9/7/19
1
DOMAIN 3
Stakeholder Engagement
MSc. PMP. Nguyen Thanh Phuoc
phuocnt@gmail.com
Key Topics
• Active Listening
• Agile chartering
• Agile modeling
• Assessing and incorporating
community and stakeholder values
• Brainstorming
• Collaboration (game)
• Communication management
– Face to face (F2F)
– Social media
– Two-way (trustworthy, conversion-
driven
• Conflict resolution (Levels of conflict)
• Definition of DONE
• Workshops
2
• Emotional Intelligence
• Facilitation
• Information radiators
• Knowledge sharing/written
communication
• Negotiation
• Participatory decision model
– Decision Spectrum
– First of five voting
– Simple voting
– Thumbs up/down/sideways
• Personas
• Stakeholder management
• Wireframes
9/7/19
2
Tasks
1. Engage empowered business stakeholders
2. Share information frequency with all stakeholders
3. Form working agreements for participation
4. Assess organizational changes to maintain stakeholder
management
5. Use collaborative decision making and conflict
resolution
6. Establish a shared vision to align stakeholders
7. Maintain a shared understanding of success
8. Provide transparency for better decisions
9. Balance certainty and adaptability for better planning
3
44
Stakeholders
9/7/19
3
[K&S] Taking Care of Stakeholders
• Stakeholder Stewardship versus Stakeholder Management
– Stakeholder stewardship means looking after everyone with a mindset of
serving the team rather than trying to tell people how to do their jobs
• Educating Stakeholders about Agile
• Keep Stakeholders Engaged
• The project team is considered stakeholders in traditional project
management (according to PMBOK Guide) but not in Agile projects
5
[K&S] Taking Care of Stakeholders
• Educating Stakeholders about Agile
– Executives and project sponsors
– Managers
– The development team
– The user community
– Supporting groups
If the project stakeholders are new to agile methods, they may need some basic
education about how agile projects operate to help them understand the approach
that will be used, address any myths about agile, and guide their expectations. This
education should include the goals, values, practices, and benefits of the agile
approach to help them understand why the project will be executed in this manner.
6
9/7/19
4
[K&S] Taking Care of Stakeholders
• Keep Stakeholders Engaged
– One benefit of short iterations is that they prevent stakeholders
from losing interest in the process
– to ensure we will hear about change requests as soon as possible.
– Help us identify potential risks, defects, and issues
– engaging stakeholders in project events is that not all
stakeholders can be handled in the same way
• the ScrumMaster, project manager, or other designated
person needs to use their emotional intelligence and
interpersonal skills to try to understand these stakeholders’
concerns and find a positive way to engage them with the
project
– Another aspect of stakeholder stewardship is establishing a
process for escalating issues that need a high level of authority to
resolve
7
55
StakeholdersManagement
9/7/19
5
Stakeholder Management Process
9
1. identify all the stakeholders periodically (in particular the key
stakeholders who will have a big impact on project success)
2. communicate with selected stakeholders for requirements
and needs gathering
3. enhance stakeholder involvement by active communication
and information sharing
4. as project evolves, the interests of key stakeholders must be
managed actively
5. discuss updated estimates and projections timely and openly
(even in case of bad news) so as to facilitate future planning
6. keep a good relationship with all stakeholders by
disseminating necessary information and collecting feedback
from them
66
Manage StakeholdersExpectations
9/7/19
6
77
StakeholdersClassification
[K&S] Incorporating Stakeholder Values
• Focus on bringing project priorities into alignment with
stakeholder priorities
• Incorporates stakeholder values into a project is by engaging
the product owner in the prioritization of the backlog
• Invite stakeholders to planning meetings and sprint review
12
9/7/19
7
Why the Big Focus on Stakeholders?
• user story workshops,
• participatory decision making,
• collaboration games,
• and frequent discussions of the definition of “done.”
13
Principles of Stakeholder Engagement
1. Get the right stakeholder
2. Cement(Keep) stakeholder involvement
Ex: We could also report on the benefits or issues resulting from the
stakeholders’ involvement
3. Actively manage stakeholder interest
4. Frequency discuss what “done” looks like
5. Show progress and capabilities
6. Candidly discuss estimates and projections
14
9/7/19
8
Establishing a Shared Vision
• some key tools that agile teams
use to establish a shared vision
among all the stakeholders
– agile charters,
– the definition of done,
– workshops,
– modeling,
– wireframes,
– and personas.
