The document provides an overview of problem solving methods. It discusses brainstorming techniques like electronic, directed, guided, and individual brainstorming. It also covers topics like SWOT analysis, Pareto analysis, and the scientific method. The scientific method is presented as a general problem solving approach that can be applied across various fields through three main ingredients: creative/logical methods, procedural principles/theories, and thinking attributes/skills. Intuition is also discussed as an important part of problem solving and decision making.