
 
Introduction to Scrum@Scale
Introduction to Scrum@ScaleIntroduction to Scrum@Scale
Introduction to Scrum@Scale
 
Simple cloud migration with OpenText Migrate
Simple cloud migration with OpenText MigrateSimple cloud migration with OpenText Migrate
Simple cloud migration with OpenText Migrate
 
The Ideal Approach to Application Modernization; Which Way to the Cloud?
The Ideal Approach to Application Modernization; Which Way to the Cloud?The Ideal Approach to Application Modernization; Which Way to the Cloud?
The Ideal Approach to Application Modernization; Which Way to the Cloud?
 
Reduce Costs and Build a Strong Operational Foundation with the AWS Migration...
Reduce Costs and Build a Strong Operational Foundation with the AWS Migration...Reduce Costs and Build a Strong Operational Foundation with the AWS Migration...
Reduce Costs and Build a Strong Operational Foundation with the AWS Migration...
 
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
Migrating Enterprise Applications to AWS: Best Practices & Techniques (ENT303...
 
Office 365 Migration Planning
Office 365 Migration PlanningOffice 365 Migration Planning
Office 365 Migration Planning
 
Indhu G_M&AT
Indhu G_M&ATIndhu G_M&AT
Indhu G_M&AT
 
Agile at Salesforce From theory to practice, how to be agile at scale
Agile at Salesforce From theory to practice, how to be agile at scaleAgile at Salesforce From theory to practice, how to be agile at scale
Agile at Salesforce From theory to practice, how to be agile at scale
 
Modern Workplace with Microsoft 365
Modern Workplace with Microsoft 365Modern Workplace with Microsoft 365
Modern Workplace with Microsoft 365
 
Salesforce: CI,CD & CT
Salesforce: CI,CD & CTSalesforce: CI,CD & CT
Salesforce: CI,CD & CT
 
Agile Test Management Using Jira and Zephyr
Agile Test Management Using Jira and ZephyrAgile Test Management Using Jira and Zephyr
Agile Test Management Using Jira and Zephyr
 

Similar to SpiraTeam Overview Presentation (2022)

SpiraTeam Overview Presentation (2021)
SpiraTeam Overview Presentation (2021)SpiraTeam Overview Presentation (2021)
SpiraTeam Overview Presentation (2021)
Inflectra
 
SpiraTeam Overview Presentation (2019)
SpiraTeam Overview Presentation (2019)SpiraTeam Overview Presentation (2019)
SpiraTeam Overview Presentation (2019)
Inflectra
 
SpiraPlan Overview Presentation (2022)
SpiraPlan Overview Presentation (2022)SpiraPlan Overview Presentation (2022)
SpiraPlan Overview Presentation (2022)
Inflectra
 
SpiraTest Overview Presentation (2022)
SpiraTest Overview Presentation (2022)SpiraTest Overview Presentation (2022)
SpiraTest Overview Presentation (2022)
Inflectra
 
SpiraTest Overview Presentation (2021)
SpiraTest Overview Presentation (2021)SpiraTest Overview Presentation (2021)
SpiraTest Overview Presentation (2021)
Inflectra
 
SpiraPlan Overview Presentation (2019)
SpiraPlan Overview Presentation (2019)SpiraPlan Overview Presentation (2019)
SpiraPlan Overview Presentation (2019)
Inflectra
 
Lightning Session: How to Manage Your Agile Projects with SpiraTeam
Lightning Session: How to Manage Your Agile Projects with SpiraTeamLightning Session: How to Manage Your Agile Projects with SpiraTeam
Lightning Session: How to Manage Your Agile Projects with SpiraTeam
Inflectra
 
SpiraPlan Overview Presentation (2021)
SpiraPlan Overview Presentation (2021)SpiraPlan Overview Presentation (2021)
SpiraPlan Overview Presentation (2021)
Inflectra
 
SpiraTest Overview Presentation (2019)
SpiraTest Overview Presentation (2019)SpiraTest Overview Presentation (2019)
SpiraTest Overview Presentation (2019)
Inflectra
 
Inflectra Overview Presentation (2023)
Inflectra Overview Presentation (2023)Inflectra Overview Presentation (2023)
Inflectra Overview Presentation (2023)
Inflectra
 
Webinar: How to Leverage SpiraTeam for QA Excellence
Webinar: How to Leverage SpiraTeam for QA ExcellenceWebinar: How to Leverage SpiraTeam for QA Excellence
Webinar: How to Leverage SpiraTeam for QA Excellence
Inflectra
 
Inflectra Overview Presentation (2022)
Inflectra Overview Presentation (2022)Inflectra Overview Presentation (2022)
Inflectra Overview Presentation (2022)
Inflectra
 
Rapise Overview Presentation (2021)
Rapise Overview Presentation (2021)Rapise Overview Presentation (2021)
Rapise Overview Presentation (2021)
Inflectra
 
