Ramesh Nikam
[Microsoft Certified Professional]
Mobile No.: +1 415 395 6584(C.P.)
nikamramesh@gmail.com / rameshraonikam@icloud.com
Profile :
• Having 12.00 years of core IT Experience in Design, Development, integration and deployments
on Microsoft Technology with integration of different LOB applications with utilized ASP.NET,
ASP.NET MVC, WPF, C# and SQL Server and WS/WCF, Info Path, SharePoint environments
and BI with SSRS, PPS, Excel Service, Visio Service etc. and the relevant core experience in
ASP.NET, C# with PL/SQL and SharePoint.
• Well versed in principles of organizational development, team facilitation, group process,
leadership development and ability to analyze situation and offer innovative cost effective
solutions.
• Accustomed to work in a team environment with tight schedules and capable of working
effectively under pressure.
• Capable of adapting to work on new system & environment easily and well versed with SDLC
Concepts.
• Working in Agile-Scrum development methodology from last 9+ years.
• Presently working in First Republic Banking client side as Lead Developer cum Consultant on
ASP.NET, C#, WCF, SharePoint 2010/2013, SPD, BI with requirement gathering, Analysis,
design, Developments, deployment and support.
SharePoint Certifications: [Microsoft Certified Professional and Technical Specialist]
1. Certification Name Microsoft SharePoint 2010, Application Development
2. Certification Name Microsoft SharePoint 2010, PRO: Application Design & Development
3. Certification Name : Microsoft Office SharePoint Server 2007 - Application Development
4. Certification Name : Windows SharePoint Services 3.0 - Application Development
Hardware and Software Environment:
Operating Systems : Windows2000/XP, Windows2003, 2008, 2010
Primary Skill Sets : C#, ASP.NET, Silverlight, JavaScript, SharePoint.
Secondary Skill Sets : OOAD (Object Oriented Analysis and Design), XML.
Web Servers : IIS 6.0/7.0
RDBMS : SQL Server 2000/2005/2008/2010
Utility Tools : TFS/CVS/VSS, Microsoft Visio.
Environment : Windows 2003/2008/XP, Linux
Portal Tools : SharePoint 2007/2010/2013
Services Frameworks : Asp.net, Web Service, WCF
Business Domains : Investment Bankimg, Insurance Services, Airline Services,
E-Learning and knowledge Management
BPM Tools : K2 Designer, K2 Studio, Nintex basic etc.
Education Qualification :
Page 1 of 8
M. Sc. In Computer Science from Dr. BAM University, Maharashtra, India with average Marks 61.43% (First Class)
in M/A-2003.
B. Sc. In Computer Science from Dr. BAM University, Maharashtra, India with average Marks 65.85% (First Class)
in M/A-2000
PROFESSIONAL EXPERIENCE
Project Experience Highlights:
Project #1
--------------------------------------------------------------------------------------------------------------
Project Title : EagleSpace Portal Applications
Client : First Republic Bank, SF, USA
Role : Lead Developer cum Consultant
Technology : C#, ASP.NET, SQL Server, SSRS, SharePoint 2010/2013
Environment : Windows 2008 Server.
Duration : 16-Sept-2015 to till Date.
Synopsis : Collaborations, Social networking, banking with document
management, Content management, workflow, custom web parts, List and libraries customization and
site definitions, all kind features development including to achieve all bankers daily document flow,
maintaining , loan, investment automations etc.
Roles and Responsibilities:
Leading 7 people’s team with part of planning, design, configuration, testing and implementation of
SharePoint Server 2013 and migration of SharePoint 2010 to SharePoint 2013 solutions, Use SharePoint
Designer; Implement master pages, views, templates and other custom components. Develop workflows
leveraging the functionality. Use Visual studio and SharePoint designer for custom workflows.
Project #2
--------------------------------------------------------------------------------------------------------------
Project Title : APAC IT OPC Risk Management Portal
Client : BNP Paribas (CIB), Singapore
Role : Sr. Developer cum Consultant
Technology : C#, ASP.NET, SQL Server, SSRS, SharePoint 2010/2013
Environment : Windows 2008 Server.
Duration : 08-Sept-2014 to 31-Aug-2015.
Synopsis : Risk register operation process in CIB-BNPP banking to collect and
fallow risk mitigation and acceptance process, this process include entering data about all risk
identified and fallow same. Documents processing workflow for banking operation document regarding
to Risk, Recommendation and without recommendation operation documents, record management with
document and record retention policy implementation and backup plan for same. Involved auto
document route to depart ted related to risk and Reco, WFR etc. to particular document library and
list and Its include 2 major process workflow for risk mitigation and risk acceptance. There is many
data lists which acts as master list for risk register include Risk Owner table, IT risk mapping analysis
table, default processing table, IT family , Basel level type event master, Basel 1,2 & 3 level entries
masters, Reference event types and issue assignee user details. For Item approval automation
workflow we used SharePoint Custom application Page with creating framework for workflow handle
through List events and custom application page action to achieve automation of approval process for
different list items using SharePoint Time Job API.
