BUILDING STRONG®
• Project Overview & History
• Problem Statement
• Plan Formulation Process
• Tentatively Selected Plan
• Shorefront features
• Inundation Features
• Tie-In features
• Residual Risk features
• Environmental Analysis
• Next steps
Presentation Outline
2
BUILDING STRONG®
Meeting Purpose
 Public Information Session & NEPA Meeting
 Provide an update on the Reformulation Study and
Tentatively Selected Plan (TSP)
 Provide an opportunity for feedback on:
► Tentatively Selected Plan
► Alternatives considered in arriving at the TSP
3
BUILDING STRONG®
Project Partners
►NY State Department of Environmental
Conservation (NYSDEC)
►New York City
• Mayor’s Office of Recovery and Resiliency
• Department of Parks and Recreation
• Department of Environmental Protection
►National Park Service, Gateway (Cooperating Agency)
BUILDING STRONG®
Study Area
5
BUILDING STRONG®
Reformulation Goals
 Recommend long-term coastal storm risk reduction
for Rockaway and Jamaica Bay
 Address multiple risks in a comprehensive system
for Rockaway and Jamaica Bay that is
► Engineeringly Feasible
► Economically Justified
► Environmentally Acceptable
6
BUILDING STRONG®
Risks
 Flooding (inundation) along Atlantic Ocean
Coast and Jamaica Bay
 Wave Damage
 Beach Erosion
 Effects of Sea Level Change
BUILDING STRONG®
Coastal Storm Risk Vulnerability
► Structures exposed to inundation, waves and erosion
► Naturally low-lying topography – inundation occurs
across broad areas
► Densely populated urban area
► Extensive low-lying infrastructure – Critical
infrastructure within inundation impact areas
► Degraded coastal ecosystems undermine natural
resiliency of the area
>41,000 structures at risk of inundation for 1%
event
Problem Statement
8
BUILDING STRONG®
Scale of the Flooding Problem
Blue illustrates current 1% annual chance of flooding
Purple illustrates 1.3 feet of Relative Sea Level Change in 2070, (mid-range SLC) added to the 1% flooding
9
BUILDING STRONG®
Sand Movement and Erosion
Simulation
+16 years
BUILDING STRONG®
Original Project (1970s)
Project Authorized in 1965 as a Beach Erosion Control and
Hurricane Protection Project
Beach Erosion Control Features:
 Beach Berm at +10 ft Mean Sea Level (MSL)
 5M Cubic Yards of sand place for initial construction
 Renourishment for a period of 10 years
Hurricane Protection Features:
Never Constructed and Subsequently De-authorized
 Hurricane Barrier w/ Navigation gate across Rockaway Inlet
 Floodwall at +18 ft MSL, for 7.7 miles along Rockaway
11
BUILDING STRONG® 12
Original Authorized Project
BUILDING STRONG®
Original Project (1970s)
 1974 authorization – authorized separate construction of “beach erosion
control” portion plus 10 years of renourishment
 The “Hurricane Protection Features” were de-authorized by Congress
 Constructed in 1975-1977
 Terminal groin added at Beach 149th Street in 1979
 Project renourished regularly through 1987, and in 1996, 2000, and 2004
 Due to lack of renourishment, the beach was below design size when
Sandy hit
13
BUILDING STRONG®
Original Authorized Project Cross-Section
As a beach erosion control project – no dune feature or
wall to offer protection against surge (flooding)
14
BUILDING STRONG®
Planning Process Overview
Rockaway Project Area formulated as a system,
considering shorefront and bay
- First Planning step is to evaluate and screen measures
- Second Planning Step is to compare alternatives and
identify the Tentatively Selected Plan
- Following the Draft Report and EIS additional
feasibility-level design is conducted on TSP.
BUILDING STRONG®
Storm Risk Management Measures
 Coastal storm risk management can be achieved through a
variety of engineered features, designed as appropriate for each
project area.
 Features can include
► hurricane storm surge barriers
► hurricane dunes and levees
► seawalls
► revetments
► groins
► breakwaters
► beaches and dunes (beach nourishment)
► bypassing and backpassing of sand
► non-structural measures such as house-raising,
road raising, relocations and buyouts.
BUILDING STRONG®
Final Array of Alternatives
A - No Action Alternative
B - Non-Structural Alternative
C - Rockaway Storm Surge Barrier (2 Possible
Alignments)
• Beachfill with reinforced dune
• Groins & Groin extensions
• Barrier with navigation and sector gates
• Tie In Features
D - Jamaica Bay Perimeter Plan
• Beachfill with reinforced dune
• Groins & groin extensions
• Living Shoreline and/or T-Wall where appropriate
• Smaller inlet closure gates to reduce wall length
BUILDING STRONG®
BUILDING STRONG®
Tentatively Selected Plan
BUILDING STRONG®
Elements Common to All Alternatives
 Atlantic Shorefront Features (Composite Seawall,
Beachfill, Groins)
 Atlantic Shorefront East and West Tie-ins*
 Rockaway Bayside Tie-in*
 Coney Island Tie-in*
* Alternative tie-ins will be developed further during detailed design
20
BUILDING STRONG®
Tentatively Selected Plan
(Shorefront Component)
• Composite Seawall, beach berm
• Construction of 12 new groins between Beach 90th to Beach 122nd
• Enhancement of existing groin field from Beach 36th to Beach 49th
(extending groins) and new groin at Beach 34th
Groin Construction
34th St new groin - 526 ft
37th St extend groin - 175 ft
40th St extend groin - 200 ft
43rd St extend groin - 75 ft
46th St extend groin - 150 ft
49th St extend groin - 200 ft
92nd St new groin - 326 ft
95th St new groin - 326 ft
98th St new groin - 326 ft
101st St new groin - 326 ft
104th St new groin - 326 ft
106th St new groin - 326 ft
108th St new groin - 326 ft
110th St new groin - 351 ft
113th St new groin - 376 ft
115th St new groin - 376 ft
118th St new groin - 376 ft
121st St new groin - 326 ft
Typical groin section Typical groin layout
BUILDING STRONG®
Shorefront Component includes Initial sand placement and
renourishment 50 years
Red line indicates previous
Authorized project elevation
BUILDING STRONG® 23
Composite Seawall Cross-Section
BUILDING STRONG®
Barrier Alignment Alternatives
Three alignments of the storm surge barrier originally considered
- Hydrodynamic modeling undertaken for design of openings
- Effects of scour on Gil Hodges Bridge eliminated C-1W
- Impacts to existing utilities considered
C-1E is the preferred alignment, C-2 is close in comparison
Preliminary Water Quality modeling undertaken to evaluate plans
Additional modeling to be undertaken for the final design
BUILDING STRONG®
Surge Barrier Details
Hurricane Barrier Alternative Alignment Gate Opening Aggregate Length
Alignment Total Opening (ft)
Number of 100-foot
Vertical Lift Gates
Number of 200-foot
Sector Gates
C-1E 1,100 7 2
C-2 1,700 11 3
Both Alignments
• Maximum tidal amplitude change of 0.2 feet, Minimal change to flow speeds and direction
25
Oosterscheldekering Storm Surge Barrier
with lift gates
Source: (https://beeldbank.rws.nl Rijkswaterstaat / Harry van Reeken)