Inflectra Lightning Session: Exploring the Full Potential of the Inflectra Suite
Inflectra Lightning Session: Exploring the Full Potential of the Inflectra SuiteInflectra Lightning Session: Exploring the Full Potential of the Inflectra Suite
Inflectra Lightning Session: Exploring the Full Potential of the Inflectra Suite
Inflectra
 
Lightning Sesssion: How To Turbo-Charge Your Test Management with SpiraTest
Lightning Sesssion: How To Turbo-Charge Your Test Management with SpiraTestLightning Sesssion: How To Turbo-Charge Your Test Management with SpiraTest
Lightning Sesssion: How To Turbo-Charge Your Test Management with SpiraTest
Inflectra
 
Webinar: Discover the Power of SpiraTeam - A Jira Alternative To Revolutioniz...
Webinar: Discover the Power of SpiraTeam - A Jira Alternative To Revolutioniz...Webinar: Discover the Power of SpiraTeam - A Jira Alternative To Revolutioniz...
Webinar: Discover the Power of SpiraTeam - A Jira Alternative To Revolutioniz...
Inflectra
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
Inflectra
 
Rapise Overview Presentation (2019)
Rapise Overview Presentation (2019)Rapise Overview Presentation (2019)
Rapise Overview Presentation (2019)
Inflectra
 
NERC CIP - Top Testing & Compliance Challenges, How to Address Them
NERC CIP - Top Testing & Compliance Challenges, How to Address ThemNERC CIP - Top Testing & Compliance Challenges, How to Address Them
NERC CIP - Top Testing & Compliance Challenges, How to Address Them
Inflectra
 
Inflectra Overview Presentation (2019)
Inflectra Overview Presentation (2019)Inflectra Overview Presentation (2019)
Inflectra Overview Presentation (2019)
Inflectra
 

Similar to SpiraTeam Overview Presentation (2022) (20)

SpiraTeam Overview Presentation (2021)
SpiraTeam Overview Presentation (2021)SpiraTeam Overview Presentation (2021)
SpiraTeam Overview Presentation (2021)
 
SpiraTeam Overview Presentation (2019)
SpiraTeam Overview Presentation (2019)SpiraTeam Overview Presentation (2019)
SpiraTeam Overview Presentation (2019)
 
SpiraPlan Overview Presentation (2022)
SpiraPlan Overview Presentation (2022)SpiraPlan Overview Presentation (2022)
SpiraPlan Overview Presentation (2022)
 
SpiraTest Overview Presentation (2022)
SpiraTest Overview Presentation (2022)SpiraTest Overview Presentation (2022)
SpiraTest Overview Presentation (2022)
 
SpiraTest Overview Presentation (2021)
SpiraTest Overview Presentation (2021)SpiraTest Overview Presentation (2021)
SpiraTest Overview Presentation (2021)
 
SpiraPlan Overview Presentation (2019)
SpiraPlan Overview Presentation (2019)SpiraPlan Overview Presentation (2019)
SpiraPlan Overview Presentation (2019)
 
Lightning Session: How to Manage Your Agile Projects with SpiraTeam
Lightning Session: How to Manage Your Agile Projects with SpiraTeamLightning Session: How to Manage Your Agile Projects with SpiraTeam
Lightning Session: How to Manage Your Agile Projects with SpiraTeam
 
SpiraPlan Overview Presentation (2021)
SpiraPlan Overview Presentation (2021)SpiraPlan Overview Presentation (2021)
SpiraPlan Overview Presentation (2021)
 
SpiraTest Overview Presentation (2019)
SpiraTest Overview Presentation (2019)SpiraTest Overview Presentation (2019)
SpiraTest Overview Presentation (2019)
 
Inflectra Overview Presentation (2023)
Inflectra Overview Presentation (2023)Inflectra Overview Presentation (2023)
Inflectra Overview Presentation (2023)
 
Webinar: How to Leverage SpiraTeam for QA Excellence
Webinar: How to Leverage SpiraTeam for QA ExcellenceWebinar: How to Leverage SpiraTeam for QA Excellence
Webinar: How to Leverage SpiraTeam for QA Excellence
 
Inflectra Overview Presentation (2022)
Inflectra Overview Presentation (2022)Inflectra Overview Presentation (2022)
Inflectra Overview Presentation (2022)
 
Rapise Overview Presentation (2021)
Rapise Overview Presentation (2021)Rapise Overview Presentation (2021)
Rapise Overview Presentation (2021)
 
Inflectra Lightning Session: Exploring the Full Potential of the Inflectra Suite
Inflectra Lightning Session: Exploring the Full Potential of the Inflectra SuiteInflectra Lightning Session: Exploring the Full Potential of the Inflectra Suite
Inflectra Lightning Session: Exploring the Full Potential of the Inflectra Suite
 