Page 2 of 8
Roles and Responsibilities:
Involved in Planning, design, configuration, testing and implementation of SharePoint Server 2013 and
migration of SharePoint 2010 to SharePoint 2013 solutions, performed typical administrative activities
such as site creation, manage/monitor user permission, and backup/restore sites. Provide User issues
resolution and Production support.
Project #3
--------------------------------------------------------------------------------------------------------------
Project Title : ISIS Asset Management Intranet Site, WeShare Collaboration Portal
Client : BNP Paribas (WMIT), Singapore
Role : Sr. Developer cum Consultant
Technology : C#, ASP.NET, SQL Server, SharePoint 2010/2013
Environment : Windows 2008 Server.
Duration : 24-June-2013 to 05-Sept-2014
Synopsis :
Implement a Document Management tool, in order to allow the publishing and sharing of WMIS
documents related to projects and generated from different countries. Reduce exchange of mails and
the overloading of mail boxes. Secure documents from deletion. BNP Paribas, Created Intranet
SharePoint based site for their internal asset management and document process, the mail
functionality involved as Asset and internal project document process with document process workflow
and task assignment to create banking importance documents, maintain document by document sets
and a lot type of content associated with same, include AD, And LDAP user for same to access
SharePoint through form based authentication and group wise authorization maintained.
Core Development in ASP.Net, C#, user control and common utility framework for Exception handling,
Common, Web Parts, Common content types, Classes etc.
Roles and Responsibilities: working as Analysis, designer, Developer to responsible for all stages of
project completion include requirement gathering, analysis, development, testing deployments with
production support and enhancement for same.
Custom development.
Project #4
--------------------------------------------------------------------------------------------------------------
Project Title : Videology Group (US)
Role : Sr. Developer cum Technical lead
Technology : SharePoint 2010, Office-365, C#, SQL Server
Environment : Windows 2008 Server.
Duration : 30-May.2012 to 21-June-2013
Synopsis :
Videology Inc. had web base advertising business and they have there in house software development
which has its own SharePoint portal for team collaboration and Other common documents processing,
they are also have advertisement sites which showing daily adds which business to deal different kind
of adds. The SharePoint used for internal team collaboration, blogs, and core web part developments
etc. and also we are doing enhancement on the portal which will use SharePoint features product
Office 365 which is has a Team sites hosted on Microsoft environment servers.
Roles and Responsibilities in Delivery Project:
Used SharePoint Intranet site for internal collaboration and core web part developments, content
types, document management, different news and article display on team sites and also the videology
client using portal will use SharePoint features product Office 365 which is has a Team sites hosted on
Microsoft environment servers. So responsibilities to resolved performance issue with enhancement to
Page 3 of 8
develop web parts implement security for same and guide to other project team for other SharePoint
2010 developments.
Project #5
--------------------------------------------------------------------------------------------------------------
Project Title : Abbott Laboratories (US)
Role : Sr. Developer cum Tech Lead
Technology : SharePoint2010, C#, WCF, BCS
Environment : Windows 2008 Server.
Duration : 01-Mar.2012 to 25-May.2012
Synopsis :
Abbott’s Human Resources department is in the process of leveraging the SharePoint 2010 platform
across the organization. The Abbott myHR SharePoint Portal has already been built and deployed. On
top of this the Abbott myHR integration with Payroll and mainframe has also been built and deployed.
This document will provide the basis for the Technical Specification for the SharePoint 2010 myHR
integration with Payroll, which provides additional functionalities to the myHR SharePoint Portal.
Roles and Responsibilities:
This portal will use SharePoint features such as Business Connectivity Service and Web Parts. Business
Connectivity Service (BCS) feature of SharePoint 2010 will be used to invoke the Windows
Communication Framework (WCF) service. WCF service will use ODP.Net Oracle client component to
execute the oracle package to get the pay check and pay check details.
Project #6
--------------------------------------------------------------------------------------------------------------
Project Title : EMEA, JPMC (UK)
Role : Sr. Developer
Technology : Lotus Note, C#, ASP.NET, SharePoint2010, SPD2010, SQL Server2008,
Environment : Windows 2008 Server.
Duration : 17-Oct.2011to 28-Feb.2012
Synopsis :
The Lotus Note application database has the purpose to collect under a unique archive all the standard
operating procedures that are in use. Any procedure can be input by all JPMorgan users who are
identified as the composer.
The file takes the Draft status, and consequently a mail of notification is automatically sent to the
person who is in charge of the approving process for the department which the procedure belongs to.
After being approved, the procedure assumes the Published status, and in the mean time a notification
mail informs the issue to both the Application Guardians and the users of the department which the
procedure belongs to as well as the members of eventual other departments intended to read it.
Roles and Responsibilities:
Involved in Planning, design, configuration, development, testing of SharePoint Server 2010 solutions.
Specially working on Client object model in ECMAScript in SharePoint designer 2010 with list and library
with site collection and deploying as sandbox solution for Office 365 and farm for other projects.
