SlideShare a Scribd company logo
1 of 12
POWER INDIA

PERFORMANCE OF SOLAR
PROJECTS
Under Phase I of NSM
Background
Projects Performance
Batch 1 of Phase 1
Batch 2 of Phase 1

Annexure 1: Complete Datasheet

Connect with us

November 14, 2013
POWER INDIA

DISCLAIMER

This document along with all the Reports published by the POWER INDIA is properties of
POWER INDIA.
Every effort is made to provide correct and updated information.
However, POWER INDIA takes no responsibility for content of any of the material posted,
and will not be liable for, any reliance you place on information.
POWER INDIA is not herein engaged in rendering professional advice and services to user
of this report.

www.powerind.in
POWER INDIA

POWER INDIA makes no warranties, expressed or implied, as to the ownership, accuracy,
or adequacy of the content of this report.
POWER INDIA shall not be liable for any indirect, incidental, consequential, or punitive
damages or for lost revenues or profits, whether or not advised of the possibility of such
damages or losses and regardless of the theory of liability.
POWER INDIA hereby grants the user a personal, non-exclusive, nonrefundable, nontransferable license to use the report for research purposes only pursuant to the terms and
conditions of this agreement.
POWER INDIA retains exclusive and sole ownership of each report disseminated under this
agreement.
The user cannot engage in any unauthorized use, reproduction, distribution, publication
or electronic transmission of this report or the information/forecasts therein without the
express written permission of POWER INDIA.
No part of this report may be used or reproduced in any manner or in any form or by any
means without mentioning its original source.

For further enquiries, please contact:
POWER INDIA
sparksnetwork@gmail.com
contact@powerind.in

1 of 12
POWER INDIA

Background

The Jawaharlal Nehru National Solar Mission (JNNSM or NSM) is a mission launched by
Government of India on the 11th January, 2010 to promote development of solar energy
projects in India by the Prime Minister.

NSM has set the target of 20,000 MW grid connected solar projects by 2022 as per the
following phases:
•
•
•

Phase 1: 1,000 MW (by 2013)

Phase 2: cumulative 4,000 MW (by 2017)

Phase 3: cumulative 20,000 MW (by 2022)

Under Phase 1, 950 MW solar power projects were selected in two batches (batch-I
during 2010-11 and batch-II during 2011-12) through a process of reverse bidding.

NTPC Vidyut Vyapar Nigam Limited (NVVN) was appointed as the nodal authority for
purchase of power from developers and further sale to distribution utilities/ Discoms
after bundling with power from unallocated quota of power from coal based stations of
NTPC on equal capacity basis.

A total capacity of 420 MW has been commissioned under these batches by the end of
Phase-1. In addition, a capacity of 50.5 MW under migration scheme, 88.8 MW under
IREDA-GBI scheme and 21.5 MW under old Demonstration scheme has been
commissioned, taking the total capacity commissioned to 680.80 MW.

In this report, the performance of the solar projects installed under Batch 1 as well as
Batch 2 of NSM Phase 1 are analyzed and depicted.

2 of 12
POWER INDIA

NSM Phase 1 Batch 1

The Batch 1 of NSM Phase 1 were launched and executed in the year 2010-11 and has
seen installations of around 140 MW of Solar Projects.
The complete list of Solar Projects commissioned under Batch 1 of NSM Phase 1 are as
below:

SN

Company/Project

1

Aftaab Solar Private Limited
Alex Spectrum Radiation Private
Limited
Amrit Energy Private Limited
Azure Power (Rajasthan) Private
Limited
CCCL Infrastructure Limited
DDE Renewable Energy Private
Limited
Electromech Maritech Private
Limite
EMC Limited
Finehope Allied Engineering
Private Limited
Greentech Power Private
Limited
Indian Oil Corporation Limited
Karnataka Power Corporation
Limited
Khaya Solar Projects Private
Limited
Maharashtra Seamless Limited
Mahindra Solar One Private
Limited
Newton Solar Private Limited
Northwest Energy Private
Limited
OswalWoollen Mills Limited
Precision Technik Private
Limited
Punjlloyd Solar Power Limited
Saidham Overseas Private
Limited
Saisudhir Energy Limited
SEI Solar Energy Private Limited
Vasavi Solar Power Pvt. Limited

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

State

Alloted

Comm

CoD

Odisha

5

5

07-02-2012

RJ

5

5

21-02-2012

RJ

5

5

02-02-2012

RJ

5

5

01-01-2012

TN

5

5

29-03-2012

RJ

5

5

14-02-2012

RJ

5

5

01-02-2012

UP

5

5

04-03-2012

RJ

5

5

07-02-2012

RJ

5

5

08-02-2012

RJ

5

5

02-02-2012

KA

5

5

25-06-2012

RJ

5

5

28-01-2012

RJ

5

5

07-01-2012

RJ

5

5

03-01-2012

RJ

5

5

09-02-2012

RJ

5

5

07-01-2012

RJ

5

5

10-01-2012

Rj

5

5

22-03-2012

RJ

5

5

08-01-2012

RJ

5

5

30-01-2012

AP
RJ
RJ

5
5
5

5
5
5

05-01-2012
01-01-2012
02-02-2012
3 of 12
POWER INDIA

SN

Company/Project

25

Viraj Renewables Energy
Welspun Solar AP Private
limited
Rithwik Projects Private Limited
FireStone Trading Private
Limited
Total (MW)

26
27
28

State

Alloted

Comm

CoD

RJ

5

5

05-01-2012

AP

5

5

01-01-2012

AP

5

5

24-07-2013

MH

5

5

06-09-2012

140

The MNRE releases the performance data of all the projects commissioned under
National Solar Mission on monthly basis.

Under the performance data, the performances of solar projects in terms of monthly
generation (in kWh) as well as CUF/PLF are being mentioned.

However, for the purpose of this report, only the generation figures given by MNRE are
considered and are used to calculate the PLF of the project.
Further, out of the 28 commissioned projects, around 14 projects were having
inconsistent data / data not available.

Hence, for the purpose of evaluating the performance of the Batch 1 Projects, the
sample of 14 projects which were fairly reasonable data has been considered from the
month of Oct-12 to Se-13. (Pl refer Annex 1 for the complete data)

SN

Company/Project

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Saidham Overseas Private Limited
Northwest Energy Private Limited
Mahindra Solar One Private Limited
Vasavi Solar Power Pvt. Limited
Khaya Solar Projects Private Limited
Finehope Allied Engineering Private Limited
Alex Spectrum Radiation Private Limited
Viraj Renewables Energy
Electromech Maritech Private Limite
Azure Power (Rajasthan) Private Limited
DDE Renewable Energy Private Limited
Newton Solar Private Limited
CCCL Infrastructure Limited
Indian Oil Corporation Limited
Total of Batch 1 (14 projects)

Avg PLF
(%)
23.32%
23.02%
22.77%
22.65%
22.64%
22.64%
21.83%
21.24%
20.66%
20.44%
19.38%
19.36%
18.52%
17.91%
21.17%

Total Gen
(Lac Units)
102.16
100.81
99.74
99.22
99.15
99.15
95.62
93.04
90.48
89.54
84.90
84.78
81.10
78.44
1298.14

4 of 12
POWER INDIA

Comparison of NSM Ph1 Batch 1 Solar Projects in
terms Generation/PLF
120.00

25.00%

100.00

20.00%

80.00

15.00%

60.00

10.00%

40.00
20.00

5.00%

-

0.00%

Generation (Lac Units)

PLF(%)

Thus, on an average the PLF achieved by the batch 1 solar projects is around 21.17%.