Lightning Sesssion: How To Turbo-Charge Your Test Management with SpiraTest
Lightning Sesssion: How To Turbo-Charge Your Test Management with SpiraTestLightning Sesssion: How To Turbo-Charge Your Test Management with SpiraTest
Lightning Sesssion: How To Turbo-Charge Your Test Management with SpiraTest
 
Webinar: Discover the Power of SpiraTeam - A Jira Alternative To Revolutioniz...
Webinar: Discover the Power of SpiraTeam - A Jira Alternative To Revolutioniz...Webinar: Discover the Power of SpiraTeam - A Jira Alternative To Revolutioniz...
Webinar: Discover the Power of SpiraTeam - A Jira Alternative To Revolutioniz...
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Rapise Overview Presentation (2019)
Rapise Overview Presentation (2019)Rapise Overview Presentation (2019)
Rapise Overview Presentation (2019)
 
NERC CIP - Top Testing & Compliance Challenges, How to Address Them
NERC CIP - Top Testing & Compliance Challenges, How to Address ThemNERC CIP - Top Testing & Compliance Challenges, How to Address Them
NERC CIP - Top Testing & Compliance Challenges, How to Address Them
 
Inflectra Overview Presentation (2019)
Inflectra Overview Presentation (2019)Inflectra Overview Presentation (2019)
Inflectra Overview Presentation (2019)
 

More from Inflectra

Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
From Theory to Practice: Utilizing SpiraPlan's REST API
From Theory to Practice: Utilizing SpiraPlan's REST APIFrom Theory to Practice: Utilizing SpiraPlan's REST API
From Theory to Practice: Utilizing SpiraPlan's REST API
Inflectra
 
From Challenger to Champion: How SpiraPlan Outperforms JIRA+Plugins
From Challenger to Champion: How SpiraPlan Outperforms JIRA+PluginsFrom Challenger to Champion: How SpiraPlan Outperforms JIRA+Plugins
From Challenger to Champion: How SpiraPlan Outperforms JIRA+Plugins
Inflectra
 
Webinar: SpiraTeam - A Jira Alternative to Revolutionize Your Project Management
Webinar: SpiraTeam - A Jira Alternative to Revolutionize Your Project ManagementWebinar: SpiraTeam - A Jira Alternative to Revolutionize Your Project Management
Webinar: SpiraTeam - A Jira Alternative to Revolutionize Your Project Management
Inflectra
 
Webinar: Unleashing the Power of Spira 7.7 - Scaling Agile with Program Capab...
Webinar: Unleashing the Power of Spira 7.7 - Scaling Agile with Program Capab...Webinar: Unleashing the Power of Spira 7.7 - Scaling Agile with Program Capab...
Webinar: Unleashing the Power of Spira 7.7 - Scaling Agile with Program Capab...
Inflectra
 
Webinar: Transforming Healthcare QA with SpiraTeam - Achieving Excellence in ...
Webinar: Transforming Healthcare QA with SpiraTeam - Achieving Excellence in ...Webinar: Transforming Healthcare QA with SpiraTeam - Achieving Excellence in ...
Webinar: Transforming Healthcare QA with SpiraTeam - Achieving Excellence in ...
Inflectra
 
Intro inflectra PTA DATIS Summit 2023
Intro inflectra PTA DATIS Summit 2023Intro inflectra PTA DATIS Summit 2023
Intro inflectra PTA DATIS Summit 2023
Inflectra
 
Inflectra User Summit - Mannheim - PTA 2023
Inflectra User Summit - Mannheim - PTA 2023Inflectra User Summit - Mannheim - PTA 2023
Inflectra User Summit - Mannheim - PTA 2023
Inflectra
 
Inflectra Partner Program 2023
Inflectra Partner Program 2023Inflectra Partner Program 2023
Inflectra Partner Program 2023
Inflectra
 
Embedding GAMP Compliance into Digital Health Software - The Case of SpiraPlan
Embedding GAMP Compliance into Digital Health Software - The Case of SpiraPlanEmbedding GAMP Compliance into Digital Health Software - The Case of SpiraPlan
Embedding GAMP Compliance into Digital Health Software - The Case of SpiraPlan
Inflectra
 
Lightning Session: Rapid & Easy Test Automation Using Rapise
Lightning Session: Rapid & Easy  Test Automation Using RapiseLightning Session: Rapid & Easy  Test Automation Using Rapise
Lightning Session: Rapid & Easy Test Automation Using Rapise
Inflectra
 
Spira 7.3: Agile Planning Boards To Rule Your Projects
Spira 7.3: Agile Planning Boards To Rule Your ProjectsSpira 7.3: Agile Planning Boards To Rule Your Projects
Spira 7.3: Agile Planning Boards To Rule Your Projects
Inflectra
 
Rapise 7.4 Highlights.pptx
Rapise 7.4 Highlights.pptxRapise 7.4 Highlights.pptx
Rapise 7.4 Highlights.pptx
Inflectra
 