Project #7
----------------------------------------------------------------------------------------------------------
Project Title : Sanoma Intranet Portal (Finland)
Role : Sr. Developer
Technology : SharePoint2010 (Foundation and server), C#, ASP.NET
Environment : Window 2008 Server
Duration : April-2011 to 14-Oct.2011
Page 4 of 8
Synopsis :
Business Intelligence section will contain main document library, second document library for limited
access documents and one link list. The document libraries and the link list will have yearly folders for
older items with multiple web part, list, page layouts modules, master pages, site and sub sites
definition, features, events with different functionality associated with its.
Roles and Responsibilities:
Involved in Planning, design, configuration, testing and implementation of SharePoint Server 2010
solutions, Common utilities creation with common validation methods, Designing & develop custom
module for GUI using Visual Web Parts, Standard web parts, coding Using C# code behind, Testing – unit
testing with Visual studio Test Editor, Involved in Code merging Installation Power Shell script creation,
Package and Deployment responsibilities.
Project #8
----------------------------------------------------------------------------------------------------------
Project Title : Lahivakuutus eService (Finland)
Role : Lead Developer
Technology : MOSS2007, C#, ASP.NET WS, SL & Repository patterns
Environment : Window 2008 Server, Window XP
Duration : Mar-2010 to Mar-2011.
Synopsis :
Lahivakuutus eService is the Local Insurance Group’s new indemnity insurance online service solution
for authenticated users, designed to replace the old online service for authenticated users. The
implementation of eService is part of the online service development program based on the Local
Insurance Group's strategy.
Roles and Responsibilities:
Involved in required clarification and analysis and design with task estimations,
Involved in Architecture design pattern for Web Service consume and expose through specific patterns,
Common utilities creation with common validation methods, Designing of GUI using Visual Web Parts,
Standard web parts, coding Using C# code behind, Web Service: Proxy creation stuff with Web Service,
SOAPUI (for testing the Web services), Testing – unit testing with Visual studio Test Editor, Code
merging and Deployment responsibilities.
Project #9
----------------------------------------------------------------------------------------------------------
Project Title : ResGui, Airline Services (USA)
Role : Sr. Developer
Technology : MOSS2007, Silver light, WCF, C#, ASP.NET
Environment : Window 2003 Server, Window XP
Duration : Aug-2008 to Feb.2010.
Synopsis :
Working on Airline Service Domain with ResGui Airline portal with MOSS2007 & ResGui Airline project in
Silverlight, C#, ASP.NET and WCF.
In ResGui Airline portal have implemented feature are BDC for getting data from web services and
Database, Configure User profiles with AD, this internet portal to give airline services detail
collaboration to different vendor like US Airway, Continental Airline etc. and inter Product
collaboration with Intranet portal of ResGui resource managements. And another RESGUI (Reservation
GUI) is the front-end graphical user interface for EDS Airline Reservations systems SHARES and AxsRes.
RESGUI provides a process based front end solution supporting Airline Res / Call centers, City ticket
Office (CTO), Airport Ticketing, Check In, Boarding, Special Services and Curb side roles. RESGUI
Page 5 of 8
utilizes Airline SOA (Service Oriented Architecture) Web services as the integration platform, bringing
together the capability of the legacy solutions (SHARES and AxsRes) with Ticket Reissue and Refund,
Seat Map, and EDM solution. This front end solution can be customized easily reflecting the clients
branding preferences. Apart from the front end solutions RESGUI creates the overall framework for
future development of booking engines, self service kiosks and other related services.
RESGUI is developed using EDS Airline Service Oriented Architecture (SOA). It has multilayer
architecture.
Roles and Responsibilities: Working with MOSS2007 sites with storing multilingual resource in
SharePoint List, Create template for list to reuses for new list creations, Created custom web part to
show Airline business data, Created SharePoint Designer WF for internal document approval process
and Permission Management, Site Collection Administration, Developing customized solutions and
enhancements for Blogs, Wikis and Document Management built, creation custom WF action for SPD
WF, BDC web part works with web services, POC with excel services & Info path forms. Designing of
GUI using Silver Light, coding Using C# code behind. Web Service: Proxy creation stuff with WCF and
EDS Airline SOA environment. SOAPUI (for testing the Web services), Isolated storage with Silver light,
Microsoft Enterprise Library 3.1 Application Blocks, Validation Caching, Testing – unit testing with Visual
studio Test Editor, NUnit.
Project #10
--------------------------------------------------------------------------------------------------------------
Project Title : SharePoint Competency Group
Role : Sr. Developer
Technology : C#, ASP.NET, WSS3.0/MOSS2007 and MS-SQL2005
Environment : Windows 2003 Server.
Duration : Dec-2007 to July.2008.
Synopsis : Working on the WSS3.0/SharePoint 2007 to explore various features
supported by the product.
POC Name : CBR Custom Workflow Activity
POC Name : User Personalization Mashup
MOSS2007 Feature : 1. Creating Custom Web Parts, Sites template, Sites Features.