The total month wise generations of the projects have been computed and an average
PLF has been calculated to arrive at the average monthly PLF of these 14 projects.
Chart showing average monthly PLF as well as %share in the total generation is
depicted below:

Monthly Generation/PLF Trend for NSM Ph1 Batch
1 Projects
30.00%
25.00%

21%

20.00%
15.00%
10.00%

9%

20%

8%

18% 18%
7%

7%

20%

7%

24% 24% 25% 23%

10%

9%

10%

9%

19% 20%

8%

8%

22%

9%

5.00%
0.00%

Monthly PLF (%)

% Share in Total

5 of 12
POWER INDIA

NSM Phase 1 Batch 2

The Batch 2 of NSM Phase 1 were launched and executed in the year 2011-12 and has
seen installations of around 310 MW of Solar Projects.
The complete list of Solar Projects commissioned under Batch 2 of NSM Phase 1 is as
below:

SN Company/Project
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Welspun Solar AP Pvt Ltd.
Welspun Solar AP Pvt Ltd.
Welspun Solar AP Pvt Ltd.
Mahindra Suryaparakash Pvt. Ltd
Mahindra Suryaparakash Pvt. Ltd
Solarfield Energy Two Pvt. Ltd.
Azure Solar Pvt. Ltd.
Azure Solar Pvt. Ltd.
FonrocheSaaras Energy Pvt. Ltd.
FonrocheRajhans Energy Pvt. Ltd.
Green Infra Solar Projects Ltd.
Green Infra Solar Farms Projects
Ltd.
Gail (India) Ltd.
Sh. Saibaba Green Power Pvt. Ltd
SEI Solar Power Pvt. Ltd.
PokaranSolaire Energy Pvt. Ltd
SaiMathili Power Co. Pvt. Ltd.
NVR Infra. and Services Pvt. Ltd.
LEPL Projects Ltd.
Sunborne Energy Raj. Solar Pvt Ltd
Symphony Vyapar Pvt. Ltd.
Lexicon Vanijiya Pvt. Ltd.
Jackson Power Pvt. Ltd.
Jackson Power Pvt Ltd.
Saisudhir Energy Ltd.
Essel MP Energy Ltd.
Enfield Infra. Ltd.
Total (MW)

State

Alloted Comm.

CoD

RJ
RJ
RJ
RJ
RJ
RJ
RJ
RJ
RJ
RJ
RJ

15
15
20
20
10
20
15
20
15
5
20

15
15
20
20
10
20
15
20
15
5
20

22-01-2013
31-01-2013
19-02-2013
20-02-2013
20-02-2013
20-02-2013
12-02-2013
13-02-2013
21-01-2013
23-12-2012
30-01-2013

RJ

5

5

24-12-2012

RJ
MH
RJ
RJ
RJ
RJ
RJ
RJ
RJ
RJ
RJ
RJ
AP
MH
RJ

5
5
20
5
10
10
10
5
10
10
10
10
20
20
10
310

5
5
20
5
10
10
10
5
10
10
10
10
20
0
0

18-02-2013
22-02-2013
11-02-2013
24-02-2013
26-02-2013
25-02-2013
26-03-2013
26-03-2013
27-04-2013
01-05-2013
26-04-2013
26-04-2013
26-04-2013

Similar to Batch 1, the MNRE releases the performance data of all the projects
commissioned under Phase 2 on monthly basis.
6 of 12
POWER INDIA
Under the performance data, the performances of solar projects in terms of monthly
generation (in kWh) as well as CUF/PLF are being mentioned.

For the purpose of this report, only the generation figures given by MNRE are
considered and are used to calculate the PLF of the project.

However, as currently the data are available from the month of Apr-13 to Sep-13 i.e. 6
months only hence the evaluation of the performance of projects will not be appropriate
at this stage.
The complete data has been depicted in Annex 1 of this report.

7 of 12
POWER INDIA

POWER INDIA

Power, in the present edge, is the life blood for each & every economy around the globe.
It is an essential requirement for all facets of our life and has been recognized as a basic
human need. Socio-economic development of any country depends upon development
of this critical infrastructure.

Indian Power sector has been in the fore front of Indian growth story. With huge captive
coal reserves, significant potential for generation of power from renewable energy
sources, and a highly investor friendly Government policy for setting-up green-field
Power projects, Indian Power sector is abreast with untapped opportunities. The
growth of the economy and its global competitiveness hinges on the availability of
reliable and quality power at competitive rates.

POWER INDIA is putting an effort to bolster the sturdy growth of Indian Power Sector
by providing comprehensive supports in terms of latest happenings, analysis,
publications, links and other resources related to the Indian and Global Power Sector to
the Power Professionals.

SERVICES
OFFERED

8 of 12
POWER INDIA
Annexure – 1
Commissioning & Performance Data of Solar Projects under National Solar Mission Phase 1

Batch 1 Solar Projects under National Solar Mission Phase 1
Company/Project

Stat
e

Capacit
y (MW)