Spijkenisse - Hartelkering Storm Surge Barrier
with sector gates (credit: Quistnix!)
BUILDING STRONG® 26
Lake Borgne, New Orleans Surge Barrier
built by the USACE in 2011 (1.8 miles long)
BUILDING STRONG®
Residual Risk Features
 Areas vulnerable to SLC or high frequency
events will be protected in the short term prior to
construction of the barrier
 NNBFs and some structures identified
 Small scale Non-Structural solutions will be
explored in final design
27
BUILDING STRONG®
Typical Residual Risk Measures
FLOOD SIDE LAND SIDE
FLOOD SIDE LAND SIDE
Generic measures are assigned
considering:
► Shoreline Type and Condition
► Alignment
► Land Use
Generic measure is either:
► Retrofit Existing Structure
► New Construction
Cost developed for each project
based on measure and length
Retrofit L-Wall
Retrofit Crown Wall
BUILDING STRONG®
Generic Residual Risk Measures (cont’d)
FLOOD SIDE LAND SIDE FLOOD SIDE LAND SIDE
New I-WallBulkhead
FLOOD SIDE LAND SIDE
Revetment
FLOOD SIDE LAND SIDE
Berm
BUILDING STRONG®
Edgemere Residual Risk Concept
BUILDING STRONG®
Mott Basin Residual Risk Concept
31
BUILDING STRONG®
Cost Breakdown
Construction, Mitigation, and Real Estate Costs
Alternative C-1E Alternative C-2 Alternative D
Construction $3,328,135,000 $3,361,337,000 $4,467,352,000
Mitigation $90,833,000 $75,783,000 $123,383,000
Real Estate $29,436,000 $17,386,000 $179,955,000
First Cost Total $3,448,404,000 $3,454,506,000 $4,770,690,000
IDC $333,029,000 $336,274,000 $424,262,000
Total Construction
Cost
$3,781,433,000 $3,790,780,000 $5,194,952,000
32
FY 2016, 50 year study period, 3.125 discount rate
BUILDING STRONG®
Annual Costs
Annual Costs
Alternative C-1E Alternative C-2 Alternative D
Construction $150,474,000 $150,846,000 $206,722,000
Renourishment $5,740,000 $5,740,000 $5,740,000
OMRR&R $7,424,000 $7,124,000 $14,954,000
Total AAEQ $163,638,000 $163,710,000 $227,416,000
33
FY 2016, 50 year study period, 3.125 discount rate
Alternative Plan – Benefit Cost Ratio
Plan Total Cost Benefits Net Benefits BCR
C-1E $163,638,000 $509,233,000 $345,595,000 3.1
C-2 $163,710,000 $509,233,000 $345,523,000 3.1
D $227,416,000 $497,582,000 $270,166,000 2.2
FY 2016, 50 year study period, 3.125 discount rate
Project Costs and Economics
The TSP is the NED Plan, identified as the plan that has highest net benefits
Consideration of Environmental Impacts
Unavoidable, Minimal &Temporary
Recreational and Environmental Impacts
Beach Access:
Temporary disruption to beach access via walkovers over the
Aesthetics:
Potential impacts to view of beach from north side of the dune
Surfing and Fishing:
Will be temporary and will dissipate as the beach returns to equilibrium
Beach Usage:
Impacts end as construction moves along Beach
Groins/Jetties:
Impact local shoreline sand supply, disrupt benthic habitat,
provide vertical and structural habitat for many marine organisms; Potential
adverse effect to buried cultural resources
Seawalls:
Reduce aquatic-terrestrial connectivity. Reduce spawning habitat for forage
fish. Potential loss of upper beach and backshore altered sediment
transport (loss of beach shoreward of the structure); Potential adverse
effects to buried cultural resources
Storm Surge Barrier Impacts:
Potential to affect tidal hydraulics and water quality parameters such as
temperature, dissolved oxygen, nutrient concentrations, etc. Impacts to bay
bottom, potentially limiting wetland areas along the shoreline area
Adverse effects to Gateway National Recreation Area historic districts
Impacts Avoided or Minimized
Benthic:
Short term, recovery expected within 2 - 6.5 months
nearshore and 1.5 to 2.5 years offshore following
construction
Fisheries:
No long-term impacts expected, will generally avoid
construction area
Shorebirds/Endangered Species:
No construction during breeding season
Avoidance and enhancement of existing
foraging/nesting habitats
Water Quality:
Short term turbidity (including impacts to dissolved
oxygen), ends as soon as each element is
constructed
Air Quality and Noise:
Temporary impacts, during 24-7 construction only
Aesthetics:
New sand similar to the existing beach.
Impacts Considered: Benthic Communities, Fisheries, Shorebirds, Water Quality, Air Quality
and Noise, Cultural Resources, Aesthetics, Surfing, Fishing, Beach Usage.
BUILDING STRONG®
Hydrodynamic modeling to date:
1) Tidal Amplitude impacts
► Identified reductions in tidal amplitude of less than 0.2 feet
► Results consistent
• over full 35-day simulation period, and
• for all hurricane barrier alignments and configurations
evaluated for the TSP
2) Jamaica Bay Eutrophication Model
Bay specific model to assess impacts in greater detail.
Barrier Analysis
36
BUILDING STRONG®
Next Steps
 Public and agency input on features, locations and
scales
 Refine design and evaluation of specific plans
► Detailed, coordinated Water Quality Modeling
► Refine design
► Identify scale of barrier and tie ins
 Department of Interior (Gateway) agreement with plan
 Final Report and Environmental Impact Statement
BUILDING STRONG®
Implementation
 The Selected Plan will be built incrementally,
Atlantic Shoreline will be in the first phase
 Significant Federal funding is available for
construction (Sandy Funding to USACE for
projects like this totals $3.5B)
38
BUILDING STRONG®
Schedule
 Draft General Reevaluation Report available for public
and agency review: November 17, 2016
 Final Report (June 2017) must be reviewed and
approved both internally within the USACE and
externally, including local, state, and other Federal
oversight
 Construction start of first phase (Targeted for 2019) will
depend on length of reviews and approvals, and relative
complexity of design
39
BUILDING STRONG®
Local Sponsor
Responsibilities
Local Sponsor
►Must cost-share construction and renourishment
►Must commit to doing O&M
►Must indemnify State and Federal Governments
►Must obtain all necessary real estate
40
BUILDING STRONG®
Operation and Maintenance
Local Sponsor must maintain project once built
► Maintain public access
► Prohibit excavation and alterations
► Grade and reshape beach to original elevations to repair erosion
► Operate and Maintain the Storm Surge Barriers
► Conduct quarterly inspections and take beach width
measurements
► Send quarterly inspection reports to State and Corps
► Conduct pre-storm & post-storm inspections
► Participate in yearly inspection with State and Corps
41
BUILDING STRONG®
Real Estate Required
 Perpetual beach easements for all parcels
where sand is placed
 Fee acquisition required for structural
components
42
BUILDING STRONG®
Public Access Overview
 Federal funding requires public access open to all
 Public accessways to beaches must be within ¼ of a mile in each direction
 Local Sponsor responsible for developing a Public Access Plan
BUILDING STRONG®
Questions

