Awesome stuff coming your way
April 2nd 2019
Johannes Brännström
Solutions Architect, Red Hat
1
okd.io
Istio
Knative / Serverless / FaaS
Workspace-As-Code
Operators
Federated{}
Machine{}
Perf/Sec/Virt?
Istio / OpenShift Service Mesh
Microservices Evolution
Service
Config
Svc Discovery
Routing
Circuit Breaker
Tracing
Service
Platform
Container Platform
(+ Service Mesh)
...2014 2018
GENERAL DISTRIBUTION
Canaries with Kubernetes
Pod
Container
JVM
Service A
v1
Pod
Container
JVM
Service A
v2
Service
Route/
Ingress
50%
50%
@burrsutter
Canaries with Istio
Pod
Container
JVM
Service A
v1
Pod
Container
JVM
Service A
v2
Service
Route/
Ingress
90%
10%
@burrsutter
Dark Launch with Istio
Pod
Container
JVM
Service A
v1
Pod
Container
JVM
Service A
v2
Service
Route/
Ingress
100%
0%
@burrsutter
Mirrored traffic
Istio - Cloud Native Service Mesh
Control the flow of traffic between services:
● A/B Testing
● Quantile based deployments
● Canary Deployments
● Staged Rollouts
● Fault injection
● Traffic mirroring
Application independent security:
● Zero trust network
● Mutual Transport Layer Security (TLS)
● Service to service encryption
● Service to service authentication
● Transport authentication
● Origin authentication
Connect Secure
Product Manager: Brian Harrington
Istio - Cloud Native Service Mesh
Uniform abstraction for policy control
● Allow for traffic redirection in response to
real time events
● Response codes
● Service latency
● Rule based processing based on headers
Visibility into application deployments
● Pluggable backend for telemetry capture
● Allows for COTS applications to get
non-zero visibility into performance
● Prometheus
● Others TBD based on customer need
● Application tracing
● Jaeger
● Service topology
● Kiali
Control Observe
Product Manager: Brian Harrington
OPENSHIFT SERVICE MESH
Observe Observe
Secure
ControlConnect
Jaeger Prometheus
Istio
Product Manager: Brian Harrington
Kiali (GUI for Istio / OSM)
Product Manager: Brian Harrington
OSM vs Upstream Istio - What’s different?
Istio is an “operator first product” (using Operator Framework)-
https://github.com/Maistra/istio-operator
The operator manages the installation and updates utilizing the
Operator Lifecycle Manager (OLM)
Product Manager: Brian Harrington
LEARN MORE
● Tutorial using Minishift/Minikube
http://bit.ly/istio-tutorial
● Online labs, no installation needed
https://learn.openshift.com/servicemesh/
● Book, and more if you look around
https://developers.redhat.com/books/introducing-istio-service-mesh-microservices/
Product Manager: Brian Harrington
Knative / Serverless
Product Manager: William Markito
Build / Pipelines
A pluggable model for
building artifacts, like jar
files, zips or containers
from source code.
Knative Overview - Components
Serving
An event-driven model
that serves the container
with your application and
can "scale to zero".
Eventing
Common infrastructure for
consuming and producing
events that will stimulate
applications.
"...an extension to Kubernetes exposing building blocks to build modern, source-centric, and
container-based applications that can run anywhere".
Product Manager: William Markito
Code repository (GitHub, GitLab, Local)
Application
B Function A
Application
A
Knative
Red Hat Service Mesh
(Istio)
Step 2: Serving
Cloud
event
Autoscaler (scale to 0)
Activator
Controller
<container>
function
<container>
function<container>
function
<container>
application
Step 1: Build
events
Operators
New
entry
New file
New
Login
Services
Many
(200+)
ReceiveAdapter
ReceiveAdapter
Data
Grid
Gluster /
Ceph
SSO
ISVs...
Fuse
(Camel-k)
Dockerfile
B
Function B
Step 3: Events
Strimzi
channel
Event Sources
Channels
Receivers
...
