Name of the Course:
Projects and
Operations
Management
Course Code: 3.2
Course Credits: 4 Credits
Module 1
Topics to be covered
• Definition of Project
• Five phases of project management: Project Initiation, Project Planning,
Project Execution, Project Monitoring and Controlling, Project Closing
What is a
project?
A project is a planned set of interrelated tasks to be
executed over a fixed period, within certain costs and
other limitations. (Time, Cost and Quality)
A project can also be defined as a set of inputs and
outputs required to achieve a particular goal.
It can range from simple to complex and can be
managed by one person or a hundred.
“A unique set of coordinated activities, with definite
starting and finishing points, undertaken by an
individual or organization to meet specific objectives
within defined schedule, cost and performance
parameters”.
Examples of a project
Types of Project
Types of
project
• Manufacturing Projects: Laptops, steel, smart
gadgets
• Construction Projects: Apartment, Villa,
Township
• Management Projects: Banking, Insurance,
Wealth, IT & ITES
• Research and Innovation Projects: smart
devices
• Thermal Power Projects
• Automobile Projects: Car, Scooter, Bike
• Home Appliance Project: TV, AC, Washing
Machine Mobile / Electronics Project
• Commodity Project: Crude / Gold / Copper /
Diamond
• Metro / Communication Project: Air/ Train /
Highway
Programme & Portfolio
• A “Process” is a repetitive sequence of tasks, and
the tasks are known at the outset since it is
repetitive.
• A “Programme” is defined as a group of related
projects managed in a coordinated way to obtain
benefits not available from managing the projects
individually.
• A “Portfolio” is a grouping of financial assets such
as stocks, bonds and cash equivalents, as well as
their funds counterparts, including mutual,
exchange-traded and closed funds.
• Portfolios are held directly by investors and/or
managed by financial professionals.
Programme
Management
• Process of managing
multiple related
projects at once.
• Project management is
often used to describe
one project
• Involves multiple
related projects and
working toward the
same goal or result.
Portfolio Management
• Portfolio management is the art and science of
making decisions about investment mix and
policy, matching investments to objectives, asset
allocation for individuals and institutions, and
balancing risk against performance.
• Portfolio management is all about determining
strengths, weaknesses, opportunities and threats
in the choice of debt vs. equity, domestic vs
international, growth vs. safety, and many other
trade-offs encountered in the attempt to
maximize return at a given appetite for risk.
What is Project Management?
• It is the application of skills, experience, knowledge, methods, and
processes to achieve the objectives of a project.
• It is the body or content of knowledge regarding projects, i.e.,
planning, controlling, and reviewing.
• Project management also involves making sure you complete the
project on time.
• Examples of projects may also include a relief effort for a natural
disaster or setting up a strategy to break into a new sales geographic
market are also projects.
Project
Management
Core
Components
Difference b/w Project and Operations Management
Project Management
• Is the discipline of carefully projecting or
planning, organizing, motivating and
controlling resources to achieve specific
goals and meet specific success criteria.
• It is the application of knowledge, skills,
tools and techniques to project activities to
meet the project requirements.
• Project is a temporary endeavour
undertaken to create a unique product
• Project creates a unique product, service
or result.
• Project require project management.
Operations Management
• Is an area of management concerned with
overseeing, designing and controlling the
process of production and redesigning
business operations in the production of
goods or services.
• It is a field that can, at times, be
misunderstood because of its
multidisciplinary nature.
• Operations are permanent initiatives that
produce repetitive results, with resources
assigned to do the same set of tasks and
produce a standard output.
• Operation creates multi-products, services
or results.
• Operations require business process
management or operations management.
Difference b/w Project and Operations
Management
Project Management
• One-time affair
• Moves from one state to another i.e.,
results in a change
• Single clear objective
• Definable start and end points
• Greater need and emphasis on
planning as one has to think ahead all
the time
• More human resource related
• Project oriented
• Non-repetitive and unique
• Complex team building
• Role of manager and team
membership is temporary
Operations Management
• Continuous process
• Single state
• No clear (single) objective
• No real start and end points
• Not much emphasis on planning
• Resource and machine related
• Product or process-oriented
• Repetitive and non-unique
• Simple team building
• Role of manager and team
membership is permanent or long
term
Project Manager
Role of
Project
Manager
1. Fundamental role
2. Recruit the best possible
team
3. Motivate and lead the
team
4. Control Finances
5. Respond to change
6. Communicate
Role of
Project
Manager
• Fundamental role:
• He ensures that the project is
delivered on time, to budget and to
the required quality standard.