CoD

Oct-12

Nov-12

Dec-12

Jan-13*

Feb-13

Mar-13

Apr-13

May-13

Jun-13

Jul-13

Aug-13*

Sep-13

1

Aftaab Solar Private Limited

OR

5

07-02-2012

0.01

6.67

8.21

7.61

7.01

8.44

7.80

8.39

5.94

5.73

6.26

6.80

2

Alex Spectrum Radiation
Private Limited

RJ

5

21-02-2012

8.29

7.09

6.69

6.69

6.68

9.03

8.34

9.40

8.54

8.14

8.29

8.44

3

Amrit Energy Private Limited

RJ

5

02-02-2012

0.01

6.89

7.73

7.80

7.87

9.61

8.78

9.82

-

-

-

7.23

4

Azure Power (Rajasthan)
Private Limited

RJ

5

01-01-2012

8.27

6.50

6.83

6.46

6.09

8.55

8.29

8.68

7.90

7.08

7.33

7.57

5

CCCL Infrastructure Limited

TN

5

29-03-2012

5.70

6.11

5.78

6.15

6.52

7.58

7.20

7.44

6.55

7.21

7.36

7.50

RJ

5

14-02-2012

7.77

7.30

7.00

6.59

6.19

8.45

8.10

6.79

7.18

5.89

6.51

7.14

RJ

5

01-02-2012

8.07

7.50

7.01

7.00

6.99

8.84

8.57

8.96

7.17

5.98

6.79

7.60

UP

5

04-03-2012

7.13

5.31

4.98

5.50

6.02

7.38

8.10

8.32

6.29

-

-

6.75

RJ

5

07-02-2012

8.38

7.41

6.79

6.97

7.15

9.88

10.06

11.06

8.88

7.23

7.52

7.82

RJ

5

08-02-2012

-

-

-

-

-

-

-

-

-

-

-

-

RJ

5

02-02-2012

6.82

6.08

6.12

6.18

6.24

7.32

6.10

7.17

6.41

6.33

6.67

7.00

KA

5

25-06-2012

-

-

6.82

-

-

-

-

-

-

-

-

-

RJ

5

28-01-2012

8.02

6.82

6.12

6.43

6.75

9.13

9.53

10.93

9.98

8.20

8.48

8.76

SN

6
7
8
9
10
11
12
13

DDE Renewable Energy Private
Limited
Electromech Maritech Private
Limite
EMC Limited
Finehope Allied Engineering
Private Limited
Greentech Power Private
Limited
Indian Oil Corporation Limited
Karnataka Power Corporation
Limited
Khaya Solar Projects Private
Limited

14

Maharashtra Seamless Limited

RJ

5

07-01-2012

-

7.76

-

-

-

-

-

-

-

-

-

-

15

Mahindra Solar One Private
Limited

RJ

5

03-01-2012

8.33

6.74

6.30

6.33

6.35

9.61

9.67

11.03

9.13

8.54

8.75

8.95

16

Newton Solar Private Limited

RJ

5

09-02-2012

7.56

6.86

6.44

6.39

6.35

8.03

7.80

8.30

7.29

5.92

6.58

7.25

17

Northwest Energy Private
Limited

RJ

5

07-01-2012

9.19

8.39

8.10

7.84

7.57

9.39

8.76

9.12

7.88

7.73

8.20

8.67
POWER INDIA

Stat
e

Capacit
y (MW)

CoD

Oct-12

Nov-12

Dec-12

Jan-13*

Feb-13

Mar-13

Apr-13

May-13

Jun-13

Jul-13

Aug-13*

Sep-13

OswalWoollen Mills Limited

RJ

5

10-01-2012

-

-

-

-

-

-

-

-

-

8.17

7.65

7.12

19

Precision Technik Private
Limited

RJ

5

22-03-2012

-

-

-

-

-

-

-

-

-

-

-

-

20

Punjlloyd Solar Power Limited

RJ

5

08-01-2012

6.63

6.06

-

-

5.43

6.60

7.72

8.73

7.53

7.35

7.65

7.95

21

Saidham Overseas Private
Limited

RJ

5

30-01-2012

8.63

7.23

6.40

6.78

7.15

9.68

9.92

11.58

10.10

8.09

8.23

8.37

22

Saisudhir Energy Limited

AP

5

05-01-2012

0.00

0.00

8.26

-

-

8.24

83.83

8.23

6.28

5.85

6.30

6.74

23

SEI Solar Energy Private Limited

RJ

5

01-01-2012

7.79

6.92

5.89

6.07

6.25

-

8.14

8.74

7.64

7.20

-

-

24

Vasavi Solar Power Pvt. Limited

RJ

5

02-02-2012

8.14

6.97

5.93

6.46

7.00

9.50

9.73

11.19

9.88

7.80

8.15

8.50

25

Viraj Renewables Energy

RJ

5

05-01-2012

8.15

7.39

7.52

7.36

7.20

8.79

8.15

8.56

7.21

7.05

7.57

8.09

26

Welspun Solar AP Private
limited

AP

5

01-01-2012

-

7.71

7.45

7.81

8.17

9.13

8.50

8.12

7.06

6.14

6.47

6.80

27

Rithwik Projects Private Limited

AP

5

24-07-2013

-

-

-

-

-

-

-

-

-

-

-

-

28

FireStone Trading Private
Limited

MH

5

06-09-2012

-

-

-

-

-

-

-

-

-

-

-

-

SN

Company/Project

18

* Due to non-availability of data from MNRE, estimated using extrapolation methods

Batch 2 Solar Projects under National Solar Mission Phase 1

SN Company/Project
1
2
3
4
5
6
7

Welspun Solar AP Pvt Ltd.
Welspun Solar AP Pvt Ltd.
Welspun Solar AP Pvt Ltd.
Mahindra Suryaparakash Pvt.
Ltd
Mahindra Suryaparakash Pvt.
Ltd
Solarfield Energy Two Pvt. Ltd.
Azure Solar Pvt. Ltd.

State

Alloted Commissioned

CoD

Apr-13

May-13

Jun-13

Jul-13

Aug-13*

Sep-13

RJ
RJ
RJ

15
15
20

15
15
20

22-01-2013
31-01-2013
19-02-2013

26.78
26.02
33.53

29.42
35.96

26.00
26.00
30.82

23.16
24.40
29.80

24.24
25.51
31.03

25.31
26.63
32.26

RJ

20

20

20-02-2013

27.34

29.39

25.94

25.28

26.41

27.54

RJ

10

10

20-02-2013

13.01

14.47

12.92

13.10

13.47

13.84

RJ
RJ

20
15

20
15

20-02-2013
12-02-2013

27.19
27.46

28.55
28.86

25.45
24.36

25.57
22.33

27.18
23.07

28.79
23.82
POWER INDIA

SN Company/Project
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Azure Solar Pvt. Ltd.
FonrocheSaaras Energy Pvt. Ltd.
FonrocheRajhans Energy Pvt.
Ltd.
Green Infra Solar Projects Ltd.
Green Infra Solar Farms Projects
Ltd.
Gail (India) Ltd.
Sh. Saibaba Green Power Pvt.
Ltd
SEI Solar Power Pvt. Ltd.
PokaranSolaire Energy Pvt. Ltd
SaiMathili Power Co. Pvt. Ltd.
NVR Infra. and Services Pvt. Ltd.
LEPL Projects Ltd.
Sunborne Energy Raj. Solar Pvt
Ltd
Symphony Vyapar Pvt. Ltd.
Lexicon Vanijiya Pvt. Ltd.
Jackson Power Pvt. Ltd.
Jackson Power Pvt Ltd.
Saisudhir Energy Ltd.
Essel MP Energy Ltd.
Enfield Infra. Ltd.