Router
Red Hat
User
Events
Product Manager: William Markito
FUNCTION - AS - A - SERVICE
Red Hat OpenShift
Knative
Function as a Service*
The leading enterprise Kubernetes platform
Automated Operations
Build and run anywhere (Hybrid Cloud)
Developer experience
APIs, CLI, service binding
Events Build Serving
Building blocks for serverless
Source-centric and container-based
Red Hat Enterprise Linux or Red Hat CoreOS
Kubernetes
Automated
Operations
Hybrid Install / Ops
Ops & Dev Consoles
Install / Upgrade
Security / Auth
Network / CNI
Storage / CSI
Istio
Operator Framework
RH MW Services
(Operator backed)
ISV Services
(Operator backed)
ODO CLI Eclipse Che
Invoker Runtime CLI API
LEARN MORE
● Tutorial using Minishift/Minikube
bit.ly/knative-tutorial
● Funny(er) tutorial?
https://developers.redhat.com/coderland/serverless/
Product Manager: Brian Harrington
Container Native Java
Quarkus.io
Quarkus.io
Dev Tools
Stable team, multi projects
Long tail adds up
Agile teams own 3+ code bases
Contribute to 10+ others
WHAT DEVELOPERS NEED
IN ORDER TO CONTRIBUTE
27
● Project sources
● Dependencies
● Developer Tools: language servers, debuggers, testing tools, security tools, etc...
● Commands
● Build and packaging tools
● Terminal
● Operating system
● Web server / application server
● Database
● (All other runtime components)
For each service that is maintained!
● Project sources
● Dependencies
● Developer Tools: language servers, debuggers, testing tools, security tools, etc...
● Commands
● Build and packaging tools
● Terminal
● Operating system
● Web server / application server
● Database
● (All other runtime components)
CODEREADY WORKSPACES
28
Shareable
+
Secure
WORKSPACE AS CODE
29
Workspaces: An instance of a stack for your projects
A Workspace is made of
● The Runtime from the Stack
● The Source code of your Project
● The IDE and its configuration
User can share the workspace for collaboration or easy development
● Local desktop instance of OCP 4
● Replaces oc cluster, Minishift and CDK
● Focus on ease of access and native experience
● Native installer on macOS and Windows
● Native hypervisor support
● Tray icon integration
● Provides OCP 4 on RH CoreOS, dev tools and tutorials
● Leverages the standard OpenShift Installer
CodeReady Containers
Product Manager: Steve Speicher
Dev Console
31
● Application-centric views and
tasks of Kubernetes, OpenShift +
Operator-enabled addons
● Developer workflows
● Import app
● Web IDE (Eclipse Che)
● DevOps workflows
● Pipelines
● Environments
● Third-party integrations
TARGET FOR 4.2
Product Manager: Steve Speicher
● OCI compliant and
docker compatible
● CLI via crictl
● Improved performance
and scalability
● Continue to track the
Kube CRI
Light-weight
runtime for the
Kube CRI
Secure & flexible
OCI container
builds
● Integrated into OCP
build pods
● Performance
improvements for
knative enablement
● Image signing
improvements
A
docker-compatible
CLI for containers
● Remote management
API via Varlink
● Image/container
tagging
● Advanced namespace
isolation
Container Tools
OCI tooling to create, run, and manage, Linux Containers with a
cluster-friendly life cycle
Product Manager: Scott McCarty
Operator Framework
Shifting towards testing and certification workflow for our partners
For Builders and the community
● Easily create application on Kubernetes via a common method
● Provide standardized set of tools to build consistent apps
For application consumers and Kubernetes users
● Keep used apps up to date for security reasons and app lifecycle management
● Consume of cloud-native / kube-native applications more secure and easier
Product Manager: Daniel Messer
AVAILABLE NOWOPERATOR MATURITY MODEL
Product Manager: Daniel Messer
Federation
Federation V2 - Multi-Cluster Service Delivery
https://github.com/kubernetes/community/tree/master/sig-multicluster
OpenShift Clusters c1 through c7
c1
c2
c7
...