Blockchain Development and Innovation in the Banking and Finance Space Webina...
Blockchain Development and Innovation in the Banking and Finance Space Webina...Blockchain Development and Innovation in the Banking and Finance Space Webina...
Blockchain Development and Innovation in the Banking and Finance Space Webina...
Inflectra
 
Top Ten Tips for Tackling Test Automation Webinar Presentation.pptx
Top Ten Tips for Tackling Test Automation Webinar Presentation.pptxTop Ten Tips for Tackling Test Automation Webinar Presentation.pptx
Top Ten Tips for Tackling Test Automation Webinar Presentation.pptx
Inflectra
 
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptxRethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Inflectra
 
Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...
Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...
Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...
Inflectra
 
Show and Tell: SpiraApps - Spira Extensibility Framework You've Been Waiting...
 Show and Tell: SpiraApps - Spira Extensibility Framework You've Been Waiting... Show and Tell: SpiraApps - Spira Extensibility Framework You've Been Waiting...
Show and Tell: SpiraApps - Spira Extensibility Framework You've Been Waiting...
Inflectra
 
Rapise 7.2: New Functionality: Global Objects
Rapise 7.2: New Functionality: Global ObjectsRapise 7.2: New Functionality: Global Objects
Rapise 7.2: New Functionality: Global Objects
Inflectra
 
RemoteLaunch Overview Presentation (2022)
RemoteLaunch Overview Presentation (2022)RemoteLaunch Overview Presentation (2022)
RemoteLaunch Overview Presentation (2022)
Inflectra
 

More from Inflectra (20)

Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
From Theory to Practice: Utilizing SpiraPlan's REST API
From Theory to Practice: Utilizing SpiraPlan's REST APIFrom Theory to Practice: Utilizing SpiraPlan's REST API
From Theory to Practice: Utilizing SpiraPlan's REST API
 
From Challenger to Champion: How SpiraPlan Outperforms JIRA+Plugins
From Challenger to Champion: How SpiraPlan Outperforms JIRA+PluginsFrom Challenger to Champion: How SpiraPlan Outperforms JIRA+Plugins
From Challenger to Champion: How SpiraPlan Outperforms JIRA+Plugins
 
Webinar: SpiraTeam - A Jira Alternative to Revolutionize Your Project Management
Webinar: SpiraTeam - A Jira Alternative to Revolutionize Your Project ManagementWebinar: SpiraTeam - A Jira Alternative to Revolutionize Your Project Management
Webinar: SpiraTeam - A Jira Alternative to Revolutionize Your Project Management
 
Webinar: Unleashing the Power of Spira 7.7 - Scaling Agile with Program Capab...
Webinar: Unleashing the Power of Spira 7.7 - Scaling Agile with Program Capab...Webinar: Unleashing the Power of Spira 7.7 - Scaling Agile with Program Capab...
Webinar: Unleashing the Power of Spira 7.7 - Scaling Agile with Program Capab...
 
Webinar: Transforming Healthcare QA with SpiraTeam - Achieving Excellence in ...
Webinar: Transforming Healthcare QA with SpiraTeam - Achieving Excellence in ...Webinar: Transforming Healthcare QA with SpiraTeam - Achieving Excellence in ...
Webinar: Transforming Healthcare QA with SpiraTeam - Achieving Excellence in ...
 
Intro inflectra PTA DATIS Summit 2023
Intro inflectra PTA DATIS Summit 2023Intro inflectra PTA DATIS Summit 2023
Intro inflectra PTA DATIS Summit 2023
 
Inflectra User Summit - Mannheim - PTA 2023
Inflectra User Summit - Mannheim - PTA 2023Inflectra User Summit - Mannheim - PTA 2023
Inflectra User Summit - Mannheim - PTA 2023
 
Inflectra Partner Program 2023
Inflectra Partner Program 2023Inflectra Partner Program 2023
Inflectra Partner Program 2023
 
Embedding GAMP Compliance into Digital Health Software - The Case of SpiraPlan
Embedding GAMP Compliance into Digital Health Software - The Case of SpiraPlanEmbedding GAMP Compliance into Digital Health Software - The Case of SpiraPlan
Embedding GAMP Compliance into Digital Health Software - The Case of SpiraPlan
 
Lightning Session: Rapid & Easy Test Automation Using Rapise
Lightning Session: Rapid & Easy  Test Automation Using RapiseLightning Session: Rapid & Easy  Test Automation Using Rapise
Lightning Session: Rapid & Easy Test Automation Using Rapise
 
Spira 7.3: Agile Planning Boards To Rule Your Projects
Spira 7.3: Agile Planning Boards To Rule Your ProjectsSpira 7.3: Agile Planning Boards To Rule Your Projects
Spira 7.3: Agile Planning Boards To Rule Your Projects
 
Rapise 7.4 Highlights.pptx
Rapise 7.4 Highlights.pptxRapise 7.4 Highlights.pptx
Rapise 7.4 Highlights.pptx
 
Blockchain Development and Innovation in the Banking and Finance Space Webina...
Blockchain Development and Innovation in the Banking and Finance Space Webina...Blockchain Development and Innovation in the Banking and Finance Space Webina...
Blockchain Development and Innovation in the Banking and Finance Space Webina...
 