State

Alloted Commissioned

CoD

Apr-13

May-13

Jun-13

Jul-13

Aug-13*

Sep-13

RJ
RJ

20
15

20
15

13-02-2013
21-01-2013

36.51
29.15

38.27
31.26

32.47
28.72

29.71
-

30.63
-

31.54
27.99

RJ

5

5

23-12-2012

-

10.15

8.96

-

-

9.05

RJ

20

20

30-01-2013

-

-

-

-

-

-

RJ

5

5

24-12-2012

-

-

-

-

-

-

RJ

5

5

18-02-2013

-

-

-

-

-

-

MH

5

5

22-02-2013

-

9.79

6.87

5.40

6.27

7.14

RJ
RJ
RJ
RJ
RJ

20
5
10
10
10

20
5
10
10
10

11-02-2013
24-02-2013
26-02-2013
25-02-2013
26-03-2013

16.77
-

17.29
-

16.48
-

14.87
-

15.33
-

13.69
15.78
16.73
13.69

RJ

5

5

26-03-2013

7.85

8.99

7.93

7.87

7.79

7.71

RJ
RJ
RJ
RJ
AP
MH
RJ

10
10
10
10
20
20
10

10
10
10
10
20
0
0

27-04-2013
01-05-2013
26-04-2013
26-04-2013
26-04-2013

-

-

15.24
15.57
-

0.00
0.00
-

-

15.75
15.62
16.04
14.92
-

* Due to non-availability of data from MNRE, estimated using extrapolation methods

More Related Content

What's hot

Gensol's credentials in solar industry
Gensol's credentials in solar industryGensol's credentials in solar industry
Gensol's credentials in solar industryAshish Verma
 
500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis
500 MW SECI’s Government Rooftop Tender: Technical Bid AnalysisGensol Engineering Limited
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in IndiaRBSA Advisors
 
Energy & entertainment quiz
Energy & entertainment quizEnergy & entertainment quiz
Energy & entertainment quizNTPC
 
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...Ashish Sachdeva
 
Solar Energy India
Solar Energy IndiaSolar Energy India
Solar Energy Indiafirstgreen
 
A Summer Internship report
A Summer Internship reportA Summer Internship report
A Summer Internship reportDharmveer kumar
 
Bridge to-india the-india-solar-handbook-june-2014-edition
Bridge to-india the-india-solar-handbook-june-2014-editionBridge to-india the-india-solar-handbook-june-2014-edition
Bridge to-india the-india-solar-handbook-june-2014-editionSanman Rajput
 
Green Corner l2010
Green Corner l2010Green Corner l2010
Green Corner l2010Amit Bharti
 
Integrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuIntegrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuDato Mat Isa
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateSaurabh Parihar
 
Indian Solar News | week 4 July 2021 - Solar Power roadmap, 39% india's 39% p...
Indian Solar News | week 4 July 2021 - Solar Power roadmap, 39% india's 39% p...Indian Solar News | week 4 July 2021 - Solar Power roadmap, 39% india's 39% p...
Indian Solar News | week 4 July 2021 - Solar Power roadmap, 39% india's 39% p...Rohit Arora
 
Solar PV and power electronics
Solar PV and power electronicsSolar PV and power electronics
Solar PV and power electronicsH Janardan Prabhu
 

What's hot (20)

Mnre report
Mnre reportMnre report
Mnre report
 
RE 2022
RE 2022RE 2022
RE 2022
 
Gensol's credentials in solar industry
Gensol's credentials in solar industryGensol's credentials in solar industry
Gensol's credentials in solar industry
 
500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis
500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in India
 
Energy & entertainment quiz
Energy & entertainment quizEnergy & entertainment quiz
Energy & entertainment quiz
 
Phases of Construction - Solar Project
Phases of Construction - Solar ProjectPhases of Construction - Solar Project
Phases of Construction - Solar Project
 
Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
 
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
Evolution of Solar Power in India | Opportunities & Challenges by Green Dream...
 
Solar Energy India
Solar Energy IndiaSolar Energy India
Solar Energy India
 
A Summer Internship report
A Summer Internship reportA Summer Internship report
A Summer Internship report
 
Bridge to-india the-india-solar-handbook-june-2014-edition
Bridge to-india the-india-solar-handbook-june-2014-editionBridge to-india the-india-solar-handbook-june-2014-edition
Bridge to-india the-india-solar-handbook-june-2014-edition
 
Report Solar-Power- 2014
Report Solar-Power- 2014Report Solar-Power- 2014
Report Solar-Power- 2014
 
Green Corner l2010
Green Corner l2010Green Corner l2010
Green Corner l2010
 
Integrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuIntegrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for Terengganu
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Indian Solar News | week 4 July 2021 - Solar Power roadmap, 39% india's 39% p...
Indian Solar News | week 4 July 2021 - Solar Power roadmap, 39% india's 39% p...Indian Solar News | week 4 July 2021 - Solar Power roadmap, 39% india's 39% p...
Indian Solar News | week 4 July 2021 - Solar Power roadmap, 39% india's 39% p...
 
JNNSM Solar Power in India
JNNSM Solar Power in IndiaJNNSM Solar Power in India
JNNSM Solar Power in India
 
Solar PV and power electronics
Solar PV and power electronicsSolar PV and power electronics
Solar PV and power electronics
 

Viewers also liked

Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Spark Network
 
Analysis of Trading activities by Licensed Traders for November 2013
Analysis of Trading activities by Licensed Traders for November 2013Analysis of Trading activities by Licensed Traders for November 2013
Analysis of Trading activities by Licensed Traders for November 2013Spark Network
 
Analysis of Trading activities by Licensed Traders for October 2013
Analysis of Trading activities by Licensed Traders for October 2013Analysis of Trading activities by Licensed Traders for October 2013
Analysis of Trading activities by Licensed Traders for October 2013Spark Network
 
Merc order on RPO-REC Compliance by Captive & Open Access consumers
Merc order on RPO-REC Compliance by Captive & Open Access consumersMerc order on RPO-REC Compliance by Captive & Open Access consumers
Merc order on RPO-REC Compliance by Captive & Open Access consumersSpark Network
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismSpark Network
 
GC Energy & Environmental Newsletter May 2012
GC Energy & Environmental Newsletter   May 2012GC Energy & Environmental Newsletter   May 2012
GC Energy & Environmental Newsletter May 2012generalcarbon
 
The Outcome Economy
The Outcome EconomyThe Outcome Economy
The Outcome EconomyHelge Tennø
 

Viewers also liked (8)

Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
Analysis of Trading activities by Licensed Traders for November 2013
Analysis of Trading activities by Licensed Traders for November 2013Analysis of Trading activities by Licensed Traders for November 2013
Analysis of Trading activities by Licensed Traders for November 2013
 
Analysis of Trading activities by Licensed Traders for October 2013
Analysis of Trading activities by Licensed Traders for October 2013Analysis of Trading activities by Licensed Traders for October 2013
Analysis of Trading activities by Licensed Traders for October 2013
 
Merc order on RPO-REC Compliance by Captive & Open Access consumers
Merc order on RPO-REC Compliance by Captive & Open Access consumersMerc order on RPO-REC Compliance by Captive & Open Access consumers
Merc order on RPO-REC Compliance by Captive & Open Access consumers
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
 