Cluster Registry CRD
Single Source of Truth
Federated API
Base Federated Resources
Substitution Preferences
Substitution Outputs
Placement Preferences
Placement Decisions
Schedule and Reconcile
Auxiliary Resources
FederatedDeployment
FederatedSecret
FederatedReplicaSet
FederatedConfigMap
Bonus: Federate any CRD
without writing code
$ oc get clusters$ openshift-install launch overrides:
clusters:
- clusterName: c1
replicas: 5
- clusterName: c3
replicas: 10
- clusterName: c7
replicas: 15Product Manager: Duncan Hardie
DAY 2
OPERATIONS
OPERATOR
FRAMEWORK
IMMUTABLE
INFRASTRUCTURE
Platform Automation
Auto Installer + bootstrapping
Autoscale out of the box
MachineSet node pools
Red Hat CoreOS
Discourage SSH/node mutation
Ignition for Machine config
SDK & testing tools
OperatorHub for discovery
OLM delivers upper stack services
BASE INSTALL
Product Manager: Rob Szumski
https://github.com/openshift/installer
Console & Auth
Monitoring
Over-the-air Updates
Machine Management
Optional Service Brokers
Optional OCP Components
Red Hat Product Operators
ISV/Partner Operators
Community Operators
NEW INSTALLER OPERATOR HUB
https://github.com/openshift/machine-api-operator
Provider Roadmap for OpenShift 4
Developer Preview
4.1
4.2
4.3
Installer Provisioned
Infrastructure (IPI)
User Provisioned
Infrastructure (UPI)
Baremetal
Baremetal
On RHHI**
** On qualified hardware stack
Product Manager: Katherine Dubé
OpenShift Hive
API Driven Multi-cluster Provisioning & Lifecycle Management
● Reliably provision/deprovision, upgrade, & configure OpenShift 4 clusters
○ 4.1: Internal only release
■ Initial support for OpenShift deployment on AWS only.
■ Primary focus supporting Dedicated clusters
and the new UHC Portal/API.
■ May be used to drive cluster creation for CI.
● Leverages:
○ openshift-install - Uses CLI to launch clusters in the public cloud
○ Kubernetes Cluster API - Declarative, Kubernetes-style APIs for
cluster creation, configuration, and management
○ Kubernetes Federation - Makes it easy
to manage multiple clusters
● Working code & documentation now available:
○ https://github.com/openshift/hive Hive
Future
Deliverable
Product Manager: Katherine Dubé
The Red Hat Universal Base Image is a freely useable and
redistributable container image packed with all of the value
of Red Hat Enterprise Linux
Development
● Minimal footprint
● Latest programming languages
● Makes ops happy
Production
● Performance
● Security
● Life cycle
Red Hat Universal Base Image (UBI)
The base image for all of your needs on: OpenShift, RHEL, or other platform
of choice
CONTAINER
UBI
RUNTIME
APP
RED HAT PLATFORM
CONTAINER
UBI
RUNTIME
APP
NON-RED HAT PLATFORM
Fully supported by Red Hat Supported by end user
Detailed Presentation
Product Manager: Scott McCarty
KUBERNETES NODE AND
SCHEDULER
Product Manager: Tushar Katarki
0-3 months
Quota by priority
Deamonset pods via kube-scheduler
Configurable Pod Process Namespace
Sharing
Taint node by Condition
Taint Based Evictions
Pid pod limits
KUBERNETES NODE AND SCHEDULER
PSAP related (0-3 months)
Node Feature Discovery (NFD) Operator
GPGPU Operator (with Nvidia)
CPU Manager enhancements (to respect
certain kernel tunings)
Product Manager: Tushar Katarki
6 months plus
Resource Class
Debug Containers
Support node-level user namespace
remapping​
Topology Aware Volume
Scheduling
Kubelet toleration for cgroup v2
KUBERNETES NODE AND SCHEDULER
3-6 months
Usage based scheduling
Device plugin metric enablement
Device and cpu assignment
topology aware
Operators for other hardware
accelerators
Kubelet Device Plugin Watcher
Product Manager: Tushar Katarki
3-6 months
node-feature-discovery
Operator
GPU Operator (pod
startup ordering, driver,
device plugin)
OpenShift for DGX
Documentation
NVIDIA OPENSHIFT ROADMAP
6 months plus
Priority/Preemption
Taints/Tolerations
MachineDeployment
Backlog
RBAC
Quota
Monitoring (Grafana)
More Nvidia Gpu Cloud (NGC)
containers support
NGC containers with UBI
NGC containers in RHCC Registry
Product Manager: Tushar Katarki