2. Activate Feature to changes Master Page, Style sheet of sites. 3. Pages and site Branding, Defining
site columns, custom field types and content types, provisioning document libraries using a feature.
4. Defining a custom list type using a feature creating event handlers using custom event
Receiver classes.
Project #11
----------------------------------------------------------------------------------------------------------------------------
Project Title : Uchida Spectrum Inc. (Japan)
Role : Sr. Developer
Technology : C#2.0, ASP.NET2.0, WSS3.0, SQL Server 2005
Client : Uchida Spectrum Inc. Japan
Environment : Windows 2003 Server.
Duration : Dec-2006 to Nov.2007
Project Description :
The Uchida client have the business product of Knowledge management which used for searching
documents on the basis of string tags, the company situated in Japan which has business of software
service and solution. Its having many vendors who already purchase much of the software from uchida
client like a client Hero Honda and other which actual used this product for Knowledge managements
i.e. for searching and tagging documents for further search. These product content different types of
web parts with user control like search web parts, Query construction web parts, Search Results,
Page 6 of 8
Metadata Managements, List Search, List Tree etc are used by sites to navigate and find resource
documents which feed by FAST server. The main Search engine used as FAST Search.
Roles and Responsibilities:
Project Phase I: Migration User Controls from .Net1.1 to .Net2.0 versions. Migration Web Parts .Net1.1
to .Net2.0 versions. Migration of sites feature of WSS2.0 to WSS3.0 Project Phase II: Create analysis,
Design and System requirements specification documents for web Parts with user controls. Coding using
C#, ASP.NET and ADO.NET and SharePoint Object Model. Testing: Peer Testing and Unit Testing.
Project #12
----------------------------------------------------------------------------------------------------------------------------
Project Title : E-Learning System (ver.1.0) (USA)
Role : Software Engineer
Technology : ASP.NET, C#, MS-SQL SERVER
Client : Plato Learning, USA
Environment : Windows XP
Duration : Dec-2005 to Nov.2006
Project Description :
PLATO Teaching and Learning Enterprise (PTLE) provides a unified software platform that efficiently
manages every activity that impacts student achievement and increases staff productivity by
integrating innovative functionality in the critical areas of planning, instruction, assessment, data
management, reporting, and communication. It provides flexible tools that allow districts to implement
their own improvement initiatives while demonstrating accountability to local stakeholders and state
or national mandates for school, institutions etc. It consists of following modules.
1) Account Management 2) User group Managements 3) Course Management 4) Resource Management 5)
Licensing.
Roles and Responsibilities:
Design of GUI Using HTML, ASP.NET, and Style sheet Class, Database SP, Coding Using C# code behind,
Testing – unit testing with functional requirement. A) Account Management: In this module I have
worked on pages search account, add Courseware (Name User License), Remove Courseware, Edit
Courseware. B) Licensing Module: In this module I have working on pages Transfer License, Give
New License/ Give New multiple License, Remove License.
Project #13
------------------------------------------------------------------------------------------------------------------------------
Project Title : Enterprise Resource planning (India)
Role : Programmer
Technology : C#.NET, VB.NET, SQL Server
Client : Bellite Spring Pvt. Ltd.
Environment : Windows XP/Windows2000
Duration : Jan-2004 to Nov.2005
Project Description :
ERP mainly deals with the complete automation of factory. The project Module I has Matter Data Entry(
Purchase Product, Sale Product, Supplier Info, Customer Info) & Details of Transaction(Purchase
Orders, Sales orders, Inward , Outward of goods, invoice). It mainly consists of Administration,
Purchase, Stores, Sales, Shipping, Production, and Quality Module. It also contains the Reports section
to generate reports in various modules.
Roles and Responsibilities: Understand client’s requirement creating store procedure for Transactional
forms, Master forms and reports, Creating User Interface using HTML, ASP.NET, style Sheet Class,
Coding using C# with business logic in business layer & access data using data layer and populate data
in Business entity files.
Page 7 of 8
Personal Details
Name : Ramesh Uttam Nikam
Name as roll in passport : Rameshrao Uttam Nikam
Employment History:
• Currently working as a Lead Developer cum Consultant, Mphasis Corporation, USA, from 16-Sept-
2015 to till date.
• Worked as a SharePoint Consultant in Mphasis Pte. Ltd., Singapore from 24-Jun-2013 to 31-Aug-2015.
• Worked as a Technical Architect in Mphasis Limited, from 17-Oct-2011 to 23-June-2013.
• Worked as a Sr. Software Engineer in Tieto Software Services Pvt. Ltd., from 12-Mar-2010 to 14-Oct-
2011.
• Worked as a Sr. Software Engineer in MphasiS Software & Services Pvt. Ltd., from 01-Dec-2006 to 09-
Mar-2010.
• Worked as a Software Engineer in Praxis Interactive Technologies Pvt. Ltd., from 12-Dec-2005 to 30-
Nov-2006.