GC Energy & Environmental Newsletter May 2012
GC Energy & Environmental Newsletter   May 2012GC Energy & Environmental Newsletter   May 2012
GC Energy & Environmental Newsletter May 2012
 
7116
71167116
7116
 
The Outcome Economy
The Outcome EconomyThe Outcome Economy
The Outcome Economy
 

Similar to Performance report of solar projects under NSM

Solar power integration with grid
Solar power integration with gridSolar power integration with grid
Solar power integration with gridashishant
 
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWSOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWShaantanu Gaur
 
Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016glsomani
 
Solar Power-Project-Jan 2014
Solar Power-Project-Jan 2014Solar Power-Project-Jan 2014
Solar Power-Project-Jan 2014H Janardan Prabhu
 
REWA Ultra Mega Solar Power Project in Madhya Pradesh
REWA Ultra Mega Solar Power Project in Madhya PradeshREWA Ultra Mega Solar Power Project in Madhya Pradesh
REWA Ultra Mega Solar Power Project in Madhya PradeshWRI India
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...iassrmohanty
 
Solar System
Solar SystemSolar System
Solar SystemPatel Mit
 
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Syed Hashimi
 
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...IAEME Publication
 
Grid solar demo_performance
Grid solar demo_performanceGrid solar demo_performance
Grid solar demo_performanceSanman Rajput
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.antastoya
 
#Forecasting Daily Power #Generation of #SolarPlant
#Forecasting Daily Power #Generation of #SolarPlant#Forecasting Daily Power #Generation of #SolarPlant
#Forecasting Daily Power #Generation of #SolarPlantDas A. K.
 
4th Annual Conference on Solar Power in India : The New Shining Opportunity
4th Annual Conference on Solar Power in India : The New Shining Opportunity4th Annual Conference on Solar Power in India : The New Shining Opportunity
4th Annual Conference on Solar Power in India : The New Shining OpportunityInfraline Energy
 
India solar power_plant_vpc
India solar power_plant_vpcIndia solar power_plant_vpc
India solar power_plant_vpcPasu Kumar
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Headway Solar
 

Similar to Performance report of solar projects under NSM (20)

Solar power integration with grid
Solar power integration with gridSolar power integration with grid
Solar power integration with grid
 
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWSOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
 
Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016
 
Solar Power-Project-Jan 2014
Solar Power-Project-Jan 2014Solar Power-Project-Jan 2014
Solar Power-Project-Jan 2014
 
REWA Ultra Mega Solar Power Project in Madhya Pradesh
REWA Ultra Mega Solar Power Project in Madhya PradeshREWA Ultra Mega Solar Power Project in Madhya Pradesh
REWA Ultra Mega Solar Power Project in Madhya Pradesh
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
30120140501001
3012014050100130120140501001
30120140501001
 
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
 
Solar System
Solar SystemSolar System
Solar System
 
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
 
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
 
Grid solar demo_performance
Grid solar demo_performanceGrid solar demo_performance
Grid solar demo_performance
 
Sanjunit
SanjunitSanjunit
Sanjunit
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
#Forecasting Daily Power #Generation of #SolarPlant
#Forecasting Daily Power #Generation of #SolarPlant#Forecasting Daily Power #Generation of #SolarPlant
#Forecasting Daily Power #Generation of #SolarPlant
 
Detailed project report.pptx
Detailed project report.pptxDetailed project report.pptx
Detailed project report.pptx
 
4th Annual Conference on Solar Power in India : The New Shining Opportunity
4th Annual Conference on Solar Power in India : The New Shining Opportunity4th Annual Conference on Solar Power in India : The New Shining Opportunity
4th Annual Conference on Solar Power in India : The New Shining Opportunity
 
India solar power_plant_vpc
India solar power_plant_vpcIndia solar power_plant_vpc
India solar power_plant_vpc
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
History of Solar Energy
History of Solar EnergyHistory of Solar Energy
History of Solar Energy
 

More from Spark Network

Large Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way ForwardLarge Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way ForwardSpark Network
 
India's Power Generating Capacity - September 2013
India's Power Generating Capacity - September 2013India's Power Generating Capacity - September 2013
India's Power Generating Capacity - September 2013Spark Network
 
National Solar Mission - Phase II Batch I
National Solar Mission - Phase II Batch INational Solar Mission - Phase II Batch I
National Solar Mission - Phase II Batch ISpark Network
 
Consultative Paper for Solar Projects tariff by TNERC
Consultative Paper for Solar Projects tariff by TNERCConsultative Paper for Solar Projects tariff by TNERC
Consultative Paper for Solar Projects tariff by TNERCSpark Network
 
CEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power SectorCEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power SectorSpark Network
 
Results punjab Solar RfP
Results punjab Solar RfPResults punjab Solar RfP
Results punjab Solar RfPSpark Network
 
Notice to-channel-partners-10072013
Notice to-channel-partners-10072013Notice to-channel-partners-10072013
Notice to-channel-partners-10072013Spark Network
 
List channelpartners sp_jnnsm
List channelpartners sp_jnnsmList channelpartners sp_jnnsm
List channelpartners sp_jnnsmSpark Network
 

More from Spark Network (8)

Large Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way ForwardLarge Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way Forward
 
India's Power Generating Capacity - September 2013
India's Power Generating Capacity - September 2013India's Power Generating Capacity - September 2013
India's Power Generating Capacity - September 2013
 
National Solar Mission - Phase II Batch I
National Solar Mission - Phase II Batch INational Solar Mission - Phase II Batch I
National Solar Mission - Phase II Batch I
 
Consultative Paper for Solar Projects tariff by TNERC
Consultative Paper for Solar Projects tariff by TNERCConsultative Paper for Solar Projects tariff by TNERC
Consultative Paper for Solar Projects tariff by TNERC
 
CEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power SectorCEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power Sector
 
Results punjab Solar RfP
Results punjab Solar RfPResults punjab Solar RfP
Results punjab Solar RfP
 
Notice to-channel-partners-10072013
Notice to-channel-partners-10072013Notice to-channel-partners-10072013
Notice to-channel-partners-10072013
 
List channelpartners sp_jnnsm
List channelpartners sp_jnnsmList channelpartners sp_jnnsm
List channelpartners sp_jnnsm
 

Recently uploaded

NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Salesforce Education Cloud - A Complete Guide.pdf
Salesforce Education Cloud - A Complete Guide.pdfSalesforce Education Cloud - A Complete Guide.pdf
Salesforce Education Cloud - A Complete Guide.pdfHarryJohnson78
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 

Recently uploaded (20)

NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Salesforce Education Cloud - A Complete Guide.pdf
Salesforce Education Cloud - A Complete Guide.pdfSalesforce Education Cloud - A Complete Guide.pdf
Salesforce Education Cloud - A Complete Guide.pdf
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 