15
121
2
Project Charter
ProjectSuccess
9/7/19
9
Establishing a Shared Vision
• [T&T, K&S] Agile Chartering
– project charter is one of the first documents produced for a project
• It describes the project’s goal, purpose, composition, and
approach, and it provides authorization from the sponsor for
the project to proceed
• Agile charters can range from very lightweight worksheets and
barely expanded vision statements to fairly detailed documents
– Agile versus Non-Agile Charters
• The goal of an agile charter is to describe the project at a high
level, gain agreement about the project s W5H attributes (Who,
What, Where, When, Why, and How), and obtain the authority
to proceed
• they typically have less detail than non-agile charters, are
shorter documents, and focus more on how the project will be
run than on exactly what will be built
19
Establishing a Shared Vision
• [T&T, K&S] Agile Chartering
– Developing an Agile Charter (cont.)
Elevator Statement (ELEVATOR PITCH)
20
9/7/19
10
Establishing a Shared Vision
• [T&T, K&S] Agile Chartering
– Elevator Statement (cont.)
21
[T&T] Definition of DONE
• User stories
• Releases
• Final Project Deliverables
22
9/7/19
11
[T&T] Agile Modeling
• Use Case Diagrams
• Data Model
23
[T&T] Agile Modeling
• Use Case Diagrams
• Data Model
• Screen Designs
24
9/7/19
12
[T&T] Wireframes
• Quick mock-up of a product
• Low fidelity prototyping
• Quick and cheap way
25
[T&T] Personas
• Provide an archetypal description of users
• Be grounded in reality
• Be goal-oriented, specific and relevant, generate focus
• not REQUIREMENT but ARGUMENT
26
9/7/19
13
[K&S] Communicating with Stakeholders
[K&S] Communicating with Stakeholders
• Face to Face Communication
– face-to-face communication at a whiteboard has the highest efficiency
28
9/7/19
14
[T&T] Two-Way Communication
29
• the “dispatching”
model traditionally
used in a command
and control approach
• In the collaborative,
two-way
communication style
used on agile
projects
[T&T] Knowledge Sharing
30
• Agile methods also emphasize knowledge sharing by using low-
tech, high-touch tools like cards on a wall to plan and schedule
the project
• to share knowledge amongst the team members, not just
generate lists of work done, work planned, and issues that have
arisen
• to speed the sharing of information that occurs in face- to-face
environments through osmotic communication and tacit
(unwritten) knowledge
• they are high-ceremony ways (iteration review) to share
knowledge
– Customer to Team
– Team to Customer
9/7/19
15
[T&T] Knowledge Sharing
31
[T&T] Information Radiators
32
9/7/19
16
[T&T] Information Radiators
33
Some of the information radiators that are used in Agile
projects are:
1. Burnup charts
2. Burndown charts
3. Kanban or Task Boards
4. Impediment Logs
[T&T] Information Radiators
34
Some of the information radiators that are used in Agile
projects are:
1. Burnup charts
2. Burndown charts
3. Kanban or Task Boards
4. Impediment Logs
9/7/19
17
[T&T] Information Radiators
35
Some of the information radiators that are used in Agile
projects are:
1. Burnup charts
2. Burndown charts
3. Kanban or Task Boards
4. Impediment Logs
[T&T] Social Media
36
9/7/19
18
[T&T] Working Collaboratively
Benefits of this T&T
• Generates wiser decisions
– via shared information
• Promotes problem solving rather than
procedural decision making
• Fosters action by mobilizing shared
resources to get work done
• Builds social capital by building
relationships and understanding
• Fosters ownership of collective problems
by valuing participation and shifting
power downwards
37
Study by Steven Yaffee from the University of Michigan
[T&T] Working Collaboratively
• Green Zone/ Red Zone
– For collaboration to be most effective, we have to assess the groups
openness to working together. Lyssa Adkins recommends using the
“Green Zone, Red Zone” model to diagnose how much support there is
for collaboration.
38
9/7/19
19
[T&T] Working Collaboratively
• Green Zone/ Red Zone
– To promote effective collaboration, agile leaders, coaches, and
facilitators aim to stay in the Green Zone and continuously model
Green Zone behavior. This strengthens and supports Green Zone
thinking and behavior in the other project stakeholders, so that the
group can direct their energy toward working together effectively.
39
[T&T] Workshop
• make workshops more effective:
– Diverse groups reflect a wider range of viewpoints than just
a few experts
– To prevent dominant individuals è the facilitator can use
techniques such as going round-robin style around the
group or generating ideas on sticky notes.