• Worked as a Programmer in Bellite Spring Pvt. Ltd. , from 01-Jan.2004 to 28-Nov-2005
Primary Skills : C#, ASP.NET, Silverlight, JavaScript, SharePoint
Secondary Skills : OOAD (Object Oriented Analysis and Design), XML
Page 8 of 8

Rameshrao nikam

  • 1.
    Ramesh Nikam [Microsoft CertifiedProfessional] Mobile No.: +1 415 395 6584(C.P.) nikamramesh@gmail.com / rameshraonikam@icloud.com Profile : • Having 12.00 years of core IT Experience in Design, Development, integration and deployments on Microsoft Technology with integration of different LOB applications with utilized ASP.NET, ASP.NET MVC, WPF, C# and SQL Server and WS/WCF, Info Path, SharePoint environments and BI with SSRS, PPS, Excel Service, Visio Service etc. and the relevant core experience in ASP.NET, C# with PL/SQL and SharePoint. • Well versed in principles of organizational development, team facilitation, group process, leadership development and ability to analyze situation and offer innovative cost effective solutions. • Accustomed to work in a team environment with tight schedules and capable of working effectively under pressure. • Capable of adapting to work on new system & environment easily and well versed with SDLC Concepts. • Working in Agile-Scrum development methodology from last 9+ years. • Presently working in First Republic Banking client side as Lead Developer cum Consultant on ASP.NET, C#, WCF, SharePoint 2010/2013, SPD, BI with requirement gathering, Analysis, design, Developments, deployment and support. SharePoint Certifications: [Microsoft Certified Professional and Technical Specialist] 1. Certification Name Microsoft SharePoint 2010, Application Development 2. Certification Name Microsoft SharePoint 2010, PRO: Application Design & Development 3. Certification Name : Microsoft Office SharePoint Server 2007 - Application Development 4. Certification Name : Windows SharePoint Services 3.0 - Application Development Hardware and Software Environment: Operating Systems : Windows2000/XP, Windows2003, 2008, 2010 Primary Skill Sets : C#, ASP.NET, Silverlight, JavaScript, SharePoint. Secondary Skill Sets : OOAD (Object Oriented Analysis and Design), XML. Web Servers : IIS 6.0/7.0 RDBMS : SQL Server 2000/2005/2008/2010 Utility Tools : TFS/CVS/VSS, Microsoft Visio. Environment : Windows 2003/2008/XP, Linux Portal Tools : SharePoint 2007/2010/2013 Services Frameworks : Asp.net, Web Service, WCF Business Domains : Investment Bankimg, Insurance Services, Airline Services, E-Learning and knowledge Management BPM Tools : K2 Designer, K2 Studio, Nintex basic etc. Education Qualification : Page 1 of 8
  • 2.
    M. Sc. InComputer Science from Dr. BAM University, Maharashtra, India with average Marks 61.43% (First Class) in M/A-2003. B. Sc. In Computer Science from Dr. BAM University, Maharashtra, India with average Marks 65.85% (First Class) in M/A-2000 PROFESSIONAL EXPERIENCE Project Experience Highlights: Project #1 -------------------------------------------------------------------------------------------------------------- Project Title : EagleSpace Portal Applications Client : First Republic Bank, SF, USA Role : Lead Developer cum Consultant Technology : C#, ASP.NET, SQL Server, SSRS, SharePoint 2010/2013 Environment : Windows 2008 Server. Duration : 16-Sept-2015 to till Date. Synopsis : Collaborations, Social networking, banking with document management, Content management, workflow, custom web parts, List and libraries customization and site definitions, all kind features development including to achieve all bankers daily document flow, maintaining , loan, investment automations etc. Roles and Responsibilities: Leading 7 people’s team with part of planning, design, configuration, testing and implementation of SharePoint Server 2013 and migration of SharePoint 2010 to SharePoint 2013 solutions, Use SharePoint Designer; Implement master pages, views, templates and other custom components. Develop workflows leveraging the functionality. Use Visual studio and SharePoint designer for custom workflows. Project #2 -------------------------------------------------------------------------------------------------------------- Project Title : APAC IT OPC Risk Management Portal Client : BNP Paribas (CIB), Singapore Role : Sr. Developer cum Consultant Technology : C#, ASP.NET, SQL Server, SSRS, SharePoint 2010/2013 Environment : Windows 2008 Server. Duration : 08-Sept-2014 to 31-Aug-2015. Synopsis : Risk register operation process in CIB-BNPP banking to collect and fallow risk mitigation and acceptance process, this process include entering data about all risk identified and fallow same. Documents processing workflow for banking operation document regarding to Risk, Recommendation and without recommendation operation documents, record management with document and record retention policy implementation and backup plan for same. Involved auto document route to depart ted related to risk and Reco, WFR etc. to particular document library and list and Its include 2 major process workflow for risk mitigation and risk acceptance. There is many data lists which acts as master list for risk register include Risk Owner table, IT risk mapping analysis table, default processing table, IT family , Basel level type event master, Basel 1,2 & 3 level entries masters, Reference event types and issue assignee user details. For Item approval automation workflow we used SharePoint Custom application Page with creating framework for workflow handle through List events and custom application page action to achieve automation of approval process for different list items using SharePoint Time Job API. Page 2 of 8
  • 3.