• He ensures the project is effectively
resourced and manages
relationships with a wide range of
groups.
• He is also responsible for managing
the work of consultants, allocating
and utilizing resources in an
efficient manner and maintaining a
cooperative, motivated and
successful team.
Role of
Project
Manager
• Recruit the best possible team:
• The first and foremost responsibility of
the project manager is to deliver a project
with a great team.
• The role is to find and recruit the best-fit
people to the team and be sure of their
skills and abilities in order to
collaboratively work on achieving shared
goals.
• Motivate and lead the team:
• He should motivate the subordinates to
build an efficient team and lead the team.
• Throughout the project, it is needed to
track team tasks and make sure that
every job is done on time and within
budget.
Role of
Project
Manager
• Control Finances:
• He should define and allocate a clear and
sufficient budget that contributes to
exploiting available opportunities and
achieving the project goals.
• He should ensure that you do not spend
more than the budget which will lead to
sponsor dissatisfaction at the end of the
project.
• Respond to change:
• He should consider the ability to control
change which will be the most critical
requirement for doing the job
successfully.
• During the lifecycle of your project, an
authorized person is needed who controls
all changes made to the project scope
and responds to change requests.
Role of
Project
Manager
• Communicate:
• The project manager must have
well-developed communication
skills.
• Communicating the status of the
project regularly and developing
reports leads to coping with many
problems, such as poor
performance, lack of workforce,
overestimates, etc.
• His task is to keep the project on
track and communicate the status
to the stakeholders.
Phases of project
Phases of a project
Phases of a project
• The project initiation phase is the first stage of turning an
abstract idea into a meaningful goal.
• In this stage, you need to develop a business case and
define the project on a broad level. In order to do that,
you have to determine the need for the project and
create a project charter.
• The project charter is an important document consisting
of details like the project constraints, goals, appointment
of the project manager, budget, expected timeline, etc.
• Once you have the project goals and project scope,
identify key project stakeholders–the people who are to
be involved in the project.
• Create a stakeholder register with the roles, designation,
communication requirements, and influence.
• Define project goals
• Create a business
case
• Complete the
project charter
• Draw up a list of
stakeholders
Initiation
Example of an automobile manufacturer assigned to
develop an electric vehicle. The selection of the
design, capacity, and battery power of the vehicle will
not be a part of the initiation phase. The only
certainty would be that an electric vehicle will be
developed within the given timeframe and budget.
Phases of a project
• The project planning stage requires complete
diligence as it lays out the project’s roadmap.
• Unless you are using a modern project management
methodology like agile project management, the
second phase of project management is expected to
take almost half of the entire project’s timespan.
• In this phase, the primary tasks are identifying
technical requirements, developing a detailed
project schedule, creating a communication plan,
and setting up goals/deliverables.
• There are several methods of setting up the
project’s goals but S.M.A.R.T. and C.L.E.A.R. are the
most popular.
• Define scope
• Create a project plan
• Set a budget
baseline
• Define roles and
responsibilities
Planning
Phases of a project
• S.M.A.R.T Goals
• The ‘SMART’ criteria ensure that the goals you set for your project are
critically analyzed.
• It is an established method that reduces risk and allows project managers to
make clearly defined and achievable goals.
Phases of a project
• C.L.E.A.R. Goals
• The ‘CLEAR’ method of setting up goals is designed to cater to the dynamic
nature of a modern workplace.
• Today’s fast-paced businesses require flexibility and immediate results and
CLEAR can help citizen developers with that.
Phases of a project
• During the planning stage, the scope of the project is defined.
• There is a possibility of changing the scope of the project demands but the
project manager must approve the change.
• Project managers also develop a work breakdown structure (WBS), which
clearly visualizes the entire project in different sections for team
management.