More Related Content

What's hot

Cooks beach & flaxmill bay update 16 august 2019
Cooks beach & flaxmill bay update   16 august 2019Cooks beach & flaxmill bay update   16 august 2019
Cooks beach & flaxmill bay update 16 august 2019
kinders
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
Fairfax County
 
Drainage Salvation-JRiopelle
Drainage Salvation-JRiopelleDrainage Salvation-JRiopelle
Drainage Salvation-JRiopelle
Jim Riopelle CGSA, AGS
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
Fairfax County
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream Restoration
Fairfax County
 
ESTC 2011 Presentation by Scott Liggett, Beach Renourishment
ESTC 2011 Presentation by Scott Liggett, Beach RenourishmentESTC 2011 Presentation by Scott Liggett, Beach Renourishment
ESTC 2011 Presentation by Scott Liggett, Beach Renourishment
The International Ecotourism Society (TIES)
 
Doe On Nonconforming Uses
Doe On Nonconforming UsesDoe On Nonconforming Uses
Doe On Nonconforming Uses
Richard Civille
 
DOE Nonconforming Uses
DOE Nonconforming UsesDOE Nonconforming Uses
DOE Nonconforming Uses
BSH Admin
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
Fairfax County
 
Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit Project
Fairfax County
 
A 1 Concrete Leveling Western New York
A 1 Concrete Leveling Western New YorkA 1 Concrete Leveling Western New York
A 1 Concrete Leveling Western New York
A-1 Concrete Leveling & Foundation Repair
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer Repair
Fairfax County
 
ASDSO Dam Safety 2010 Presentation
ASDSO Dam Safety 2010 PresentationASDSO Dam Safety 2010 Presentation
ASDSO Dam Safety 2010 Presentation
Jeremy Young, PE
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Tonyamis
 
Mitigating foundation distress
Mitigating foundation distressMitigating foundation distress
Mitigating foundation distress
Infocengrs63
 
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
Recycling and Resource Management Division
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Fairfax County
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015
Fairfax County
 
2012 9 Philadelphia Museum of Art Construction Project
2012 9 Philadelphia Museum of Art Construction Project2012 9 Philadelphia Museum of Art Construction Project
2012 9 Philadelphia Museum of Art Construction Project
IAMFA
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
Fairfax County
 

What's hot (20)

Cooks beach & flaxmill bay update 16 august 2019
Cooks beach & flaxmill bay update   16 august 2019Cooks beach & flaxmill bay update   16 august 2019
Cooks beach & flaxmill bay update 16 august 2019
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Drainage Salvation-JRiopelle
Drainage Salvation-JRiopelleDrainage Salvation-JRiopelle
Drainage Salvation-JRiopelle
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream Restoration
 
ESTC 2011 Presentation by Scott Liggett, Beach Renourishment
ESTC 2011 Presentation by Scott Liggett, Beach RenourishmentESTC 2011 Presentation by Scott Liggett, Beach Renourishment
ESTC 2011 Presentation by Scott Liggett, Beach Renourishment
 
Doe On Nonconforming Uses
Doe On Nonconforming UsesDoe On Nonconforming Uses
Doe On Nonconforming Uses
 
DOE Nonconforming Uses
DOE Nonconforming UsesDOE Nonconforming Uses
DOE Nonconforming Uses
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit Project
 
A 1 Concrete Leveling Western New York
A 1 Concrete Leveling Western New YorkA 1 Concrete Leveling Western New York
A 1 Concrete Leveling Western New York
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer Repair
 
ASDSO Dam Safety 2010 Presentation
ASDSO Dam Safety 2010 PresentationASDSO Dam Safety 2010 Presentation
ASDSO Dam Safety 2010 Presentation
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
 
Mitigating foundation distress
Mitigating foundation distressMitigating foundation distress
Mitigating foundation distress
 
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
GLCC-DEP Presentation to Derwood Community, Waste Delineation & Nature and Ex...
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015
 
2012 9 Philadelphia Museum of Art Construction Project
2012 9 Philadelphia Museum of Art Construction Project2012 9 Philadelphia Museum of Art Construction Project
2012 9 Philadelphia Museum of Art Construction Project
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 

Viewers also liked

Stakeholder report -srijb-science and resiliency institute at jamaica bay-
Stakeholder report -srijb-science and resiliency institute at jamaica bay-Stakeholder report -srijb-science and resiliency institute at jamaica bay-
Stakeholder report -srijb-science and resiliency institute at jamaica bay-
ecowatchers
 
Jamaica Bay Greenway
Jamaica Bay GreenwayJamaica Bay Greenway
Jamaica Bay Greenway
ecowatchers
 
Sunset cove phase 2 advocacy
Sunset cove phase 2 advocacySunset cove phase 2 advocacy
Sunset cove phase 2 advocacy
ecowatchers
 
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bayArmy Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
ecowatchers
 
Nov 16 2016 nps presentation west pond[2995]
Nov 16 2016 nps presentation west pond[2995]Nov 16 2016 nps presentation west pond[2995]
Nov 16 2016 nps presentation west pond[2995]
ecowatchers
 
Blackwall island planting project
Blackwall island planting projectBlackwall island planting project
Blackwall island planting project
ecowatchers
 
Dep head of bay oyster project jam bay task force fall 2017 update
Dep head of bay oyster project jam bay task force fall 2017 updateDep head of bay oyster project jam bay task force fall 2017 update
Dep head of bay oyster project jam bay task force fall 2017 update
ecowatchers
 
Nps presentaion on horshoe crabs in jamaica bay
Nps presentaion on horshoe crabs in jamaica bayNps presentaion on horshoe crabs in jamaica bay
Nps presentaion on horshoe crabs in jamaica bay
ecowatchers
 
Iciea08
Iciea08Iciea08
Iciea08
Hanaa Salman
 
May 5 2016 NPS presentation-update on west pond breach repairs
May 5 2016 NPS presentation-update on west pond breach repairsMay 5 2016 NPS presentation-update on west pond breach repairs
May 5 2016 NPS presentation-update on west pond breach repairs
ecowatchers
 
Nps presentation on restoration plans for north and south garden
Nps presentation on restoration plans for north and south gardenNps presentation on restoration plans for north and south garden
Nps presentation on restoration plans for north and south garden
ecowatchers
 
Dep head of bay oyster project jam bay task force november 2016
Dep head of bay oyster project jam bay task force november 2016Dep head of bay oyster project jam bay task force november 2016
Dep head of bay oyster project jam bay task force november 2016
ecowatchers
 
Usace new york harbor drift removal
Usace new york harbor drift removalUsace new york harbor drift removal
Usace new york harbor drift removal
ecowatchers
 
5 dep presentation to jbtf-fall 2015
5 dep presentation to jbtf-fall 20155 dep presentation to jbtf-fall 2015
5 dep presentation to jbtf-fall 2015
ecowatchers
 
Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin
Paerdegat Basin Restoraion update may 6 2014-By John McLaughlinPaerdegat Basin Restoraion update may 6 2014-By John McLaughlin
Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin
ecowatchers
 
Jamaica bay marine debris program nov 2016
Jamaica bay marine debris program nov 2016Jamaica bay marine debris program nov 2016
Jamaica bay marine debris program nov 2016
ecowatchers
 
Weppler jamaica bay task force 29 oct15_sand
Weppler jamaica bay task force 29 oct15_sandWeppler jamaica bay task force 29 oct15_sand
Weppler jamaica bay task force 29 oct15_sand
ecowatchers
 
6 jb task force marine debris presentation
6 jb task force marine debris presentation6 jb task force marine debris presentation
6 jb task force marine debris presentation
ecowatchers
 
Black wall rulers bar presentation final
Black wall rulers bar presentation finalBlack wall rulers bar presentation final
Black wall rulers bar presentation final
ecowatchers
 
Fall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration ProjectFall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration Project
ecowatchers
 

Viewers also liked (20)

Stakeholder report -srijb-science and resiliency institute at jamaica bay-
Stakeholder report -srijb-science and resiliency institute at jamaica bay-Stakeholder report -srijb-science and resiliency institute at jamaica bay-
Stakeholder report -srijb-science and resiliency institute at jamaica bay-
 
Jamaica Bay Greenway
Jamaica Bay GreenwayJamaica Bay Greenway
Jamaica Bay Greenway
 
Sunset cove phase 2 advocacy
Sunset cove phase 2 advocacySunset cove phase 2 advocacy
Sunset cove phase 2 advocacy
 
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bayArmy Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
 
Nov 16 2016 nps presentation west pond[2995]
Nov 16 2016 nps presentation west pond[2995]Nov 16 2016 nps presentation west pond[2995]
Nov 16 2016 nps presentation west pond[2995]
 
Blackwall island planting project
Blackwall island planting projectBlackwall island planting project
Blackwall island planting project
 