Top Ten Tips for Tackling Test Automation Webinar Presentation.pptx
Top Ten Tips for Tackling Test Automation Webinar Presentation.pptxTop Ten Tips for Tackling Test Automation Webinar Presentation.pptx
Top Ten Tips for Tackling Test Automation Webinar Presentation.pptx
 
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptxRethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
 
Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...
Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...
Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...
 
Show and Tell: SpiraApps - Spira Extensibility Framework You've Been Waiting...
 Show and Tell: SpiraApps - Spira Extensibility Framework You've Been Waiting... Show and Tell: SpiraApps - Spira Extensibility Framework You've Been Waiting...
Show and Tell: SpiraApps - Spira Extensibility Framework You've Been Waiting...
 
Rapise 7.2: New Functionality: Global Objects
Rapise 7.2: New Functionality: Global ObjectsRapise 7.2: New Functionality: Global Objects
Rapise 7.2: New Functionality: Global Objects
 
RemoteLaunch Overview Presentation (2022)
RemoteLaunch Overview Presentation (2022)RemoteLaunch Overview Presentation (2022)
RemoteLaunch Overview Presentation (2022)
 

Recently uploaded

Using Xen Hypervisor for Functional Safety
Using Xen Hypervisor for Functional SafetyUsing Xen Hypervisor for Functional Safety
Using Xen Hypervisor for Functional Safety
Ayan Halder
 
Utilocate provides Smarter, Better, Faster, Safer Locate Ticket Management
Utilocate provides Smarter, Better, Faster, Safer Locate Ticket ManagementUtilocate provides Smarter, Better, Faster, Safer Locate Ticket Management
Utilocate provides Smarter, Better, Faster, Safer Locate Ticket Management
Utilocate
 
Energy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina JonuziEnergy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina Jonuzi
Green Software Development
 
Codeigniter VS Cakephp Which is Better for Web Development.pdf
Codeigniter VS Cakephp Which is Better for Web Development.pdfCodeigniter VS Cakephp Which is Better for Web Development.pdf
Codeigniter VS Cakephp Which is Better for Web Development.pdf
Semiosis Software Private Limited
 
A Study of Variable-Role-based Feature Enrichment in Neural Models of Code
A Study of Variable-Role-based Feature Enrichment in Neural Models of CodeA Study of Variable-Role-based Feature Enrichment in Neural Models of Code
A Study of Variable-Role-based Feature Enrichment in Neural Models of Code
Aftab Hussain
 
GraphSummit Paris - The art of the possible with Graph Technology
GraphSummit Paris - The art of the possible with Graph TechnologyGraphSummit Paris - The art of the possible with Graph Technology
GraphSummit Paris - The art of the possible with Graph Technology
Neo4j
 
Automated software refactoring with OpenRewrite and Generative AI.pptx.pdf
Automated software refactoring with OpenRewrite and Generative AI.pptx.pdfAutomated software refactoring with OpenRewrite and Generative AI.pptx.pdf
Automated software refactoring with OpenRewrite and Generative AI.pptx.pdf
timtebeek1
 
Graspan: A Big Data System for Big Code Analysis
Graspan: A Big Data System for Big Code AnalysisGraspan: A Big Data System for Big Code Analysis
Graspan: A Big Data System for Big Code Analysis
Aftab Hussain
 
What is Augmented Reality Image Tracking
What is Augmented Reality Image TrackingWhat is Augmented Reality Image Tracking
What is Augmented Reality Image Tracking
pavan998932
 
Hand Rolled Applicative User Validation Code Kata
Hand Rolled Applicative User ValidationCode KataHand Rolled Applicative User ValidationCode Kata
Hand Rolled Applicative User Validation Code Kata
Philip Schwarz
 
openEuler Case Study - The Journey to Supply Chain Security
openEuler Case Study - The Journey to Supply Chain SecurityopenEuler Case Study - The Journey to Supply Chain Security
openEuler Case Study - The Journey to Supply Chain Security
Shane Coughlan
 
Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604
Fermin Galan
 
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Crescat
 
Transform Your Communication with Cloud-Based IVR Solutions
Transform Your Communication with Cloud-Based IVR SolutionsTransform Your Communication with Cloud-Based IVR Solutions
Transform Your Communication with Cloud-Based IVR Solutions
TheSMSPoint
 
Enterprise Resource Planning System in Telangana
Enterprise Resource Planning System in TelanganaEnterprise Resource Planning System in Telangana
Enterprise Resource Planning System in Telangana
NYGGS Automation Suite
 