Performance report of solar projects under NSM

  • 1. POWER INDIA PERFORMANCE OF SOLAR PROJECTS Under Phase I of NSM Background Projects Performance Batch 1 of Phase 1 Batch 2 of Phase 1 Annexure 1: Complete Datasheet Connect with us November 14, 2013
  • 2. POWER INDIA DISCLAIMER This document along with all the Reports published by the POWER INDIA is properties of POWER INDIA. Every effort is made to provide correct and updated information. However, POWER INDIA takes no responsibility for content of any of the material posted, and will not be liable for, any reliance you place on information. POWER INDIA is not herein engaged in rendering professional advice and services to user of this report. www.powerind.in POWER INDIA POWER INDIA makes no warranties, expressed or implied, as to the ownership, accuracy, or adequacy of the content of this report. POWER INDIA shall not be liable for any indirect, incidental, consequential, or punitive damages or for lost revenues or profits, whether or not advised of the possibility of such damages or losses and regardless of the theory of liability. POWER INDIA hereby grants the user a personal, non-exclusive, nonrefundable, nontransferable license to use the report for research purposes only pursuant to the terms and conditions of this agreement. POWER INDIA retains exclusive and sole ownership of each report disseminated under this agreement. The user cannot engage in any unauthorized use, reproduction, distribution, publication or electronic transmission of this report or the information/forecasts therein without the express written permission of POWER INDIA. No part of this report may be used or reproduced in any manner or in any form or by any means without mentioning its original source. For further enquiries, please contact: POWER INDIA sparksnetwork@gmail.com contact@powerind.in 1 of 12
  • 3. POWER INDIA Background The Jawaharlal Nehru National Solar Mission (JNNSM or NSM) is a mission launched by Government of India on the 11th January, 2010 to promote development of solar energy projects in India by the Prime Minister. NSM has set the target of 20,000 MW grid connected solar projects by 2022 as per the following phases: • • • Phase 1: 1,000 MW (by 2013) Phase 2: cumulative 4,000 MW (by 2017) Phase 3: cumulative 20,000 MW (by 2022) Under Phase 1, 950 MW solar power projects were selected in two batches (batch-I during 2010-11 and batch-II during 2011-12) through a process of reverse bidding. NTPC Vidyut Vyapar Nigam Limited (NVVN) was appointed as the nodal authority for purchase of power from developers and further sale to distribution utilities/ Discoms after bundling with power from unallocated quota of power from coal based stations of NTPC on equal capacity basis. A total capacity of 420 MW has been commissioned under these batches by the end of Phase-1. In addition, a capacity of 50.5 MW under migration scheme, 88.8 MW under IREDA-GBI scheme and 21.5 MW under old Demonstration scheme has been commissioned, taking the total capacity commissioned to 680.80 MW. In this report, the performance of the solar projects installed under Batch 1 as well as Batch 2 of NSM Phase 1 are analyzed and depicted. 2 of 12
  • 4. POWER INDIA NSM Phase 1 Batch 1 The Batch 1 of NSM Phase 1 were launched and executed in the year 2010-11 and has seen installations of around 140 MW of Solar Projects. The complete list of Solar Projects commissioned under Batch 1 of NSM Phase 1 are as below: SN Company/Project 1 Aftaab Solar Private Limited Alex Spectrum Radiation Private Limited Amrit Energy Private Limited Azure Power (Rajasthan) Private Limited CCCL Infrastructure Limited DDE Renewable Energy Private Limited Electromech Maritech Private Limite EMC Limited Finehope Allied Engineering Private Limited Greentech Power Private Limited Indian Oil Corporation Limited Karnataka Power Corporation Limited Khaya Solar Projects Private Limited Maharashtra Seamless Limited Mahindra Solar One Private Limited Newton Solar Private Limited Northwest Energy Private Limited OswalWoollen Mills Limited Precision Technik Private Limited Punjlloyd Solar Power Limited Saidham Overseas Private Limited Saisudhir Energy Limited SEI Solar Energy Private Limited Vasavi Solar Power Pvt. Limited 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 State Alloted Comm CoD Odisha 5 5 07-02-2012 RJ 5 5 21-02-2012 RJ 5 5 02-02-2012 RJ 5 5 01-01-2012 TN 5 5 29-03-2012 RJ 5 5 14-02-2012 RJ 5 5 01-02-2012 UP 5 5 04-03-2012 RJ 5 5 07-02-2012 RJ 5 5 08-02-2012 RJ 5 5 02-02-2012 KA 5 5 25-06-2012 RJ 5 5 28-01-2012 RJ 5 5 07-01-2012 RJ 5 5 03-01-2012 RJ 5 5 09-02-2012 RJ 5 5 07-01-2012 RJ 5 5 10-01-2012 Rj 5 5 22-03-2012 RJ 5 5 08-01-2012 RJ 5 5 30-01-2012 AP RJ RJ 5 5 5 5 5 5 05-01-2012 01-01-2012 02-02-2012 3 of 12