Dep head of bay oyster project jam bay task force fall 2017 update
Dep head of bay oyster project jam bay task force fall 2017 updateDep head of bay oyster project jam bay task force fall 2017 update
Dep head of bay oyster project jam bay task force fall 2017 update
 
Nps presentaion on horshoe crabs in jamaica bay
Nps presentaion on horshoe crabs in jamaica bayNps presentaion on horshoe crabs in jamaica bay
Nps presentaion on horshoe crabs in jamaica bay
 
Iciea08
Iciea08Iciea08
Iciea08
 
May 5 2016 NPS presentation-update on west pond breach repairs
May 5 2016 NPS presentation-update on west pond breach repairsMay 5 2016 NPS presentation-update on west pond breach repairs
May 5 2016 NPS presentation-update on west pond breach repairs
 
Nps presentation on restoration plans for north and south garden
Nps presentation on restoration plans for north and south gardenNps presentation on restoration plans for north and south garden
Nps presentation on restoration plans for north and south garden
 
Dep head of bay oyster project jam bay task force november 2016
Dep head of bay oyster project jam bay task force november 2016Dep head of bay oyster project jam bay task force november 2016
Dep head of bay oyster project jam bay task force november 2016
 
Usace new york harbor drift removal
Usace new york harbor drift removalUsace new york harbor drift removal
Usace new york harbor drift removal
 
5 dep presentation to jbtf-fall 2015
5 dep presentation to jbtf-fall 20155 dep presentation to jbtf-fall 2015
5 dep presentation to jbtf-fall 2015
 
Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin
Paerdegat Basin Restoraion update may 6 2014-By John McLaughlinPaerdegat Basin Restoraion update may 6 2014-By John McLaughlin
Paerdegat Basin Restoraion update may 6 2014-By John McLaughlin
 
Jamaica bay marine debris program nov 2016
Jamaica bay marine debris program nov 2016Jamaica bay marine debris program nov 2016
Jamaica bay marine debris program nov 2016
 
Weppler jamaica bay task force 29 oct15_sand
Weppler jamaica bay task force 29 oct15_sandWeppler jamaica bay task force 29 oct15_sand
Weppler jamaica bay task force 29 oct15_sand
 
6 jb task force marine debris presentation
6 jb task force marine debris presentation6 jb task force marine debris presentation
6 jb task force marine debris presentation
 
Black wall rulers bar presentation final
Black wall rulers bar presentation finalBlack wall rulers bar presentation final
Black wall rulers bar presentation final
 
Fall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration ProjectFall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration Project
 

Similar to Oct 2016 public meeting presentation acoe reformulation plan

NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdfNYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
ecowatchers
 
Final acec design summit pres 2017
Final acec design summit pres 2017Final acec design summit pres 2017
Final acec design summit pres 2017
melissanatech
 
ACOE Reformulation study for Jamaica Bay
ACOE Reformulation study for Jamaica BayACOE Reformulation study for Jamaica Bay
ACOE Reformulation study for Jamaica Bay
ecowatchers
 
KYC Harbour Redevelopment - AGM 2013 - Status Update
KYC Harbour Redevelopment  - AGM 2013 - Status UpdateKYC Harbour Redevelopment  - AGM 2013 - Status Update
KYC Harbour Redevelopment - AGM 2013 - Status Update
kingstonyc
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ecowatchers
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
dignagni
 
Projects(Nov 17 2010)
Projects(Nov 17 2010)Projects(Nov 17 2010)
Projects(Nov 17 2010)
Ora Berman
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
Toronto Public Consultation Unit
 
Responses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at QuogueResponses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at Quogue
QuogueBeaches
 
Ala wai openhouse_presentation_20may2014_draft
Ala wai openhouse_presentation_20may2014_draftAla wai openhouse_presentation_20may2014_draft
Ala wai openhouse_presentation_20may2014_draft
Honolulu Civil Beat
 
Washington Plaza Culvert Repair
Washington Plaza Culvert RepairWashington Plaza Culvert Repair
Washington Plaza Culvert Repair
Fairfax County
 
Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214
Naoise
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdf
freezefreeze2
 
GeoSS,18SEAGS, 2013, Singapore
GeoSS,18SEAGS, 2013, SingaporeGeoSS,18SEAGS, 2013, Singapore
GeoSS,18SEAGS, 2013, Singapore
Tong Seng Chua
 
GeoSS,18SEAGS,CTS,04062013, A
GeoSS,18SEAGS,CTS,04062013, AGeoSS,18SEAGS,CTS,04062013, A
GeoSS,18SEAGS,CTS,04062013, A
Tong Seng Chua
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
Fairfax County
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
Toronto Public Consultation Unit
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
Leo Youngman
 
Boston Engineering and Design Poster
Boston Engineering and Design PosterBoston Engineering and Design Poster
Boston Engineering and Design Poster
Thomas Bryce
 
Water tank-lecture
Water tank-lectureWater tank-lecture
Water tank-lecture
Adnan Lazem
 

Similar to Oct 2016 public meeting presentation acoe reformulation plan (20)

NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdfNYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
 
Final acec design summit pres 2017
Final acec design summit pres 2017Final acec design summit pres 2017
Final acec design summit pres 2017
 
ACOE Reformulation study for Jamaica Bay
ACOE Reformulation study for Jamaica BayACOE Reformulation study for Jamaica Bay
ACOE Reformulation study for Jamaica Bay
 
KYC Harbour Redevelopment - AGM 2013 - Status Update
KYC Harbour Redevelopment  - AGM 2013 - Status UpdateKYC Harbour Redevelopment  - AGM 2013 - Status Update
KYC Harbour Redevelopment - AGM 2013 - Status Update
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
 
Projects(Nov 17 2010)
Projects(Nov 17 2010)Projects(Nov 17 2010)
Projects(Nov 17 2010)
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
Responses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at QuogueResponses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at Quogue
 
Ala wai openhouse_presentation_20may2014_draft
Ala wai openhouse_presentation_20may2014_draftAla wai openhouse_presentation_20may2014_draft
Ala wai openhouse_presentation_20may2014_draft
 
Washington Plaza Culvert Repair
Washington Plaza Culvert RepairWashington Plaza Culvert Repair
Washington Plaza Culvert Repair
 
Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdf
 
GeoSS,18SEAGS, 2013, Singapore
GeoSS,18SEAGS, 2013, SingaporeGeoSS,18SEAGS, 2013, Singapore
GeoSS,18SEAGS, 2013, Singapore
 
GeoSS,18SEAGS,CTS,04062013, A
GeoSS,18SEAGS,CTS,04062013, AGeoSS,18SEAGS,CTS,04062013, A
GeoSS,18SEAGS,CTS,04062013, A
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Boston Engineering and Design Poster
Boston Engineering and Design PosterBoston Engineering and Design Poster
Boston Engineering and Design Poster
 
Water tank-lecture
Water tank-lectureWater tank-lecture
Water tank-lecture
 

More from ecowatchers

Baron - Jamaica Bay Task Force Meeting 18June24.pdf
Baron - Jamaica Bay Task Force Meeting 18June24.pdfBaron - Jamaica Bay Task Force Meeting 18June24.pdf
Baron - Jamaica Bay Task Force Meeting 18June24.pdf
ecowatchers
 
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdfJBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
ecowatchers
 
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptxNYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
ecowatchers
 
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdfBaron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
ecowatchers
 
Fall 2023 JBTF presentation on Additional HRE project areas. .pptx
Fall 2023 JBTF presentation on Additional HRE project areas. .pptxFall 2023 JBTF presentation on Additional HRE project areas. .pptx
Fall 2023 JBTF presentation on Additional HRE project areas. .pptx
ecowatchers
 
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdfNPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
ecowatchers
 
