ELP 405 – ORGANIC PRODUCTION TECHNOLOGY
Detailed Bankable Project on Piggery
BY,
G. PARTHASARATHY
(21UAG069)
2
Introduction
• Pig farming in India is primarily
a small scale unorganized rural
activity and is an integral part of
diversified agriculture.
• Piggery farms provide
employment opportunities to
rural population and gives
supplementary income to the
farmers.
3
CONT…
Pigs are prolific breeders, and they produce
more offspring in shorter duration. Pig
Farming requires relatively lesser investment
and provide high returns.
• Dressing percentage in pigs is 60-80%
which is high compared to other meat
producing animal.
• Pigs produce organic manure useful in
agriculture farming.
4
CONT… • Pigs store rapid fats which is
widely used in poultry feed, soap,
paint, and chemical industries.
• Pigs give quick returns as the
weight gain in fatteners is fast and
can be achieved within 6-8 months.
• Pig products like pork, bacon,
ham, sausages etc. Have a great
demand both locally and globally.
5
Piggery management
systems
• Extensive system:- Traditional
method and indigenous pig low
growth and high mortality.
• Semi-intensive :- minimal
management practice with
feeding or without feeding.
• Intensive system:-commercial
production with feeding, space
and housing.
6
Significance of
piggery • The pig has got highest feed
conversion efficiency i.e. they
produce more live weight gain
from a given weight of feed than
any other class of meat producing
animals except broilers.
• The pig can utilise wide variety of
feed stuffs and convert them into
valuable nutritious meat.
However, feeding of damaged
grains, garbage and other
unbalanced rations may result in
lower feed efficiency.
7
Cont…
• They are prolific with shorter generation
interval. A sow can be bred as early as 8-
9 months of age and can farrow twice in
a year. They produce 6-12 piglets in each
farrowing.
• Pig farming requires small investment on
buildings and equipments
• Pig farming provides quick returns since
the marketable weight of fatteners can be
achieved with in a period of 6-8 months.
8
Cont… • Pork is most nutritious with
high fat and low water content
and has got better energy value
than that of other meats. It is
rich in vitamins like thiamin,
Niacin and riboflavin.
• Pigs manure is widely used as
fertilizer for agriculture farms
and fish ponds.
9
Scope of piggery • The majority of the pig population in India
is of indigenous breeds (76 percent) though
population of cross-bred and exotic pigs
increased by 12.7 percent from year 2003 to
2012.
• India’s average meat yield of indigenous
breeds is around 35 Kg/animal, which is
quite low in comparison to world average of
around 78 Kg/animal.
• Pork production in India is estimated at 464
thousand metric tons in FY 2014 – 15 (April
–March) (GOI), which contributes
approximately 8 percent of the country’s
animal protein sources.
10
• From FY 2009-10 to 2014-15, pork production increased at a
slow pace with compound annual growth rate of 1.4 percent
due to population growth.
• The per capita pork consumption in India is negligible with
the consumption mainly concentrated in north-eastern states
including Assam, Nagaland, Arunachal Pradesh, Manipur,
Meghalaya, Mizoram, Sikkim, and Tripura.
• Other Indian states with high pork consumption include
Bihar, Jharkhand, West Bengal, Goa and Kerala.
Cont…
11
Cont… • From year 2010 to 2015 pork
imports increased at a CAGR of 11
percent on steady demand in hotel,
restaurant and institutional sector
as well in high-end retail segment.
• Pork imports increased to 527
metric tons during 2014-15,
recording 28 per cent growth over
the previous year.
• Major suppliers of pork meat to
India are Belgium, Sri Lanka,
Spain, Italy, and Netherland.
Indian exports of pork and pork
products are negligible.
12
Composition of pork
13
Recommended breeds of pigs for different regions
of India
14
15
Large white Yorkshire
cross
• Used in Southern areas of
India.
• Grows rapidly gives good
dressing percentage
• highly prolific
• Males 250-340 kg
• Females 180-270 kg
PIGGERY ECONOMICS
17
Basis and pre-assumptions
The following assumptions have been taken into consideration:-
1. The Salaries & Wages, Cost of Raw Materials, Utilities, Cost of
Land and Rents etc. are based on prevailing rates in 2021.
These cost factors are likely to vary with time and with location.
2. Interest on loan has been taken @ 13.05% on an average. This
rate may vary depending upon the policy of the financial
Institutions/agencies from time to time.
3. The cost of Machinery and Equipments refer to a particular
make/model and the prices are approximate prevailing in 2021.
18
Implementation Schedule:
• The major activities in the implementation of the project have
been listed and the average time for implementation of the
project is estimated at 4 Months or 122 Days.
19
20
21
22
23
24
25
26
27
28
Schemes related to piggery in Tamil Nadu
29
Integration of Piggery with Other IFS Components
Crop–Piggery: Pigs consume crop
residues, and their manure enriches
soil fertility for next cropping cycle.
Piggery–Fishery: Pig waste is used
in ponds to promote plankton
growth, boosting fish yield
naturally.
1. Piggery–Biogas: Pig dung is fed
into biogas units, producing
renewable energy for
household/farm use.
30
Cont...
4. Piggery–Vermicomposting: Combines pig manure with farm.
waste to produce nutrient-rich vermicompost.
5. Piggery–Agroforestry: Pigs graze under tree plantations,
controlling weeds and enhancing land utilization.
6. Piggery–Poultry/Dairy: Offers diversified income, with shared
feed, water systems and integrated waste use
31
References
• Bibliography:
32
Cont...
WEBULOGRAPHY:
1. https://agriculture.vikaspedia.in Model bankable project on Pig Farming – Agriculture –
Vikaspedia
2. National Cooperative Development Corporation – NCDC (Detailed Project Report on Setting up
of a Pig Rearing farm – NCDC)
3. Project Proposal of Pig Breeding Unit of Swan Farm, Animal Husbandry & Veterinary
Department, Meghalaya
4. TNLDA
5. https://tnlda.tn.gov.in Model DPR of Pig breed development unit under NLM ...
6. Chief Minister’s Atmanirbhar Asom Abhija https://cmaaa.assam.gov.in Project Profile for
Financial Assistance under ...
7. Official Website of NABARD chapter 12 area development plan/ scheme commercial pig farming.
8. TNAU Agritech Portal https://agritech.tnau.ac.in Pig Farming