• A detailed project timeline with each deliverable is another important
element of the planning stage.
• Using that timeline, project managers can develop a project
communication plan and a schedule of communication with the relevant
stakeholders.
Phases of a project
• The project execution stage is where your team
does the actual work.
• As a project manager, your job is to establish
efficient workflows and carefully monitor the
progress of your team.
• Another responsibility of the project manager
during this phase is to consistently maintain
effective collaboration between project
stakeholders.
• This ensures that everyone stays on the same
page and the project runs smoothly without any
issues.
• Allocate project
resources
• Manage project
resources
• Build the product or
process
• Meet often and fix the
issues as they rise
Execution
Phases of a project
• The project monitoring and controlling phase run
simultaneously with project execution, thereby
ensuring that objectives and project deliverables are
met.
• As a project manager, you can make sure that no
one deviates from the original plan by establishing
Critical Success Factors (CSF) and Key Performance
Indicators (KPI).
• During the monitoring phase of project
management, the manager is also responsible for
quantitatively tracking the effort and cost during the
process.
• This tracking not only ensures that the project
remains within the budget but also is important for
future projects.
• Track efforts and cost
• Monitor project
progress
• Ensure adherence to
plan
• Prevent any chances
for disruptions
Monitoring and
control
Phases of a project
• The project closure stage indicates the end of the project after
the final delivery.
• There are times when external talent is hired specifically for
the project on contract.
• Terminating these contracts and completing the necessary
paperwork is also the responsibility of the project manager.
• Most teams hold a reflection meeting after the completion of
the project in order to contemplate their successes and
failures during the project.
• This is an effective method to ensure continuous improvement
within the company to enhance the overall productivity of the
team in the future.
• The final task of this phase is to review the entire project and
complete a detailed report that covers every aspect.
• All the necessary data is stored in a secure place that can be
accessed by project managers of that organization.
• Handover deliverables
• Review project
deliverables
• Get project results
approved
• Document project
learnings
Completion
End of module 1
Module 1.pptx
Module 1.pptx

Module 1.pptx

  • 1.
    Name of theCourse: Projects and Operations Management Course Code: 3.2 Course Credits: 4 Credits
  • 2.
  • 3.
    Topics to becovered • Definition of Project • Five phases of project management: Project Initiation, Project Planning, Project Execution, Project Monitoring and Controlling, Project Closing
  • 4.
    What is a project? Aproject is a planned set of interrelated tasks to be executed over a fixed period, within certain costs and other limitations. (Time, Cost and Quality) A project can also be defined as a set of inputs and outputs required to achieve a particular goal. It can range from simple to complex and can be managed by one person or a hundred. “A unique set of coordinated activities, with definite starting and finishing points, undertaken by an individual or organization to meet specific objectives within defined schedule, cost and performance parameters”.
  • 5.
  • 6.
  • 7.
    Types of project • ManufacturingProjects: Laptops, steel, smart gadgets • Construction Projects: Apartment, Villa, Township • Management Projects: Banking, Insurance, Wealth, IT & ITES • Research and Innovation Projects: smart devices • Thermal Power Projects • Automobile Projects: Car, Scooter, Bike • Home Appliance Project: TV, AC, Washing Machine Mobile / Electronics Project • Commodity Project: Crude / Gold / Copper / Diamond • Metro / Communication Project: Air/ Train / Highway
  • 8.
    Programme & Portfolio •A “Process” is a repetitive sequence of tasks, and the tasks are known at the outset since it is repetitive. • A “Programme” is defined as a group of related projects managed in a coordinated way to obtain benefits not available from managing the projects individually. • A “Portfolio” is a grouping of financial assets such as stocks, bonds and cash equivalents, as well as their funds counterparts, including mutual, exchange-traded and closed funds. • Portfolios are held directly by investors and/or managed by financial professionals.
  • 9.
    Programme Management • Process ofmanaging multiple related projects at once. • Project management is often used to describe one project • Involves multiple related projects and working toward the same goal or result.
  • 10.