November 17 2022 Jam Bay Task Force.pdf
November 17 2022 Jam Bay Task Force.pdfNovember 17 2022 Jam Bay Task Force.pdf
November 17 2022 Jam Bay Task Force.pdf
ecowatchers
 
Baron-Jamaica Bay Task force 17Nov22.pdf
Baron-Jamaica Bay Task force 17Nov22.pdfBaron-Jamaica Bay Task force 17Nov22.pdf
Baron-Jamaica Bay Task force 17Nov22.pdf
ecowatchers
 
Jamaica Bay Task Force_May 2022.pdf
Jamaica Bay Task Force_May 2022.pdfJamaica Bay Task Force_May 2022.pdf
Jamaica Bay Task Force_May 2022.pdf
ecowatchers
 
Jamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdfJamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdf
ecowatchers
 
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
ecowatchers
 
Ribbed Mussel Study Status JBTF.pdf
Ribbed Mussel Study Status JBTF.pdfRibbed Mussel Study Status JBTF.pdf
Ribbed Mussel Study Status JBTF.pdf
ecowatchers
 
Weppler jam bay task force 3 nov 21
Weppler jam bay task force  3 nov 21Weppler jam bay task force  3 nov 21
Weppler jam bay task force 3 nov 21
ecowatchers
 
Jb task force 2021 1103
Jb task force 2021 1103Jb task force 2021 1103
Jb task force 2021 1103
ecowatchers
 
201130 west pond reduced
201130 west pond reduced201130 west pond reduced
201130 west pond reduced
ecowatchers
 
Jamaica bay ecowatchers task force presentation 12.9.2020
Jamaica bay ecowatchers task force presentation   12.9.2020Jamaica bay ecowatchers task force presentation   12.9.2020
Jamaica bay ecowatchers task force presentation 12.9.2020
ecowatchers
 
Nyc parks marine debris removal
Nyc parks marine debris removalNyc parks marine debris removal
Nyc parks marine debris removal
ecowatchers
 
Raptor mgmt presentation12 09-2020
Raptor mgmt presentation12 09-2020Raptor mgmt presentation12 09-2020
Raptor mgmt presentation12 09-2020
ecowatchers
 
20191113 jbfs presentation final
20191113 jbfs presentation final20191113 jbfs presentation final
20191113 jbfs presentation final
ecowatchers
 
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
ecowatchers
 

More from ecowatchers (20)

Baron - Jamaica Bay Task Force Meeting 18June24.pdf
Baron - Jamaica Bay Task Force Meeting 18June24.pdfBaron - Jamaica Bay Task Force Meeting 18June24.pdf
Baron - Jamaica Bay Task Force Meeting 18June24.pdf
 
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdfJBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
JBTF Nov2023 - JBRPC West Pond Living Shoreline.pdf
 
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptxNYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
NYCParks_HookCreekSedimentPlacement_20231130_FINAL.pptx
 
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdfBaron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
Baron - Jamaica Bay Task Force Meeting 2 - 30Nov23.pdf
 
Fall 2023 JBTF presentation on Additional HRE project areas. .pptx
Fall 2023 JBTF presentation on Additional HRE project areas. .pptxFall 2023 JBTF presentation on Additional HRE project areas. .pptx
Fall 2023 JBTF presentation on Additional HRE project areas. .pptx
 
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdfNPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
NPS presentation Jamaica Bay Task Force Meeting 2022-11-17.pdf
 
November 17 2022 Jam Bay Task Force.pdf
November 17 2022 Jam Bay Task Force.pdfNovember 17 2022 Jam Bay Task Force.pdf
November 17 2022 Jam Bay Task Force.pdf
 
Baron-Jamaica Bay Task force 17Nov22.pdf
Baron-Jamaica Bay Task force 17Nov22.pdfBaron-Jamaica Bay Task force 17Nov22.pdf
Baron-Jamaica Bay Task force 17Nov22.pdf
 
Jamaica Bay Task Force_May 2022.pdf
Jamaica Bay Task Force_May 2022.pdfJamaica Bay Task Force_May 2022.pdf
Jamaica Bay Task Force_May 2022.pdf
 
Jamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdfJamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdf
 
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
Spring 2022 Task Force Meeting presentation on Adjacent Sediment Slurry Enric...
 
Ribbed Mussel Study Status JBTF.pdf
Ribbed Mussel Study Status JBTF.pdfRibbed Mussel Study Status JBTF.pdf
Ribbed Mussel Study Status JBTF.pdf
 
Weppler jam bay task force 3 nov 21
Weppler jam bay task force  3 nov 21Weppler jam bay task force  3 nov 21
Weppler jam bay task force 3 nov 21
 
Jb task force 2021 1103
Jb task force 2021 1103Jb task force 2021 1103
Jb task force 2021 1103
 
201130 west pond reduced
201130 west pond reduced201130 west pond reduced
201130 west pond reduced
 
Jamaica bay ecowatchers task force presentation 12.9.2020
Jamaica bay ecowatchers task force presentation   12.9.2020Jamaica bay ecowatchers task force presentation   12.9.2020
Jamaica bay ecowatchers task force presentation 12.9.2020
 
Nyc parks marine debris removal
Nyc parks marine debris removalNyc parks marine debris removal
Nyc parks marine debris removal
 
Raptor mgmt presentation12 09-2020
Raptor mgmt presentation12 09-2020Raptor mgmt presentation12 09-2020
Raptor mgmt presentation12 09-2020
 
20191113 jbfs presentation final
20191113 jbfs presentation final20191113 jbfs presentation final
20191113 jbfs presentation final
 
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
Jamaica Bay Wildlife refuge west pond proposal for protecting the south shore...
 

Recently uploaded

Mass Production of Trichogramma sp..pptx
Mass Production of Trichogramma sp..pptxMass Production of Trichogramma sp..pptx
Mass Production of Trichogramma sp..pptx
SwastikBhattacharjya
 
一比一原版美国南加州大学毕业证(usc学位证)如何办理
一比一原版美国南加州大学毕业证(usc学位证)如何办理一比一原版美国南加州大学毕业证(usc学位证)如何办理
一比一原版美国南加州大学毕业证(usc学位证)如何办理
43ekmxzp
 
Exploring low emissions development opportunities in food systems
Exploring low emissions development opportunities in food systemsExploring low emissions development opportunities in food systems
Exploring low emissions development opportunities in food systems
CIFOR-ICRAF
 
一比一原版美国亚利桑那大学毕业证(ua学位证)如何办理
一比一原版美国亚利桑那大学毕业证(ua学位证)如何办理一比一原版美国亚利桑那大学毕业证(ua学位证)如何办理
一比一原版美国亚利桑那大学毕业证(ua学位证)如何办理
lyurzi7r
 
Statewise Ramsar sites in India By B.pptx
Statewise Ramsar sites in India By B.pptxStatewise Ramsar sites in India By B.pptx
Statewise Ramsar sites in India By B.pptx
B. BHASKAR
 
INDONESIA Long-Term Strategy for Low Carbon and Climate Resilience 2050
INDONESIA Long-Term Strategy for Low Carbon and Climate Resilience 2050INDONESIA Long-Term Strategy for Low Carbon and Climate Resilience 2050
INDONESIA Long-Term Strategy for Low Carbon and Climate Resilience 2050
Azka Fauzan
 
一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理
yxfus
 
Rain Water Harvesting Services in Chennai.pptx
Rain Water Harvesting Services in Chennai.pptxRain Water Harvesting Services in Chennai.pptx
Rain Water Harvesting Services in Chennai.pptx
treewater3
 
GFW Office Hours: How to Use Planet Imagery on Global Forest Watch_June 11, 2024
GFW Office Hours: How to Use Planet Imagery on Global Forest Watch_June 11, 2024GFW Office Hours: How to Use Planet Imagery on Global Forest Watch_June 11, 2024
GFW Office Hours: How to Use Planet Imagery on Global Forest Watch_June 11, 2024
Global Forest Watch
 