• User story workshop (story writing workshop)
• Reason for conducting user story workshops is to
– Engage the key stakeholders in the design process (ex: UI)
– Can discuss the trade-offs and priorities of the work
– The team will get a better understanding of the
stakeholders’ needs, without jumping directly to possible
solutions
– the business will get a better sense of the costs and options
40
9/7/19
20
[T&T] Brainstorming
• A group tries to rapidly generate a lot
of ideas about a problem or issue
• Agile teams can use this approach to
help identify options, solve issues,
and find ways to improve processes
• For example, the team might
brainstorm
– Product roles to feature in personas
– Features to include in the minimal viable
product for a release
– Potential risks that could impact the
project
– Solutions to a problem raised in a
retrospective
41
[T&T] Brainstorming
• Brainstorming Methods: There are many different methods that can be
used for brainstorming Ex:
1. Capture ideas.
– Quiet Writing (1)
• the participants are given five to seven minutes to generate a list of ideas
individually before the group gathers to share their ideas
– Round – Robin (2)
• People take turns by passing a token around the group. When a participant
receives the token, he or she will suggest an idea and then pass the token to
the next person
– Free – for – All (3)
• People just shout out their ideas spontaneously
2. the next steps are to sort them
- Sorting the ideas is often done by putting them on aboard
- Consolidating similar ideas and removing duplicates until a list of distinct
suggestions emerges until a list of distinct suggestions emerges
3. prioritize them
4. implement the most likely (best) ideas
42
9/7/19
21
[T&T] Collaboration Games
Collaboration games (innovation games) are facilitated workshop
techniques that agile stakeholders can use to get a better
understanding of complex or ambiguous issues and reach
consensus on options and solutions.
Some examples of the collaborative games
1. Remember the Future
– This is a vision-setting and requirements-elicitation exercise
2. Prune the Product Tree
– This exercise helps stakeholders gather and shape requirements
3. Speedboat (aka Sailboat)
– The goal of this exercise is to identify threats and opportunities(risks) for
the project
4. Buy a Feature
43
[T&T] Collaboration Games
1. Remember the Future Game
– This is a vision-setting and requirements-elicitation exercise
44
9/7/19
22
[T&T] Collaboration Games
2. Prune the Product Tree
– This exercise helps stakeholders gather and shape requirements
45
[T&T] Collaboration Games
3. Speedboat (aka Sailboat)
– The goal of this exercise is to identify threats and opportunities(risks)
for the project
46
9/7/19
23
USING CRITICAL INTERPERSONAL
(SOFT) SKILLS
Using Critical Interpersonal Skills
• [T&T] Emotional
Intelligence
• [T&T] Active Listening
• [K&S] Facilitation
• Negotiation
• Conflict resolution
• Participatory decision
making
48
9/7/19
24
Using Critical Interpersonal Skills
• [T&T] Emotional Intelligence
49
NĂNG LỰC
CÁ NHÂN
(Personal Competence)
NHẬN BIẾT
BẢN THÂN
(Self-
awareness)
QUẢN LÝ
BẢN THÂN
(Self-
management)
NĂNG LỰC
XÃ HỘI
(Social Competence)
HIỂU
NGƯỜI KHÁC
(Social
awareness)
QUẢN LÝ CÁC
MỐI QUAN HỆ
(Relationship
Management)
Chân dung của người có trí tuệ cảm xúccao
9/7/19
25
• Cấp độ trí tuệ cảm xúc
của một người
• Thường được thể hiện
bằng một con số hoặc
mức độ cao thấp
• Dựa trên một bài kiểm
tra đã được chuẩn hóa
motional uotient
Chỉ số cảm xúc
• Nhận biết bản thân
• Quản lý bản thân
• Hiểu người khác
• Xây dựng các mối quan
hệ tích cực
motional ntelligence
Trí tuệ cảm xúc
EI & EQ
S elf-talk
A net-work
M entor
E nvironment
Tự tạo năng lượng bằng mô hìnhSAME
9/7/19
26
“Bí quyết thành công nếu có là biết đặt mình
vào vị trí của người khác và xem xét mọi việc
vừa theo quan điểm của họ, vừa theo quan
điểm của mình”
Henry Ford
Using Critical Interpersonal Skills
• [T&T] Active Listening
54
9/7/19
27
Using Critical Interpersonal Skills
• [K&S] Facilitation (MC)
– Goals
• A clear goal for each meeting or workshop
session
• Get engaged in the discussion from the start
• can shorten the session time, making the
discussion feel more valuable to all involved
– Rules
• Basic ground rules
• The rules must also been force during each
session
– Timing
• breaks will take place
– Assisting
55
Using Critical Interpersonal Skills
• [K&S] Facilitation (cont.)