OpenMetadata Community Meeting - 5th June 2024
OpenMetadata Community Meeting - 5th June 2024OpenMetadata Community Meeting - 5th June 2024
OpenMetadata Community Meeting - 5th June 2024
OpenMetadata
 
SWEBOK and Education at FUSE Okinawa 2024
SWEBOK and Education at FUSE Okinawa 2024SWEBOK and Education at FUSE Okinawa 2024
SWEBOK and Education at FUSE Okinawa 2024
Hironori Washizaki
 
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Łukasz Chruściel
 
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit ParisNeo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 

Recently uploaded (20)

Using Xen Hypervisor for Functional Safety
Using Xen Hypervisor for Functional SafetyUsing Xen Hypervisor for Functional Safety
Using Xen Hypervisor for Functional Safety
 
Utilocate provides Smarter, Better, Faster, Safer Locate Ticket Management
Utilocate provides Smarter, Better, Faster, Safer Locate Ticket ManagementUtilocate provides Smarter, Better, Faster, Safer Locate Ticket Management
Utilocate provides Smarter, Better, Faster, Safer Locate Ticket Management
 
Energy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina JonuziEnergy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina Jonuzi
 
Codeigniter VS Cakephp Which is Better for Web Development.pdf
Codeigniter VS Cakephp Which is Better for Web Development.pdfCodeigniter VS Cakephp Which is Better for Web Development.pdf
Codeigniter VS Cakephp Which is Better for Web Development.pdf
 
A Study of Variable-Role-based Feature Enrichment in Neural Models of Code
A Study of Variable-Role-based Feature Enrichment in Neural Models of CodeA Study of Variable-Role-based Feature Enrichment in Neural Models of Code
A Study of Variable-Role-based Feature Enrichment in Neural Models of Code
 
GraphSummit Paris - The art of the possible with Graph Technology
GraphSummit Paris - The art of the possible with Graph TechnologyGraphSummit Paris - The art of the possible with Graph Technology
GraphSummit Paris - The art of the possible with Graph Technology
 
Automated software refactoring with OpenRewrite and Generative AI.pptx.pdf
Automated software refactoring with OpenRewrite and Generative AI.pptx.pdfAutomated software refactoring with OpenRewrite and Generative AI.pptx.pdf
Automated software refactoring with OpenRewrite and Generative AI.pptx.pdf
 
Graspan: A Big Data System for Big Code Analysis
Graspan: A Big Data System for Big Code AnalysisGraspan: A Big Data System for Big Code Analysis
Graspan: A Big Data System for Big Code Analysis
 
What is Augmented Reality Image Tracking
What is Augmented Reality Image TrackingWhat is Augmented Reality Image Tracking
What is Augmented Reality Image Tracking
 
Hand Rolled Applicative User Validation Code Kata
Hand Rolled Applicative User ValidationCode KataHand Rolled Applicative User ValidationCode Kata
Hand Rolled Applicative User Validation Code Kata
 
openEuler Case Study - The Journey to Supply Chain Security
openEuler Case Study - The Journey to Supply Chain SecurityopenEuler Case Study - The Journey to Supply Chain Security
openEuler Case Study - The Journey to Supply Chain Security
 
Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604
 
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...
 
Transform Your Communication with Cloud-Based IVR Solutions
Transform Your Communication with Cloud-Based IVR SolutionsTransform Your Communication with Cloud-Based IVR Solutions
Transform Your Communication with Cloud-Based IVR Solutions
 
Enterprise Resource Planning System in Telangana
Enterprise Resource Planning System in TelanganaEnterprise Resource Planning System in Telangana
Enterprise Resource Planning System in Telangana
 
OpenMetadata Community Meeting - 5th June 2024
OpenMetadata Community Meeting - 5th June 2024OpenMetadata Community Meeting - 5th June 2024
OpenMetadata Community Meeting - 5th June 2024
 
SWEBOK and Education at FUSE Okinawa 2024
SWEBOK and Education at FUSE Okinawa 2024SWEBOK and Education at FUSE Okinawa 2024
SWEBOK and Education at FUSE Okinawa 2024
 
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
 
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit ParisNeo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 

SpiraTeam Overview Presentation (2022)