Vip Call Girls Bangalore 9024918724 Independent Call Girl Service Bangalore
Vip Call Girls Bangalore 9024918724 Independent Call Girl Service BangaloreVip Call Girls Bangalore 9024918724 Independent Call Girl Service Bangalore
Vip Call Girls Bangalore 9024918724 Independent Call Girl Service Bangalore
sachinkumarji156
 
Morgan Freeman Net Worth: A Comprehensive Analysis of the Legendary Actor’s W...
Morgan Freeman Net Worth: A Comprehensive Analysis of the Legendary Actor’s W...Morgan Freeman Net Worth: A Comprehensive Analysis of the Legendary Actor’s W...
Morgan Freeman Net Worth: A Comprehensive Analysis of the Legendary Actor’s W...
greendigital
 
一比一原版(Glasgow毕业证)英国格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证)英国格拉斯哥大学毕业证如何办理一比一原版(Glasgow毕业证)英国格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证)英国格拉斯哥大学毕业证如何办理
aonx8o5f
 
一比一原版美国加州大学圣塔芭芭拉分校毕业证如何办理
一比一原版美国加州大学圣塔芭芭拉分校毕业证如何办理一比一原版美国加州大学圣塔芭芭拉分校毕业证如何办理
一比一原版美国加州大学圣塔芭芭拉分校毕业证如何办理
yfvet
 
Monitor indicators of genetic diversity from space using Earth Observation data
Monitor indicators of genetic diversity from space using Earth Observation dataMonitor indicators of genetic diversity from space using Earth Observation data
Monitor indicators of genetic diversity from space using Earth Observation data
Spatial Genetics
 
一比一原版(unuk毕业证书)英国诺丁汉大学毕业证如何办理
一比一原版(unuk毕业证书)英国诺丁汉大学毕业证如何办理一比一原版(unuk毕业证书)英国诺丁汉大学毕业证如何办理
一比一原版(unuk毕业证书)英国诺丁汉大学毕业证如何办理
evtena
 
原版制作(UPSaclay毕业证书)巴黎萨克雷大学毕业证PDF成绩单一模一样
原版制作(UPSaclay毕业证书)巴黎萨克雷大学毕业证PDF成绩单一模一样原版制作(UPSaclay毕业证书)巴黎萨克雷大学毕业证PDF成绩单一模一样
原版制作(UPSaclay毕业证书)巴黎萨克雷大学毕业证PDF成绩单一模一样
astuz
 
一比一原版美国加州大学欧文分校毕业证(uci学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(uci学位证)如何办理一比一原版美国加州大学欧文分校毕业证(uci学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(uci学位证)如何办理
twqryq79
 
Good Agricultural Practices Presentation PDF.pdf
Good Agricultural Practices Presentation PDF.pdfGood Agricultural Practices Presentation PDF.pdf
Good Agricultural Practices Presentation PDF.pdf
ronnelapilado23
 
一比一原版美国贝翰文大学毕业证(BU学位证)如何办理
一比一原版美国贝翰文大学毕业证(BU学位证)如何办理一比一原版美国贝翰文大学毕业证(BU学位证)如何办理
一比一原版美国贝翰文大学毕业证(BU学位证)如何办理
sf3cfttw
 
Earthquake Disaster Management Ojas Class 9 - C.ppt
Earthquake Disaster Management Ojas Class 9 - C.pptEarthquake Disaster Management Ojas Class 9 - C.ppt
Earthquake Disaster Management Ojas Class 9 - C.ppt
OjasGoel
 

Recently uploaded (20)

Mass Production of Trichogramma sp..pptx
Mass Production of Trichogramma sp..pptxMass Production of Trichogramma sp..pptx
Mass Production of Trichogramma sp..pptx
 
一比一原版美国南加州大学毕业证(usc学位证)如何办理
一比一原版美国南加州大学毕业证(usc学位证)如何办理一比一原版美国南加州大学毕业证(usc学位证)如何办理
一比一原版美国南加州大学毕业证(usc学位证)如何办理
 
Exploring low emissions development opportunities in food systems
Exploring low emissions development opportunities in food systemsExploring low emissions development opportunities in food systems
Exploring low emissions development opportunities in food systems
 
一比一原版美国亚利桑那大学毕业证(ua学位证)如何办理
一比一原版美国亚利桑那大学毕业证(ua学位证)如何办理一比一原版美国亚利桑那大学毕业证(ua学位证)如何办理
一比一原版美国亚利桑那大学毕业证(ua学位证)如何办理
 
Statewise Ramsar sites in India By B.pptx
Statewise Ramsar sites in India By B.pptxStatewise Ramsar sites in India By B.pptx
Statewise Ramsar sites in India By B.pptx
 
INDONESIA Long-Term Strategy for Low Carbon and Climate Resilience 2050
INDONESIA Long-Term Strategy for Low Carbon and Climate Resilience 2050INDONESIA Long-Term Strategy for Low Carbon and Climate Resilience 2050
INDONESIA Long-Term Strategy for Low Carbon and Climate Resilience 2050
 
一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理
 
Rain Water Harvesting Services in Chennai.pptx
Rain Water Harvesting Services in Chennai.pptxRain Water Harvesting Services in Chennai.pptx
Rain Water Harvesting Services in Chennai.pptx
 
GFW Office Hours: How to Use Planet Imagery on Global Forest Watch_June 11, 2024
GFW Office Hours: How to Use Planet Imagery on Global Forest Watch_June 11, 2024GFW Office Hours: How to Use Planet Imagery on Global Forest Watch_June 11, 2024
GFW Office Hours: How to Use Planet Imagery on Global Forest Watch_June 11, 2024
 
Vip Call Girls Bangalore 9024918724 Independent Call Girl Service Bangalore
Vip Call Girls Bangalore 9024918724 Independent Call Girl Service BangaloreVip Call Girls Bangalore 9024918724 Independent Call Girl Service Bangalore
Vip Call Girls Bangalore 9024918724 Independent Call Girl Service Bangalore
 
Morgan Freeman Net Worth: A Comprehensive Analysis of the Legendary Actor’s W...
Morgan Freeman Net Worth: A Comprehensive Analysis of the Legendary Actor’s W...Morgan Freeman Net Worth: A Comprehensive Analysis of the Legendary Actor’s W...
Morgan Freeman Net Worth: A Comprehensive Analysis of the Legendary Actor’s W...
 
一比一原版(Glasgow毕业证)英国格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证)英国格拉斯哥大学毕业证如何办理一比一原版(Glasgow毕业证)英国格拉斯哥大学毕业证如何办理
一比一原版(Glasgow毕业证)英国格拉斯哥大学毕业证如何办理
 
一比一原版美国加州大学圣塔芭芭拉分校毕业证如何办理
一比一原版美国加州大学圣塔芭芭拉分校毕业证如何办理一比一原版美国加州大学圣塔芭芭拉分校毕业证如何办理
一比一原版美国加州大学圣塔芭芭拉分校毕业证如何办理
 
Monitor indicators of genetic diversity from space using Earth Observation data
Monitor indicators of genetic diversity from space using Earth Observation dataMonitor indicators of genetic diversity from space using Earth Observation data
Monitor indicators of genetic diversity from space using Earth Observation data
 
一比一原版(unuk毕业证书)英国诺丁汉大学毕业证如何办理
一比一原版(unuk毕业证书)英国诺丁汉大学毕业证如何办理一比一原版(unuk毕业证书)英国诺丁汉大学毕业证如何办理
一比一原版(unuk毕业证书)英国诺丁汉大学毕业证如何办理
 