– Visioning Product Box – Teams create a product box similar to the one
on a store shelf. This encourages the team to identify the most
important features of the product.
– Spider Web – A context diagramming exercise where everyone draws
pictures and lines to represent relationships of a product with other
products and services.
– Requirements Buy a feature – This game helps the team in prioritizing
features
– White Elephant Sizing
– Retrospectives with Sailboat
– Learning Matrix – Captures what went well and what did not ideas
that can be implemented, and individuals who performed well.
56
9/7/19
28
Using Critical Interpersonal Skills
• [T&T] Conflict Resolution
58
9/7/19
29
Negotiation to resolve conflict
• Kenneth Thomas and Ralph Kilmann identified five conflict
modes:
– Competing - High assertiveness and low cooperativeness.
The goal is to “win.”
– Avoiding - Low assertiveness and low cooperativeness.
The goal is to “delay.”
– Compromising - Moderate assertiveness and cooperativeness.
The goal is to “find a middle ground.”
– Collaborating - High assertiveness and high cooperativeness.
The goal is to “find a win-win solution.”
– Accommodating - Low assertiveness and high cooperativeness.
The goal is to “yield.”
• Agile always focuses on Collaborating Mode of conflict resolution è
This results in a positive mindset among the team.
• The agile leader plays a significant role in ensuring the collaborative
style of conflict resolution, where the outcome always results in a
Win-Win scenario. 60
9/7/19
30
[K&S] Participatory Decision Making
• engaging the project stakeholders in
the decision-making process
• Communication and decision-making
processes are more critical for
keeping everyone informed and
engaged
• Teams need to be enabled and
encouraged to make these decisions
quickly because in the short
timeboxes in which Agile works, any
delay in decision making can have a
greater impact on the project
timeline.
• With participatory decision models, a
key point to remember is, “not
involved means not committed.”
61
[K&S] Participatory Decision Making
• Agile methods favor more team empowerment and less
command-and-control direction on projects.
• Convergent, Shared Collaboration
– Convergence: aim for convergence, or collective agreement on the
best answer
– Shared Collaboration: looking for group consensus than individual
• Participatory Decision Models
– Simple Voting
– Thumbs Up/Down/Sideways
– Fist-of-Five Voting
62
9/7/19
31
[K&S] Participatory Decision Making
• Highsmith’s Decision Spectrum
63
Chapter Review by Quizziz CODE
• Active Listening
• Agile chartering
• Agile modeling
• Assessing and incorporating
community and stakeholder values
• Brainstorming
• Collaboration (game)
• Communication management
– Face to face (F2F)
– Social media
– Two-way (trustworthy, conversion-
driven
• Conflict resolution (Levels of conflict)
• Definition of DONE
• Workshops
64
• Emotional Intelligence
• Facilitation
• ROI/NPV/IRR
• Information radiators
• Knowledge sharing/written
communication
• Negotiation
• Participatory decision model
– Decision Spectrum
– First of five voting
– Simple voting
– Thumbs up/down/sideways
• Personas
• Stakeholder management
• Wireframes
9/7/19
32
References
• PMI-ACP Exam Prep 2015 By Mike Griffiths, PMI-ACP, PMP
• Many other resources from Internet
65
Thank you for your attention!
66
9/7/19
33
10 Stakeholder Management Principles adapted for Agile
Product Development
1. Communicate
2. Consult, early and often
3. Remember, they’re only human
4. Plan it!
5. Relationships are key
6. Simple, but not easy
7. Just part of managing risk
8. Compromise (but not on your vision)
9. Understand what success is
10.Clear responsibilities
68
9/7/19
34
5 Ways Agile Teams Can Engage Stakeholders
1. Encourage Early
Involvement
2. Connect the Dots &
Explain Product Benefits
3. Ensure Inclusion in
Priority Discussions
4. Collaborate During
Release Planning
5. Solicit Feedback During
Reviews
69
9/7/19
35
9/7/19
36
9/7/19
37
Requirements in Agile
9/7/19
38
141
4
Collecting Requirements
151
5
User Stories
9/7/19
39
161
6
User Stories Samples
171
7
Writing User Stories
9/7/19
40
181
8
User Stories Characteristics - INVEST
191
9
User Stories Characteristics - INVEST
9/7/19
41
202
0
User Stories Characteristics - INVEST
212
1
User Stories Characteristics - 3C
9/7/19
42
222
2
Splitting Stories
232
3
User Story Types
9/7/19
43
242
4
Difference between Story, Epic andTheme
Thank you for your attention!