  • 5. POWER INDIA SN Company/Project 25 Viraj Renewables Energy Welspun Solar AP Private limited Rithwik Projects Private Limited FireStone Trading Private Limited Total (MW) 26 27 28 State Alloted Comm CoD RJ 5 5 05-01-2012 AP 5 5 01-01-2012 AP 5 5 24-07-2013 MH 5 5 06-09-2012 140 The MNRE releases the performance data of all the projects commissioned under National Solar Mission on monthly basis. Under the performance data, the performances of solar projects in terms of monthly generation (in kWh) as well as CUF/PLF are being mentioned. However, for the purpose of this report, only the generation figures given by MNRE are considered and are used to calculate the PLF of the project. Further, out of the 28 commissioned projects, around 14 projects were having inconsistent data / data not available. Hence, for the purpose of evaluating the performance of the Batch 1 Projects, the sample of 14 projects which were fairly reasonable data has been considered from the month of Oct-12 to Se-13. (Pl refer Annex 1 for the complete data) SN Company/Project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Saidham Overseas Private Limited Northwest Energy Private Limited Mahindra Solar One Private Limited Vasavi Solar Power Pvt. Limited Khaya Solar Projects Private Limited Finehope Allied Engineering Private Limited Alex Spectrum Radiation Private Limited Viraj Renewables Energy Electromech Maritech Private Limite Azure Power (Rajasthan) Private Limited DDE Renewable Energy Private Limited Newton Solar Private Limited CCCL Infrastructure Limited Indian Oil Corporation Limited Total of Batch 1 (14 projects) Avg PLF (%) 23.32% 23.02% 22.77% 22.65% 22.64% 22.64% 21.83% 21.24% 20.66% 20.44% 19.38% 19.36% 18.52% 17.91% 21.17% Total Gen (Lac Units) 102.16 100.81 99.74 99.22 99.15 99.15 95.62 93.04 90.48 89.54 84.90 84.78 81.10 78.44 1298.14 4 of 12
  • 6. POWER INDIA Comparison of NSM Ph1 Batch 1 Solar Projects in terms Generation/PLF 120.00 25.00% 100.00 20.00% 80.00 15.00% 60.00 10.00% 40.00 20.00 5.00% - 0.00% Generation (Lac Units) PLF(%) Thus, on an average the PLF achieved by the batch 1 solar projects is around 21.17%. The total month wise generations of the projects have been computed and an average PLF has been calculated to arrive at the average monthly PLF of these 14 projects. Chart showing average monthly PLF as well as %share in the total generation is depicted below: Monthly Generation/PLF Trend for NSM Ph1 Batch 1 Projects 30.00% 25.00% 21% 20.00% 15.00% 10.00% 9% 20% 8% 18% 18% 7% 7% 20% 7% 24% 24% 25% 23% 10% 9% 10% 9% 19% 20% 8% 8% 22% 9% 5.00% 0.00% Monthly PLF (%) % Share in Total 5 of 12
  • 7. POWER INDIA NSM Phase 1 Batch 2 The Batch 2 of NSM Phase 1 were launched and executed in the year 2011-12 and has seen installations of around 310 MW of Solar Projects. The complete list of Solar Projects commissioned under Batch 2 of NSM Phase 1 is as below: SN Company/Project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Welspun Solar AP Pvt Ltd. Welspun Solar AP Pvt Ltd. Welspun Solar AP Pvt Ltd. Mahindra Suryaparakash Pvt. Ltd Mahindra Suryaparakash Pvt. Ltd Solarfield Energy Two Pvt. Ltd. Azure Solar Pvt. Ltd. Azure Solar Pvt. Ltd. FonrocheSaaras Energy Pvt. Ltd. FonrocheRajhans Energy Pvt. Ltd. Green Infra Solar Projects Ltd. Green Infra Solar Farms Projects Ltd. Gail (India) Ltd. Sh. Saibaba Green Power Pvt. Ltd SEI Solar Power Pvt. Ltd. PokaranSolaire Energy Pvt. Ltd SaiMathili Power Co. Pvt. Ltd. NVR Infra. and Services Pvt. Ltd. LEPL Projects Ltd. Sunborne Energy Raj. Solar Pvt Ltd Symphony Vyapar Pvt. Ltd. Lexicon Vanijiya Pvt. Ltd. Jackson Power Pvt. Ltd. Jackson Power Pvt Ltd. Saisudhir Energy Ltd. Essel MP Energy Ltd. Enfield Infra. Ltd. Total (MW) State Alloted Comm. CoD RJ RJ RJ RJ RJ RJ RJ RJ RJ RJ RJ 15 15 20 20 10 20 15 20 15 5 20 15 15 20 20 10 20 15 20 15 5 20 22-01-2013 31-01-2013 19-02-2013 20-02-2013 20-02-2013 20-02-2013 12-02-2013 13-02-2013 21-01-2013 23-12-2012 30-01-2013 RJ 5 5 24-12-2012 RJ MH RJ RJ RJ RJ RJ RJ RJ RJ RJ RJ AP MH RJ 5 5 20 5 10 10 10 5 10 10 10 10 20 20 10 310 5 5 20 5 10 10 10 5 10 10 10 10 20 0 0 18-02-2013 22-02-2013 11-02-2013 24-02-2013 26-02-2013 25-02-2013 26-03-2013 26-03-2013 27-04-2013 01-05-2013 26-04-2013 26-04-2013 26-04-2013 Similar to Batch 1, the MNRE releases the performance data of all the projects commissioned under Phase 2 on monthly basis. 6 of 12
  • 8. POWER INDIA Under the performance data, the performances of solar projects in terms of monthly generation (in kWh) as well as CUF/PLF are being mentioned. For the purpose of this report, only the generation figures given by MNRE are considered and are used to calculate the PLF of the project. However, as currently the data are available from the month of Apr-13 to Sep-13 i.e. 6 months only hence the evaluation of the performance of projects will not be appropriate at this stage. The complete data has been depicted in Annex 1 of this report. 7 of 12
  • 9. POWER INDIA POWER INDIA Power, in the present edge, is the life blood for each & every economy around the globe. It is an essential requirement for all facets of our life and has been recognized as a basic human need. Socio-economic development of any country depends upon development of this critical infrastructure. Indian Power sector has been in the fore front of Indian growth story. With huge captive coal reserves, significant potential for generation of power from renewable energy sources, and a highly investor friendly Government policy for setting-up green-field Power projects, Indian Power sector is abreast with untapped opportunities. The growth of the economy and its global competitiveness hinges on the availability of reliable and quality power at competitive rates. POWER INDIA is putting an effort to bolster the sturdy growth of Indian Power Sector by providing comprehensive supports in terms of latest happenings, analysis, publications, links and other resources related to the Indian and Global Power Sector to the Power Professionals. SERVICES OFFERED 8 of 12