原版制作(UPSaclay毕业证书)巴黎萨克雷大学毕业证PDF成绩单一模一样
原版制作(UPSaclay毕业证书)巴黎萨克雷大学毕业证PDF成绩单一模一样原版制作(UPSaclay毕业证书)巴黎萨克雷大学毕业证PDF成绩单一模一样
原版制作(UPSaclay毕业证书)巴黎萨克雷大学毕业证PDF成绩单一模一样
 
一比一原版美国加州大学欧文分校毕业证(uci学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(uci学位证)如何办理一比一原版美国加州大学欧文分校毕业证(uci学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(uci学位证)如何办理
 
Good Agricultural Practices Presentation PDF.pdf
Good Agricultural Practices Presentation PDF.pdfGood Agricultural Practices Presentation PDF.pdf
Good Agricultural Practices Presentation PDF.pdf
 
一比一原版美国贝翰文大学毕业证(BU学位证)如何办理
一比一原版美国贝翰文大学毕业证(BU学位证)如何办理一比一原版美国贝翰文大学毕业证(BU学位证)如何办理
一比一原版美国贝翰文大学毕业证(BU学位证)如何办理
 
Earthquake Disaster Management Ojas Class 9 - C.ppt
Earthquake Disaster Management Ojas Class 9 - C.pptEarthquake Disaster Management Ojas Class 9 - C.ppt
Earthquake Disaster Management Ojas Class 9 - C.ppt
 