Security
SECURITY FEATURE ROADMAP
DEFENSE IN DEPTH - Control, Defend, Extend
Trusted Container Content
Quay Registry with
Image Scanning
CI/CD Pipeline
ImageStreams
Security Ecosystem
Container Host Multi-tenancy / Container Optimized
Immutable OS
Built-In IAM
Secrets Management
Deployment Policies (SCCs)
Audit & Logging
Network Policy & Isolation
API Management
Linux Host Security
- RHCOS minimal, immutable OS
- RHCOS updates managed and delivered as
integrated part of the OpenShift platform
Authentication & Authorization
- Integration with external Keycloak
- Use group membership from external IPs
Secrets & Certificates
- Encrypted certs stored in etcd (4.0)
- Improved cert management and Integration
with external CAs via ACME
- Integration with external Key Management
Systems
Integrated Audit & Logging
- East / West traffic tracing with OpenShift
Service Mesh
Network Policies
- Control service access flow with OpenShift
Service Mesh
Networking Isolation
- East / West mutual TLS authentication with
OpenShift Service Mesh
- Multus to isolate control plane / data plane
(4.0)
Image Security
- Clair v3 covers more content
Product Manager: Kirsten Newcomer
Metadata Provider
• Embedded Marketplace for
content governance
• Policy Management via UI
• Policy Enforcement
• Vulnerability Dashboards
• Notifications / Alerting
• Content ingress & federation
• Single source of truth for
deployment artifacts
• Metadata repository
• Signatures & attestations
• Event triggers / notifications
• Provenance data for content
inside images / applications
• Provide Metadata
(attestations) to Quay
• Integrated in CI/CD pipeline
automation
AN UPDATE ON POLICY
Product Manager: Dirk Herrmann
CONTAINER-NATIVE VIRTUALIZATION
● CNV 1.3 Tech Preview (now)
● CNV 1.4 Tech Preview (soon)
○ Basic live migration
○ Containerized data importer
■ Progress reporting
■ Disk expansion
■ Blank disks
○ Operators for KubeVirt,
Containerized data importer
○ UI Enhancements
■ RDP, Serial, VNC, consoles
■ CRUD Disks, VM templates
Product Manager: Steve Gordon
Questions?
54

Red Hat and kubernetes: awesome stuff coming your way

  • 1.
    Awesome stuff comingyour way April 2nd 2019 Johannes Brännström Solutions Architect, Red Hat 1
  • 2.
  • 3.
    Istio Knative / Serverless/ FaaS Workspace-As-Code Operators Federated{} Machine{} Perf/Sec/Virt?
  • 4.
    Istio / OpenShiftService Mesh
  • 5.
    Microservices Evolution Service Config Svc Discovery Routing CircuitBreaker Tracing Service Platform Container Platform (+ Service Mesh) ...2014 2018
  • 6.
  • 7.
    Canaries with Kubernetes Pod Container JVM ServiceA v1 Pod Container JVM Service A v2 Service Route/ Ingress 50% 50% @burrsutter
  • 8.
    Canaries with Istio Pod Container JVM ServiceA v1 Pod Container JVM Service A v2 Service Route/ Ingress 90% 10% @burrsutter
  • 9.
    Dark Launch withIstio Pod Container JVM Service A v1 Pod Container JVM Service A v2 Service Route/ Ingress 100% 0% @burrsutter Mirrored traffic
  • 10.
    Istio - CloudNative Service Mesh Control the flow of traffic between services: ● A/B Testing ● Quantile based deployments ● Canary Deployments ● Staged Rollouts ● Fault injection ● Traffic mirroring Application independent security: ● Zero trust network ● Mutual Transport Layer Security (TLS) ● Service to service encryption ● Service to service authentication ● Transport authentication ● Origin authentication Connect Secure Product Manager: Brian Harrington
  • 11.
    Istio - CloudNative Service Mesh Uniform abstraction for policy control ● Allow for traffic redirection in response to real time events ● Response codes ● Service latency ● Rule based processing based on headers Visibility into application deployments ● Pluggable backend for telemetry capture ● Allows for COTS applications to get non-zero visibility into performance ● Prometheus ● Others TBD based on customer need ● Application tracing ● Jaeger ● Service topology ● Kiali Control Observe Product Manager: Brian Harrington
  • 12.