    Roles and Responsibilities: Involvedin Planning, design, configuration, testing and implementation of SharePoint Server 2013 and migration of SharePoint 2010 to SharePoint 2013 solutions, performed typical administrative activities such as site creation, manage/monitor user permission, and backup/restore sites. Provide User issues resolution and Production support. Project #3 -------------------------------------------------------------------------------------------------------------- Project Title : ISIS Asset Management Intranet Site, WeShare Collaboration Portal Client : BNP Paribas (WMIT), Singapore Role : Sr. Developer cum Consultant Technology : C#, ASP.NET, SQL Server, SharePoint 2010/2013 Environment : Windows 2008 Server. Duration : 24-June-2013 to 05-Sept-2014 Synopsis : Implement a Document Management tool, in order to allow the publishing and sharing of WMIS documents related to projects and generated from different countries. Reduce exchange of mails and the overloading of mail boxes. Secure documents from deletion. BNP Paribas, Created Intranet SharePoint based site for their internal asset management and document process, the mail functionality involved as Asset and internal project document process with document process workflow and task assignment to create banking importance documents, maintain document by document sets and a lot type of content associated with same, include AD, And LDAP user for same to access SharePoint through form based authentication and group wise authorization maintained. Core Development in ASP.Net, C#, user control and common utility framework for Exception handling, Common, Web Parts, Common content types, Classes etc. Roles and Responsibilities: working as Analysis, designer, Developer to responsible for all stages of project completion include requirement gathering, analysis, development, testing deployments with production support and enhancement for same. Custom development. Project #4 -------------------------------------------------------------------------------------------------------------- Project Title : Videology Group (US) Role : Sr. Developer cum Technical lead Technology : SharePoint 2010, Office-365, C#, SQL Server Environment : Windows 2008 Server. Duration : 30-May.2012 to 21-June-2013 Synopsis : Videology Inc. had web base advertising business and they have there in house software development which has its own SharePoint portal for team collaboration and Other common documents processing, they are also have advertisement sites which showing daily adds which business to deal different kind of adds. The SharePoint used for internal team collaboration, blogs, and core web part developments etc. and also we are doing enhancement on the portal which will use SharePoint features product Office 365 which is has a Team sites hosted on Microsoft environment servers. Roles and Responsibilities in Delivery Project: Used SharePoint Intranet site for internal collaboration and core web part developments, content types, document management, different news and article display on team sites and also the videology client using portal will use SharePoint features product Office 365 which is has a Team sites hosted on Microsoft environment servers. So responsibilities to resolved performance issue with enhancement to Page 3 of 8
  • 4.
    develop web partsimplement security for same and guide to other project team for other SharePoint 2010 developments. Project #5 -------------------------------------------------------------------------------------------------------------- Project Title : Abbott Laboratories (US) Role : Sr. Developer cum Tech Lead Technology : SharePoint2010, C#, WCF, BCS Environment : Windows 2008 Server. Duration : 01-Mar.2012 to 25-May.2012 Synopsis : Abbott’s Human Resources department is in the process of leveraging the SharePoint 2010 platform across the organization. The Abbott myHR SharePoint Portal has already been built and deployed. On top of this the Abbott myHR integration with Payroll and mainframe has also been built and deployed. This document will provide the basis for the Technical Specification for the SharePoint 2010 myHR integration with Payroll, which provides additional functionalities to the myHR SharePoint Portal. Roles and Responsibilities: This portal will use SharePoint features such as Business Connectivity Service and Web Parts. Business Connectivity Service (BCS) feature of SharePoint 2010 will be used to invoke the Windows Communication Framework (WCF) service. WCF service will use ODP.Net Oracle client component to execute the oracle package to get the pay check and pay check details. Project #6 -------------------------------------------------------------------------------------------------------------- Project Title : EMEA, JPMC (UK) Role : Sr. Developer Technology : Lotus Note, C#, ASP.NET, SharePoint2010, SPD2010, SQL Server2008, Environment : Windows 2008 Server. Duration : 17-Oct.2011to 28-Feb.2012 Synopsis : The Lotus Note application database has the purpose to collect under a unique archive all the standard operating procedures that are in use. Any procedure can be input by all JPMorgan users who are identified as the composer. The file takes the Draft status, and consequently a mail of notification is automatically sent to the person who is in charge of the approving process for the department which the procedure belongs to. After being approved, the procedure assumes the Published status, and in the mean time a notification mail informs the issue to both the Application Guardians and the users of the department which the procedure belongs to as well as the members of eventual other departments intended to read it. Roles and Responsibilities: Involved in Planning, design, configuration, development, testing of SharePoint Server 2010 solutions. Specially working on Client object model in ECMAScript in SharePoint designer 2010 with list and library with site collection and deploying as sandbox solution for Office 365 and farm for other projects. Project #7 ---------------------------------------------------------------------------------------------------------- Project Title : Sanoma Intranet Portal (Finland) Role : Sr. Developer Technology : SharePoint2010 (Foundation and server), C#, ASP.NET Environment : Window 2008 Server Duration : April-2011 to 14-Oct.2011 Page 4 of 8
  • 5.