88

PMI-ACP Domain III: Stakeholder Engagement v1.0

  • 1.
    9/7/19 1 DOMAIN 3 Stakeholder Engagement MSc.PMP. Nguyen Thanh Phuoc phuocnt@gmail.com Key Topics • Active Listening • Agile chartering • Agile modeling • Assessing and incorporating community and stakeholder values • Brainstorming • Collaboration (game) • Communication management – Face to face (F2F) – Social media – Two-way (trustworthy, conversion- driven • Conflict resolution (Levels of conflict) • Definition of DONE • Workshops 2 • Emotional Intelligence • Facilitation • Information radiators • Knowledge sharing/written communication • Negotiation • Participatory decision model – Decision Spectrum – First of five voting – Simple voting – Thumbs up/down/sideways • Personas • Stakeholder management • Wireframes
  • 2.
    9/7/19 2 Tasks 1. Engage empoweredbusiness stakeholders 2. Share information frequency with all stakeholders 3. Form working agreements for participation 4. Assess organizational changes to maintain stakeholder management 5. Use collaborative decision making and conflict resolution 6. Establish a shared vision to align stakeholders 7. Maintain a shared understanding of success 8. Provide transparency for better decisions 9. Balance certainty and adaptability for better planning 3 44 Stakeholders
  • 3.
    9/7/19 3 [K&S] Taking Careof Stakeholders • Stakeholder Stewardship versus Stakeholder Management – Stakeholder stewardship means looking after everyone with a mindset of serving the team rather than trying to tell people how to do their jobs • Educating Stakeholders about Agile • Keep Stakeholders Engaged • The project team is considered stakeholders in traditional project management (according to PMBOK Guide) but not in Agile projects 5 [K&S] Taking Care of Stakeholders • Educating Stakeholders about Agile – Executives and project sponsors – Managers – The development team – The user community – Supporting groups If the project stakeholders are new to agile methods, they may need some basic education about how agile projects operate to help them understand the approach that will be used, address any myths about agile, and guide their expectations. This education should include the goals, values, practices, and benefits of the agile approach to help them understand why the project will be executed in this manner. 6
  • 4.
    9/7/19 4 [K&S] Taking Careof Stakeholders • Keep Stakeholders Engaged – One benefit of short iterations is that they prevent stakeholders from losing interest in the process – to ensure we will hear about change requests as soon as possible. – Help us identify potential risks, defects, and issues – engaging stakeholders in project events is that not all stakeholders can be handled in the same way • the ScrumMaster, project manager, or other designated person needs to use their emotional intelligence and interpersonal skills to try to understand these stakeholders’ concerns and find a positive way to engage them with the project – Another aspect of stakeholder stewardship is establishing a process for escalating issues that need a high level of authority to resolve 7 55 StakeholdersManagement
  • 5.
    9/7/19 5 Stakeholder Management Process 9 1.identify all the stakeholders periodically (in particular the key stakeholders who will have a big impact on project success) 2. communicate with selected stakeholders for requirements and needs gathering 3. enhance stakeholder involvement by active communication and information sharing 4. as project evolves, the interests of key stakeholders must be managed actively 5. discuss updated estimates and projections timely and openly (even in case of bad news) so as to facilitate future planning 6. keep a good relationship with all stakeholders by disseminating necessary information and collecting feedback from them 66 Manage StakeholdersExpectations
  • 6.
    9/7/19 6 77 StakeholdersClassification [K&S] Incorporating StakeholderValues • Focus on bringing project priorities into alignment with stakeholder priorities • Incorporates stakeholder values into a project is by engaging the product owner in the prioritization of the backlog • Invite stakeholders to planning meetings and sprint review 12
  • 7.
    9/7/19 7 Why the BigFocus on Stakeholders? • user story workshops, • participatory decision making, • collaboration games, • and frequent discussions of the definition of “done.” 13 Principles of Stakeholder Engagement 1. Get the right stakeholder 2. Cement(Keep) stakeholder involvement Ex: We could also report on the benefits or issues resulting from the stakeholders’ involvement 3. Actively manage stakeholder interest 4. Frequency discuss what “done” looks like 5. Show progress and capabilities 6. Candidly discuss estimates and projections 14
  • 8.