  • 2. ® Helping Teams Deliver Together How Software Development Has Changed & What That Means
  • 3. ® ® The Agile Manifesto Changes Everything Requirements Gathering Business Design Unit Testing Traditional Waterfall Methodology Release Complete Technical Design Systems Development Integration Testing Acceptance Testing (UAT) Limited Upfront Planning Release #1 Release #2 Agile Methodology It 1 It 2 It 3 It 4 It 5 It 6 Release #3 It 7 It 8 It 9 Release #4 It 10 It 11 It 12 Iteration N Iteration Planning Release Complete Development, Continuous Integration, Unit Testing, Functional & Acceptance Testing The agile manifesto challenged the orthodoxy around software development, freeing it from the tyranny of process and rigidity, and embracing user feedback and change.
  • 4. ® ® Agile – Led to Continuous Delivery Iteration Iteration Scope Tested, Integrated Working System Iteration Plan Release Plan Organizations quickly realized how much more efficient they could be having integrated teams that collaboratively define the requirements, plan the releases and sprints, test the product during development and deploy the latest update in a seamless way
  • 5. ® ALM Unifies Test & Dev With the rise of agile methodologies such as Scrum, XP and Kanban, these three separate "stove-piped" worlds could no longer exist. The term Application Lifecycle Management (or ALM) was the unification of development and testing into a single process
  • 6. ® ® What is ALM Anyway? Application Lifecycle Management (ALM) is really an umbrella term that covers several different disciplines that traditionally were considered separate:
  • 7. ® ® How ALM Brings It All Together ALM is basically the fusing together of the disciplines concerned with all aspects of the software delivery process. It encompasses project management, requirements management, development, testing and quality assurance, as well as customer support and IT service delivery
  • 8. ® But What About Infrastructure & Operations?
  • 9. ® ® Development & Operations (DevOps) ALM unified software development and testing, but the IT infrastructure (Operations) was missing from the picture… The logical next step has been the unification of all three disciplines into a single integrated process called DevOps. Enter SpiraTeam® to help teams work together in DevOps and Agile.
  • 10. ® The SpiraTeam Difference How are we different and what our customers say
  • 11. ® ® SpiraPlan® Agile Program & Portfolio Management SpiraTeam® Application Lifecycle Management (ALM) Introducing the Inflectra® Suite SpiraTest® Requirements, Test Management & Bug Tracking KronoDesk® IT Support & Help Desk Rapise® Test Automation (Web, GUI, Services) TaraVault® - Source Code Management SpiraCapture™ Exploratory Testing
  • 12. ® ® SpiraTeam – The Integrated ALM Platform See Spira Comparison Matrix to compare SpiraTeam vs. SpiraTest SpiraTeam® SpiraTest® Requirements, Test & Defect Management Agile Project Management KronoDesk® IT Support & Help Desk Ticketing Rapise® Test Automation Platform (Web, GUI, Services) TaraVault® - Source Code Management & DevOps +
  • 14. ® ® How Do We Foster Harmony? 1. Across Disciplines 2.Through Simplicity 3.Across Ecosystems
  • 15. ® ® Harmony Across the Disciplines Testers Developers Managers We consider each of these three stakeholders groups when designing features for SpiraTeam, so that everyone in teams can get the most out of the system working together.
  • 16. ® Simplicity = Productivity from Day One • Less Time Doing: • More Time Doing: No plugins, customization or configuration needed day one
  • 17. ® ® If all you have is an ‘issue’ tracker… Then everything is an issue…
  • 18. ® ® Instead, SpiraTeam Guides Your Process 1. Create Product 2. Add Users to Product (Membership) 3. Follow Product Workflow: Requirements Planning Test Planning Sprint Planning Schedule & Resourcing Tracking & Execution
  • 19. ® ® Harmony Across Ecosystems We recognize that you need to integrate SpiraTeam with other tools and systems We make this easy and straightforward so you can get working faster & easier
  • 20. ® 20 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation Inflectra Core Values  Great Products: Build for Our Users Not Investors  Building great software for customers, not chasing the latest fad.  Great Team: We Just Get it Done  Treat customers well, solve their problems, no drama or red tape.  Great Workplace: Family and Life Flexibility  Unlimited vacation, amazing benefits, flex/part time welcomed.  Great Community: Enabling Second Acts  Expanding opportunities for new/second careers in technology.
  • 21. ® How SpiraTeam Works For You Features for different industries and methodologies
  • 22. ® ® Bridging Between Agile and Compliance Support for Regulated Processes Modern, Agile Processes • Baselining • Risk Management • Electronic Signatures • Data Privacy • Compliance • Workflow • Requirements Mgt • On-Premise • CI / CD • Scrum • Kanban • Scaled Agile • DevOps • Distributed Teams • Remote Working • Cloud-Based
  • 23. ® 23 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation ® Healthcare & Life Sciences  Electronic signatures for FDA 21 Part 11 compliance  Secure hosting with support for HIPAA BAA agreements  End to end traceability of requirements, tests, and code  Validated platform where you control update cadence
  • 24. ® 24 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation ® Financial Services & Insurance  Secure cloud platform (SOC2) or on-premise deployment  Generate financial compliance documentation automatically  Integration with automated testing and verification tools  End-to-end traceability and auditability of testing
  • 25. ® 25 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation ® Energy, Industrial, & Automotive  Testing for public safety with world class test management  Define requirements and test for compliance  Integrate standards and regulations into your test plans  Understand and manage risk of critical systems