    OPENSHIFT SERVICE MESH ObserveObserve Secure ControlConnect Jaeger Prometheus Istio Product Manager: Brian Harrington
  • 13.
    Kiali (GUI forIstio / OSM) Product Manager: Brian Harrington
  • 14.
    OSM vs UpstreamIstio - What’s different? Istio is an “operator first product” (using Operator Framework)- https://github.com/Maistra/istio-operator The operator manages the installation and updates utilizing the Operator Lifecycle Manager (OLM) Product Manager: Brian Harrington
  • 15.
    LEARN MORE ● Tutorialusing Minishift/Minikube http://bit.ly/istio-tutorial ● Online labs, no installation needed https://learn.openshift.com/servicemesh/ ● Book, and more if you look around https://developers.redhat.com/books/introducing-istio-service-mesh-microservices/ Product Manager: Brian Harrington
  • 16.
  • 17.
    Product Manager: WilliamMarkito Build / Pipelines A pluggable model for building artifacts, like jar files, zips or containers from source code. Knative Overview - Components Serving An event-driven model that serves the container with your application and can "scale to zero". Eventing Common infrastructure for consuming and producing events that will stimulate applications. "...an extension to Kubernetes exposing building blocks to build modern, source-centric, and container-based applications that can run anywhere".
  • 18.
    Product Manager: WilliamMarkito Code repository (GitHub, GitLab, Local) Application B Function A Application A Knative Red Hat Service Mesh (Istio) Step 2: Serving Cloud event Autoscaler (scale to 0) Activator Controller <container> function <container> function<container> function <container> application Step 1: Build events Operators New entry New file New Login Services Many (200+) ReceiveAdapter ReceiveAdapter Data Grid Gluster / Ceph SSO ISVs... Fuse (Camel-k) Dockerfile B Function B Step 3: Events Strimzi channel Event Sources Channels Receivers ... Router Red Hat User Events
  • 19.
    Product Manager: WilliamMarkito FUNCTION - AS - A - SERVICE Red Hat OpenShift Knative Function as a Service* The leading enterprise Kubernetes platform Automated Operations Build and run anywhere (Hybrid Cloud) Developer experience APIs, CLI, service binding Events Build Serving Building blocks for serverless Source-centric and container-based Red Hat Enterprise Linux or Red Hat CoreOS Kubernetes Automated Operations Hybrid Install / Ops Ops & Dev Consoles Install / Upgrade Security / Auth Network / CNI Storage / CSI Istio Operator Framework RH MW Services (Operator backed) ISV Services (Operator backed) ODO CLI Eclipse Che Invoker Runtime CLI API
  • 20.
    LEARN MORE ● Tutorialusing Minishift/Minikube bit.ly/knative-tutorial ● Funny(er) tutorial? https://developers.redhat.com/coderland/serverless/ Product Manager: Brian Harrington
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
    Stable team, multiprojects Long tail adds up Agile teams own 3+ code bases Contribute to 10+ others
  • 26.
    WHAT DEVELOPERS NEED INORDER TO CONTRIBUTE 27 ● Project sources ● Dependencies ● Developer Tools: language servers, debuggers, testing tools, security tools, etc... ● Commands ● Build and packaging tools ● Terminal ● Operating system ● Web server / application server ● Database ● (All other runtime components) For each service that is maintained!
  • 27.
    ● Project sources ●Dependencies ● Developer Tools: language servers, debuggers, testing tools, security tools, etc... ● Commands ● Build and packaging tools ● Terminal ● Operating system ● Web server / application server ● Database ● (All other runtime components) CODEREADY WORKSPACES 28 Shareable + Secure
  • 28.
    WORKSPACE AS CODE 29 Workspaces:An instance of a stack for your projects A Workspace is made of ● The Runtime from the Stack ● The Source code of your Project ● The IDE and its configuration User can share the workspace for collaboration or easy development
  • 29.