    9/7/19 8 Establishing a SharedVision • some key tools that agile teams use to establish a shared vision among all the stakeholders – agile charters, – the definition of done, – workshops, – modeling, – wireframes, – and personas. 15 121 2 Project Charter ProjectSuccess
  • 9.
    9/7/19 9 Establishing a SharedVision • [T&T, K&S] Agile Chartering – project charter is one of the first documents produced for a project • It describes the project’s goal, purpose, composition, and approach, and it provides authorization from the sponsor for the project to proceed • Agile charters can range from very lightweight worksheets and barely expanded vision statements to fairly detailed documents – Agile versus Non-Agile Charters • The goal of an agile charter is to describe the project at a high level, gain agreement about the project s W5H attributes (Who, What, Where, When, Why, and How), and obtain the authority to proceed • they typically have less detail than non-agile charters, are shorter documents, and focus more on how the project will be run than on exactly what will be built 19 Establishing a Shared Vision • [T&T, K&S] Agile Chartering – Developing an Agile Charter (cont.) Elevator Statement (ELEVATOR PITCH) 20
  • 10.
    9/7/19 10 Establishing a SharedVision • [T&T, K&S] Agile Chartering – Elevator Statement (cont.) 21 [T&T] Definition of DONE • User stories • Releases • Final Project Deliverables 22
  • 11.
    9/7/19 11 [T&T] Agile Modeling •Use Case Diagrams • Data Model 23 [T&T] Agile Modeling • Use Case Diagrams • Data Model • Screen Designs 24
  • 12.
    9/7/19 12 [T&T] Wireframes • Quickmock-up of a product • Low fidelity prototyping • Quick and cheap way 25 [T&T] Personas • Provide an archetypal description of users • Be grounded in reality • Be goal-oriented, specific and relevant, generate focus • not REQUIREMENT but ARGUMENT 26
  • 13.
    9/7/19 13 [K&S] Communicating withStakeholders [K&S] Communicating with Stakeholders • Face to Face Communication – face-to-face communication at a whiteboard has the highest efficiency 28
  • 14.
    9/7/19 14 [T&T] Two-Way Communication 29 •the “dispatching” model traditionally used in a command and control approach • In the collaborative, two-way communication style used on agile projects [T&T] Knowledge Sharing 30 • Agile methods also emphasize knowledge sharing by using low- tech, high-touch tools like cards on a wall to plan and schedule the project • to share knowledge amongst the team members, not just generate lists of work done, work planned, and issues that have arisen • to speed the sharing of information that occurs in face- to-face environments through osmotic communication and tacit (unwritten) knowledge • they are high-ceremony ways (iteration review) to share knowledge – Customer to Team – Team to Customer
  • 15.
  • 16.
    9/7/19 16 [T&T] Information Radiators 33 Someof the information radiators that are used in Agile projects are: 1. Burnup charts 2. Burndown charts 3. Kanban or Task Boards 4. Impediment Logs [T&T] Information Radiators 34 Some of the information radiators that are used in Agile projects are: 1. Burnup charts 2. Burndown charts 3. Kanban or Task Boards 4. Impediment Logs
  • 17.
    9/7/19 17 [T&T] Information Radiators 35 Someof the information radiators that are used in Agile projects are: 1. Burnup charts 2. Burndown charts 3. Kanban or Task Boards 4. Impediment Logs [T&T] Social Media 36
  • 18.
    9/7/19 18 [T&T] Working Collaboratively Benefitsof this T&T • Generates wiser decisions – via shared information • Promotes problem solving rather than procedural decision making • Fosters action by mobilizing shared resources to get work done • Builds social capital by building relationships and understanding • Fosters ownership of collective problems by valuing participation and shifting power downwards 37 Study by Steven Yaffee from the University of Michigan [T&T] Working Collaboratively • Green Zone/ Red Zone – For collaboration to be most effective, we have to assess the groups openness to working together. Lyssa Adkins recommends using the “Green Zone, Red Zone” model to diagnose how much support there is for collaboration. 38
  • 19.