    Synopsis : Business Intelligencesection will contain main document library, second document library for limited access documents and one link list. The document libraries and the link list will have yearly folders for older items with multiple web part, list, page layouts modules, master pages, site and sub sites definition, features, events with different functionality associated with its. Roles and Responsibilities: Involved in Planning, design, configuration, testing and implementation of SharePoint Server 2010 solutions, Common utilities creation with common validation methods, Designing & develop custom module for GUI using Visual Web Parts, Standard web parts, coding Using C# code behind, Testing – unit testing with Visual studio Test Editor, Involved in Code merging Installation Power Shell script creation, Package and Deployment responsibilities. Project #8 ---------------------------------------------------------------------------------------------------------- Project Title : Lahivakuutus eService (Finland) Role : Lead Developer Technology : MOSS2007, C#, ASP.NET WS, SL & Repository patterns Environment : Window 2008 Server, Window XP Duration : Mar-2010 to Mar-2011. Synopsis : Lahivakuutus eService is the Local Insurance Group’s new indemnity insurance online service solution for authenticated users, designed to replace the old online service for authenticated users. The implementation of eService is part of the online service development program based on the Local Insurance Group's strategy. Roles and Responsibilities: Involved in required clarification and analysis and design with task estimations, Involved in Architecture design pattern for Web Service consume and expose through specific patterns, Common utilities creation with common validation methods, Designing of GUI using Visual Web Parts, Standard web parts, coding Using C# code behind, Web Service: Proxy creation stuff with Web Service, SOAPUI (for testing the Web services), Testing – unit testing with Visual studio Test Editor, Code merging and Deployment responsibilities. Project #9 ---------------------------------------------------------------------------------------------------------- Project Title : ResGui, Airline Services (USA) Role : Sr. Developer Technology : MOSS2007, Silver light, WCF, C#, ASP.NET Environment : Window 2003 Server, Window XP Duration : Aug-2008 to Feb.2010. Synopsis : Working on Airline Service Domain with ResGui Airline portal with MOSS2007 & ResGui Airline project in Silverlight, C#, ASP.NET and WCF. In ResGui Airline portal have implemented feature are BDC for getting data from web services and Database, Configure User profiles with AD, this internet portal to give airline services detail collaboration to different vendor like US Airway, Continental Airline etc. and inter Product collaboration with Intranet portal of ResGui resource managements. And another RESGUI (Reservation GUI) is the front-end graphical user interface for EDS Airline Reservations systems SHARES and AxsRes. RESGUI provides a process based front end solution supporting Airline Res / Call centers, City ticket Office (CTO), Airport Ticketing, Check In, Boarding, Special Services and Curb side roles. RESGUI Page 5 of 8
  • 6.
    utilizes Airline SOA(Service Oriented Architecture) Web services as the integration platform, bringing together the capability of the legacy solutions (SHARES and AxsRes) with Ticket Reissue and Refund, Seat Map, and EDM solution. This front end solution can be customized easily reflecting the clients branding preferences. Apart from the front end solutions RESGUI creates the overall framework for future development of booking engines, self service kiosks and other related services. RESGUI is developed using EDS Airline Service Oriented Architecture (SOA). It has multilayer architecture. Roles and Responsibilities: Working with MOSS2007 sites with storing multilingual resource in SharePoint List, Create template for list to reuses for new list creations, Created custom web part to show Airline business data, Created SharePoint Designer WF for internal document approval process and Permission Management, Site Collection Administration, Developing customized solutions and enhancements for Blogs, Wikis and Document Management built, creation custom WF action for SPD WF, BDC web part works with web services, POC with excel services & Info path forms. Designing of GUI using Silver Light, coding Using C# code behind. Web Service: Proxy creation stuff with WCF and EDS Airline SOA environment. SOAPUI (for testing the Web services), Isolated storage with Silver light, Microsoft Enterprise Library 3.1 Application Blocks, Validation Caching, Testing – unit testing with Visual studio Test Editor, NUnit. Project #10 -------------------------------------------------------------------------------------------------------------- Project Title : SharePoint Competency Group Role : Sr. Developer Technology : C#, ASP.NET, WSS3.0/MOSS2007 and MS-SQL2005 Environment : Windows 2003 Server. Duration : Dec-2007 to July.2008. Synopsis : Working on the WSS3.0/SharePoint 2007 to explore various features supported by the product. POC Name : CBR Custom Workflow Activity POC Name : User Personalization Mashup MOSS2007 Feature : 1. Creating Custom Web Parts, Sites template, Sites Features. 2. Activate Feature to changes Master Page, Style sheet of sites. 3. Pages and site Branding, Defining site columns, custom field types and content types, provisioning document libraries using a feature. 4. Defining a custom list type using a feature creating event handlers using custom event Receiver classes. Project #11 ---------------------------------------------------------------------------------------------------------------------------- Project Title : Uchida Spectrum Inc. (Japan) Role : Sr. Developer Technology : C#2.0, ASP.NET2.0, WSS3.0, SQL Server 2005 Client : Uchida Spectrum Inc. Japan Environment : Windows 2003 Server. Duration : Dec-2006 to Nov.2007 Project Description : The Uchida client have the business product of Knowledge management which used for searching documents on the basis of string tags, the company situated in Japan which has business of software service and solution. Its having many vendors who already purchase much of the software from uchida client like a client Hero Honda and other which actual used this product for Knowledge managements i.e. for searching and tagging documents for further search. These product content different types of web parts with user control like search web parts, Query construction web parts, Search Results, Page 6 of 8
  • 7.