    ● Local desktopinstance of OCP 4 ● Replaces oc cluster, Minishift and CDK ● Focus on ease of access and native experience ● Native installer on macOS and Windows ● Native hypervisor support ● Tray icon integration ● Provides OCP 4 on RH CoreOS, dev tools and tutorials ● Leverages the standard OpenShift Installer CodeReady Containers Product Manager: Steve Speicher
  • 30.
    Dev Console 31 ● Application-centricviews and tasks of Kubernetes, OpenShift + Operator-enabled addons ● Developer workflows ● Import app ● Web IDE (Eclipse Che) ● DevOps workflows ● Pipelines ● Environments ● Third-party integrations TARGET FOR 4.2 Product Manager: Steve Speicher
  • 31.
    ● OCI compliantand docker compatible ● CLI via crictl ● Improved performance and scalability ● Continue to track the Kube CRI Light-weight runtime for the Kube CRI Secure & flexible OCI container builds ● Integrated into OCP build pods ● Performance improvements for knative enablement ● Image signing improvements A docker-compatible CLI for containers ● Remote management API via Varlink ● Image/container tagging ● Advanced namespace isolation Container Tools OCI tooling to create, run, and manage, Linux Containers with a cluster-friendly life cycle Product Manager: Scott McCarty
  • 32.
    Operator Framework Shifting towardstesting and certification workflow for our partners
  • 33.
    For Builders andthe community ● Easily create application on Kubernetes via a common method ● Provide standardized set of tools to build consistent apps For application consumers and Kubernetes users ● Keep used apps up to date for security reasons and app lifecycle management ● Consume of cloud-native / kube-native applications more secure and easier Product Manager: Daniel Messer
  • 34.
    AVAILABLE NOWOPERATOR MATURITYMODEL Product Manager: Daniel Messer
  • 35.
  • 36.
    Federation V2 -Multi-Cluster Service Delivery https://github.com/kubernetes/community/tree/master/sig-multicluster OpenShift Clusters c1 through c7 c1 c2 c7 ... Cluster Registry CRD Single Source of Truth Federated API Base Federated Resources Substitution Preferences Substitution Outputs Placement Preferences Placement Decisions Schedule and Reconcile Auxiliary Resources FederatedDeployment FederatedSecret FederatedReplicaSet FederatedConfigMap Bonus: Federate any CRD without writing code $ oc get clusters$ openshift-install launch overrides: clusters: - clusterName: c1 replicas: 5 - clusterName: c3 replicas: 10 - clusterName: c7 replicas: 15Product Manager: Duncan Hardie
  • 37.
    DAY 2 OPERATIONS OPERATOR FRAMEWORK IMMUTABLE INFRASTRUCTURE Platform Automation AutoInstaller + bootstrapping Autoscale out of the box MachineSet node pools Red Hat CoreOS Discourage SSH/node mutation Ignition for Machine config SDK & testing tools OperatorHub for discovery OLM delivers upper stack services
  • 38.
    BASE INSTALL Product Manager:Rob Szumski https://github.com/openshift/installer Console & Auth Monitoring Over-the-air Updates Machine Management Optional Service Brokers Optional OCP Components Red Hat Product Operators ISV/Partner Operators Community Operators NEW INSTALLER OPERATOR HUB
  • 39.
  • 41.
    Provider Roadmap forOpenShift 4 Developer Preview 4.1 4.2 4.3 Installer Provisioned Infrastructure (IPI) User Provisioned Infrastructure (UPI) Baremetal Baremetal On RHHI** ** On qualified hardware stack Product Manager: Katherine Dubé
  • 42.
    OpenShift Hive API DrivenMulti-cluster Provisioning & Lifecycle Management ● Reliably provision/deprovision, upgrade, & configure OpenShift 4 clusters ○ 4.1: Internal only release ■ Initial support for OpenShift deployment on AWS only. ■ Primary focus supporting Dedicated clusters and the new UHC Portal/API. ■ May be used to drive cluster creation for CI. ● Leverages: ○ openshift-install - Uses CLI to launch clusters in the public cloud ○ Kubernetes Cluster API - Declarative, Kubernetes-style APIs for cluster creation, configuration, and management ○ Kubernetes Federation - Makes it easy to manage multiple clusters ● Working code & documentation now available: ○ https://github.com/openshift/hive Hive Future Deliverable Product Manager: Katherine Dubé
  • 43.