    Portfolio Management • Portfoliomanagement is the art and science of making decisions about investment mix and policy, matching investments to objectives, asset allocation for individuals and institutions, and balancing risk against performance. • Portfolio management is all about determining strengths, weaknesses, opportunities and threats in the choice of debt vs. equity, domestic vs international, growth vs. safety, and many other trade-offs encountered in the attempt to maximize return at a given appetite for risk.
  • 11.
    What is ProjectManagement? • It is the application of skills, experience, knowledge, methods, and processes to achieve the objectives of a project. • It is the body or content of knowledge regarding projects, i.e., planning, controlling, and reviewing. • Project management also involves making sure you complete the project on time. • Examples of projects may also include a relief effort for a natural disaster or setting up a strategy to break into a new sales geographic market are also projects.
  • 12.
  • 13.
    Difference b/w Projectand Operations Management Project Management • Is the discipline of carefully projecting or planning, organizing, motivating and controlling resources to achieve specific goals and meet specific success criteria. • It is the application of knowledge, skills, tools and techniques to project activities to meet the project requirements. • Project is a temporary endeavour undertaken to create a unique product • Project creates a unique product, service or result. • Project require project management. Operations Management • Is an area of management concerned with overseeing, designing and controlling the process of production and redesigning business operations in the production of goods or services. • It is a field that can, at times, be misunderstood because of its multidisciplinary nature. • Operations are permanent initiatives that produce repetitive results, with resources assigned to do the same set of tasks and produce a standard output. • Operation creates multi-products, services or results. • Operations require business process management or operations management.
  • 14.
    Difference b/w Projectand Operations Management Project Management • One-time affair • Moves from one state to another i.e., results in a change • Single clear objective • Definable start and end points • Greater need and emphasis on planning as one has to think ahead all the time • More human resource related • Project oriented • Non-repetitive and unique • Complex team building • Role of manager and team membership is temporary Operations Management • Continuous process • Single state • No clear (single) objective • No real start and end points • Not much emphasis on planning • Resource and machine related • Product or process-oriented • Repetitive and non-unique • Simple team building • Role of manager and team membership is permanent or long term
  • 15.
  • 16.
    Role of Project Manager 1. Fundamentalrole 2. Recruit the best possible team 3. Motivate and lead the team 4. Control Finances 5. Respond to change 6. Communicate
  • 17.
    Role of Project Manager • Fundamentalrole: • He ensures that the project is delivered on time, to budget and to the required quality standard. • He ensures the project is effectively resourced and manages relationships with a wide range of groups. • He is also responsible for managing the work of consultants, allocating and utilizing resources in an efficient manner and maintaining a cooperative, motivated and successful team.
  • 18.
    Role of Project Manager • Recruitthe best possible team: • The first and foremost responsibility of the project manager is to deliver a project with a great team. • The role is to find and recruit the best-fit people to the team and be sure of their skills and abilities in order to collaboratively work on achieving shared goals. • Motivate and lead the team: • He should motivate the subordinates to build an efficient team and lead the team. • Throughout the project, it is needed to track team tasks and make sure that every job is done on time and within budget.
  • 19.
    Role of Project Manager • ControlFinances: • He should define and allocate a clear and sufficient budget that contributes to exploiting available opportunities and achieving the project goals. • He should ensure that you do not spend more than the budget which will lead to sponsor dissatisfaction at the end of the project. • Respond to change: • He should consider the ability to control change which will be the most critical requirement for doing the job successfully. • During the lifecycle of your project, an authorized person is needed who controls all changes made to the project scope and responds to change requests.
  • 20.
    Role of Project Manager • Communicate: •The project manager must have well-developed communication skills. • Communicating the status of the project regularly and developing reports leads to coping with many problems, such as poor performance, lack of workforce, overestimates, etc. • His task is to keep the project on track and communicate the status to the stakeholders.
  • 21.
  • 22.
    Phases of aproject
  • 23.