  • 26. ® 26 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation ® Defense, Government & Aerospace  Manage programs and portfolios across platforms  Test step level traceability for mission systems  Automate testing and compliance with RemoteLaunch  Security and privacy with on-premise and AWS GovCloud
  • 27. ® 27 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation ® Representative Customers by Industry  We have ~ 80,000 users in 5,000+ companies worldwide: Energy & Industrial Government & Defense Retail & Consumer Goods Healthcare & Bio-Technology Financial & Business Services Information Technology Transportation & Hospitality Telecommunications
  • 28. ® ® Regulated Industries - Automating Compliance End-to-end traceability out of the box Data Privacy, Security baked in Generate Documentation from data Workflows & Electronic Signatures Integration across the software value chain
  • 30. ® ® Global Partner Network Page: 30 North America Asia Australia South America & Mexico Europe Middle East & Africa
  • 31. ® ® Customer Testimonials Great product for managing your software development projects. When evaluating solutions, it became clear to me that the choice would be SpiraTeam. For the price to feature ratio, it could do everything and more than we would need. With the ability to just add additional licenses as our team grew it provided the flexibility we needed. The support team at Inflectra is also top notch. Any time I had a question/issue, they were there to help in a quick and friendly manner. - Brian Kratsch, Tolko Industries Ltd. “ “ “ Inflectra’s SpiraTeam is disrupting this market. And deservedly so. If you’re in the market for an ALM tool, I recommend you put SpiraTeam at the top of your shortlist. This is a great suite for managing the application development life cycle. Very competitive in features and functions. - Jim Reardan, Process1st Consulting
  • 33. ® Feature Overview Lets Look at the Key Features in SpiraTeam
  • 34. ® ® Integrated Program & Project Dashboards Customizable reporting dashboards at the program, product, project, release and sprint levels
  • 37. ® ® Agile Project Planning Agile planning boards with test and task traceability that support multiple methodologies including Scrum and Kanban.
  • 38. ® ® Resource Management Manage the people and teams on your projects with centralized timecard submission and resource planning.
  • 39. ® ® Document Management Complete integrated document management system with versioning, check-in/out and approval workflows.
  • 40. ® ® Customizable Reporting Library of standard and custom reports, export in various formats including Word, PDF, Excel and PDF
  • 42. ® ® Test Management & QA Manage your automated and manual test cases, test suites and testing artifacts in a central repository.
  • 43. ® ® Automated Testing Orchestrate your automated tests from SpiraTeam, with integrated test lab management and data-driven testing
  • 44. ® ® Manual & Exploratory Testing SpiraTeam provides an easy to use testing wizard for manual and exploratory tests, with SpiraCapture™ for session capture.
  • 45. ® ® Data-Driven Testing SpiraTeam lets you parameterize your test cases and execute them using different data combinations for full coverage.
  • 47. ® ® Issue & Defect Tracking SpiraTeam includes a flexible bug and issue tracker with list and agile board views, and integrated workflow engine.
  • 48. ® ® Source Code Management Integrated source code management using Git or Subversion hosted in TaraVault or external. Allows code-level traceability. &
  • 49. ® ® Code Reviews & Pull Requests Manage your development workflows including merge/pull requests and code reviews with full traceability.
  • 50. ® ® Task Tracking Track project tasks with customizable workflows. Measure progress against the requirements and user stories
  • 51. ® ® Build Integrated with CI / CD Tools Build Management in SpiraTeam lets you integrate with continuous integration build servers with full traceability for each build
  • 54. ® ® Collaboration and Instant Messaging Real-time collaboration and communication with SpiraTeam instant messenger, artifact following, RSS Feeds and Email
  • 55. ® Integration Options SpiraTeam Fits into Your Ecosystem Seamlessly
  • 56. ® ® Recap: Harmony Across Ecosystems We recognize that you need to integrate SpiraTeam with other tools and systems We make this easy and straightforward so you can get working faster & easier
  • 57. ® ® Import / Conversion Automation Load Testing Unit Testing IDE CI/CD Bug-Tracking Detailed Integration List Open Ecosystem – Over 70 Integrations
  • 58. ® 58 | 4/6/2022 © Copyright 2006-2022 Inflectra Corporation Questions?

Editor's Notes

  1. Make great products Help you work together Help you deliver your products faster, more easily, with less pain, and less stress At a grand scale – we’re passionate about making products that you will find transformative to how you work. We both want to use our tools every day to help you do a whole number of complex things, and at the same time get out of your way so you don’t need to worry about SpiraTeam and can instead focus on helping your own customers
  2. Managers, our third pillar, could always take advantage of our reporting, dashboards, and traceability features. But we knew we could do a lot more to help managers – both senior leaders and those in other roles like BI
  3. That’s the very high level, but what does this mean in detail for you? What have we or are we about to release that can help you? Let’s talk testers first
  4. Let’s talk next about developers
  5. Managers, our third pillar, could always take advantage of our reporting, dashboards, and traceability features. But we knew we could do a lot more to help managers – both senior leaders and those in other roles like BI