    The Red HatUniversal Base Image is a freely useable and redistributable container image packed with all of the value of Red Hat Enterprise Linux Development ● Minimal footprint ● Latest programming languages ● Makes ops happy Production ● Performance ● Security ● Life cycle Red Hat Universal Base Image (UBI) The base image for all of your needs on: OpenShift, RHEL, or other platform of choice CONTAINER UBI RUNTIME APP RED HAT PLATFORM CONTAINER UBI RUNTIME APP NON-RED HAT PLATFORM Fully supported by Red Hat Supported by end user Detailed Presentation Product Manager: Scott McCarty
  • 44.
  • 45.
    0-3 months Quota bypriority Deamonset pods via kube-scheduler Configurable Pod Process Namespace Sharing Taint node by Condition Taint Based Evictions Pid pod limits KUBERNETES NODE AND SCHEDULER PSAP related (0-3 months) Node Feature Discovery (NFD) Operator GPGPU Operator (with Nvidia) CPU Manager enhancements (to respect certain kernel tunings) Product Manager: Tushar Katarki
  • 46.
    6 months plus ResourceClass Debug Containers Support node-level user namespace remapping​ Topology Aware Volume Scheduling Kubelet toleration for cgroup v2 KUBERNETES NODE AND SCHEDULER 3-6 months Usage based scheduling Device plugin metric enablement Device and cpu assignment topology aware Operators for other hardware accelerators Kubelet Device Plugin Watcher Product Manager: Tushar Katarki
  • 47.
    3-6 months node-feature-discovery Operator GPU Operator(pod startup ordering, driver, device plugin) OpenShift for DGX Documentation NVIDIA OPENSHIFT ROADMAP 6 months plus Priority/Preemption Taints/Tolerations MachineDeployment Backlog RBAC Quota Monitoring (Grafana) More Nvidia Gpu Cloud (NGC) containers support NGC containers with UBI NGC containers in RHCC Registry Product Manager: Tushar Katarki
  • 48.
  • 49.
    SECURITY FEATURE ROADMAP DEFENSEIN DEPTH - Control, Defend, Extend Trusted Container Content Quay Registry with Image Scanning CI/CD Pipeline ImageStreams Security Ecosystem Container Host Multi-tenancy / Container Optimized Immutable OS Built-In IAM Secrets Management Deployment Policies (SCCs) Audit & Logging Network Policy & Isolation API Management Linux Host Security - RHCOS minimal, immutable OS - RHCOS updates managed and delivered as integrated part of the OpenShift platform Authentication & Authorization - Integration with external Keycloak - Use group membership from external IPs Secrets & Certificates - Encrypted certs stored in etcd (4.0) - Improved cert management and Integration with external CAs via ACME - Integration with external Key Management Systems Integrated Audit & Logging - East / West traffic tracing with OpenShift Service Mesh Network Policies - Control service access flow with OpenShift Service Mesh Networking Isolation - East / West mutual TLS authentication with OpenShift Service Mesh - Multus to isolate control plane / data plane (4.0) Image Security - Clair v3 covers more content Product Manager: Kirsten Newcomer
  • 50.
    Metadata Provider • EmbeddedMarketplace for content governance • Policy Management via UI • Policy Enforcement • Vulnerability Dashboards • Notifications / Alerting • Content ingress & federation • Single source of truth for deployment artifacts • Metadata repository • Signatures & attestations • Event triggers / notifications • Provenance data for content inside images / applications • Provide Metadata (attestations) to Quay • Integrated in CI/CD pipeline automation AN UPDATE ON POLICY Product Manager: Dirk Herrmann
  • 51.
    CONTAINER-NATIVE VIRTUALIZATION ● CNV1.3 Tech Preview (now) ● CNV 1.4 Tech Preview (soon) ○ Basic live migration ○ Containerized data importer ■ Progress reporting ■ Disk expansion ■ Blank disks ○ Operators for KubeVirt, Containerized data importer ○ UI Enhancements ■ RDP, Serial, VNC, consoles ■ CRUD Disks, VM templates Product Manager: Steve Gordon
  • 52.