    Phases of aproject • The project initiation phase is the first stage of turning an abstract idea into a meaningful goal. • In this stage, you need to develop a business case and define the project on a broad level. In order to do that, you have to determine the need for the project and create a project charter. • The project charter is an important document consisting of details like the project constraints, goals, appointment of the project manager, budget, expected timeline, etc. • Once you have the project goals and project scope, identify key project stakeholders–the people who are to be involved in the project. • Create a stakeholder register with the roles, designation, communication requirements, and influence. • Define project goals • Create a business case • Complete the project charter • Draw up a list of stakeholders Initiation Example of an automobile manufacturer assigned to develop an electric vehicle. The selection of the design, capacity, and battery power of the vehicle will not be a part of the initiation phase. The only certainty would be that an electric vehicle will be developed within the given timeframe and budget.
  • 24.
    Phases of aproject • The project planning stage requires complete diligence as it lays out the project’s roadmap. • Unless you are using a modern project management methodology like agile project management, the second phase of project management is expected to take almost half of the entire project’s timespan. • In this phase, the primary tasks are identifying technical requirements, developing a detailed project schedule, creating a communication plan, and setting up goals/deliverables. • There are several methods of setting up the project’s goals but S.M.A.R.T. and C.L.E.A.R. are the most popular. • Define scope • Create a project plan • Set a budget baseline • Define roles and responsibilities Planning
  • 25.
    Phases of aproject • S.M.A.R.T Goals • The ‘SMART’ criteria ensure that the goals you set for your project are critically analyzed. • It is an established method that reduces risk and allows project managers to make clearly defined and achievable goals.
  • 26.
    Phases of aproject • C.L.E.A.R. Goals • The ‘CLEAR’ method of setting up goals is designed to cater to the dynamic nature of a modern workplace. • Today’s fast-paced businesses require flexibility and immediate results and CLEAR can help citizen developers with that.
  • 27.
    Phases of aproject • During the planning stage, the scope of the project is defined. • There is a possibility of changing the scope of the project demands but the project manager must approve the change. • Project managers also develop a work breakdown structure (WBS), which clearly visualizes the entire project in different sections for team management. • A detailed project timeline with each deliverable is another important element of the planning stage. • Using that timeline, project managers can develop a project communication plan and a schedule of communication with the relevant stakeholders.
  • 28.
    Phases of aproject • The project execution stage is where your team does the actual work. • As a project manager, your job is to establish efficient workflows and carefully monitor the progress of your team. • Another responsibility of the project manager during this phase is to consistently maintain effective collaboration between project stakeholders. • This ensures that everyone stays on the same page and the project runs smoothly without any issues. • Allocate project resources • Manage project resources • Build the product or process • Meet often and fix the issues as they rise Execution
  • 29.
    Phases of aproject • The project monitoring and controlling phase run simultaneously with project execution, thereby ensuring that objectives and project deliverables are met. • As a project manager, you can make sure that no one deviates from the original plan by establishing Critical Success Factors (CSF) and Key Performance Indicators (KPI). • During the monitoring phase of project management, the manager is also responsible for quantitatively tracking the effort and cost during the process. • This tracking not only ensures that the project remains within the budget but also is important for future projects. • Track efforts and cost • Monitor project progress • Ensure adherence to plan • Prevent any chances for disruptions Monitoring and control
  • 30.
    Phases of aproject • The project closure stage indicates the end of the project after the final delivery. • There are times when external talent is hired specifically for the project on contract. • Terminating these contracts and completing the necessary paperwork is also the responsibility of the project manager. • Most teams hold a reflection meeting after the completion of the project in order to contemplate their successes and failures during the project. • This is an effective method to ensure continuous improvement within the company to enhance the overall productivity of the team in the future. • The final task of this phase is to review the entire project and complete a detailed report that covers every aspect. • All the necessary data is stored in a secure place that can be accessed by project managers of that organization. • Handover deliverables • Review project deliverables • Get project results approved • Document project learnings Completion
  • 31.

Editor's Notes

  • #25 Agile project management is an iterative approach to managing software development projects that focuses on continuous releases and incorporating customer feedback with every iteration.
  • #26 Agile project management is an iterative approach to managing software development projects that focuses on continuous releases and incorporating customer feedback with every iteration.
  • #27 Agile project management is an iterative approach to managing software development projects that focuses on continuous releases and incorporating customer feedback with every iteration.
  • #28 Agile project management is an iterative approach to managing software development projects that focuses on continuous releases and incorporating customer feedback with every iteration.