Oct 2016 public meeting presentation acoe reformulation plan

  • 1. US Army Corps of Engineers BUILDING STRONG® Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016
  • 2. BUILDING STRONG® • Project Overview & History • Problem Statement • Plan Formulation Process • Tentatively Selected Plan • Shorefront features • Inundation Features • Tie-In features • Residual Risk features • Environmental Analysis • Next steps Presentation Outline 2
  • 3. BUILDING STRONG® Meeting Purpose  Public Information Session & NEPA Meeting  Provide an update on the Reformulation Study and Tentatively Selected Plan (TSP)  Provide an opportunity for feedback on: ► Tentatively Selected Plan ► Alternatives considered in arriving at the TSP 3
  • 4. BUILDING STRONG® Project Partners ►NY State Department of Environmental Conservation (NYSDEC) ►New York City • Mayor’s Office of Recovery and Resiliency • Department of Parks and Recreation • Department of Environmental Protection ►National Park Service, Gateway (Cooperating Agency)
  • 6. BUILDING STRONG® Reformulation Goals  Recommend long-term coastal storm risk reduction for Rockaway and Jamaica Bay  Address multiple risks in a comprehensive system for Rockaway and Jamaica Bay that is ► Engineeringly Feasible ► Economically Justified ► Environmentally Acceptable 6
  • 7. BUILDING STRONG® Risks  Flooding (inundation) along Atlantic Ocean Coast and Jamaica Bay  Wave Damage  Beach Erosion  Effects of Sea Level Change
  • 8. BUILDING STRONG® Coastal Storm Risk Vulnerability ► Structures exposed to inundation, waves and erosion ► Naturally low-lying topography – inundation occurs across broad areas ► Densely populated urban area ► Extensive low-lying infrastructure – Critical infrastructure within inundation impact areas ► Degraded coastal ecosystems undermine natural resiliency of the area >41,000 structures at risk of inundation for 1% event Problem Statement 8
  • 9. BUILDING STRONG® Scale of the Flooding Problem Blue illustrates current 1% annual chance of flooding Purple illustrates 1.3 feet of Relative Sea Level Change in 2070, (mid-range SLC) added to the 1% flooding 9
  • 10. BUILDING STRONG® Sand Movement and Erosion Simulation +16 years
  • 11. BUILDING STRONG® Original Project (1970s) Project Authorized in 1965 as a Beach Erosion Control and Hurricane Protection Project Beach Erosion Control Features:  Beach Berm at +10 ft Mean Sea Level (MSL)  5M Cubic Yards of sand place for initial construction  Renourishment for a period of 10 years Hurricane Protection Features: Never Constructed and Subsequently De-authorized  Hurricane Barrier w/ Navigation gate across Rockaway Inlet  Floodwall at +18 ft MSL, for 7.7 miles along Rockaway 11
  • 12. BUILDING STRONG® 12 Original Authorized Project
  • 13. BUILDING STRONG® Original Project (1970s)  1974 authorization – authorized separate construction of “beach erosion control” portion plus 10 years of renourishment  The “Hurricane Protection Features” were de-authorized by Congress  Constructed in 1975-1977  Terminal groin added at Beach 149th Street in 1979  Project renourished regularly through 1987, and in 1996, 2000, and 2004  Due to lack of renourishment, the beach was below design size when Sandy hit 13
  • 14. BUILDING STRONG® Original Authorized Project Cross-Section As a beach erosion control project – no dune feature or wall to offer protection against surge (flooding) 14
  • 15. BUILDING STRONG® Planning Process Overview Rockaway Project Area formulated as a system, considering shorefront and bay - First Planning step is to evaluate and screen measures - Second Planning Step is to compare alternatives and identify the Tentatively Selected Plan - Following the Draft Report and EIS additional feasibility-level design is conducted on TSP.
  • 16. BUILDING STRONG® Storm Risk Management Measures  Coastal storm risk management can be achieved through a variety of engineered features, designed as appropriate for each project area.  Features can include ► hurricane storm surge barriers ► hurricane dunes and levees ► seawalls ► revetments ► groins ► breakwaters ► beaches and dunes (beach nourishment) ► bypassing and backpassing of sand ► non-structural measures such as house-raising, road raising, relocations and buyouts.
  • 17. BUILDING STRONG® Final Array of Alternatives A - No Action Alternative B - Non-Structural Alternative C - Rockaway Storm Surge Barrier (2 Possible Alignments) • Beachfill with reinforced dune • Groins & Groin extensions • Barrier with navigation and sector gates • Tie In Features D - Jamaica Bay Perimeter Plan • Beachfill with reinforced dune • Groins & groin extensions • Living Shoreline and/or T-Wall where appropriate • Smaller inlet closure gates to reduce wall length
  • 20. BUILDING STRONG® Elements Common to All Alternatives  Atlantic Shorefront Features (Composite Seawall, Beachfill, Groins)  Atlantic Shorefront East and West Tie-ins*  Rockaway Bayside Tie-in*  Coney Island Tie-in* * Alternative tie-ins will be developed further during detailed design 20
  • 21. BUILDING STRONG® Tentatively Selected Plan (Shorefront Component) • Composite Seawall, beach berm • Construction of 12 new groins between Beach 90th to Beach 122nd • Enhancement of existing groin field from Beach 36th to Beach 49th (extending groins) and new groin at Beach 34th Groin Construction 34th St new groin - 526 ft 37th St extend groin - 175 ft 40th St extend groin - 200 ft 43rd St extend groin - 75 ft 46th St extend groin - 150 ft 49th St extend groin - 200 ft 92nd St new groin - 326 ft 95th St new groin - 326 ft 98th St new groin - 326 ft 101st St new groin - 326 ft 104th St new groin - 326 ft 106th St new groin - 326 ft 108th St new groin - 326 ft 110th St new groin - 351 ft 113th St new groin - 376 ft 115th St new groin - 376 ft 118th St new groin - 376 ft 121st St new groin - 326 ft Typical groin section Typical groin layout
  • 22. BUILDING STRONG® Shorefront Component includes Initial sand placement and renourishment 50 years Red line indicates previous Authorized project elevation
  • 23. BUILDING STRONG® 23 Composite Seawall Cross-Section
  • 24. BUILDING STRONG® Barrier Alignment Alternatives Three alignments of the storm surge barrier originally considered - Hydrodynamic modeling undertaken for design of openings - Effects of scour on Gil Hodges Bridge eliminated C-1W - Impacts to existing utilities considered C-1E is the preferred alignment, C-2 is close in comparison Preliminary Water Quality modeling undertaken to evaluate plans Additional modeling to be undertaken for the final design
  • 25. BUILDING STRONG® Surge Barrier Details Hurricane Barrier Alternative Alignment Gate Opening Aggregate Length Alignment Total Opening (ft) Number of 100-foot Vertical Lift Gates Number of 200-foot Sector Gates C-1E 1,100 7 2 C-2 1,700 11 3 Both Alignments • Maximum tidal amplitude change of 0.2 feet, Minimal change to flow speeds and direction 25 Oosterscheldekering Storm Surge Barrier with lift gates Source: (https://beeldbank.rws.nl Rijkswaterstaat / Harry van Reeken) Spijkenisse - Hartelkering Storm Surge Barrier with sector gates (credit: Quistnix!)
  • 26. BUILDING STRONG® 26 Lake Borgne, New Orleans Surge Barrier built by the USACE in 2011 (1.8 miles long)
  • 27. BUILDING STRONG® Residual Risk Features  Areas vulnerable to SLC or high frequency events will be protected in the short term prior to construction of the barrier  NNBFs and some structures identified  Small scale Non-Structural solutions will be explored in final design 27
  • 28. BUILDING STRONG® Typical Residual Risk Measures FLOOD SIDE LAND SIDE FLOOD SIDE LAND SIDE Generic measures are assigned considering: ► Shoreline Type and Condition ► Alignment ► Land Use Generic measure is either: ► Retrofit Existing Structure ► New Construction Cost developed for each project based on measure and length Retrofit L-Wall Retrofit Crown Wall
  • 29. BUILDING STRONG® Generic Residual Risk Measures (cont’d) FLOOD SIDE LAND SIDE FLOOD SIDE LAND SIDE New I-WallBulkhead FLOOD SIDE LAND SIDE Revetment FLOOD SIDE LAND SIDE Berm
  • 31. BUILDING STRONG® Mott Basin Residual Risk Concept 31
  • 32. BUILDING STRONG® Cost Breakdown Construction, Mitigation, and Real Estate Costs Alternative C-1E Alternative C-2 Alternative D Construction $3,328,135,000 $3,361,337,000 $4,467,352,000 Mitigation $90,833,000 $75,783,000 $123,383,000 Real Estate $29,436,000 $17,386,000 $179,955,000 First Cost Total $3,448,404,000 $3,454,506,000 $4,770,690,000 IDC $333,029,000 $336,274,000 $424,262,000 Total Construction Cost $3,781,433,000 $3,790,780,000 $5,194,952,000 32 FY 2016, 50 year study period, 3.125 discount rate
  • 33. BUILDING STRONG® Annual Costs Annual Costs Alternative C-1E Alternative C-2 Alternative D Construction $150,474,000 $150,846,000 $206,722,000 Renourishment $5,740,000 $5,740,000 $5,740,000 OMRR&R $7,424,000 $7,124,000 $14,954,000 Total AAEQ $163,638,000 $163,710,000 $227,416,000 33 FY 2016, 50 year study period, 3.125 discount rate
  • 34. Alternative Plan – Benefit Cost Ratio Plan Total Cost Benefits Net Benefits BCR C-1E $163,638,000 $509,233,000 $345,595,000 3.1 C-2 $163,710,000 $509,233,000 $345,523,000 3.1 D $227,416,000 $497,582,000 $270,166,000 2.2 FY 2016, 50 year study period, 3.125 discount rate Project Costs and Economics The TSP is the NED Plan, identified as the plan that has highest net benefits
  • 35. Consideration of Environmental Impacts Unavoidable, Minimal &Temporary Recreational and Environmental Impacts Beach Access: Temporary disruption to beach access via walkovers over the Aesthetics: Potential impacts to view of beach from north side of the dune Surfing and Fishing: Will be temporary and will dissipate as the beach returns to equilibrium Beach Usage: Impacts end as construction moves along Beach Groins/Jetties: Impact local shoreline sand supply, disrupt benthic habitat, provide vertical and structural habitat for many marine organisms; Potential adverse effect to buried cultural resources Seawalls: Reduce aquatic-terrestrial connectivity. Reduce spawning habitat for forage fish. Potential loss of upper beach and backshore altered sediment transport (loss of beach shoreward of the structure); Potential adverse effects to buried cultural resources Storm Surge Barrier Impacts: Potential to affect tidal hydraulics and water quality parameters such as temperature, dissolved oxygen, nutrient concentrations, etc. Impacts to bay bottom, potentially limiting wetland areas along the shoreline area Adverse effects to Gateway National Recreation Area historic districts Impacts Avoided or Minimized Benthic: Short term, recovery expected within 2 - 6.5 months nearshore and 1.5 to 2.5 years offshore following construction Fisheries: No long-term impacts expected, will generally avoid construction area Shorebirds/Endangered Species: No construction during breeding season Avoidance and enhancement of existing foraging/nesting habitats Water Quality: Short term turbidity (including impacts to dissolved oxygen), ends as soon as each element is constructed Air Quality and Noise: Temporary impacts, during 24-7 construction only Aesthetics: New sand similar to the existing beach. Impacts Considered: Benthic Communities, Fisheries, Shorebirds, Water Quality, Air Quality and Noise, Cultural Resources, Aesthetics, Surfing, Fishing, Beach Usage.
  • 36. BUILDING STRONG® Hydrodynamic modeling to date: 1) Tidal Amplitude impacts ► Identified reductions in tidal amplitude of less than 0.2 feet ► Results consistent • over full 35-day simulation period, and • for all hurricane barrier alignments and configurations evaluated for the TSP 2) Jamaica Bay Eutrophication Model Bay specific model to assess impacts in greater detail. Barrier Analysis 36
  • 37. BUILDING STRONG® Next Steps  Public and agency input on features, locations and scales  Refine design and evaluation of specific plans ► Detailed, coordinated Water Quality Modeling ► Refine design ► Identify scale of barrier and tie ins  Department of Interior (Gateway) agreement with plan  Final Report and Environmental Impact Statement
  • 38. BUILDING STRONG® Implementation  The Selected Plan will be built incrementally, Atlantic Shoreline will be in the first phase  Significant Federal funding is available for construction (Sandy Funding to USACE for projects like this totals $3.5B) 38
  • 39. BUILDING STRONG® Schedule  Draft General Reevaluation Report available for public and agency review: November 17, 2016  Final Report (June 2017) must be reviewed and approved both internally within the USACE and externally, including local, state, and other Federal oversight  Construction start of first phase (Targeted for 2019) will depend on length of reviews and approvals, and relative complexity of design 39
  • 40. BUILDING STRONG® Local Sponsor Responsibilities Local Sponsor ►Must cost-share construction and renourishment ►Must commit to doing O&M ►Must indemnify State and Federal Governments ►Must obtain all necessary real estate 40
  • 41. BUILDING STRONG® Operation and Maintenance Local Sponsor must maintain project once built ► Maintain public access ► Prohibit excavation and alterations ► Grade and reshape beach to original elevations to repair erosion ► Operate and Maintain the Storm Surge Barriers ► Conduct quarterly inspections and take beach width measurements ► Send quarterly inspection reports to State and Corps ► Conduct pre-storm & post-storm inspections ► Participate in yearly inspection with State and Corps 41
  • 42. BUILDING STRONG® Real Estate Required  Perpetual beach easements for all parcels where sand is placed  Fee acquisition required for structural components 42
  • 43. BUILDING STRONG® Public Access Overview  Federal funding requires public access open to all  Public accessways to beaches must be within ¼ of a mile in each direction  Local Sponsor responsible for developing a Public Access Plan