    9/7/19 19 [T&T] Working Collaboratively •Green Zone/ Red Zone – To promote effective collaboration, agile leaders, coaches, and facilitators aim to stay in the Green Zone and continuously model Green Zone behavior. This strengthens and supports Green Zone thinking and behavior in the other project stakeholders, so that the group can direct their energy toward working together effectively. 39 [T&T] Workshop • make workshops more effective: – Diverse groups reflect a wider range of viewpoints than just a few experts – To prevent dominant individuals è the facilitator can use techniques such as going round-robin style around the group or generating ideas on sticky notes. • User story workshop (story writing workshop) • Reason for conducting user story workshops is to – Engage the key stakeholders in the design process (ex: UI) – Can discuss the trade-offs and priorities of the work – The team will get a better understanding of the stakeholders’ needs, without jumping directly to possible solutions – the business will get a better sense of the costs and options 40
  • 20.
    9/7/19 20 [T&T] Brainstorming • Agroup tries to rapidly generate a lot of ideas about a problem or issue • Agile teams can use this approach to help identify options, solve issues, and find ways to improve processes • For example, the team might brainstorm – Product roles to feature in personas – Features to include in the minimal viable product for a release – Potential risks that could impact the project – Solutions to a problem raised in a retrospective 41 [T&T] Brainstorming • Brainstorming Methods: There are many different methods that can be used for brainstorming Ex: 1. Capture ideas. – Quiet Writing (1) • the participants are given five to seven minutes to generate a list of ideas individually before the group gathers to share their ideas – Round – Robin (2) • People take turns by passing a token around the group. When a participant receives the token, he or she will suggest an idea and then pass the token to the next person – Free – for – All (3) • People just shout out their ideas spontaneously 2. the next steps are to sort them - Sorting the ideas is often done by putting them on aboard - Consolidating similar ideas and removing duplicates until a list of distinct suggestions emerges until a list of distinct suggestions emerges 3. prioritize them 4. implement the most likely (best) ideas 42
  • 21.
    9/7/19 21 [T&T] Collaboration Games Collaborationgames (innovation games) are facilitated workshop techniques that agile stakeholders can use to get a better understanding of complex or ambiguous issues and reach consensus on options and solutions. Some examples of the collaborative games 1. Remember the Future – This is a vision-setting and requirements-elicitation exercise 2. Prune the Product Tree – This exercise helps stakeholders gather and shape requirements 3. Speedboat (aka Sailboat) – The goal of this exercise is to identify threats and opportunities(risks) for the project 4. Buy a Feature 43 [T&T] Collaboration Games 1. Remember the Future Game – This is a vision-setting and requirements-elicitation exercise 44
  • 22.
    9/7/19 22 [T&T] Collaboration Games 2.Prune the Product Tree – This exercise helps stakeholders gather and shape requirements 45 [T&T] Collaboration Games 3. Speedboat (aka Sailboat) – The goal of this exercise is to identify threats and opportunities(risks) for the project 46
  • 23.
    9/7/19 23 USING CRITICAL INTERPERSONAL (SOFT)SKILLS Using Critical Interpersonal Skills • [T&T] Emotional Intelligence • [T&T] Active Listening • [K&S] Facilitation • Negotiation • Conflict resolution • Participatory decision making 48
  • 24.
    9/7/19 24 Using Critical InterpersonalSkills • [T&T] Emotional Intelligence 49 NĂNG LỰC CÁ NHÂN (Personal Competence) NHẬN BIẾT BẢN THÂN (Self- awareness) QUẢN LÝ BẢN THÂN (Self- management) NĂNG LỰC XÃ HỘI (Social Competence) HIỂU NGƯỜI KHÁC (Social awareness) QUẢN LÝ CÁC MỐI QUAN HỆ (Relationship Management) Chân dung của người có trí tuệ cảm xúccao
  • 25.
    9/7/19 25 • Cấp độtrí tuệ cảm xúc của một người • Thường được thể hiện bằng một con số hoặc mức độ cao thấp • Dựa trên một bài kiểm tra đã được chuẩn hóa motional uotient Chỉ số cảm xúc • Nhận biết bản thân • Quản lý bản thân • Hiểu người khác • Xây dựng các mối quan hệ tích cực motional ntelligence Trí tuệ cảm xúc EI & EQ S elf-talk A net-work M entor E nvironment Tự tạo năng lượng bằng mô hìnhSAME
  • 26.
    9/7/19 26 “Bí quyết thànhcông nếu có là biết đặt mình vào vị trí của người khác và xem xét mọi việc vừa theo quan điểm của họ, vừa theo quan điểm của mình” Henry Ford Using Critical Interpersonal Skills • [T&T] Active Listening 54
  • 27.