  • 10. POWER INDIA Annexure – 1 Commissioning & Performance Data of Solar Projects under National Solar Mission Phase 1 Batch 1 Solar Projects under National Solar Mission Phase 1 Company/Project Stat e Capacit y (MW) CoD Oct-12 Nov-12 Dec-12 Jan-13* Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13* Sep-13 1 Aftaab Solar Private Limited OR 5 07-02-2012 0.01 6.67 8.21 7.61 7.01 8.44 7.80 8.39 5.94 5.73 6.26 6.80 2 Alex Spectrum Radiation Private Limited RJ 5 21-02-2012 8.29 7.09 6.69 6.69 6.68 9.03 8.34 9.40 8.54 8.14 8.29 8.44 3 Amrit Energy Private Limited RJ 5 02-02-2012 0.01 6.89 7.73 7.80 7.87 9.61 8.78 9.82 - - - 7.23 4 Azure Power (Rajasthan) Private Limited RJ 5 01-01-2012 8.27 6.50 6.83 6.46 6.09 8.55 8.29 8.68 7.90 7.08 7.33 7.57 5 CCCL Infrastructure Limited TN 5 29-03-2012 5.70 6.11 5.78 6.15 6.52 7.58 7.20 7.44 6.55 7.21 7.36 7.50 RJ 5 14-02-2012 7.77 7.30 7.00 6.59 6.19 8.45 8.10 6.79 7.18 5.89 6.51 7.14 RJ 5 01-02-2012 8.07 7.50 7.01 7.00 6.99 8.84 8.57 8.96 7.17 5.98 6.79 7.60 UP 5 04-03-2012 7.13 5.31 4.98 5.50 6.02 7.38 8.10 8.32 6.29 - - 6.75 RJ 5 07-02-2012 8.38 7.41 6.79 6.97 7.15 9.88 10.06 11.06 8.88 7.23 7.52 7.82 RJ 5 08-02-2012 - - - - - - - - - - - - RJ 5 02-02-2012 6.82 6.08 6.12 6.18 6.24 7.32 6.10 7.17 6.41 6.33 6.67 7.00 KA 5 25-06-2012 - - 6.82 - - - - - - - - - RJ 5 28-01-2012 8.02 6.82 6.12 6.43 6.75 9.13 9.53 10.93 9.98 8.20 8.48 8.76 SN 6 7 8 9 10 11 12 13 DDE Renewable Energy Private Limited Electromech Maritech Private Limite EMC Limited Finehope Allied Engineering Private Limited Greentech Power Private Limited Indian Oil Corporation Limited Karnataka Power Corporation Limited Khaya Solar Projects Private Limited 14 Maharashtra Seamless Limited RJ 5 07-01-2012 - 7.76 - - - - - - - - - - 15 Mahindra Solar One Private Limited RJ 5 03-01-2012 8.33 6.74 6.30 6.33 6.35 9.61 9.67 11.03 9.13 8.54 8.75 8.95 16 Newton Solar Private Limited RJ 5 09-02-2012 7.56 6.86 6.44 6.39 6.35 8.03 7.80 8.30 7.29 5.92 6.58 7.25 17 Northwest Energy Private Limited RJ 5 07-01-2012 9.19 8.39 8.10 7.84 7.57 9.39 8.76 9.12 7.88 7.73 8.20 8.67
  • 11. POWER INDIA Stat e Capacit y (MW) CoD Oct-12 Nov-12 Dec-12 Jan-13* Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13* Sep-13 OswalWoollen Mills Limited RJ 5 10-01-2012 - - - - - - - - - 8.17 7.65 7.12 19 Precision Technik Private Limited RJ 5 22-03-2012 - - - - - - - - - - - - 20 Punjlloyd Solar Power Limited RJ 5 08-01-2012 6.63 6.06 - - 5.43 6.60 7.72 8.73 7.53 7.35 7.65 7.95 21 Saidham Overseas Private Limited RJ 5 30-01-2012 8.63 7.23 6.40 6.78 7.15 9.68 9.92 11.58 10.10 8.09 8.23 8.37 22 Saisudhir Energy Limited AP 5 05-01-2012 0.00 0.00 8.26 - - 8.24 83.83 8.23 6.28 5.85 6.30 6.74 23 SEI Solar Energy Private Limited RJ 5 01-01-2012 7.79 6.92 5.89 6.07 6.25 - 8.14 8.74 7.64 7.20 - - 24 Vasavi Solar Power Pvt. Limited RJ 5 02-02-2012 8.14 6.97 5.93 6.46 7.00 9.50 9.73 11.19 9.88 7.80 8.15 8.50 25 Viraj Renewables Energy RJ 5 05-01-2012 8.15 7.39 7.52 7.36 7.20 8.79 8.15 8.56 7.21 7.05 7.57 8.09 26 Welspun Solar AP Private limited AP 5 01-01-2012 - 7.71 7.45 7.81 8.17 9.13 8.50 8.12 7.06 6.14 6.47 6.80 27 Rithwik Projects Private Limited AP 5 24-07-2013 - - - - - - - - - - - - 28 FireStone Trading Private Limited MH 5 06-09-2012 - - - - - - - - - - - - SN Company/Project 18 * Due to non-availability of data from MNRE, estimated using extrapolation methods Batch 2 Solar Projects under National Solar Mission Phase 1 SN Company/Project 1 2 3 4 5 6 7 Welspun Solar AP Pvt Ltd. Welspun Solar AP Pvt Ltd. Welspun Solar AP Pvt Ltd. Mahindra Suryaparakash Pvt. Ltd Mahindra Suryaparakash Pvt. Ltd Solarfield Energy Two Pvt. Ltd. Azure Solar Pvt. Ltd. State Alloted Commissioned CoD Apr-13 May-13 Jun-13 Jul-13 Aug-13* Sep-13 RJ RJ RJ 15 15 20 15 15 20 22-01-2013 31-01-2013 19-02-2013 26.78 26.02 33.53 29.42 35.96 26.00 26.00 30.82 23.16 24.40 29.80 24.24 25.51 31.03 25.31 26.63 32.26 RJ 20 20 20-02-2013 27.34 29.39 25.94 25.28 26.41 27.54 RJ 10 10 20-02-2013 13.01 14.47 12.92 13.10 13.47 13.84 RJ RJ 20 15 20 15 20-02-2013 12-02-2013 27.19 27.46 28.55 28.86 25.45 24.36 25.57 22.33 27.18 23.07 28.79 23.82
  • 12. POWER INDIA SN Company/Project 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Azure Solar Pvt. Ltd. FonrocheSaaras Energy Pvt. Ltd. FonrocheRajhans Energy Pvt. Ltd. Green Infra Solar Projects Ltd. Green Infra Solar Farms Projects Ltd. Gail (India) Ltd. Sh. Saibaba Green Power Pvt. Ltd SEI Solar Power Pvt. Ltd. PokaranSolaire Energy Pvt. Ltd SaiMathili Power Co. Pvt. Ltd. NVR Infra. and Services Pvt. Ltd. LEPL Projects Ltd. Sunborne Energy Raj. Solar Pvt Ltd Symphony Vyapar Pvt. Ltd. Lexicon Vanijiya Pvt. Ltd. Jackson Power Pvt. Ltd. Jackson Power Pvt Ltd. Saisudhir Energy Ltd. Essel MP Energy Ltd. Enfield Infra. Ltd. State Alloted Commissioned CoD Apr-13 May-13 Jun-13 Jul-13 Aug-13* Sep-13 RJ RJ 20 15 20 15 13-02-2013 21-01-2013 36.51 29.15 38.27 31.26 32.47 28.72 29.71 - 30.63 - 31.54 27.99 RJ 5 5 23-12-2012 - 10.15 8.96 - - 9.05 RJ 20 20 30-01-2013 - - - - - - RJ 5 5 24-12-2012 - - - - - - RJ 5 5 18-02-2013 - - - - - - MH 5 5 22-02-2013 - 9.79 6.87 5.40 6.27 7.14 RJ RJ RJ RJ RJ 20 5 10 10 10 20 5 10 10 10 11-02-2013 24-02-2013 26-02-2013 25-02-2013 26-03-2013 16.77 - 17.29 - 16.48 - 14.87 - 15.33 - 13.69 15.78 16.73 13.69 RJ 5 5 26-03-2013 7.85 8.99 7.93 7.87 7.79 7.71 RJ RJ RJ RJ AP MH RJ 10 10 10 10 20 20 10 10 10 10 10 20 0 0 27-04-2013 01-05-2013 26-04-2013 26-04-2013 26-04-2013 - - 15.24 15.57 - 0.00 0.00 - - 15.75 15.62 16.04 14.92 - * Due to non-availability of data from MNRE, estimated using extrapolation methods