    Metadata Managements, ListSearch, List Tree etc are used by sites to navigate and find resource documents which feed by FAST server. The main Search engine used as FAST Search. Roles and Responsibilities: Project Phase I: Migration User Controls from .Net1.1 to .Net2.0 versions. Migration Web Parts .Net1.1 to .Net2.0 versions. Migration of sites feature of WSS2.0 to WSS3.0 Project Phase II: Create analysis, Design and System requirements specification documents for web Parts with user controls. Coding using C#, ASP.NET and ADO.NET and SharePoint Object Model. Testing: Peer Testing and Unit Testing. Project #12 ---------------------------------------------------------------------------------------------------------------------------- Project Title : E-Learning System (ver.1.0) (USA) Role : Software Engineer Technology : ASP.NET, C#, MS-SQL SERVER Client : Plato Learning, USA Environment : Windows XP Duration : Dec-2005 to Nov.2006 Project Description : PLATO Teaching and Learning Enterprise (PTLE) provides a unified software platform that efficiently manages every activity that impacts student achievement and increases staff productivity by integrating innovative functionality in the critical areas of planning, instruction, assessment, data management, reporting, and communication. It provides flexible tools that allow districts to implement their own improvement initiatives while demonstrating accountability to local stakeholders and state or national mandates for school, institutions etc. It consists of following modules. 1) Account Management 2) User group Managements 3) Course Management 4) Resource Management 5) Licensing. Roles and Responsibilities: Design of GUI Using HTML, ASP.NET, and Style sheet Class, Database SP, Coding Using C# code behind, Testing – unit testing with functional requirement. A) Account Management: In this module I have worked on pages search account, add Courseware (Name User License), Remove Courseware, Edit Courseware. B) Licensing Module: In this module I have working on pages Transfer License, Give New License/ Give New multiple License, Remove License. Project #13 ------------------------------------------------------------------------------------------------------------------------------ Project Title : Enterprise Resource planning (India) Role : Programmer Technology : C#.NET, VB.NET, SQL Server Client : Bellite Spring Pvt. Ltd. Environment : Windows XP/Windows2000 Duration : Jan-2004 to Nov.2005 Project Description : ERP mainly deals with the complete automation of factory. The project Module I has Matter Data Entry( Purchase Product, Sale Product, Supplier Info, Customer Info) & Details of Transaction(Purchase Orders, Sales orders, Inward , Outward of goods, invoice). It mainly consists of Administration, Purchase, Stores, Sales, Shipping, Production, and Quality Module. It also contains the Reports section to generate reports in various modules. Roles and Responsibilities: Understand client’s requirement creating store procedure for Transactional forms, Master forms and reports, Creating User Interface using HTML, ASP.NET, style Sheet Class, Coding using C# with business logic in business layer & access data using data layer and populate data in Business entity files. Page 7 of 8
  • 8.
    Personal Details Name :Ramesh Uttam Nikam Name as roll in passport : Rameshrao Uttam Nikam Employment History: • Currently working as a Lead Developer cum Consultant, Mphasis Corporation, USA, from 16-Sept- 2015 to till date. • Worked as a SharePoint Consultant in Mphasis Pte. Ltd., Singapore from 24-Jun-2013 to 31-Aug-2015. • Worked as a Technical Architect in Mphasis Limited, from 17-Oct-2011 to 23-June-2013. • Worked as a Sr. Software Engineer in Tieto Software Services Pvt. Ltd., from 12-Mar-2010 to 14-Oct- 2011. • Worked as a Sr. Software Engineer in MphasiS Software & Services Pvt. Ltd., from 01-Dec-2006 to 09- Mar-2010. • Worked as a Software Engineer in Praxis Interactive Technologies Pvt. Ltd., from 12-Dec-2005 to 30- Nov-2006. • Worked as a Programmer in Bellite Spring Pvt. Ltd. , from 01-Jan.2004 to 28-Nov-2005 Primary Skills : C#, ASP.NET, Silverlight, JavaScript, SharePoint Secondary Skills : OOAD (Object Oriented Analysis and Design), XML Page 8 of 8