    9/7/19 27 Using Critical InterpersonalSkills • [K&S] Facilitation (MC) – Goals • A clear goal for each meeting or workshop session • Get engaged in the discussion from the start • can shorten the session time, making the discussion feel more valuable to all involved – Rules • Basic ground rules • The rules must also been force during each session – Timing • breaks will take place – Assisting 55 Using Critical Interpersonal Skills • [K&S] Facilitation (cont.) – Visioning Product Box – Teams create a product box similar to the one on a store shelf. This encourages the team to identify the most important features of the product. – Spider Web – A context diagramming exercise where everyone draws pictures and lines to represent relationships of a product with other products and services. – Requirements Buy a feature – This game helps the team in prioritizing features – White Elephant Sizing – Retrospectives with Sailboat – Learning Matrix – Captures what went well and what did not ideas that can be implemented, and individuals who performed well. 56
  • 28.
    9/7/19 28 Using Critical InterpersonalSkills • [T&T] Conflict Resolution 58
  • 29.
    9/7/19 29 Negotiation to resolveconflict • Kenneth Thomas and Ralph Kilmann identified five conflict modes: – Competing - High assertiveness and low cooperativeness. The goal is to “win.” – Avoiding - Low assertiveness and low cooperativeness. The goal is to “delay.” – Compromising - Moderate assertiveness and cooperativeness. The goal is to “find a middle ground.” – Collaborating - High assertiveness and high cooperativeness. The goal is to “find a win-win solution.” – Accommodating - Low assertiveness and high cooperativeness. The goal is to “yield.” • Agile always focuses on Collaborating Mode of conflict resolution è This results in a positive mindset among the team. • The agile leader plays a significant role in ensuring the collaborative style of conflict resolution, where the outcome always results in a Win-Win scenario. 60
  • 30.
    9/7/19 30 [K&S] Participatory DecisionMaking • engaging the project stakeholders in the decision-making process • Communication and decision-making processes are more critical for keeping everyone informed and engaged • Teams need to be enabled and encouraged to make these decisions quickly because in the short timeboxes in which Agile works, any delay in decision making can have a greater impact on the project timeline. • With participatory decision models, a key point to remember is, “not involved means not committed.” 61 [K&S] Participatory Decision Making • Agile methods favor more team empowerment and less command-and-control direction on projects. • Convergent, Shared Collaboration – Convergence: aim for convergence, or collective agreement on the best answer – Shared Collaboration: looking for group consensus than individual • Participatory Decision Models – Simple Voting – Thumbs Up/Down/Sideways – Fist-of-Five Voting 62
  • 31.
    9/7/19 31 [K&S] Participatory DecisionMaking • Highsmith’s Decision Spectrum 63 Chapter Review by Quizziz CODE • Active Listening • Agile chartering • Agile modeling • Assessing and incorporating community and stakeholder values • Brainstorming • Collaboration (game) • Communication management – Face to face (F2F) – Social media – Two-way (trustworthy, conversion- driven • Conflict resolution (Levels of conflict) • Definition of DONE • Workshops 64 • Emotional Intelligence • Facilitation • ROI/NPV/IRR • Information radiators • Knowledge sharing/written communication • Negotiation • Participatory decision model – Decision Spectrum – First of five voting – Simple voting – Thumbs up/down/sideways • Personas • Stakeholder management • Wireframes
  • 32.
    9/7/19 32 References • PMI-ACP ExamPrep 2015 By Mike Griffiths, PMI-ACP, PMP • Many other resources from Internet 65 Thank you for your attention! 66
  • 33.
    9/7/19 33 10 Stakeholder ManagementPrinciples adapted for Agile Product Development 1. Communicate 2. Consult, early and often 3. Remember, they’re only human 4. Plan it! 5. Relationships are key 6. Simple, but not easy 7. Just part of managing risk 8. Compromise (but not on your vision) 9. Understand what success is 10.Clear responsibilities 68
  • 34.
    9/7/19 34 5 Ways AgileTeams Can Engage Stakeholders 1. Encourage Early Involvement 2. Connect the Dots & Explain Product Benefits 3. Ensure Inclusion in Priority Discussions 4. Collaborate During Release Planning 5. Solicit Feedback During Reviews 69
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
    9/7/19 40 181 8 User Stories Characteristics- INVEST 191 9 User Stories Characteristics - INVEST
  • 41.
    9/7/19 41 202 0 User Stories Characteristics- INVEST 212 1 User Stories Characteristics - 3C
  • 42.
  • 43.
    9/7/19 43 242 4 Difference between Story,Epic andTheme Thank you for your attention! 88